Anchor rod transfer unit
By equipping the anchor bolt transfer unit with a track beam lifting and supporting device, the mechanized installation of the track beam was realized, solving the problems of slow installation speed and manual handling in the existing technology, and improving construction safety and efficiency.
Patent Information
- Application Number
- CN202520537562.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-26
- Publication Date
- 2025-12-16
- Estimated Expiration
- 2035-03-26
AI Technical Summary
The existing anchor bolt transfer unit does not have the function of installing track beams, which causes the installation speed of track beams of monorail cranes in the roadway to lag far behind the roadway excavation speed. This results in dangerous construction, high labor intensity, low efficiency, and the need for manual long-distance material handling.
Design an anchor bolt transfer unit equipped with a track beam lifting device and a track beam support device to realize the mechanized installation of track beams. Combined with a drilling and anchoring device, it can install suspended anchor bolts and suspension plates, and transfer materials through a scraper conveyor.
The mechanized installation of track beams has been achieved, improving installation efficiency and safety, reducing the distance for manual material handling, and increasing the transportation efficiency of tunnel support materials.
Smart Images

Figure CN223676330U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of comprehensive mechanized tunneling system of underground mine roadway, specifically is a kind of anchor rod transfer machine group with monorail crane track beam installation function. BACKGROUND
[0002] With the development of coal mine equipment, anchor machine and anchor rod transfer machine group are used in matching, which improves the speed of roadway excavation and anchor rod support. Currently, many coal mines use monorail crane for material transportation, but the track beam installation uses single anchor rod machine to manually drill holes to install suspension anchor rod (anchor cable), manually erects scaffold to install suspension plate and suspension chain, and manually pushes the track beam to the installation height for installation operation. This construction has high risk coefficient, high labor intensity and low operation efficiency. The current anchor rod transfer machine group does not have track beam installation function, and the installation speed of roadway monorail crane track beam is far behind the speed of roadway excavation. The support materials required by the roadway need to be manually transported over a long distance to the head. SUMMARY
[0003] The utility model provides a kind of anchor rod transfer machine group, solve above-mentioned problems, construction personnel operate drill anchor device on the front platform of anchor rod transfer machine group to construct suspension anchor rod (anchor cable) and install suspension plate and suspension chain, track beam lifting device and track beam lifting device are set on anchor rod transfer machine group, track beam lifting device is lifted to a certain height after track beam, and the installation personnel on the front platform and rear platform place track beam on track beam lifting device, and track beam lifting device is lifted to specified height, and the installation personnel on the front platform and rear platform install monorail crane track beam to suspension chain in specified position;Drill anchor device on anchor rod transfer machine group can also be used for roadway roof anchor cable (anchor rod) support, and scraper conveyor on anchor rod transfer machine group transfers coal to subsequent equipment.
[0004] The technical scheme adopted by the utility model is as follows: the anchor rod transfer machine group comprises a machine body, a drill anchor device connected with the machine body, and a scraper conveyor connected with the machine body, characterized in that it further comprises a track beam lifting device connected with the machine body, a track beam lifting device connected with the machine body, and a front platform and a rear platform connected with the machine body.
[0005] In the above technical scheme, one embodiment is that the track beam lifting device comprises a portal, a goods shelf is installed on the portal, and a lifting oil cylinder is connected with the portal.
[0006] In the above technical scheme, one embodiment is that the track beam lifting device is a scissor-type lifting platform.
[0007] The utility model discloses an effective benefit fruit is: the anchor rod transfer machine group and the anchor machine are matched with when using, the anchor rod transfer machine group not only can carry out roadway roof anchor cable (anchor rod) support, can also install monorail crane track beam in time along with roadway excavation, realizes mechanized installation track beam, improves track beam installation efficiency and security, and roadway installs track beam in time, and monorail crane can transport material such as roadway support material to the position very close to the roadway head, solves the problem that manpower needs to carry material to the roadway head long distance. BRIEF DESCRIPTION OF DRAWINGS
[0008] Figure 1 It is the structure schematic diagram of an embodiment of the utility model;
[0009] Figure 2 It is Figure 1 The structure schematic diagram of the top view;
[0010] Figure 3 It is the three -dimensional structure schematic diagram of an embodiment of the utility model;
[0011] Figure 4 It is another three -dimensional structure schematic diagram of an embodiment of the utility model;
[0012] Figure 5 It is Figure 1 The three -dimensional structure schematic diagram of an embodiment of the middle machine body part;
[0013] Figure 6 It is Figure 1 The three -dimensional structure schematic diagram of an embodiment of the front platform;
[0014] Figure 7 It is Figure 1 The three -dimensional structure schematic diagram of an embodiment of the track beam lifting device;
[0015] Figure 8 It is Figure 1 The three -dimensional structure schematic diagram of an embodiment of the track beam lifting device;
[0016] Figure 9 It is Figure 1 The three -dimensional structure schematic diagram of an embodiment of the rear platform;
[0017] Figure 10 It is the three -dimensional structure schematic diagram of an embodiment of the utility model and anchor machine, transfer machine matched working state; DETAILED DESCRIPTION
[0018] In order to make the technical personnel of the prior art better understand the technical scheme of the utility model, the following will be combined with the attached Figures 1-10 , of the utility model is further explained in detail.
[0019] As Figures 1-4 shown, the anchor rod transfer machine group according to one embodiment of the utility model includes a machine body part 2, a drilling anchor device 3 is connected with the machine body part 2, a scraper conveyor 1 is connected with the machine body part 2, a track beam lifting device 5 is connected with the machine body part 2, a track beam lifting device 6 is connected with the machine body part 2, a front platform 4 and a rear platform 7 are connected with the machine body part 2.
[0020] As Figures 1-3 , Figure 5 , Figure 7 shown, the track beam lifting device 5 according to one embodiment of the utility model includes a portal frame 501, a goods shelf 502 is installed on the portal frame 501, a lifting oil cylinder 503 is connected with the portal frame 501, the portal frame 501 is connected with the machine body part 2, the lifting oil cylinder 503 is telescopic, and the goods shelf 502 is driven to move up and down by a plate chain installed on a chain wheel of the lifting oil cylinder 503 and connected with the portal frame 501 and the goods shelf 502.
[0021] As Figures 1-5 , Figure 8 shown, the track beam lifting device 6 according to one embodiment of the utility model is a scissor type lifting platform, including a base 601, a scissor arm 602 is connected with the base 601 and a supporting plate 604, the base 601 is connected with a rack 202 and an angle adjusting oil cylinder 201 in the machine body part 2, a lifting oil cylinder 603 is telescopic to drive the supporting plate 604 to move up and down, and the angle adjusting oil cylinder 201 is telescopic to drive the base 601 to rotate along an axis connected with the rack 202.
[0022] As Figures 1-6 shown, the front platform 4 according to one embodiment of the utility model includes a fixed rod 401, a connecting rod 402 is connected with the fixed rod 401 and a top platform plate 403, a first oil cylinder 404 is connected with the top platform plate 403 and the machine body part 2, the fixed rod 401 is connected with a traveling part 203 in the machine body part 2, and the first oil cylinder 404 is telescopic to drive the top platform plate 403 to move up and down.
[0023] As Figures 1-5 , Figure 9 shown, the rear platform 7 according to one embodiment of the utility model includes a base sleeve 701, a sleeve rod 702 is installed in the base sleeve 701, a second oil cylinder 703 is connected with the sleeve 701 and the sleeve rod 702, a platform plate 704 is connected with the sleeve rod 702, the base sleeve 701 is connected with the machine body part 2, and the second oil cylinder 703 is telescopic to drive the platform plate 704 to move up and down.
[0024] When the anchor rod transfer machine group of the embodiment works, as Figures 1-10As shown, it is one working embodiment of the anchor rod transfer machine set, which is used with the anchor digging machine 9 and the transfer machine 10, one end of the transfer machine 10 is connected with the anchor digging machine 9, the other end is overlapped on the scraper conveyor 1 in the anchor rod transfer machine set, the anchor digging machine 9 is responsible for the roadway excavation and the roadway roof and side slope high anchor rod support, the transfer machine 10 is responsible for transferring the material transported by the anchor digging machine 9 to the scraper conveyor 1 in the anchor rod transfer machine set, and the roadway side slope low anchor rod support, the anchor rod transfer machine set is responsible for transporting the material transported by the transfer machine 10 to the subsequent matched equipment, and the roof anchor cable support and the track beam installation, the anchor rod transfer machine set performs the track beam installation operation of the roadway monorail crane: the personnel on the front platform 4 adjust the top platform 403 on the front platform 4 to the appropriate height according to the height of the roadway, operate the drilling and anchoring device 3 to construct the suspended anchor rod (anchor cable), install the suspension plate on the suspended anchor rod (anchor cable), install the suspension chain on the suspension plate, the track beam lifting device 5 lifts the track beam 8 to a certain height, the personnel on the front platform 4 and the rear platform 7 move the track beam 8 to the track beam lifting device 6, the supporting plate 604 on the track beam lifting device 6 is lifted to the appropriate height, and then the personnel on the front platform 4 and the rear platform 7 install the track beam 8 on the suspension chain; when the track beam installation of the roadway monorail crane with slope is performed, the angle adjusting oil cylinder 201 is extended and retracted to drive the track beam lifting device 6 to rotate to the horizontal position, and then the lifting operation of the track beam 8 is performed.
[0025] In the present application, the terms "first", "second" and the like are used only for the purpose of description, and should not be understood as indicating or implying relative importance. The terms "mounting", "connecting" and the like should be understood in a broad sense, for example, "connecting" can be fixed connection, can also be detachable connection, or integral connection, or indirect connection through intermediate medium. For ordinary skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
[0026] In the description of the present application, it should be understood that the orientation or position relationship indicated by the terms "upper", "lower", "left", "right", "front", "back" and the like is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present application and simplifying the description, and therefore, it should not be understood as indicating or implying that the device or unit referred to must have a specific direction, a specific orientation structure and operation, therefore, it should not be understood as a limitation on the present application.
[0027] In the description of the present application, the description of the term "one embodiment" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In the present application, the illustrative description of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0028] The above are only preferred embodiments of the present application, and are not used to limit the present application. For those skilled in the art, the present application can have various changes and modifications, and any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A rock bolt rehandler unit, comprising a machine body (2), a rock bolting device (3) connected to the machine body (2), and a flighted conveyor (1) connected to the machine body (2), characterized in that: The track beam lifting device (5) is connected with the machine body (2), the track beam lifting device (6) is connected with the machine body (2), and the front platform (4) and the rear platform (7) are connected with the machine body (2).
2. A rod reloader unit according to claim 1, characterised in that: The track beam lifting device (5) comprises a portal frame (501), a rack (502) is installed on the portal frame (501), and a lifting oil cylinder (503) is connected with the portal frame (501).
3. A rod reloader unit according to claim 1, characterized in that: The track beam lifting device (6) is a scissor type lifting platform.