High-altitude corridor hanging basket suspension track

By designing hanging tracks and track pulleys in the high-altitude corridor, the problems of limited operation height and inefficiency in the construction of super high-rise corridors are solved, efficient construction and convenient maintenance are achieved, and the appearance aesthetics can be maintained.

CN223177103UActive Publication Date: 2025-08-01CHINA HUASHI ENTERPRISES
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422272167.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2025-08-01
Estimated Expiration
2034-09-14

AI Technical Summary

Technical Problem

Traditional aerial working vehicles are highly restricted in the construction of super high-rise corridors, and their construction efficiency is inefficient, which makes them difficult to meet the needs of later maintenance and maintenance, and the structure of the aerial working platform is complex and difficult to disassemble.

Method used

A high-altitude corridor hanging basket hanging track is designed, including a hanging basket hanging track and a track pulley with hanging basket hanging lugs, allowing the hanging basket to slide at the bottom of the corridor, and with the removable exterior decorative sealing plate to ensure the convenience of construction and maintenance.

Benefits of technology

It realizes efficient construction and maintenance within all areas of the bottom of the corridor, with high construction/inspection efficiency, and the hanging basket hanging track is hidden inside the corridor, and does not need to be removed for subsequent use, and maintains a beautiful appearance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223177103U_ABST
    Figure CN223177103U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-altitude corridor hanging basket suspension track which comprises hanging basket suspension track bodies installed on the two sides between a lower interlayer and a bottom outer decoration layer of a corridor, track grooves are formed in the positions, on the two sides of a track opening, of the hanging basket suspension track bodies, and track pulleys with hanging basket lifting lugs are arranged in the track grooves in a sliding mode. The hanging basket hanging rail is arranged and matched with the rail pulley with the hanging basket lifting lug to drive the hanging basket to slide along the bottom of the corridor, so that construction / overhaul operation can be carried out in all ranges of the bottom of the corridor, and the construction / overhaul efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, and particularly relates to a hanging track for a high-altitude corridor hanging basket. Background Art

[0002] In high-rise buildings, as an important passage connecting different building units, the design and construction of high-altitude corridors not only need to meet the basic structural safety and traffic requirements, but also, with the acceleration of the urban modernization process, put forward higher requirements for the improvement of its internal functions and the aesthetics of its appearance. However, for the bottom exterior decoration, lighting and other construction and later maintenance and repair work of ultra-high-rise corridors, the following defects are faced

[0003] 1. Working height limitation: Although traditional aerial work platforms can meet the high-altitude construction requirements to a certain extent, their working height is limited. For ultra-high-rise corridors, it is often difficult to reach the required construction height, thus restricting the construction scope and efficiency.

[0004] 2. Low construction efficiency: Due to its own structure and operation complexity, the aerial work platform needs to frequently adjust its position and height during the construction process, which not only consumes time and effort, but also easily leads to an extended construction period, increasing costs and risks.

[0005] 3. Difficulty in meeting the later maintenance and repair requirements: Although the aerial work platform can provide a more stable construction environment, its structure is complex, and it is often difficult to disassemble or retain it for daily maintenance and repair after the construction is completed. As a result, during the daily use of the corridor, once maintenance or repair is required, it is often necessary to build a temporary work platform again, increasing unnecessary trouble and costs. Summary of the Utility Model

[0006] In order to overcome the problems of working height limitation, low construction efficiency and difficulty in meeting the later maintenance and repair requirements in the construction of the bottom exterior decoration, lighting, etc. and later maintenance and repair of ultra-high-rise corridors in the prior art, the utility model provides a hanging track for a high-altitude corridor hanging basket.

[0007] The technical solution of the utility model is as follows:

[0008] A hanging track for a high-altitude corridor hanging basket, comprising hanging baskets hanging tracks installed on both sides between the lower mezzanine and the bottom exterior decoration layer of the corridor. Track grooves are arranged on both sides of the opening of the track, and track pulleys with hanging basket lugs are slidably arranged in the track grooves.

[0009] As a preferred scheme of the utility model, an operation opening for the bottom of the hanging basket lug to extend out and slide along the length direction of the hanging basket hanging track is opened on the bottom exterior decoration layer of the corridor, and the operation opening is sealed by a plurality of detachable exterior decoration cover plates.

[0010] As a preferred solution of the present invention, card slots are provided on both sides of the interior of the operation opening, and card blocks that are engaged with the card slots are provided on both sides of the exterior decorative cover plate.

[0011] As a preferred solution of the present invention, the hanging basket suspension track is an inverted U-shaped steel structure, and the hanging basket suspension track is welded to the bottom of the lower mezzanine of the corridor through a track fixing piece.

[0012] As a preferred solution of the present invention, a storage track for accommodating a track pulley is provided at the end of the hanging basket hanging track, the storage track is connected to the hanging basket hanging track, and the height of the storage track is higher than the hanging basket hanging track. When the track pulley is stored in the storage track, the hanging basket ear is stored inside the bottom outer decorative layer.

[0013] As a preferred solution of the present invention, the side of the storage rail close to the hanging basket hanging rail is higher than the side of the storage rail away from the hanging basket hanging rail.

[0014] As a preferred solution of the present invention, two sets of track pulleys are provided in each of the hanging basket suspension tracks, a detachable angle steel is connected between the hanging basket lugs of the two sets of track pulleys, and the distance between the two sets of track pulleys matches the width of the hanging basket, and the hanging basket lugs are connected to the working lifting rings of the hanging basket through track steel wire ropes.

[0015] As a preferred solution of the present invention, a first angle steel bolt hole is provided on the hanging basket lifting ear, and second angle steel bolt holes are provided at both ends of the angle steel. The first angle steel bolt hole and the corresponding second angle steel bolt hole are combined with angle steel fixing bolts to fix the hanging basket lifting ear to the corresponding end of the angle steel.

[0016] As a preferred solution of the present invention, screw openings are provided at both ends of the bottom of the angle steel, and a nut is welded above each of the screw openings. A plurality of groups of screw reserved holes are provided at intervals along the length direction of the hanging basket suspension track at the position of the top of the hanging basket suspension track facing the track opening. Each group of the screw reserved holes includes two screw reserved holes, and the spacing between the two screw reserved holes is the same as the spacing between the two nuts. The nuts and the corresponding screw reserved holes cooperate with the limiting screws to fix the positions of the two sets of track pulleys in the hanging basket suspension track.

[0017] As a preferred solution of the present invention, a plurality of track reserved holes for assisting the hanging basket to move forward or backward are arranged at intervals along the length direction of the hanging basket hanging track on the top of the hanging basket hanging track.

[0018] Compared with the prior art, the beneficial effects of the present utility model are as follows:

[0019] By setting a hanging track for the hanging basket and cooperating with a track pulley with a hanging basket lug, the present utility model drives the hanging basket to slide along the bottom of the corridor, realizing construction / repair operations within all ranges at the bottom of the corridor, and having high construction / repair efficiency; at the same time, since the hanging track of the hanging basket is hidden inside the corridor, it does not need to be removed after construction operations, facilitating the direct use of subsequent repair operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present utility model, the following will briefly introduce the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present utility model. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.

[0021] Figure 1 It is a schematic structural diagram of the hanging track of the high-altitude corridor hanging basket hidden inside the high-altitude corridor after the operation is completed in an embodiment of the present utility model;

[0022] Figure 2 For Figure 1 an enlarged view of part A in

[0023] Figure 3 It is a schematic structural diagram of the high-altitude corridor repair operation state in an embodiment of the present utility model;

[0024] Figure 4 It is a side view of the state where a person descends from the corridor to the hanging basket in an embodiment of the present utility model;

[0025] Figure 5 It is a side view of the state where the hanging basket is suspended to the fixed state of the hanging track of the hanging basket in an embodiment of the present utility model;

[0026] Figure 6 For Figure 5 an enlarged view of part B in

[0027] Figure 7 It is a side view of the connection state between the hanging basket lug of the track pulley and the angle steel in an embodiment of the present utility model.

[0028] In the figure,

[0029] 1. Suspension track of hanging basket; 101. Track groove; 102. Track pulley; 103. Hanging ear of hanging basket; 1031. First angle steel bolt hole; 104. Storage track; 105. Angle steel; 1051. Second angle steel bolt hole; 1052. Nut; 106. Track wire rope; 107. Angle steel fixing bolt; 108. Reserved hole for screw rod; 109. Limit screw rod; 110. Reserved hole for track; 2. Corridor; 201. Lower mezzanine; 202. Bottom exterior decoration layer; 2021. Operation opening; 2022. Card slot; 203. Exterior decoration sealing plate; 2031. Card block; 3. Hanging basket; 301. Working lifting ring; 4. Track fixing part. Detailed implementation mode

[0030] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present utility model clearer and more understandable, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be noted that: similar reference numerals and letters denote similar items in the following drawings. Therefore, once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, it is declared that the embodiments described below are only used to explain the present utility model and are not used to limit the present utility model.

[0031] It should be noted that the terms "installation", "setting", "connection", "fixation", etc. should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or integrated; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. It can be the communication inside two components or the interaction relationship between two components, unless otherwise clearly defined. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the product of this application is usually placed during use, or the orientation or positional relationship commonly understood by those skilled in the art, or the orientation or positional relationship in which the product of this application is usually placed during use. It is only for the convenience of describing this application and simplifying the description, rather than indicating or implying that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to this application.

[0032] Please refer to Figures 1 to 7, this embodiment provides a hanging track for a high-altitude corridor hanging basket, including hanging basket hanging tracks 1 installed on both sides between the lower sandwich layer 201 and the bottom exterior decoration layer 202 of the corridor 2. Track grooves 101 are provided on both sides of the hanging basket hanging track 1 at the track opening. A track pulley 102 with a hanging basket ear 103 is slidably arranged in the track groove 101, and the hanging basket 3 can be suspended through the hanging basket ear 103. By setting the hanging basket hanging track 1 and cooperating with the track pulley 102 with the hanging basket ear 103, the hanging basket 3 is driven to slide along the bottom of the corridor 2, enabling construction / repair work to be carried out within all ranges at the bottom of the corridor 2, and the construction / repair efficiency is high; at the same time, since the hanging basket hanging track 1 is hidden inside the corridor 2, it does not need to be removed after construction operations, facilitating direct use for subsequent repair work.

[0033] Please refer to Figure 1 , Figure 2 , Figure 7 , in one embodiment, in order to meet the requirement for the hanging basket ear 103 to extend out of the bottom exterior decoration layer 202 and ensure that the hanging basket 3 can slide smoothly along the hanging basket hanging track 1, an operation opening 2021 is provided on the bottom exterior decoration layer 202. This operation opening 2021 not only allows the hanging basket ear 103 to extend out, but also ensures that the hanging basket 3 can slide along the hanging basket hanging track 1 at the bottom of the corridor 2, so as to enable construction / repair work to be carried out within all ranges at the bottom of the corridor 2. Additionally, in order to keep the appearance of the corridor 2 neat and beautiful, the operation opening 2021 needs to be sealed by a number of detachable exterior decoration sealing plates 203 in the non-operation state. During the subsequent use of the repair work, the exterior decoration sealing plates 203 are opened one by one. The exterior decoration sealing plates 203 can not only keep the appearance of the corridor 2 neat and beautiful, but also effectively prevent dust, rainwater, etc. from entering the interior of the corridor 2.

[0034] Furthermore, in order to ensure the stability and easy disassembly of the exterior decoration sealing plate 203, clamping grooves 2022 are provided on both inner sides of the operation opening 2021, and clamping blocks 2031 that are engaged with the clamping grooves 2022 are provided on both sides of the exterior decoration sealing plate 203. Through the engagement of the clamping blocks 2031 with the clamping grooves 2022, the exterior decoration sealing plate 203 can be tightly fixed on the operation opening 2021 to prevent it from loosening or falling off.

[0035] Please refer to Figure 7In one embodiment, the hanging basket suspension track 1 is an inverted U-shaped steel structure. The inverted U-shaped steel structure forms track grooves 101 on both sides of the hanging basket suspension track 1 that can accommodate and guide the sliding of the track pulleys 102. This simplifies the suspension and movement mechanism of the hanging basket 3 and enhances the load-bearing capacity and stability of the track, facilitating integrated installation with the corridor 2. In addition, the hanging basket suspension track 1 is welded to the bottom of the lower interlayer 201 of the corridor 2 via the track fixings 4, ensuring that the track can stably support the movement and operation of the hanging basket 3 during construction and maintenance.

[0036] See also Figure 4 、 Figure 5 In one embodiment, a storage track 104 for accommodating the track pulley 102 is provided at the end of the hanging basket suspension track 1. The storage track 104 is connected to the hanging basket suspension track 1 and is higher than the hanging basket suspension track 1. This height difference ensures that when the track pulley 102 is stored in the storage track 104, the hanging basket lug 103 can be completely stored within the bottom outer decorative layer 202, effectively preventing the hanging basket lug 103 on the track pulley 102 from extending out of the operating opening 2021 when not in operation, making the operating opening 2021 unable to be sealed by the outer decorative cover 203.

[0037] Furthermore, the side of the storage rail 104 close to the hanging basket suspension rail 1 is higher than the side of the storage rail 104 away from the hanging basket suspension rail 1, ensuring that the track pulley 102 will not slide out of the range of the storage rail 104 in normal conditions.

[0038] See also Figures 3 to 7 In one embodiment, each hanging basket suspension track 1 is provided with two sets of track pulleys 102, each with a hanging basket lug 103 to achieve stable suspension of the hanging basket 3. When the hanging basket 3 is suspended by the hanging basket lugs 103 on the two sets of track pulleys 102, a detachable angle steel 105 is connected between the hanging basket lugs 103 of the two sets of track pulleys 102, so that the two sets of track pulleys 102 remain synchronized during movement, and the distance between the two sets of track pulleys 102 matches the width of the hanging basket 3. The hanging basket lugs 103 are connected to the working ring 301 of the hanging basket 3 via a track wire rope 106. The provision of the angle steel 105 not only enhances structural stability but also ensures precise control of the distance between the track pulleys 102 to accommodate hanging baskets 3 of different widths.

[0039] See also Figure 6 、 Figure 7, in one embodiment, a first angle steel bolt hole 1031 is provided on the hanging basket lug 103, and second angle steel bolt holes 1051 are provided at both ends of the angle steel 105. The first angle steel bolt hole 1031 and the corresponding second angle steel bolt hole 1051 cooperate with the angle steel fixing bolt 107 to fix the hanging basket lug 103 to the corresponding end of the angle steel 105. In addition, screw openings are provided at both bottom ends of the angle steel 105, and nuts 1052 are welded above each screw opening to facilitate subsequent fixing operations. Multiple groups of screw reserved hole groups are arranged at intervals along the length direction of the hanging basket suspension track 1 at the position directly opposite the track opening at the top of the hanging basket suspension track 1. Each group of screw reserved hole groups includes two screw reserved holes 108, and the distance between the two screw reserved holes 108 is the same as the distance between the two nuts 1052. By cooperating the nut 1052 with the corresponding screw reserved hole 108 and the limit screw 109, the positions of the two sets of track pulleys 102 in the hanging basket suspension track 1 can be fixed, so that the hanging basket 3 remains stable during construction and does not slide randomly.

[0040] Please refer to Figure 7 , in one embodiment, a plurality of track reserved holes 110 are arranged at intervals along the length direction of the hanging basket suspension track 1 at the top of the hanging basket suspension track 1, and personnel can use tools to hook the track reserved holes 110 to assist the hanging basket 3 to move forward or backward.

[0041] It should be understood that for those of ordinary skill in the art, improvements or transformations can be made according to the above description, and all such improvements and transformations should fall within the protection scope of the appended claims of the present utility model.

[0042] The above describes the patent of the present utility model with reference to the accompanying drawings. Obviously, the implementation of the patent of the present utility model is not limited by the above methods. As long as various improvements are made by adopting the method concept and technical solution of the patent of the present utility model, or the concept and technical solution of the patent of the present utility model are directly applied to other occasions without improvement, they are all within the protection scope of the present utility model.

Claims

1. An over - height skywalk hanging basket suspension track, characterized in that, It includes hanging tracks for gondolas installed on both sides between the lower mezzanine of the corridor and the bottom exterior decoration layer. Track grooves are provided on both sides of the opening of the hanging track for gondolas, and track pulleys with gondola lifting lugs are slidably arranged in the track grooves. Among them, an operation opening is provided on the bottom exterior decoration layer of the corridor for the bottom of the gondola lifting lug to extend out and slide along the length direction of the hanging track for gondolas. The operation opening is sealed by a number of detachable exterior decoration cover plates.

2. The hanging track of the high-altitude connecting corridor hanging basket according to claim 1, characterized in that, Clamping grooves are provided on both inner sides of the operation opening, and clamping blocks that are clamped with the clamping grooves are provided on both sides of the exterior decoration cover plate.

3. The hanging track of the high-altitude connecting corridor hanging basket according to claim 1, wherein The hanging track for gondolas is a steel structure in an inverted U shape, and the hanging track for gondolas is welded to the bottom of the lower mezzanine of the corridor through track fixing parts.

4. The hanging track of the high-altitude corridor hanging basket according to claim 1, characterized in that A storage track for receiving the track pulley is provided at the end of the hanging track for gondolas. The storage track is communicated with the hanging track for gondolas, and the height of the storage track is higher than that of the hanging track for gondolas. When the track pulley is received in the storage track, the gondola lifting lug is received inside the bottom exterior decoration layer.

5. The hanging track of the high-altitude connecting corridor hanging basket according to claim 4, characterized in that One side of the storage track close to the hanging track for gondolas is higher than the side of the storage track far from the hanging track for gondolas.

6. The hanging track of the high-altitude connecting corridor hanging basket according to claim 1, characterized in that Two sets of the track pulleys are arranged in each hanging track for gondolas. A detachable angle steel is connected between the gondola lifting lugs of the two sets of the track pulleys, and the distance between the two sets of the track pulleys is matched with the width of the gondola. The gondola lifting lug is connected to the working sling ring of the gondola through a track wire rope.

7. The hanging track of the high-altitude connecting corridor hanging basket according to claim 6, characterized in that, First angle steel bolt holes are provided on the gondola lifting lug, and second angle steel bolt holes are provided at both ends of the angle steel. The first angle steel bolt hole and the corresponding second angle steel bolt hole cooperate with an angle steel fixing bolt to fix the gondola lifting lug to the corresponding end of the angle steel.

8. The hanging track of the high-altitude connecting corridor hanging basket according to claim 6, characterized in that Screw openings are provided at both bottom ends of the angle steel, and nuts are welded above each screw opening. Multiple groups of screw reserved hole groups are arranged at intervals along the length direction of the hanging track for gondolas at the position of the track opening on the top of the hanging track for gondolas. Each group of screw reserved hole groups includes two screw reserved holes, and the distance between the two screw reserved holes is the same as the distance between the two nuts. The nut and the corresponding screw reserved hole cooperate with a limit screw to fix the positions of the two sets of the track pulleys in the hanging track for gondolas.

9. The hanging track of the high-altitude connecting corridor hanging basket according to claim 1, characterized in that Multiple track reserved holes for assisting the gondola to move forward or backward are arranged at intervals along the length direction of the hanging track for gondolas on the top of the hanging track for gondolas.