Fastening component
By installing fastening members between the laminated plates, using the combined structure of hanging rods, nuts and clips, the tightness problem at the connection of the laminated plates is solved, the risk of slurry leakage is reduced, and the construction quality and efficiency are improved.
Patent Information
- Application Number
- CN202422074710.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2025-07-11
- Estimated Expiration
- 2034-08-27
AI Technical Summary
The lack of tightness at the connections between the overlapping plates leads to slurry leakage and affects the apparent quality and structural strength of the concrete.
Fastening members are adopted, including a boom, a first nut, a PCV wire tube, a screw, a mountain card and a second nut, and the connection tightness between the stacked plates is increased through welding and detachable installation, and the gap is eliminated by using the pulling force.
Effectively reduce slurry leakage during concrete pouring, improve the fit tightness between the laminated plate and the plate and strip formwork, and reduce construction costs.
Smart Images

Figure CN223088919U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction, in particular to a fastening member. Background Art
[0002] The laminated slab plays a load-bearing role in the precast structure. After bearing the surface load, it can realize the transfer to the shear wall or other force-bearing structures, forming a reliable transfer path and giving full play to the bearing capacity of each structure. However, under the restrictive effect of the precast construction technology level, the connection formed between the laminated slabs lacks tightness, and slurry leakage occurs during the concrete pouring construction, resulting in poor appearance quality of the formed concrete and even affecting the performance of the structure such as strength. In response to this, at present, it is processed by applying multiple layers of putty later, but this process is time-consuming and laborious.
[0003] At present, most precast projects still adopt the construction of PC laminated slabs with wooden formwork. There is a large difference in stiffness between the PC laminated slab and the formwork at the bottom of the slab. During the concrete pouring process, due to the large stiffness of the PC laminated slab, the deformation during pouring is small; while the stiffness of the formwork is small, and the deformation during concrete pouring is large. The different degrees of deformation between the two cause gaps between the slab strip formwork and the PC laminated slab, resulting in slurry leakage at the bottom of the slab strip. If the control of slurry leakage at the junction of the PC laminated slab and the cast-in-place beam is not ideal, it will cause an increase in processes such as cutting, chiseling, secondary plastering, and detailed grinding, thus leading to an increase in costs.
[0004] In view of the problems of lack of tightness in the connection formed between the laminated slabs and slurry leakage caused by the gaps between the slab strip formwork and the PC laminated slab in the prior art, those skilled in the art have been looking for solutions. Content of the Utility Model
[0005] The purpose of the utility model is to provide a fastening member to solve the problems of lack of tightness in the connection formed between the laminated slabs and slurry leakage caused by the gaps between the slab strip formwork and the PC laminated slab.
[0006] To solve the above technical problems, the utility model provides a fastening member, which includes: a suspension rod, a first nut, a PCV wire pipe, a screw rod, a U-shaped clamp, and a second nut. The first nut is welded and fixed in the middle of the suspension rod, and one end of the screw rod is connected to the first nut and then perpendicularly fastened to the middle of the suspension rod; the PCV wire pipe is sleeved outside the first nut and part of the screw rod; the U-shaped clamp and the second nut are detachably installed on the second end of the screw rod.
[0007] Optionally, in the fastening member, the length of the suspension rod is 200 mm longer than the width of the laminated slab strip.
[0008] Optionally, in the fastening member, the suspension rod is a steel bar.
[0009] Optionally, in the fastening member, the diameter of the suspension rod is 8 mm and the length is 350 mm.
[0010] Optionally, in the fastening member, the diameter of the PCV pipeline is 20 mm and the length is 100 mm.
[0011] Optionally, in the fastening member, the diameter of the screw rod is 12 mm and the length is 150 mm.
[0012] Optionally, in the fastening member, it further includes: a tape for sealing the end face where the PCV pipeline is sleeved with the first nut.
[0013] Optionally, in the fastening member, the first nut is a hexagonal nut.
[0014] Optionally, in the fastening member, the second nut is a hexagonal nut.
[0015] In the fastening member provided by the present utility model, there are a suspension rod, a first nut, a PCV pipeline, a screw rod, a U-shaped clamp and a second nut. The first nut is welded and fixed to the middle of the suspension rod. One end of the screw rod is connected to the first nut and then perpendicularly fastened to the middle of the suspension rod. The PCV pipeline is sleeved outside the first nut and part of the screw rod. The U-shaped clamp and the second nut are detachably installed on the second end of the screw rod. The fastening member of the present utility model is installed between the rib strips of two laminated plates, increasing the tightness of the joint formed between the laminated plates, effectively reducing the phenomenon of slurry leakage during the concrete pouring construction. Based on the fastening member applying a pulling force to the laminated plate and the rib strip formwork, the rib strip formwork and the laminated plate are fitted more tightly, eliminating the gap between them to reduce the risk of slurry leakage. Description of the Drawings
[0016] Figure 1 is the top view of the fastening member in an embodiment of the present utility model;
[0017] Figure 2 is the side view of the fastening member in an embodiment of the present utility model;
[0018] Figure 3 is the schematic diagram of the installation position of the fastening member in an embodiment of the present utility model;
[0019] Figure 4 is the top view of the fastening member in the actual use scenario in an embodiment of the present utility model;
[0020] Figure 5It is the bottom view of the fastening member in an actual use scenario in an embodiment of the present utility model.
[0021] In the figure:
[0022] 100 - fastening member;
[0023] 1 - suspension rod;
[0024] 2 - first nut;
[0025] 3 - PCV pipeline;
[0026] 4 - screw rod;
[0027] 5 - U-shaped clamp;
[0028] 6 - second nut;
[0029] 7 - laminated slab;
[0030] 8 - slab strip formwork;
[0031] 9 - square timber. Specific embodiments
[0032] The following further elaborates on the fastening member proposed in the present utility model in conjunction with the attached drawings and specific embodiments. According to the following description and the claims, the advantages and features of the present utility model will be clearer. It should be noted that the attached drawings are all in a very simplified form and use non-precise scales, only for the purpose of facilitating and clearly assisting in explaining the objectives of the embodiments of the present utility model.
[0033] Now, the present utility model will be further elaborated in detail in conjunction with the attached drawings. These attached drawings are all simplified schematic diagrams, only showing the basic structure of the present utility model in a schematic manner, so they only show the components related to the present utility model.
[0034] In the description of the utility model, it should be understood that the orientation or positional relationships indicated by terms such as "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. are based on the orientation or positional relationships shown in the attached drawings, and are only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the utility model.
[0035] In addition, the terms "first" and "second" are for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, features defined with "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the utility model, "a plurality of" means two or more, unless otherwise specifically defined.
[0036] In the utility model, unless otherwise clearly specified and defined, terms such as "installed", "connected", "joined", "fixed", etc. shall be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two components. For those of ordinary skill in the art, the specific meanings of the above terms in the utility model can be understood according to specific circumstances.
[0037] Please refer to Figure 1 and Figure 2 , the fastening member includes: a suspension rod 1, a first nut 2, a PCV wire pipe 3, a screw rod 4, a channel-shaped clamp 5, and a second nut 6. The first nut 2 is welded and fixed to the middle of the suspension rod 1. One end of the screw rod 4 is connected (threaded connection) to the first nut and then perpendicularly fastened to the middle of the suspension rod 1; the PCV wire pipe 3 is sleeved outside the first nut 2 and part of the screw rod 4; the channel-shaped clamp 5 and the second nut 6 are detachably installed on the second end of the screw rod.
[0038] Furthermore, the fastening member further includes: a tape for sealing the end face where the PCV wire pipe 3 is sleeved with the first nut 2.
[0039] Preferably, the length of the suspension rod 1 is 200 mm longer than the width (D1) of the composite slab strip, so that the fastening member can be installed between the strip belts of two composite slabs to meet the span requirements.
[0040] In this embodiment, the suspension rod is preferably a steel bar with a diameter of 8 mm and a length of 350 mm; the PCV wire pipe 3 has a diameter of 20 mm and a length of 100 mm; the screw rod 4 has a diameter of 12 mm and a length of 150 mm.
[0041] Preferably, the first nut 2 is a hexagonal nut; the second nut 6 is a hexagonal nut, and the second nut 6 serves to limit and fix the channel-shaped clamp 5.
[0042] Please refer to Figures 2 to 5, a plurality of fastening members 100 are arranged between the laminated slab A and the laminated slab B. The width of the laminated slab strip is defined as D1 and the length is defined as D2. At this time, it is necessary to ensure that the length L of the suspension rod of each fastening member is determined (L = D1 + 200 mm), and a suspension rod is arranged at each position interval of (1 / 4 - 1 / 3)D2 along the long side direction of the laminated slab strip. Then, holes are drilled in the strip formwork, and the hooked end is hung on the suspension rod. Based on the fastening member, the tightness of the joint formed between the laminated slabs is increased, effectively reducing the phenomenon of slurry leakage during the concrete pouring construction; the bottom of the strip formwork is clamped by combining the square wood 9 and the hill-shaped clamp 5 in a tensioning manner, and the strip formwork 8 and the laminated slab 7 are more closely fitted by using the tensile force between the upper and lower parts, eliminating the gap between the two and reducing the risk of slurry leakage.
[0043] It can be understood that the above examples are only examples listed for better understanding the technical solutions of the embodiments of the present application and do not serve as the sole limitation of this embodiment.
[0044] Obviously, those skilled in the art can make various changes and modifications to the utility model without departing from the spirit and scope of the utility model. Thus, if these modifications and variations of the utility model fall within the scope of the claims of the utility model and its equivalent technologies, the utility model is also intended to include these modifications and variations.
Claims
1. A fastening member, characterized in that, Including: A suspension rod (1), a first nut (2), a PCV wire tube (3), a screw rod (4), a U-shaped clamp (5) and a second nut (6). The first nut (2) is fixedly welded to the middle of the suspension rod (1). One end of the screw rod (4) is connected to the first nut and then vertically fastened to the middle of the suspension rod (1). The PCV wire tube (3) is sleeved outside the first nut (2) and part of the screw rod (4). The U-shaped clamp (5) and the second nut (6) are detachably installed on the second end of the screw rod.
2. The fastening member according to claim 1, wherein The length of the suspension rod (1) is 200 mm longer than the width of the composite slab strip.
3. The fastening member according to claim 1, characterized in that, The suspension rod is a steel bar.
4. The fastening member according to claim 1, characterized in that The diameter of the suspension rod is 8 mm and the length is 350 mm.
5. The fastening member according to claim 1, wherein The diameter of the PCV wire tube (3) is 20 mm and the length is 100 mm.
6. The fastening member according to claim 1, characterized in that, The diameter of the screw rod (4) is 12 mm and the length is 150 mm.
7. The fastening member according to claim 1, characterized in that Also including: A tape for sealing the end face where the PCV wire tube (3) is sleeved with the first nut (2).
8. The fastening member according to any one of claims 1 to 7, characterized in that, The first nut (2) is a hexagonal nut.
9. The fastening member according to any one of claims 1 to 7, characterized in that The second nut (6) is a hexagonal nut.