Device for collecting pressure-injected concrete in concrete-filled steel tube arch bridge

By installing the collection pipe assembly on the top of the arch rib of the steel pipe concrete arch bridge, the problem of polluted water source of concrete spills in the arch is solved, and environmentally friendly concrete collection and construction treatment is achieved.

CN223292953UActive Publication Date: 2025-09-02ZHEJIANG DACHENG CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422559730.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-23
Publication Date
2025-09-02
Estimated Expiration
2034-10-23

AI Technical Summary

Technical Problem

When concrete is pressed into the arch ribs of the steel pipe concrete arch bridge, the overflowing concrete pollutes the lower water source protection area, and the existing technology has failed to effectively solve this pollution problem.

Method used

A collection tube assembly is designed, including straight steel pipes, elbow steel pipes, hoses and fastening connectors, connected to the collector through a long pipe, installed in the middle of the top of the arch rib, forming a collection device to collect concrete poured from the bottom of the arch to the overflowing of the arch.

Benefits of technology

It effectively reduces the pollution of concrete to the lower reservoir, realizes the collection and environmentally friendly treatment of concrete in the arch, and is suitable for the construction of steel pipe concrete arch bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223292953U_ABST
    Figure CN223292953U_ABST
Patent Text Reader

Abstract

The utility model discloses a collecting device for pressure-injected concrete in a concrete-filled steel tube arch bridge, which comprises a collecting pipe assembly, the concrete-filled steel tube arch bridge comprises an arch rib, the collecting pipe assembly is arranged in the middle of the top of the arch rib, a collector is arranged at an arch seat, the collecting pipe assembly is connected with the collector through a long pipe, and the long pipe is connected with the collecting pipe assembly. And the long pipe is fixed on the lower arch rib, so that the pollution of the concrete to a lower reservoir is effectively reduced, the problem that the concrete pouring top in the arch rib overflows to cause pollution is solved, and the collecting device is suitable for the construction of pressure injection concrete collection in the concrete filled steel tube arch bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel tube concrete arch bridge construction, in particular to a device for collecting pressurized concrete in an arch of a steel tube concrete arch bridge. Background Art

[0002] After the arch ribs of a top-decker steel tube concrete arch bridge are installed, they need to be grouted with self-compacting concrete. Because all the pipe openings of the arch ribs are welded and sealed, grouting holes must be opened at the top of the arch ribs to ensure compaction. Conventionally, overflowing concrete after grouted concrete injection does not need to be collected and treated. However, when the lower part of the arch bridge is located in a water source protection area, it poses a pollution risk. Therefore, the collection of overflowing concrete after grouted concrete injection needs to be further improved to ensure that the water resources and environment are not polluted.

[0003] To this end, the utility model proposes a device for collecting pressurized concrete in a steel tube concrete arch bridge, which is used to solve the problem of pollution caused by overflow from the top of the concrete pouring in the arch rib. Utility Model Content

[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide a device for collecting concrete injected into the arch of a steel tube concrete arch bridge, which is convenient for collecting concrete injected from the bottom of the arch to the top of the arch and has green and environmentally friendly significance.

[0005] To achieve the above purpose, the technical solution of the utility model is as follows:

[0006] A device for collecting concrete injected into the arch of a steel tube concrete arch bridge comprises a collecting pipe assembly. The steel tube concrete arch bridge comprises arch ribs. The collecting pipe assembly is installed in the middle of the top of the arch rib, wherein a collector is provided at the arch seat. The collecting pipe assembly is connected to the collector via a long pipe, so that the collecting pipe assembly collects the concrete injected from the arch bottom to the arch top and overflows into the collector. The long pipe is fixed to the lower arch rib.

[0007] Furthermore, the collecting pipe assembly includes a straight steel pipe and a hose, the straight steel pipe is fixed to the top of the arch rib, the end of the straight steel pipe is provided with a hose, and the long pipe is connected to the hose.

[0008] Furthermore, it includes an elbow steel pipe, the elbow steel pipe is connected to the straight steel pipe through a fastening connector, and the hose is connected to the elbow steel pipe.

[0009] Furthermore, the straight steel pipe is welded to the top of the arch rib.

[0010] Furthermore, the fastening connection piece is a snap ring.

[0011] Furthermore, a hose is connected to the end of the long tube facing the collector.

[0012] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0013] 1) The utility model installs the collection pipe assembly in the middle of the top of the arch rib, wherein a collector is provided at the arch seat. The collection pipe assembly and the collector are connected by a long pipe fixed to the lower arch rib. The long pipe allows the collection pipe assembly to collect the concrete overflowed from the arch bottom to the arch top into the collector, effectively reducing the pollution of the lower reservoir by the concrete, solving the problem of pollution caused by overflow from the top of the concrete pouring in the arch rib. The utility model is suitable for the construction of collecting the concrete pressurized in the arch of the steel tube concrete arch bridge;

[0014] 2) The collection device of the utility model is assembled into an integral body using pipes and is installed in the middle of the top of the arch rib of the arch bridge. The lower collector is provided to form a collection device, which is convenient for collecting the concrete that overflows from the arch bottom to the arch top;

[0015] 3) The device of the utility model is reasonably designed and easy to install, and effectively collects the concrete that overflows from the arch bottom to the arch top. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the main arch cross-section structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the local structure of the main arch of the utility model.

[0018] In the figure: 1. Straight steel pipe; 2. Elbow steel pipe; 3. Hose; 4. Fastening connector; 5. Long pipe; 6. Collector; 7. Lower arch rib. DETAILED DESCRIPTION

[0019] The present invention will be further described below in conjunction with the accompanying drawings, but the scope of protection of the present invention is not limited to the described scope.

[0020] Please refer to Figure 1-2 A device for collecting pressurized concrete in a steel tube concrete-filled arch bridge includes a collection pipe assembly. The steel tube concrete-filled arch bridge includes arch ribs. The collection pipe assembly is installed in the middle of the top of the arch rib. A collector 6 is provided at the arch seat. The collection pipe assembly and collector 6 are connected by a long tube 5. The collection pipe assembly collects concrete that overflows from the arch bottom to the arch top into collector 6, effectively reducing concrete contamination of the lower reservoir and solving the problem of pollution caused by overflow from the top of the arch rib. Long tube 5 is fixed to the lower arch rib 7.

[0021] The collecting pipe assembly includes a straight steel pipe 1 and a hose 3. The straight steel pipe 1 is fixed to the top of the arch rib. The end of the straight steel pipe 1 is provided with a hose 3, and a long pipe 5 is connected to the hose 3. Furthermore, the straight steel pipe 1 is welded to the top of the arch rib to ensure its tightness.

[0022] In this embodiment, the hose 3 is a fire hose, and the long tube 5 is a large-diameter corrugated tube with a diameter of 500-600 cm. Water is injected into the upper part of the corrugated tube to ensure that the concrete can flow smoothly into the collector 6.

[0023] The collecting pipe assembly of this embodiment further includes an elbow steel pipe 2 , which is connected to the straight steel pipe 1 via a fastening connector 4 , and a hose 3 is connected to the elbow steel pipe 2 .

[0024] Furthermore, the fastening connection member 4 is a snap ring.

[0025] The end of the long pipe 5 toward the collector 6 is connected with a hose 3. Specifically, the collector 6 is welded with steel bars and placed in an open space near the arch seat. Each time the concrete is collected, it is transported away by a crane.

[0026] In this embodiment, the straight steel pipe 1 and the elbow steel pipe 2 are steel pipes with a diameter of 60-80 cm.

Claims

1. A device for collecting pressurized concrete in a steel tube concrete arch bridge, characterized in that The steel tube concrete arch bridge includes an arch rib, the collecting pipe assembly is installed in the middle of the top of the arch rib, wherein a collector (6) is provided at the arch seat, the collecting pipe assembly is connected to the collector (6) through a long pipe (5), so that the collecting pipe assembly collects the concrete overflowed from the arch bottom to the arch top into the collector (6), and the long pipe (5) is fixed on the lower arch rib (7).

2. The device for collecting pressurized concrete in a steel tube concrete arch bridge according to claim 1, characterized in that The collecting pipe assembly comprises a straight steel pipe (1) and a hose (3); the straight steel pipe (1) is fixed to the top of the arch rib; the end of the straight steel pipe (1) is provided with a hose (3); and the long pipe (5) is connected to the hose (3).

3. The device for collecting pressurized concrete in a steel tube concrete arch bridge according to claim 2, characterized in that It comprises an elbow steel pipe (2), wherein the elbow steel pipe (2) is connected to a straight steel pipe (1) via a fastening connector (4), and the hose (3) is connected to the elbow steel pipe (2).

4. The device for collecting pressurized concrete in a steel tube concrete arch bridge according to claim 3, characterized in that The straight steel pipe (1) is welded to the top of the arch rib.

5. The device for collecting pressurized concrete in a steel tube concrete arch bridge according to claim 3, characterized in that The fastening connection piece (4) is a snap ring.

6. The device for collecting pressurized concrete in a steel tube concrete arch bridge according to claim 1, characterized in that The end of the long tube (5) facing the collector (6) is connected to a hose (3).