Waste gas purification tower for waste gas treatment
By installing a combination structure of connecting frame and rubber pad on the exhaust gas purification tower, the problem of pipe swaying was solved, achieving stable connection and protection.
Patent Information
- Application Number
- CN202423176052.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2034-12-23
AI Technical Summary
When the exhaust gas purification tower is in operation, the connecting pipes are unstable and prone to shaking.
The connecting frame structure is adopted, which includes a combination of load-bearing bracket, fixing hoop and threaded cap. The connecting pipe is fixed by threaded engagement, and a rubber pad is placed between the load-bearing bracket and the connecting pipe to absorb vibration.
Ensure the stability of the connecting pipes, avoid shaking, extend service life and protect the pipes.
Smart Images

Figure CN223570406U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to waste gas treatment technical field especially, relates to a waste gas purification tower for waste gas treatment. BACKGROUND
[0002] The waste gas purification tower is a kind of equipment for waste gas purification and treatment, mainly the pollutants such as odor, harmful gas in waste gas are treated by a series of chemical reactions such as adsorption, oxidation, reduction to reach the purpose of purification, waste gas purification tower is often used in waste gas treatment of chemical, electronic, printing, pharmaceutical, food and other industries.
[0003] The main components of the waste gas purification tower currently include air inlet, filling layer, high-frequency electric field, spraying system, exhaust port and the like, and the air inlet introduces waste gas into the waste gas purification tower, the material of the filling layer can adsorb pollutants in waste gas, the high-frequency electric field degrades harmful gas by ionization effect, the spraying system is used to spray chemical agent to the filling layer to promote the progress of chemical reaction, finally, clean gas after treatment is discharged through the exhaust port, but the present inventor has found in practical application that the connecting pipeline on the waste gas purification tower is unstable during the operation of the waste gas purification tower, and the problem of shaking often occurs, therefore, we propose a waste gas purification tower for waste gas treatment. SUMMARY
[0004] In order to overcome the defects of the prior art pointed out above, the present inventor has made in-depth research, and after a lot of creative labor, the present utility model is completed.
[0005] Specifically, the technical problem to be solved by the present utility model is to provide a waste gas purification tower for waste gas treatment to solve the technical problem that the connecting pipeline on the waste gas purification tower is unstable during the operation of the waste gas purification tower, and shaking often occurs.
[0006] To solve the above technical problems, the present utility model provides the following technical scheme:
[0007] A waste gas purification tower for waste gas treatment, comprising a waste gas purification tower, a connecting pipeline is installed on the outer surface of the waste gas purification tower, the connecting pipeline is in communication with the waste gas purification tower, and the connecting pipeline is symmetrically arranged up and down;
[0008] A connecting frame is installed between the connecting pipelines, load supports are installed on the upper and lower ends of the connecting frame, the connecting pipelines are placed on the load supports, a fixing clamp is installed on the load support, the fixing clamp penetrates the load support and is installed with a threaded cap, and the connecting pipelines are installed on the load supports by thread cooperation of the fixing clamp and the threaded cap.
[0009] As an improved technical scheme, the adapter frame comprises two side plates, an adapter rib is fixedly installed between the two side plates, and the adapter rib is symmetrically arranged along the length direction of the side plate.
[0010] As an improved technical scheme, the adapter frame comprises two side plates, an adapter rib is fixedly installed between the two side plates, and the adapter rib is symmetrically arranged along the length direction of the side plate.
[0011] As an improved technical scheme, the adapter frame comprises two side plates, an adapter rib is fixedly installed between the two side plates, and the adapter rib is symmetrically arranged along the length direction of the side plate.
[0012] The fixing seat is provided with a through hole, and the fixing hoop is installed in the through hole.
[0013] As an improved technical scheme, the adapter frame comprises two side plates, an adapter rib is fixedly installed between the two side plates, and the adapter rib is symmetrically arranged along the length direction of the side plate.
[0014] As an improved technical scheme, the adapter frame comprises two side plates, an adapter rib is fixedly installed between the two side plates, and the adapter rib is symmetrically arranged along the length direction of the side plate.
[0015] After the above technical scheme is adopted, the beneficial effects of the present application are as follows:
[0016] 1. The adapter frame is arranged between the adapter pipes, and the adapter pipes are arranged on the bearing bracket, then the fixing hoop is arranged in the through hole, and the adapter pipes are arranged between the bearing bracket and the fixing hoop, the fixing hoop is fixed on the fixing seat by the threaded cap, the threaded cap is moved along the external thread on the fixing hoop, and the adapter pipes are fixed, so that the stability of the adapter pipes is improved, and the adapter pipes are fixed conveniently.
[0017] 2. The rubber pads are arranged between the bearing bracket and the adapter pipes and between the adapter pipes and the fixing hoop, the rubber pads can absorb the vibration and impact of the adapter pipes when the waste gas purification tower is operated, the adapter pipes are prevented from being damaged, and the service life of the adapter pipes is prolonged. BRIEF DESCRIPTION OF DRAWINGS
[0018] In order to more clearly illustrate the technical scheme of the embodiments of the present application, the drawings needed in the embodiment description will be briefly introduced. Obviously, the drawings in the following description are only some embodiments of the present application, and other drawings can be obtained by those skilled in the art without creative labor. Among them:
[0019] Figure 1The utility model discloses a waste gas purification tower for waste gas treatment whole structure schematic diagram.
[0020] Figure 2 The utility model discloses a waste gas purification tower for waste gas treatment whole in the connecting pipeline and auxiliary fixing mechanism connecting structure schematic diagram.
[0021] Figure 3 The utility model discloses a waste gas purification tower for waste gas treatment whole auxiliary fixing mechanism exploded view schematic diagram.
[0022] Figure 4 The utility model discloses a waste gas purification tower for waste gas treatment whole Figure 3 The utility model discloses a waste gas purification tower for waste gas treatment whole A place amplification structure schematic diagram.
[0023] Mark explanation:
[0024] In the drawing: 1, waste gas purification tower, 2, connecting pipeline, 3, side plate, 4, connecting rib, 5, bearing support, 501, fixed seat, 502, through hole, 6, fixed hoop, 7, screw cap, 8, rubber pad. Specific implementation
[0025] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings in the embodiments of the utility model, and obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the person skilled in the art without creative labor belong to the scope of protection of the utility model.
[0026] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the utility model are only used to explain the relative positional relationship, movement condition, etc. between components in a certain posture (as shown in the drawings), and if the certain posture changes, the directional indications will also change accordingly.
[0027] At the same time, "and / or" or "and / or" in the whole text means that it includes three schemes, taking "A and / or B" as an example, including A scheme, or B scheme, or A and B scheme.
[0028] In addition, the description of "first", "second" and the like in the present application is only for the purpose of description, and cannot be understood as indicating or implying the relative importance of the technical features or implying the number of the indicated technical features. Therefore, the features limited by "first" and "second" can be explicitly or implicitly included at least one of the features. In addition, the technical solutions of various embodiments can be combined with each other, but it must be based on the realization of ordinary skilled in the art, when the combination of technical solutions appears contradictory or unachievable, it should be considered that the combination of technical solutions does not exist, also not within the protection scope required by the present application.
[0029] Referring to Figures 1-4 , a waste gas purification tower for waste gas treatment is provided, which comprises a waste gas purification tower 1, an adapter pipe 2 is installed on the outer surface of the waste gas purification tower 1, the adapter pipe 2 is in communication with the waste gas purification tower 1, and the adapter pipe 2 is symmetrically arranged up and down;
[0030] The adapter pipe 2 is installed between the adapter pipe 2 and the adapter pipe 2, and the adapter pipe 2 is installed between the adapter pipe 2 and the adapter pipe 2. The upper and lower ends of the adapter frame are provided with a bearing bracket 5, the adapter pipe 2 is placed on the bearing bracket 5, the bearing bracket 5 is provided with a fixed hoop 6, the fixed hoop 6 is penetrated through the bearing bracket 5 and provided with a threaded cap 7, and the adapter pipe 2 is installed on the bearing bracket 5 through the fixed hoop 6 and the threaded cap 7.
[0031] Referring to Figure 3 , the adapter frame comprises two side plates 3, two side plates 3 are fixedly installed between the two side plates 3, and the adapter rib 4 is symmetrically arranged along the length direction of the side plate 3. The bearing bracket 5 is installed on the adapter rib 4.
[0032] Referring to Figure 3 and Figure 4 , the bearing bracket 5 is symmetrically arranged along the length direction of the side plate 3.
[0033] Referring to Figure 3 and Figure 4 , the bearing bracket 5 has an integral fixed seat 501 on the upper side, and the fixed seat 501 is symmetrically arranged;
[0034] The fixed seat 501 is provided with a through hole 502, and the fixed hoop 6 is penetrated and installed in the through hole 502.
[0035] Referring to Figure 3 and Figure 4 , the fixed hoop 6 has an integral external thread at both ends, and the external thread is threadedly connected with the threaded cap 7.
[0036] Referring to Figure 1 and Figure 2 , the bearing bracket 5 and the adapter pipe 2 and the adapter pipe 2 and the fixed hoop 6 can be provided with a rubber pad 8 for protection.
[0037] In actual use, the adapter frame is arranged between the adapter pipes 2, the adapter pipes 2 are arranged on the bearing bracket 5, then the fixing hoop 6 is arranged through the through hole 502 inner cavity, the adapter pipes 2 are arranged between the bearing bracket 5 and the fixing hoop 6, the rubber pad 8 is arranged between the bearing bracket 5 and the adapter pipes 2 and between the adapter pipes 2 and the fixing hoop 6, and the fixing hoop 6 is fixed on the fixing seat 501 by using the threaded cap 7, at this time, the threaded cap 7 is screwed along the external thread on the fixing hoop 6 until it is fixed, so as to assist the fixing between the waste gas purification tower 1 and the adapter pipes 2 and ensure the stability of the adapter, thereby facilitating the fixing of the waste gas purification tower 1 and the adapter pipes 2, and further avoiding the shaking of the adapter pipes 2. The device not only facilitates the fixing of the waste gas purification tower 1 and the adapter pipes 2, but also avoids the shaking of the adapter pipes 2.
[0038] It should be understood that the use of these embodiments is only for the purpose of illustrating the present application and is not intended to limit the protection scope of the present application. In addition, it should also be understood that after reading the technical content of the present application, those skilled in the art can make various modifications, modifications and / or variations to the present application, and all these equivalent forms also fall within the protection scope defined by the claims attached to the present application.
Claims
1. An exhaust gas purification tower for exhaust gas treatment, characterized by: The exhaust gas purification tower (1) is provided with a connecting pipe (2) on its outer surface, and the connecting pipe (2) is symmetrically arranged on the upper and lower surfaces of the exhaust gas purification tower (1). The connecting pipe (2) is provided with a connecting frame, and the upper and lower ends of the connecting frame are provided with a bearing bracket (5), the connecting pipe (2) is placed on the bearing bracket (5), the bearing bracket (5) is provided with a fixing hoop (6), the fixing hoop (6) penetrates the bearing bracket (5) and is provided with a threaded cap (7), and the connecting pipe (2) is screw-connected to the bearing bracket (5) through the fixing hoop (6) and the threaded cap (7).
2. The exhaust gas purification tower for exhaust gas treatment according to claim 1, characterized by: The connecting frame comprises two side plates (3), and the side plates (3) are fixedly provided with a connecting rib (4) between them, and the connecting rib (4) is symmetrically arranged along the length direction of the side plate (3), and the bearing bracket (5) is arranged on the connecting rib (4).
3. The exhaust gas treatment exhaust gas purification tower according to claim 2, characterized by: The bearing bracket (5) is symmetrically arranged along the length direction of the side plate (3).
4. The exhaust gas treatment exhaust gas purification tower according to claim 1, characterized by: The bearing bracket (5) is provided with an integral fixing seat (501) on the upper surface, and the fixing seat (501) is symmetrically arranged. The fixing seat (501) is provided with a through hole (502), and the fixing hoop (6) penetrates the through hole (502).
5. The exhaust gas treatment exhaust gas purification tower according to claim 1, characterized by: The fixing hoop (6) is provided with an integral external thread at both ends, and the external thread is screw-connected with the threaded cap (7).
6. The exhaust gas treatment exhaust gas purification tower according to claim 1, characterized by: The bearing bracket (5) and the connecting pipe (2) and the connecting pipe (2) and the fixing hoop (6) can be provided with a rubber pad (8) for protection.