By setting up temporary crossarms, supporting ropes, insulating netting, guy wires, and ground anchors on the angle steel tower, a stable crossing netting structure is formed, which solves the problems of long construction period and high cost of existing power line crossings, and realizes efficient and safe crossing construction.
Patent Information
- Application Number
- CN202520071636.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-13
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2035-01-13
AI Technical Summary
Existing methods for power line crossing construction suffer from problems such as long construction periods, high costs, and significant impact on roads or lines below, making it difficult to meet the requirements of high efficiency and safety in power grid construction.
An angle steel tower crossing netting device is adopted, which includes tower units and netting units. By setting temporary crossarms, supporting ropes, insulating netting, guy wires and ground anchors on the angle steel tower, a stable crossing netting structure is formed, enabling fast and safe construction.
This device requires no additional land, is simple and quick to construct, has a stable and reliable structure, shortens the construction period, ensures project progress and safety, and has high economic efficiency and reliability. It is suitable for road traffic or route applications in complex terrain and obstacle crossing environments, enabling safe and efficient construction.
Smart Images

Figure CN223689411U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a kind of angle steel tower crossing netting device, belong to iron tower netting construction technical field. BACKGROUND
[0002] In recent years, with the rapid development of power grid construction, higher requirements are put forward for the safety and efficiency of power line erection construction. At the same time, there are more and more power line erection projects crossing existing power lines, railways and highways, and the crossing conditions are becoming more and more complex.
[0003] In the process of power line erection, the traditional crossing construction methods include erecting scaffolding, holding pole netting, crane type "vehicle-mounted mobile telescopic crossing frame" and the like. However, these methods have problems such as long construction period, high cost, great influence on the road or line below, high requirements for the topography, geology and traffic conditions of the crossing section, etc. Therefore, a more efficient, safe and low-cost crossing construction scheme is needed to meet the growing demand for electricity. SUMMARY
[0004] Based on the above, the utility model provides an angle steel tower crossing netting device to solve the problems of long construction period, high cost and great influence on the road or line below in the existing crossing construction scheme.
[0005] The technical scheme of the utility model is: an angle steel tower crossing netting device, comprising:
[0006] The iron tower unit comprises two angle steel towers arranged opposite to each other;
[0007] The netting unit comprises a temporary cross arm installed on the angle steel tower, a supporting rope arranged at intervals between the two temporary cross arms, and an insulating netting fixed to the supporting rope, and the four corners of the insulating netting and the outer sides of the two temporary cross arms are respectively connected to the ground anchor through the guy wire.
[0008] In one example, the temporary cross arm is a spatial truss system which can be detachably installed on the angle steel tower and located at a predetermined distance below the conductive cross arm of the angle steel tower.
[0009] In one example, the end of the temporary cross arm and the side of the tower body connection are respectively provided with hanging line plates, wherein the hanging holes on the opposite side of the two hanging line plates are used to install the supporting rope, and the outer hanging holes of the two hanging line plates are used to install the guy wire.
[0010] In one example, the connection between the insulating netting and the supporting rope is sealed with a gold ingot bolt.
[0011] In one example, the supporting rope is made of Dilmah insulating material, the insulating netting is made of Dilmah insulating material, and the guy wire is an insulating DuPont rope.
[0012] The utility model discloses the beneficial effect has: through setting up the temporary cross arm on the angle steel tower and installing the bearing rope, the insulating fence, the guy and the ground anchor etc., compared with prior art, the device has the following advantages: 1, need not extra land construction, the fence is not restricted by topography, can more effectively guarantee the high quality completion of engineering construction, 2, the construction method of the temporary fence cross arm scheme is simple, fast, greatly shortens the construction period, ensures the project progress, has higher economy, 3, the structure of the fence cross arm is more stable compared with the pole fence, provides the necessary reliability for crossing highway, high speed railway, power transmission line etc., 4, through the guy and the ground anchor of multiple groups, especially the guy and the ground anchor cooperation that sets up on the both sides of bearing rope and the four corners of angle steel tower can guarantee the reliability of structure. 5, the parts involved in the device can be standardized and formed, and the on-site installation is fast and convenient, and has higher safety, reliability, economy.
[0013] The device is applied to the process of power line erection, and needs to cross complex topography and obstacles such as highway, railway, high speed railway, power line, gas pipeline line, etc., through the design of the angle steel tower of the self-set crossing fence temporary cross arm, the protection of the road passing or line operation below the construction area is realized, and the construction safety and efficiency are ensured. BRIEF DESCRIPTION OF DRAWINGS
[0014] Fig. 1 It is the side view of angle steel tower crossing fence device;
[0015] Fig. 2 It is the local schematic view of angle steel tower temporary cross arm;
[0016] Fig. 3 It is the plan view of angle steel tower crossing fence device;
[0017] EXPLANATION OF REFERENCE NUMERALS:
[0018] 1 angle steel tower, 2 temporary cross arm, 3 bearing rope, 4 insulating fence, 5 guy, 6 ground anchor. DETAILED DESCRIPTION
[0019] In order to make the above-mentioned purpose, features and advantages of the utility model more obvious and easy to understand, the specific embodiment of the utility model is explained in detail below. In the following description, a lot of specific details are set forth in order to fully understand the utility model. However, the utility model can be implemented in many other ways different from the description herein, and those skilled in the art can make similar improvements without departing from the connotation of the utility model, therefore, the utility model is not limited by the following disclosed specific implementation.
[0020] Please refer to Figs. 1 to 3 , the embodiment of the utility model discloses a kind of angle steel tower crossing fence device, including tower unit and fence unit.
[0021] The tower unit includes two corner steel towers 1 set opposite each other, with the area between the two corner steel towers 1 being a crossing area, such as complex terrain and obstacles like highways, railways, high-speed railways, power lines, gas pipelines, etc.
[0022] The safety net unit includes temporary crossarms 2 installed on the angle steel tower 1, multiple supporting ropes 3 spaced between two temporary crossarms 2, and an insulating safety net 4 fixed at equal intervals to the supporting ropes 3. The connection between the insulating safety net 4 and the supporting ropes 3 is sealed with bolts. The temporary crossarms 2 serve as the support platform for the crossing safety net. The crossing protection range of the insulating safety net 4 is determined according to the length and width of the road or line being crossed. The four corners of the insulating safety net 4 and the outer sides of the two temporary crossarms 2 are connected to ground anchors 6 by guy wires 5. The ground anchors 6 are located on both sides and outside the four corners of the angle steel tower 1. After the crossing accessories are installed, all components of the crossing system can be removed in sequence.
[0023] By installing temporary crossarms 2 on the angle steel tower 1 and mounting supporting ropes 3, insulating netting 4, guy wires 5, and ground anchors 6, this device has the following advantages compared to existing technologies: 1. No additional land is required for construction, and the netting is not limited by terrain, thus more effectively ensuring the high-quality completion of the project; 2. The construction method of adding temporary netting crossarms is simple and quick, greatly shortening the construction period, ensuring project progress, and possessing high economic efficiency; 3. Compared with pole-mounted netting, the temporary netting crossarm has a more stable structure, providing the necessary reliability for crossing highways, high-speed railways, power transmission lines, etc.; 4. The reliability of the structure can be ensured by multiple sets of guy wires 5 and ground anchors 6, especially those set on both sides of the supporting ropes 3 and at the four corners of the angle steel tower 1; 5. All components involved in this device can be standardized and manufactured, allowing for quick and convenient on-site installation, and possessing high safety, reliability, and economy.
[0024] For ease of installation, the temporary crossarm 2 is a spatial truss system, constructed from equal-leg angle steel connected by bolts. This facilitates installation and disassembly, ensuring it meets strength and stability requirements. It is detachably installed on the angle steel tower 1, positioned at a safe distance below the conductive crossarm of the tower. In this embodiment, the spatial truss system is a triangular frame, its inner end tightly attached to the side steel of the angle steel tower 1 and connected to the tower 1 by bolts, etc. Its bottom surface is horizontal, while its top surface is inclined. Hanging plates (conventional tower hanging plates, bolted or welded to the temporary crossarm 2) are provided on both sides of the end of the temporary crossarm 2 and at its connection to the tower body. The hanging holes on the opposite sides of the two hanging plates are used to install the supporting rope 3, while the hanging holes on the outer sides are used to install the guy wire 5.
[0025] In the embodiment, the supporting rope 3 is made of Dianima insulating material, has large bearing capacity, the insulating sealing net 4 is made of Dianima insulating material, the pull wire 5 is made of insulating DuPont rope, the tension of the pull wire 5 can be adjusted appropriately to ensure the effective width and safety distance of the sealing net, the end of the pull wire 5 is provided with the ground anchor 6, the ground anchor 6 should be surveyed and designed according to requirements, and the specification, oblique angle and burying depth of the ground anchor 6 are controlled and implemented.
[0026] The above-mentioned embodiments only express several implementation manners of the present application, the description is more specific and detailed, but it cannot be understood as the limitation of the patent scope of the present application. It should be pointed out that, for the ordinary skilled in the art, without departing from the concept of the present application, a number of modifications and improvements can be made, which all belong to the protection scope of the present application. Therefore, the protection scope of the present application patent should be subject to the appended claims.
Claims
1. A steel tower crossing closure device, characterized in that, The utility model relates to a temporary insulating fence for iron tower, which comprises: a tower unit comprising two oppositely arranged angle steel towers (1); a fence unit comprising temporary cross arms (2) mounted on the angle steel towers (1), supporting ropes (3) arranged at intervals between the two temporary cross arms (2), and insulating fences (4) fixed on the supporting ropes (3), wherein the four corners of the insulating fences (4) and the two sides of the outer ends of the two temporary cross arms (2) are respectively connected to ground anchors (6) through pull lines (5).
2. The angle steel tower spanning fence device according to claim 1, characterized in that, The temporary cross arms (2) are spatial truss systems which can be detachably mounted on the angle steel towers (1) and located at a predetermined distance below the conductive cross arms of the angle steel towers (1).
3. The angle steel tower spanning fence device according to claim 1, characterized in that, The end portions of the temporary cross arms (2) and the two sides of the connection portions with the tower bodies are respectively provided with hanging line plates, wherein the hanging holes on the opposite sides of the two hanging line plates are used for mounting the supporting ropes (3), and the hanging holes on the outer sides of the two hanging line plates are used for mounting the pull lines (5).
4. The angle steel tower spanning fence device according to claim 1, characterized in that, The connection portions of the insulating fences (4) and the supporting ropes (3) are sealed with nugget bolts.
5. The angle steel tower spanning fence device according to claim 1, characterized in that, The supporting ropes (3) are made of Dymema insulating material, the insulating fences (4) are made of Dymema insulating material, and the pull lines (5) are insulating DuPont ropes.