Positioning drilling equipment for engineering building construction
By combining the guide slide, positioning drilling unit, and dust suppression control unit, the shortcomings of existing construction equipment in positioning and vibration reduction are solved, achieving precise positioning and vibration reduction, and improving construction efficiency and safety.
Patent Information
- Application Number
- CN202520069148.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-13
- Publication Date
- 2025-11-28
- Estimated Expiration
- 2035-01-13
AI Technical Summary
Existing drilling equipment used in building construction is inadequate in terms of positioning and vibration reduction, resulting in fatigue and low efficiency for workers.
A positioning drilling device including a guide slide, a positioning drilling unit, and a dust suppression control unit was designed. The guide slide and the positioning drilling unit achieve horizontal collinearity and positioning of the drilling, the dust suppression control unit is used for dust reduction, and the lifting slide and the support box base provide stable support.
It achieves precise drilling positioning and reduces vibration, improves construction efficiency, reduces worker fatigue, and effectively reduces dust through the dust suppression control unit, thereby enhancing the safety of the construction environment.
Smart Images

Figure CN223608473U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to engineering construction construction positioning drilling equipment technical field, concretely is a kind of engineering construction construction positioning drilling equipment. BACKGROUND
[0002] Engineering construction is the production activity of engineering construction implementation phase, is the building process of various buildings, or the process of changing line on design drawing into real object, and wall drilling is often needed in engineering construction process. Now general is that staff holds water and electricity drill to carry out wall drilling, and water and electricity drill generates greater vibration when working, and staff needs to push water and electricity drill, so that staff is more laborious, more tired.
[0003] The patent with the publication number CN110744100B discloses a drilling equipment for building construction in the prior art. The technical problem of the present application is to provide a drilling equipment for building construction that allows the worker to work more easily. A drilling equipment for building construction includes a mounting plate, a sealing gasket, a fixing frame, a handle, etc. The upper and lower sides of the left side of the mounting plate are connected with the sealing gaskets, the upper part of the right side of the mounting plate is connected with the fixing frame, and the top of the fixing frame is connected with the handle.
[0004] It mainly fixes the equipment on the building wall, which is convenient for pushing and drilling, but it greatly reduces the efficiency of the whole drilling operation, and it needs to refer to multiple points for positioning, the use effect is general, and it cannot better meet the needs of positioning drilling in engineering construction. UTILITY MODEL CONTENT
[0005] The technical problem to be solved by the utility model is to overcome the defects of the prior art, provide a positioning drilling equipment for engineering construction, which can be positioned and drilled by referring to a specified point, can be adjusted in height before drilling to ensure drilling level collinearity, improve drilling effect, and is more convenient to use, and can effectively solve the problems in the background art.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a positioning drilling equipment for engineering construction, comprising a guide sliding seat, a positioning drilling unit and a dust suppression control unit.
[0007] The guide sliding seat is slidably connected with a dust collecting sliding plate at the upper end.
[0008] Positioning drilling unit: including positioning drilling box, drilling screw base, drilling cylinder, rotating seat gear ring, drilling motor, positioning crossbar, guide rotating cylinder, spring connecting ring and positioning guide cylinder, the upper end of the dust collecting slide plate is slidably connected with the positioning drilling box, the left end of the positioning drilling box is rotatably connected with the drilling screw base, the right end of the drilling cylinder is threadedly connected in the left end of the drilling screw base, the right end of the drilling screw base is provided with the rotating seat gear ring, the drilling motor is installed in the lower end of the left side of the positioning drilling box, the output shaft of the drilling motor is connected with the drilling gear, the drilling gear is meshedly connected with the rotating seat gear ring, the positioning crossbar is installed in the positioning drilling box, the right end of the inside of the drilling screw base is provided with the guide rotating cylinder, the left end of the guide rotating cylinder is rotatably connected with the spring connecting ring, the positioning guide cylinder is slidably and rotatably connected in the guide rotating cylinder, the right end of the positioning guide cylinder passes through the middle part of the positioning crossbar and is connected with the guide cylinder limiting ring; in the engineering construction, through the working of the drilling motor, the drilling screw base can drive the drilling cylinder connected with it to rotate, so that the drilling of the engineering building is realized.
[0009] Dust suppression control unit: installed in the inside of the positioning drilling box.
[0010] Further, the positioning drilling unit further comprises a positioning cone head and a push head spring, the left end of the positioning guide cylinder is provided with the positioning cone head, the left end of the push head spring is connected with the right end of the positioning cone head, and the right end of the push head spring is connected with the left end of the spring connecting ring. The positioning cone head can be calibrated at a point in the engineering construction, the positioning drilling is realized, when the drilling cylinder moves left after drilling, the engineering construction applies force to the positioning cone head, the push head spring is compressed, and then the positioning cone head moves right, so that the water outlet and dust suppression are facilitated.
[0011] Further, the dust suppression control unit comprises a water connecting plug, a water conveying hose and a dust liquid storage bag, the front end of the positioning drilling box is provided with the water connecting plug, the water outlet of the water connecting plug is connected with the right end of the positioning guide cylinder through the water conveying hose, and the left end of the dust collecting slide plate is provided with the dust liquid storage bag. The water connecting plug is convenient for connecting the outlet of the external water source, and the water conveying hose can convey water to the positioning cone head through the positioning guide cylinder.
[0012] Further, the dust suppression control unit further comprises a push plate handle and a control switch group, the front end of the dust collecting slide plate is provided with the push plate handle, and the right end of the push plate handle is provided with the control switch group. The push plate handle is more convenient for moving the dust collecting slide plate, so that the left end of the dust collecting slide plate is closely attached to the engineering building, and the control switch group can control the working of the drilling motor.
[0013] Further, still including lifting slide column and column slide cylinder, the lower end of the guide sliding seat is installed with the lifting slide column, the lower end of the lifting slide column is slidingly connected on the inner upper end of the column slide cylinder, and the inner upper end right side of the column slide cylinder is installed with the lifting assembly. The column slide cylinder facilitates the up-down sliding of the lifting slide column, and the lifting assembly can control the length of the lifting slide column rising and falling, conveniently makes the positioning cone head horizontal collinear with a point in the engineering building, and realizes positioning.
[0014] Further, still including supporting box base, the lower end of the column slide cylinder is installed with the supporting box base. The supporting box base can well support the equipment, and facilitates stable drilling and the like.
[0015] Compared with the prior art, the engineering building construction positioning drilling equipment has the following advantages.
[0016] 1. The engineering building construction positioning drilling equipment is provided with a positioning drilling unit, the drilling screw seat drives the drilling cylinder connected therewith to rotate through the meshing of the drilling gear and the rotating seat gear ring, the drilling of the engineering building is realized in the left-right movement, and the left-right sliding of the positioning guide cylinder is provided with a basis while the guide rotating cylinder rotates.
[0017] 2. The engineering building construction positioning drilling equipment is provided with the positioning drilling unit, the positioning cone head can calibrate a point in the engineering building, positioning drilling is realized, when the drilling cylinder moves left, the engineering building exerts force on the positioning cone head, the push spring is compressed, and then the positioning cone head moves right, and water is conveniently discharged to reduce dust.
[0018] 3. The engineering building construction positioning drilling equipment is provided with a dust suppression control unit, the water inlet plug is convenient for connecting the external water source outlet, the water conveying hose can convey water to the positioning cone head through the positioning guide cylinder, when drilling the engineering building, the water is sprayed into the drilling cylinder to realize dust suppression, and the water mixed with the engineering building dust can flow into the dust liquid storage bag. BRIEF DESCRIPTION OF DRAWINGS
[0019] Fig. 1 It is a structural schematic view of the utility model;
[0020] Fig. 2 It is a structural schematic view of the inner rear side of the positioning drilling box of the utility model.
[0021] Fig. 1 guide slide, 2 dust slide plate, 3 positioning drilling unit, 31 positioning drill box, 32 drilling screw seat, 33 drilling cylinder, 34 rotating seat gear ring, 35 drilling motor, 36 positioning cross rod, 37 guide rotating cylinder, 38 spring ring, 39 positioning guide cylinder, 310 positioning cone head, 311 push head spring, 4 dust suppression control unit, 41 water inlet plug, 42 water delivery hose, 43 dust liquid storage bag, 44 push plate handle, 45 control switch group, 5 lifting slide column, 6 column slide cylinder, 7 support box base. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.
[0023] Please refer to Figs. 1-2 The embodiment provides a technical solution: a positioning drilling equipment for engineering construction, which comprises a guide slide 1, a positioning drilling unit 3 and a dust suppression control unit 4.
[0024] The guide slide 1 is slidably connected with a dust slide plate 2 at the upper end.
[0025] The positioning drilling unit 3 comprises a positioning drill box 31, a drilling screw seat 32, a drilling cylinder 33, a rotating seat gear ring 34, a drilling motor 35, a positioning cross rod 36, a guide rotating cylinder 37, a spring ring 38 and a positioning guide cylinder 39. The dust slide plate 2 is slidably connected with the positioning drill box 31 at the upper end. The positioning drill box 31 is rotatably connected with the drilling screw seat 32 at the left end. The right end of the drilling screw seat 32 is threadedly connected with the inside left end of the drilling cylinder 33. The rotating seat gear ring 34 is installed at the right end of the drilling screw seat 32. The drilling motor 35 is installed at the inside lower left side of the positioning drill box 31. The output shaft of the drilling motor 35 is connected with a drilling gear, and the drilling gear is meshingly connected with the rotating seat gear ring 34. The positioning cross rod 36 is installed in the positioning drill box 31. The inside right end of the drilling screw seat 32 is installed with the guide rotating cylinder 37. The left end of the guide rotating cylinder 37 is rotatably connected with the spring ring 38. The positioning guide cylinder 39 is slidably and rotatably connected in the guide rotating cylinder 37. The right end of the positioning guide cylinder 39 passes through the middle part of the positioning cross rod 36 to connect with a guide cylinder limiting ring. Through the work of the drilling motor 35 in the engineering construction, the meshing of the drilling gear and the rotating seat gear ring 34 can make the drilling screw seat 32 drive the drilling cylinder 33 connected with it by threads to rotate, so as to realize the drilling of the engineering construction in the left and right movement. At the same time, the guide rotating cylinder 37 provides a basis for the left and right sliding of the positioning guide cylinder 39.
[0026] The positioning drilling unit 3 further comprises a positioning cone head 310 and a push head spring 311. The positioning cone head 310 is installed at the left end of the positioning guide cylinder 39, the left end of the push head spring 311 is connected to the right end of the positioning cone head 310, and the right end of the push head spring 311 is connected to the left end of the spring ring 38. The positioning cone head 310 can be used to calibrate a point in the engineering building to achieve positioning drilling. When the drilling cylinder 33 moves to the left, the engineering building applies force to the positioning cone head 310, causing the push head spring 311 to compress, and then the positioning cone head 310 moves to the right, facilitating water dust reduction.
[0027] The dust suppression control unit 4 is installed inside the positioning drill box 31.
[0028] The dust suppression control unit 4 comprises a water connection plug 41, a water delivery hose 42, and a dust liquid storage bag 43. The water connection plug 41 is installed at the front end of the positioning drill box 31, the water outlet of the water connection plug 41 is connected to the right end of the positioning guide cylinder 39 through the water delivery hose 42, and the dust liquid storage bag 43 is installed at the left end of the dust collection slide plate 2. The water connection plug 41 facilitates the connection of the external water source outlet, the water delivery hose 42 can deliver water to the positioning cone head 310 through the positioning guide cylinder 39, and when drilling in the engineering building, the water flow is sprayed into the drilling cylinder 33 to achieve dust reduction. The water mixed with the dust of the engineering building can flow into the dust liquid storage bag 43.
[0029] The dust suppression control unit 4 further comprises a push plate handle 44 and a control switch group 45. The push plate handle 44 is installed at the front end of the dust collection slide plate 2, and the control switch group 45 is installed at the right end of the push plate handle 44. The push plate handle 44 makes it more convenient to move the dust collection slide plate 2, so that the left end of the dust collection slide plate 2 is tightly attached to the engineering building, preparing for the movement of the positioning drill box 31, and the control switch group 45 can control the operation of the drilling motor 35 to achieve drilling.
[0030] The device further comprises a lifting slide column 5 and a column slide cylinder 6. The lifting slide column 5 is installed at the lower end of the guide slide seat 1, the lower end of the lifting slide column 5 is slidingly connected to the inner upper end of the column slide cylinder 6, and the inner upper end of the column slide cylinder 6 is installed with a lifting assembly on the right side. The column slide cylinder 6 facilitates the up and down sliding of the lifting slide column 5, and the lifting assembly can control the length of the lifting slide column 5 to rise and fall, making the positioning cone head 310 horizontally collinear with a point in the engineering building to achieve positioning.
[0031] The device further comprises a box supporting base 7, which is installed at the lower end of the column slide cylinder 6. The box supporting base 7 can provide good support for the device, facilitating stable drilling and other operations.
[0032] The working principle of the positioning drilling equipment for engineering construction provided by the utility model is as follows: when the equipment is used for drilling in engineering construction, the equipment is first placed on the ground directly below the position to be drilled in the engineering construction, then the switch group 45 is controlled to control the working of the lifting assembly, the lifting slide column 5 is lifted, and the positioning cone head 310 stops when it is horizontally collinear with a point in the engineering construction, then the left end of the dust-connection slide plate 2 is made close to the wall to be drilled by the push plate handle 44, the positioning drill box 31 is moved by the handle at the right end of the positioning drill box 31 to make the left end of the positioning cone head 310 adhere to a point in the engineering construction, after the position is determined, the switch group 45 is controlled to control the working of the drilling motor 35, the drilling screw base 32 is driven to rotate by the meshing of the drilling gear and the rotating seat gear ring 34, drilling is realized in the left and right movement, different diameter drilling cylinders 33 can be replaced to realize the drilling of holes of different sizes, while drilling, the external water source is delivered to the positioning cone head 310 through the water connection plug 41, the water delivery hose 42 and the positioning guide cylinder 39, and is sprayed into the drilling cylinder 33, dust reduction is realized, the water mixed with the dust of the engineering construction can flow into the dust-liquid storage bag 43, and the utility is more stable.
[0033] It is worth noting that the drilling motor 35 disclosed in the above embodiment adopts a three-phase asynchronous motor, the input ends of the drilling motor 35 and the motor in the lifting assembly are electrically connected to the output ends of the control switch group 45, the input ends of the control switch group 45 are electrically connected to the output ends of the external power supply, and the control switch group 45 controls the working of the drilling motor 35 and the motor in the lifting assembly by using the method commonly used in the prior art.
[0034] The above is only an embodiment of the utility model, and does not limit the patent range of the utility model, and any equivalent structure or equivalent process conversion by using the contents of the utility model specification and drawings, or direct or indirect application in other related technical fields, is also included in the patent protection range of the utility model.
Claims
1. A positioning drilling apparatus for construction of an engineered building, characterized by: Including guide slide (1), positioning drilling unit (3) and dust control unit (4); The guide slide (1) is slidably connected with the dust collecting slide plate (2) at the upper end. The positioning drilling unit (3) comprises a positioning drill box (31), a drilling screw base (32), a drilling cylinder (33), a rotating seat gear ring (34), a drilling motor (35), a positioning cross rod (36), a guide rotating cylinder (37), a connecting spring ring (38) and a positioning guide cylinder (39). The dust collecting slide plate (2) is slidably connected with the positioning drill box (31) at the upper end. The positioning drill box (31) is rotatably connected with the drilling screw base (32) at the left end. The right end of the drilling screw base (32) is threadedly connected with the left end inside the drilling screw base (32). The rotating seat gear ring (34) is installed at the right end of the drilling screw base (32). The drilling motor (35) is installed at the lower end inside the positioning drill box (31) on the left side. The output shaft of the drilling motor (35) is connected with a drilling gear, which is in meshing connection with the rotating seat gear ring (34). The positioning cross rod (36) is installed inside the positioning drill box (31). The guide rotating cylinder (37) is installed inside the right end of the drilling screw base (32). The left end of the guide rotating cylinder (37) is rotatably connected with the connecting spring ring (38). The positioning guide cylinder (39) is slidably and rotatably connected inside the guide rotating cylinder (37). The right end of the positioning guide cylinder (39) penetrates the middle of the positioning cross rod (36) and is connected with a guide cylinder limiting ring. The dust control unit (4) is installed inside the positioning drill box (31).
2. The positioning drilling equipment for engineering construction according to claim 1, characterized in that: The positioning drilling unit (3) further comprises a positioning cone head (310) and a push head spring (311). The positioning cone head (310) is installed at the left end of the positioning guide cylinder (39). The left end of the push head spring (311) is connected with the right end of the positioning cone head (310). The right end of the push head spring (311) is connected with the left end of the connecting spring ring (38).
3. The positioning drilling equipment for engineering construction according to claim 1, characterized in that: The dust control unit (4) comprises a water collecting plug (41), a water conveying hose (42) and a dust liquid storage bag (43). The water collecting plug (41) is installed at the front end of the positioning drill box (31). The water outlet of the water collecting plug (41) is connected with the right end of the positioning guide cylinder (39) through the water conveying hose (42). The dust liquid storage bag (43) is installed at the left end of the dust collecting slide plate (2).
4. The positioning drilling equipment for engineering construction according to claim 1, characterized in that: The dust control unit (4) further comprises a push plate handle (44) and a control switch group (45). The push plate handle (44) is installed at the front end of the dust collecting slide plate (2). The right end of the push plate handle (44) is installed with the control switch group (45).
5. The positioning drilling equipment for engineering construction according to claim 1, characterized in that: Further comprising a lifting slide column (5) and a column slide cylinder (6). The lower end of the guide slide (1) is installed with the lifting slide column (5). The lower end of the lifting slide column (5) is slidably connected with the upper end inside the column slide cylinder (6). The upper end inside the column slide cylinder (6) is installed with a lifting assembly on the right side.
6. The positioning drilling equipment for engineering construction according to claim 5, characterized in that: Further comprising a box supporting base (7). The lower end of the column slide cylinder (6) is installed with the box supporting base (7).
Citation Information
Patent Citations
A drilling device for building construction
CN110744100B