Building construction creeping formwork device

By introducing rotating columns and flipping components into the climbing formwork device for building construction, the rapid installation and disassembly of the climbing formwork sub-baffle is achieved, solving the problems of low construction efficiency and safety risks in the existing technology, and improving construction efficiency and equipment service life.

CN223675815UActive Publication Date: 2025-12-16刘冀龙
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422981707.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-04
Publication Date
2025-12-16
Estimated Expiration
2034-12-04

AI Technical Summary

Technical Problem

Existing climbing formwork devices for building construction require the installation of multiple climbing formwork main baffles when pouring the next layer of cement. This operation is cumbersome, resulting in low construction efficiency and safety risks. Furthermore, frequent extension and disassembly operations will shorten the service life of the equipment.

Method used

The design of rotating columns and flipping components allows for the quick installation of the climbing formwork sub-baffle onto the extended climbing formwork frame. The use of threaded grooves and threaded nails enables rapid installation and disassembly, forming a multi-layered cement pouring space and reducing waiting time and waste of manpower and materials.

Benefits of technology

It significantly shortens the construction cycle, improves construction efficiency, reduces waste of manpower and materials, ensures construction quality and safety, and extends the service life of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223675815U_ABST
    Figure CN223675815U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction creeping formwork device, and relates to the technical field of building construction, the building construction creeping formwork device comprises a creeping formwork main baffle, a rotating column is movably installed in the creeping formwork main baffle, and a creeping formwork auxiliary baffle is installed on the outer side surface of an overturning assembly. The creeping formwork auxiliary baffles are rapidly installed on the extended creeping formwork frame, so that the multiple creeping formwork auxiliary baffles form a second layer of cement pouring space, cement pouring spaces of different layers are rapidly formed, the construction period is remarkably shortened, the time for waiting for cement solidification is shortened, and the construction efficiency is improved. Due to the fact that cement pouring of each layer can be conducted immediately after the previous layer is completed, waste of manpower and materials is reduced, the thickness and uniformity of cement pouring of each layer can be accurately controlled, the overall quality of a building can be improved, and reworking and repairing cost caused by construction errors is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of building construction, specifically is a building construction climbing formwork device. BACKGROUND

[0002] The building construction climbing formwork device is mainly composed of the following parts, including a formwork system, a climbing system, a platform system and an auxiliary system, the climbing formwork device can ascend layer by layer along with the construction of the building structure, does not need to occupy additional construction site, and does not need to use other vertical transportation equipment, since the climbing formwork device has self-climbing capability, does not need to be hoisted by hoisting machinery, thereby reducing the use amount of hoisting machinery in construction, reducing construction cost, the climbing formwork device can speed up construction speed, since it can continuously install formwork, pour concrete and dismantle, reducing waiting time in construction.

[0003] The existing building construction climbing formwork device needs to be extended when pouring the next layer of cement, needs to extend upwards and install multiple climbing formwork main baffle plates, consumes a lot of time, thereby reducing overall construction efficiency, complicated operation steps can cause construction personnel to be tired, thereby affecting construction quality and safety, and in the process of installing and dismantling the climbing formwork main baffle plate again, the construction personnel need to work in high altitude, which increases the risk of safety accidents, improper operation or equipment failure can cause the construction personnel to fall or the formwork to collapse and other serious consequences, and frequent extension and dismantling operation can cause abrasion or damage to the parts of the building construction climbing formwork device, thereby shortening the service life of the equipment. SUMMARY

[0004] The utility model provides a building construction climbing formwork device, possesses building construction climbing formwork device fast installation construction's advantage to solve the problem that the building construction climbing formwork device dismantling installation operation step is complicated and leads to the construction efficiency reduction.

[0005] In order to realize the purpose of fast installation and construction of the building construction climbing formwork device, the utility model provides the following technical scheme:

[0006] A building construction climbing formwork device, including climbing formwork frame and installing in the top surface of climbing formwork frame climbing formwork main baffle plate, the inside movable mounting of climbing formwork main baffle plate has rotary column, the outside surface of rotary column evenly installs the ring, the outside surface of a plurality of ring and the inside movable contact of climbing formwork main baffle plate, the outside surface of rotary column installs overturning subassembly, the outside surface of overturning subassembly installs climbing formwork auxiliary baffle plate.

[0007] As a preferred technical scheme of the utility model, the overturning subassembly includes two rotary plates and handle columns, two rotary plates are correspondingly installed on the end surfaces of the rotary column, and two handle columns are correspondingly installed on the outside surfaces of the rotary plates.

[0008] As a preferred technical scheme of the utility model, the outer side surface of the rotating column is provided with a connecting support, and the outer side surface of the connecting support is fixedly connected with the inner side surface of the climbing formwork auxiliary baffle.

[0009] As a preferred technical scheme of the utility model, the inner side surface of the rotating plate is provided with a first screw groove, the inner side surface of the connecting support is provided with a second screw groove, and the inner side surface of the climbing formwork main baffle is provided with a third screw groove.

[0010] As a preferred technical scheme of the utility model, the inner wall of the first screw groove, the inner wall of the second screw groove and the inner wall of the third screw groove are movably provided with screw nails.

[0011] As a preferred technical scheme of the utility model, the inner side surface of the climbing formwork main baffle and the inner side surface of the climbing formwork auxiliary baffle are both provided with a support mounting cavity.

[0012] Compared with the prior art, the utility model provides a building construction climbing formwork device with the following advantages

[0013] Beneficial effects:

[0014] The building construction climbing formwork device can quickly form cement pouring spaces of different layers by quickly mounting the climbing formwork auxiliary baffles to the extended climbing formwork frame, thereby significantly shortening the construction period and reducing the time for waiting for cement solidification. BRIEF DESCRIPTION OF DRAWINGS

[0015] Figure 1 It is a whole structure schematic view of the utility model;

[0016] Figure 2 It is an internal structure schematic view of the utility model;

[0017] Figure 3 It is another view internal structure schematic view of the utility model;

[0018] Figure 4 It is a climbing formwork main baffle internal structure schematic view of the utility model.

[0019] In the figure: 1, climbing formwork frame; 2, climbing formwork main baffle; 3, rotating column; 4, rotating plate; 5, handle column; 6, first threaded groove; 7, connecting support; 8, collar; 9, climbing formwork auxiliary baffle; 10, second threaded groove; 11, third threaded groove; 12, threaded pin; 13, support mounting cavity. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0021] Please refer to Figures 1-4 The utility model discloses a kind of building construction climbing formwork devices, including climbing formwork frame 1 and the climbing formwork main baffle 2 of installation in the top surface of climbing formwork frame 1, rotating column 3 is movably installed in the inside of climbing formwork main baffle 2, the outside surface of rotating column 3 is uniformly installed with collar 8, the outside surface of several collars 8 is movably contacted with the inside of climbing formwork main baffle 2, the outside surface of rotating column 3 is installed with turnover assembly, the outside surface of turnover assembly is installed with climbing formwork auxiliary baffle 9, so that climbing formwork auxiliary baffle 9 is quickly installed to the climbing formwork frame 1 after extension, the support mounting cavity 13 in the inside of climbing formwork auxiliary baffle 9 is convenient to be connected with the penetration of climbing formwork frame 1, so that several climbing formwork auxiliary baffles 9 form second layer cement pouring space, when second layer cement pouring space is poured, rotating climbing formwork main baffle 2 and continuously extending climbing formwork frame 1, so that different layers of cement pouring space are quickly formed, by quickly installing and disassembling climbing formwork main baffle 2 and climbing formwork auxiliary baffle 9, construction cycle is significantly shortened, and the time of waiting for cement solidification is reduced, because the cement pouring of each layer can be immediately carried out after the completion of previous layer, reduce the waste of manpower and material.

[0022] Turnover assembly includes two rotating plates 4 and handle column 5, two rotating plates 4 are correspondingly installed on the both end surfaces of rotating column 3, two handle columns 5 are correspondingly installed on the outside surface of rotating plate 4, the outside surface of rotating column 3 is installed with connecting support 7, the outside surface of connecting support 7 is fixedly connected with the inside surface of climbing formwork auxiliary baffle 9, construction worker removes threaded pin 12, construction worker rotates both end handle columns 5, handle column 5 drives rotating plate 4 and rotating column 3 to rotate and move, so that rotating column 3 drives connecting support 7 and climbing formwork auxiliary baffle 9 to rotate.

[0023] The interiors of the two rotating plates 4 are uniformly provided with first screw grooves 6, the interior of the connecting support 7 is uniformly provided with second screw grooves 10, and the interior of the climbing formwork main baffle 2 is uniformly provided with third screw grooves 11; the inner walls of the first screw grooves 6, the inner walls of the second screw grooves 10 and the inner walls of the third screw grooves 11 are movably provided with screw nails 12; the connecting support 7 is fixed by inserting the screw nails 12 into the first screw grooves 6, the second screw grooves 10 and the third screw grooves 11, so as to fix the climbing formwork auxiliary baffle 9.

[0024] The interiors of the climbing formwork main baffle 2 and the climbing formwork auxiliary baffle 9 are uniformly provided with support installation cavities 13, and the support installation cavities 13 in the climbing formwork auxiliary baffle 9 facilitate the penetration connection with the climbing formwork frame 1.

[0025] When the cement needs to be poured, the climbing formwork main baffles 2 are installed to form a cement pouring place; when the climbing formwork main baffles 2 are installed, the climbing formwork frame 1 is first installed at the bottom end of the climbing formwork main baffles 2 to stabilize the climbing formwork frame 1; after the cement of the first layer is poured, the climbing formwork frame 1 is extended, the screw nails 12 are taken out by the construction workers, the handle columns 5 at both ends are rotated by the construction workers, the handle columns 5 drive the rotating plates 4 and the rotating columns 3 to rotate and move, the rotating columns 3 drive the clamping rings 8 to rotate and move, the friction between the rotating columns 3 and the climbing formwork main baffles 2 is increased, the position of the rotating columns 3 cannot be easily deviated, the connecting support 7 is fixed by inserting the screw nails 12 into the first screw grooves 6, the second screw grooves 10 and the third screw grooves 11, so as to fix the climbing formwork auxiliary baffle 9, the climbing formwork auxiliary baffle 9 is quickly installed on the extended climbing formwork frame 1, the support installation cavities 13 in the climbing formwork auxiliary baffle 9 facilitate the penetration connection with the climbing formwork frame 1, the climbing formwork auxiliary baffles 9 form a second layer of cement pouring space, the climbing formwork main baffles 2 are rotated and the climbing formwork frame 1 is continuously extended, so that different layers of cement pouring spaces are quickly formed, the construction period is significantly shortened by quickly installing and disassembling the climbing formwork main baffles 2 and the climbing formwork auxiliary baffles 9, the waiting time for cement solidification is reduced, the cement pouring of each layer can be immediately performed after the completion of the previous layer, the waste of manpower and materials is reduced, the construction team can more efficiently utilize resources, the thickness and uniformity of each layer of cement pouring can be accurately controlled, the overall quality of the building can be improved, and the rework and repair costs caused by construction errors are reduced.

[0026] It has to be noted that, as used herein, such terms as "including", "including a", "having", "comprising", "containing", or any other similar term are intended to be encompassing for a passage, a method, an article, or an apparatus that fails to explicitly disclose separate instances of the listed elements. In other words, such terms are to be interpreted in the context as specifying instances of the listed elements but do not preclude the presence of additional elements in the passage, the method, the article, or the apparatus that are either listed elements or additional elements inherent to such passage, method, article, or apparatus.

[0027] While the embodiments of the present application have been illustrated and described, it will be understood by those skilled in the art that various changes, modifications, substitutions, and alterations can be made therein without departing from the spirit and scope of the application, which is defined by the appended claims and their equivalents.

Claims

1. A building construction climbing formwork device comprising a climbing formwork frame (1) and a climbing formwork main shuttering (2) installed on the top surface of the climbing formwork frame (1), characterized in that: The inside of the climbing formwork main baffle (2) is movably installed with a rotating column (3), the outer side surface of the rotating column (3) is uniformly installed with a clasp (8), the outer side surface of several clasp (8) is in contact with the inside of the climbing formwork main baffle (2), the outer side surface of the rotating column (3) is installed with a turnover assembly, the outer side surface of the turnover assembly is installed with a climbing formwork auxiliary baffle (9).

2. The building construction climbing form device according to claim 1, characterized in that: The turnover assembly comprises two rotating plates (4) and handle columns (5), the two rotating plates (4) are correspondingly installed on the two end surfaces of the rotating column (3), and the two handle columns (5) are correspondingly installed on the outer side surfaces of the rotating plates (4).

3. A building construction climbing formwork apparatus according to claim 2, characterised in that: The outer side surface of the rotating column (3) is installed with a connecting support (7), and the outer side surface of the connecting support (7) is fixedly connected with the inner side surface of the climbing formwork auxiliary baffle (9).

4. A building construction climbing form device according to claim 3, characterized in that: The inside of the two rotating plates (4) is uniformly provided with a first threaded groove (6), the inside of the connecting support (7) is uniformly provided with a second threaded groove (10), and the inside of the climbing formwork main baffle (2) is uniformly provided with a third threaded groove (11).

5. A building construction climbing form device according to claim 4, characterised in that: The inner wall of the first threaded groove (6), the inner wall of the second threaded groove (10) and the inner wall of the third threaded groove (11) are movably installed with a threaded pin (12).

6. A building construction climbing formwork apparatus according to claim 5, characterised in that: The inside of the climbing formwork main baffle (2) and the inside of the climbing formwork auxiliary baffle (9) are uniformly provided with a support mounting cavity (13).