Constructional engineering foundation settlement monitoring equipment
By introducing structures such as turntables and drilling cones into foundation settlement monitoring equipment for building engineering, the problems of existing equipment being limited to single-point measurement and unstable installation have been solved, enabling multi-point measurement and stable installation, thus improving the accuracy and reliability of monitoring.
Patent Information
- Application Number
- CN202423225272.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-12-23
- Estimated Expiration
- 2034-12-26
AI Technical Summary
Existing foundation settlement monitoring equipment for building projects can only measure one point, and its installation and fixation in the construction environment are inconvenient, affecting the accuracy of the monitoring results.
A device comprising a turntable, a motor, a drilling cone, and sensors was designed. By swinging the turntable and fixing the drilling cone, multi-point measurement and stable installation are achieved. The combination of sensors and alarm lights ensures the accuracy of the measurement.
This technology enables accurate multi-point measurements on uneven ground and stable equipment installation, thereby improving the reliability and accuracy of monitoring results.
Smart Images

Figure CN223706559U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building engineering technical field, concretely is a building engineering ground foundation settlement monitoring equipment. BACKGROUND
[0002] The building engineering ground foundation settlement monitoring equipment is a key tool for ensuring building safety and preventing accidents. By real-time monitoring and analyzing settlement data, it provides engineers and architects with key data and information so that they can take necessary measures in time to ensure the stability and safety of buildings and structures.
[0003] The existing building engineering ground foundation settlement monitoring equipment can only measure the settlement height of one point during measurement, and the existing equipment is inconvenient to install and fix in the construction environment, which often affects the monitoring results. Therefore, we propose a building engineering ground foundation settlement monitoring equipment. UTILITY MODEL CONTENT
[0004] In view of the deficiencies of the prior art, the utility model provides a building engineering ground foundation settlement monitoring equipment, which solves the problems raised in the background art.
[0005] To achieve the above purpose, the utility model is implemented by the following technical scheme: a building engineering ground foundation settlement monitoring equipment, comprising a base, the base top end is rotatably connected with a turntable, the turntable top end is fixedly connected with a cylinder, the cylinder outer side is fixedly installed with a mounting bracket, the mounting bracket outer side is fixedly installed with a motor one, the mounting bracket mutually close two sides are rotatably connected with a coil line roller, the coil line roller outer side is wound with a plurality of coil ropes, the cylinder top end is fixedly installed with a long plate, the long plate and mounting bracket are fixedly installed with a connecting rod between, the long plate top end is fixedly installed with a mounting plate, when encountering uneven ground condition, can utilize the guide rod to swing left and right, then measure multiple times, so as to select accurate value, and then the unevenness of the foundation can be avoided to cause the error of measurement.
[0006] Preferably, the long plate is rotatably connected with a wire feeding disc inside, the mounting plate is fixedly installed with an electric push rod inside the top end, the electric push rod output end is fixedly installed with a clamping plate, the mounting plate mutually close two sides are fixedly installed with a fixed shaft, in order to avoid the error of measurement caused by the rope loosening during measurement, so the rope can be extruded through the clamping plate to avoid loosening.
[0007] Preferably, the other end of the rope is fixedly installed with a cone, the cone bottom end is fixedly installed with an inductor, the long plate top end is fixedly installed with an alarm lamp, the alarm lamp and inductor are electrically connected, when the inductor contacts the ground, the alarm lamp will alarm directly, which can ensure the accuracy of detection.
[0008] Preferably, the bottom end of the base is rotatably connected with a ground drilling cone, one end of the ground drilling cone penetrates through the bottom end of the base and is fixedly connected with the output end of the second motor, and the bottom end of the base is fixedly connected with four stabilizing cones.
[0009] Preferably, the top end of the base is fixedly connected with a shell, both sides of the shell are fixedly connected with handles, the top end of one of the handles is provided with a switch, one side of the shell is fixedly connected with a controller, the top end of the long plate is fixedly connected with a guide rod, and one side of the long plate is fixedly connected with a caliper plate.
[0010] Preferably, the first motor, the electric push rod and the controller are electrically connected, and the second motor is electrically connected with the switch.
[0011] The building engineering foundation settlement monitoring equipment has the following beneficial effects:
[0012] 1. The building engineering foundation settlement monitoring equipment is provided with a turntable, so that if the ground surface is uneven and other points need to be detected, the guide rod can be held to rotate the turntable, and multiple measurements can be performed, thereby monitoring different points on the ground surface.
[0013] 2. The building engineering foundation settlement monitoring equipment is provided with a ground drilling cone, so that when the device needs to be fixed, the second motor is used to drive the ground drilling cone to rotate, the device is fixed to the ground, and the stability during measurement is ensured. BRIEF DESCRIPTION OF DRAWINGS
[0014] Figure 1 It is a structural schematic view of the utility model;
[0015] Figure 2 It is another angle schematic view of the utility model;
[0016] Figure 3 It is an internal schematic view of the utility model;
[0017] Figure 4 It is the utility model Figure 1 It is an enlarged view of A in the utility model;
[0018] Figure 5 It is a base internal schematic view of the utility model.
[0019] In the figure: 1, base; 101, rotating disc; 2, shell; 201, controller; 3, cylinder; 4, long plate; 401, guide rod; 402, mounting plate; 403, caliper plate; 404, fixed shaft; 5, mounting frame; 501, connecting rod; 6, line winding roller; 601, rope; 7, motor one; 8, line feeding disc; 9, alarm lamp; 901, inductor; 10, cone; 11, scale; 12, motor two; 13, earth boring cone; 14, stabilizing cone; 15, handle; 151, switch; 16, electric push rod; 161, clamping plate. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments.
[0021] Please refer to Figures 1 to 5 The utility model provides a kind of technical solutions: a kind of construction engineering ground foundation settlement monitoring equipment, including base 1, base 1 top end rotationally connected with rotating disc 101, rotating disc 101 is used to swing left and right to long plate 4, rotating disc 101 top end is fixedly connected with cylinder 3, cylinder 3 outside is fixedly installed with mounting frame 5, mounting frame 5 outside is fixedly installed with motor one 7, motor one 7 output shaft is fixedly connected with line winding roller 6 end portion, motor one 7 is used to drive line winding roller 6 rotation, mounting frame 5 is rotationally connected with line winding roller 6 on the side of each other, line winding roller 6 outside is wound with several circles of rope 601, line winding roller 6 is used to wind rope 601, and rope 601 one end is fixed on line winding roller 6, rope 601 is used to stretch cone 10, cylinder 3 top end is fixedly installed with long plate 4, long plate 4 is used to change the position of monitoring, long plate 4 and mounting frame 5 between fixedly installed with connecting rod 501, connecting rod 501 is used to rotate synchronously to mounting frame 5 and long plate 4, long plate 4 top end is fixedly installed with mounting plate 402.
[0022] As Figure 4 Indicated, long plate 4 inside rotationally connected with line feeding disc 8, line feeding disc 8 is used to prevent rope 601 from winding itself, mounting plate 402 inside top end is fixedly installed with electric push rod 16, electric push rod 16 output end is fixedly installed with clamping plate 161, clamping plate 161 is used to extrude rope 601, mounting plate 402 is fixedly installed with fixed shaft 404 on the side of each other.
[0023] As Figure 3As shown, the other end of the rope 601 is fixedly installed with a cone 10, and the bottom end of the cone 10 is fixedly installed with an inductor 901. The inductor 901 is a contact inductor. After touching an object, the inductor 901 is used to contact the ground to transmit a signal to the alarm lamp 9. The inductor 901 is internally provided with a control chip for controlling the alarm lamp 9. The structure is an existing touch inductive alarm. The top end of the long plate 4 is fixedly installed with the alarm lamp 9. The alarm lamp 9 is used to prompt the staff. The alarm lamp 9 is electrically connected with the inductor 901.
[0024] As shown in the drawings, Figure 5 The top end of the base 1 is fixedly installed with a motor two 12. The motor two 12 is used to drive the earth boring cone 13 to rotate. The bottom end of the base 1 is rotatably connected with the earth boring cone 13. The earth boring cone 13 is a threaded cone. The earth boring cone 13 is used to fix the device to the ground. One end of the earth boring cone 13 penetrates through the bottom end of the base 1 and is fixedly connected with the output end of the motor two 12. The bottom end of the base 1 is fixedly installed with four stabilizing cones 14. The stabilizing cones 14 are used to make the device more stable when fixed to the ground.
[0025] As shown in the drawings, Figure 2 The top end of the base 1 is fixedly installed with a shell 2. Both sides of the shell 2 are fixedly installed with handles 15. The handles 15 are used by the staff to operate the equipment. The top end of one of the handles 15 is provided with a switch 151. The switch 151 is used to control the motor two 12. One side of the shell 2 is fixedly installed with a controller 201. The controller 201 is used to control the device. The top end of the long plate 4 is fixedly installed with a guide rod 401. The guide rod 401 is used to move left and right so as to monitor different positions. One side of the long plate 4 is fixedly installed with a caliper plate 403. The caliper plate 403 is internally slidably connected with a scale 11. The scale 11 is convenient for the staff to record when measuring.
[0026] As shown in the drawings, Figure 1 The motor one 7, the electric push rod 16 and the controller 201 are electrically connected. The motor two 12 and the switch 151 are electrically connected. The outdoor power supply can be powered by a portable power supply.
[0027] In summary, the building engineering foundation settlement monitoring equipment, in use, first the staff will the device to the place where the foundation settlement needs to be monitored, the monitoring equipment is placed on the stable ground, the measuring is located against the monitoring position, then the staff holds two handles 15 respectively with both hands, then presses the switch 151, makes the motor two 12 work, drives the earth boring cone 13 to the ground drilling machine, in the drilling machine process, because the equipment itself has the weight, will press down the earth boring cone 13 and move downward, at the same time, the staff can manually support the equipment and press downward, avoid the equipment rotating, make the earth boring cone 13 spin into the ground, when the base 1 bottom end and the ground keep horizontal, stop the motor two 12 work, then measure before settlement, utilize the work of the motor one 7 rotating ring roller 6, make the cone 10 rely on its own weight and drop, when the inductor 901 and the ground contact, and the alarm light 9 alarms, the staff immediately opens the electric push rod 16, drives the clamp plate 161 to the rope 601 and extrudes, makes it no longer drop, then pulls the scale 11 downward, makes its bottom end and the ground contact, then the staff records, in the monitoring process, if the ground settlement, at this time, the inductor 901 does not contact the monitoring point ground, the alarm light 9 will be closed,
[0028] When the ground is uneven, the staff can utilize the guide rod 401 to adjust different measuring points, to ensure the accuracy of measurement, when the foundation settlement, the electric push rod 16 returns to the original position, then opens the motor one 7, makes the cone 10 rely on its own weight and drop, when the alarm light 9 alarms again, utilizes the electric push rod 16 again, the clamp plate 161 to the rope 601 and extrudes, then pulls the scale 11 down and contacts the foundation surface after settlement, and to avoid the unevenness of the foundation, can hold the guide rod and make the turntable rotate, then can carry out multiple measurements, then the staff records again, finally, subtracts the first result from the second result, thereby obtains the settlement monitoring value, the above is the working principle of the utility model.
[0029] The above is only the preferred specific implementation mode of the utility model, but the protection scope of the utility model is not limited to this, any skilled person in the art in the technical range disclosed by the utility model, according to the technical scheme of the utility model and the utility model concept, carries out equivalent replacement or change, should be covered in the protection scope of the utility model.
Claims
1. A foundation settlement monitoring device for building engineering, comprising a base (1), characterized in that: The base (1) is rotatably connected to a turntable (101) at its top end. A cylinder (3) is fixedly connected to the top end of the turntable (101). A mounting frame (5) is fixedly installed on the outside of the cylinder (3). A motor (7) is fixedly installed on the outside of the mounting frame (5). A coiling roller (6) is rotatably connected to the two sides of the mounting frame (5) that are close to each other. Several turns of rope (601) are wound around the outside of the coiling roller (6). A long plate (4) is fixedly installed at the top end of the cylinder (3). A connecting rod (501) is fixedly installed between the long plate (4) and the mounting frame (5). A mounting plate (402) is fixedly installed at the top end of the long plate (4).
2. The foundation settlement monitoring device for building engineering according to claim 1, characterized in that: The long plate (4) is rotatably connected to a cable tray (8), an electric push rod (16) is fixedly installed at the top of the mounting plate (402), a clamping plate (161) is fixedly installed at the output end of the electric push rod (16), and a fixed shaft (404) is fixedly installed on the two sides of the mounting plate (402) that are close to each other.
3. The foundation settlement monitoring device for building engineering according to claim 1, characterized in that: A cone (10) is fixedly installed at the other end of the rope (601), a sensor (901) is fixedly installed at the bottom of the cone (10), and an alarm light (9) is fixedly installed at the top of the long plate (4). The alarm light (9) is electrically connected to the sensor (901).
4. The foundation settlement monitoring device for building engineering according to claim 1, characterized in that: The base (1) has a motor (12) fixedly installed at the top inside. The base (1) has a drilling cone (13) rotatably connected to the bottom. One end of the drilling cone (13) passes through the bottom of the base (1) and is fixedly connected to the output end of the motor (12). The base (1) has four stabilizing cones (14) fixedly installed at the bottom.
5. The foundation settlement monitoring device for building engineering according to claim 1, characterized in that: The base (1) has a housing (2) fixedly installed at the top. Both sides of the housing (2) have handles (15) fixedly installed. One of the handles (15) has a switch (151) at the top. A controller (201) is fixedly installed on one side of the housing (2). A guide rod (401) is fixedly installed at the top of the long plate (4). A caliper plate (403) is fixedly installed on one side of the long plate (4). A ruler (11) is slidably connected inside the caliper plate (403).
6. The foundation settlement monitoring device for building engineering according to claim 4, characterized in that: The first motor (7), the electric push rod (16) are electrically connected to the controller (201), and the second motor (12) is electrically connected to the switch (151).