Construction tool for pebble bed mixing pile construction
By setting guide vanes and tail vanes on the casing and correction seat, the problem of difficult positioning of the casing in the gravel layer construction was solved, and efficient and stable mixing pile construction was achieved.
Patent Information
- Application Number
- CN202520280889.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-21
- Publication Date
- 2026-05-15
- Estimated Expiration
- 2035-02-21
AI Technical Summary
The existing casing structure used for mixing pile construction is unreasonable, resulting in low efficiency when constructing in pebble layers and difficulty in casing positioning, which affects construction efficiency and strength.
A construction tool consisting of a sleeve and a correction seat is adopted. The sleeve is equipped with guide vanes and tail fins, and the correction seat is equipped with guide holes and correction grooves. Through the cooperation of the guide vanes and tail fins, the positioning accuracy of the sleeve is improved and the installation is easier, which helps to position the sleeve and enhances construction efficiency and strength.
The design of the guide vanes and tail fins improves the positioning accuracy and construction efficiency of the casing, enhances the construction strength of the mixing piles, simplifies the casing installation process, and improves construction efficiency and strength.
Smart Images

Figure CN224243842U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of mixing pile construction technology, and in particular to a construction tool for mixing pile construction in pebble layer. Background Technology
[0002] Cement mixing piles are a type of soil treatment system that uses cement as the main curing agent. A mixing pile machine injects cement into the soil and mixes it thoroughly, causing a series of physicochemical reactions between the cement and the soil to improve the foundation strength. Cement mixing piles are classified into single-axis, double-axis, and triple-axis mixing piles based on their main construction methods.
[0003] Mixed soil mixing piles are difficult to construct when encountering thick and large gravel layers because the piles cannot penetrate the strata, resulting in low construction efficiency and compromised pile strength. To address this, casing is typically used in conjunction with a drilling rig. However, existing casing structures are simple and difficult to operate during construction, reducing efficiency. Furthermore, casing positioning during installation is challenging, further decreasing efficiency.
[0004] Therefore, the existing casing used for mixing pile construction has a technical problem of low construction efficiency due to unreasonable structure. Summary of the Invention
[0005] This utility model provides a construction tool for the construction of gravel layer mixing piles, which solves the technical problem of low construction efficiency caused by unreasonable casing structure in the existing technology for mixing pile construction.
[0006] Some implementation schemes for solving the above-mentioned technical problems include:
[0007] A construction tool for constructing gravel layer mixing piles, including a casing;
[0008] The sleeve is inserted into the calibration seat;
[0009] The upper end of the sleeve is provided with a guide wing and a tail wing, with the tail wing located above the guide wing;
[0010] The calibration seat is provided with a guide hole for guiding the sleeve, a portion of the sleeve is inserted into the guide hole, and the calibration seat is also provided with a calibration groove that cooperates with the guide wing, wherein the guide wing is inserted into the calibration groove from top to bottom.
[0011] Preferably, the bottom wall of the correction groove is a support wall, and the lower end face of the guide vane is a positioning wall that contacts the support wall, wherein the positioning wall is perpendicular to the axis of the sleeve.
[0012] Preferably, the guide vanes are at least four in number.
[0013] Preferably, the tail fin has at least four pieces, and the thickness of the tail fin is greater than the thickness of the guide fin, and the cross-sectional shape of the tail fin is trapezoidal.
[0014] Preferably, the guide vane is offset from the tail fin, and both the guide vane and the tail fin are integrally formed with the sleeve.
[0015] Preferably, the tail fin is evenly arranged along the circumference of the sleeve, and the guide vanes are evenly arranged along the circumference of the sleeve.
[0016] Preferably, the sleeve is provided with ribs, the ribs are integral with the sleeve, and the ribs are provided on the part of the sleeve corresponding to the tail fin, and there is a gap between the tail fin and the guide vane.
[0017] Preferably, the ribs include a first rib arranged circumferentially along the sleeve and a second rib arranged axially along the sleeve, the second rib and the first rib being arranged in a grid pattern on the sleeve, and the cross-sectional shape of the first rib and the second rib being semi-circular.
[0018] Preferably, the depth of the correction groove is not less than the height of the guide vane.
[0019] Preferably, the calibration seat includes a seat body and a protrusion disposed on the seat body, the guide hole passes through the protrusion and the seat body, the calibration groove is disposed on the protrusion, and the seat body is provided with an assembly hole.
[0020] Compared with the prior art, the present invention has the following advantages:
[0021] By setting up a calibrating seat and a casing, the calibrating seat is used to correct the position of the casing and also assists in positioning the casing, giving it higher positional accuracy relative to the target location. Simultaneously, since the calibrating seat positions the casing after the target location has been cleared, its installation is easier and more precise. The ease of installation effectively improves construction efficiency, and the calibrating seat's role in correcting the casing ensures its positional accuracy, thereby effectively guaranteeing the strength of the mixing pile and further enhancing construction efficiency.
[0022] The addition of a tail fin facilitates the removal of the casing by the hydraulic vibratory hammer and also strengthens the pipe opening. Besides increasing the casing's strength, the tail fin also makes it easier to handle, further improving the construction efficiency of the mixing piles.
[0023] By setting guide vanes, the sleeve can be guided better, resulting in higher positioning accuracy. Attached Figure Description
[0024] For illustrative purposes, several embodiments of the present invention are illustrated in the following figures. These figures are incorporated herein by reference and form part of the detailed description. In some cases, well-known structures and components are shown in block diagram form to avoid obscuring the concept of the subject matter of the present invention.
[0025] Fig. 1 This is a schematic diagram of the sleeve.
[0026] Fig. 2 This is a schematic diagram of the calibration seat.
[0027] Fig. 3 This is a schematic diagram showing the sleeve and the calibration seat in action.
[0028] Fig. 4 This is a schematic diagram of the internal structure after the sleeve and the calibration seat are fitted together.
[0029] Fig. 5 This is a schematic diagram of the base.
[0030] As shown in the figure:
[0031] 1. Sleeve, 11. Guide vane, 12. Tail fin, 13. Rib.
[0032] 2. Correction seat, 21. Correction groove, 22. Guide hole, 23. Assembly hole, 24. Seat body, 25. Protrusion.
[0033] 3. Nuts.
[0034] 100. Basic base.
[0035] 200. Target location. Detailed Implementation
[0036] The specific embodiments shown below are intended to describe various configurations of the subject matter of this invention and are not intended to represent the only configuration in which the subject matter of this invention can be practiced. The specific embodiments include detailed descriptions intended to provide a thorough understanding of the subject matter of this invention. However, it will be clear and apparent to those skilled in the art that the subject matter of this invention is not limited to the specific details shown herein and can be practiced without these specific details.
[0037] Understandably, in this document, relational terms such as “first” and “second” are intended to distinguish one entity or operation from another, and are not intended to expressly or imply any actual relationship or order between these entities or operations.
[0038] The terms “comprising,” “including,” or any other variations thereof are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase “comprising one…” does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0039] Reference Figs. 1 to 5 As shown, a construction tool for pebble layer mixing pile construction includes a casing 1;
[0040] The sleeve 1 is inserted into the calibration seat;
[0041] The upper end of the sleeve 1 is provided with a guide wing 11 and a tail wing 12, with the tail wing 12 located above the guide wing 11;
[0042] The calibration seat is provided with a guide hole for guiding the sleeve 1, and a part of the sleeve 1 is inserted into the guide hole. The calibration seat is also provided with a calibration groove that cooperates with the guide wing 11, wherein the guide wing 11 is inserted into the calibration groove from top to bottom.
[0043] In some embodiments, the bottom wall of the correction groove is a support wall, and the lower end face of the guide vane 11 is a positioning wall that contacts the support wall, wherein the positioning wall is perpendicular to the axis of the sleeve 1.
[0044] In some embodiments, the guide vane 11 has at least four pieces. The tail fin 12 has at least four pieces, and the thickness of the tail fin 12 is greater than the thickness of the guide vane 11, and the cross-sectional shape of the tail fin 12 is trapezoidal.
[0045] In some embodiments, the guide vane 11 is offset from the tail fin 12, and both the guide vane 11 and the tail fin 12 are integrally formed with the sleeve 1. This makes the tail fin 12 easy to use with other tools, facilitating the installation or removal of the sleeve 1.
[0046] In some embodiments, the tail fin 12 is uniformly arranged along the circumference of the sleeve 1, and the guide vane 11 is uniformly arranged along the circumference of the sleeve 1.
[0047] In some embodiments, the sleeve 1 is provided with a rib 13, the rib 13 and the sleeve 1 are integral structures, and the rib 13 is provided on the part of the sleeve 1 corresponding to the tail fin 12, and there is a gap between the tail fin 12 and the guide vane 11.
[0048] The clearance setting makes it easy for the tail fin 12 to be used with other tools, and further makes the sleeve 1 easy to install or remove.
[0049] In some embodiments, the rib 13 includes a first rib arranged circumferentially along the sleeve 1 and a second rib arranged axially along the sleeve 1. The second rib and the first rib are arranged in a grid pattern on the sleeve 1, and the cross-sectional shape of the first rib and the second rib is semi-circular.
[0050] In some embodiments, the depth of the correction groove is not less than the height of the guide vane 11.
[0051] In some embodiments, the calibration seat includes a seat body and a protrusion disposed on the seat body, a guide hole passing through the protrusion and the seat body, a calibration groove disposed on the protrusion, and an assembly hole provided on the seat body. The seat body and the protrusion are an integral structure.
[0052] The construction process for mixing piles using the above-mentioned construction tools may include the following steps:
[0053] Determine the target location; based on the design drawings, determine the target location 200, which is the location where the mixing piles will be installed;
[0054] Clean up the debris in the target area; the debris can be cleaned up by compacting or removing part of the material, resulting in a relatively flat area.
[0055] After clearing away the debris, excavate a foundation pit at the target location. The depth of the foundation pit shall not be less than 1.5 times the diameter of the mixing pile.
[0056] Support bars are driven into the bottom wall of the foundation pit, wherein the support bars are evenly distributed at the bottom of the foundation pit and evenly distributed throughout the foundation pit, and the upper end of the support bars extends into the foundation pit.
[0057] Reinforcing ribs are provided in the foundation pit, and the reinforcing ribs are staggered from the supporting ribs. The reinforcing ribs are evenly distributed in the foundation pit, and the supporting ribs and reinforcing ribs located in the foundation pit are tied together with metal wires.
[0058] Then, concrete is poured into the foundation pit. After the concrete solidifies, the construction of the foundation base is completed. The diameter of the foundation base is not less than three times the diameter of the mixing pile. A through hole for the construction of the mixing pile is reserved in the foundation base. The upper surface of the foundation base is prepared, and the flatness error of the upper surface is not greater than 1 mm. The correction seat 2 is installed on the prepared foundation base 100, and the reference surface of the correction seat 2 is in contact with the upper surface of the foundation base.
[0059] After installing the calibration seat 2 on the prepared base, check the coaxiality of the guide hole 22 and the calibration through hole. If the coaxiality of the guide hole 22 and the calibration hole meets the requirements, proceed to the next step; if the coaxiality of the guide hole 22 and the calibration hole does not meet the requirements, correct the coaxiality of the guide hole 22 and the calibration hole before proceeding to the next step. Specifically, adjust the posture of the calibration seat 2 to adjust the coaxiality of the calibration hole and the guide hole 22. The calibration seat 2 is fixed to the base by threads. The base has a stud. The calibration seat 2 is provided with an assembly hole that mates with the stud. The stud is provided with a nut 3 to lock the calibration seat 2 to the base. The posture of the calibration seat 2 is adjusted by placing a shim between the base and the calibration seat 2, so that the coaxiality of the guide hole 22 and the calibration hole meets the requirements.
[0060] Press the sleeve 1 into the target position through the through hole, and make the guide wing 11 on the sleeve 1 cooperate with the correction groove 21 of the correction seat 2;
[0061] A drilling rig, in conjunction with the casing, forms a pile hole at the target location;
[0062] Mixing piles are formed using pile holes; the method of forming mixing piles is based on existing technology.
[0063] After the mixing pile has solidified, the sleeve 1 is removed using the tail wing 12 of the sleeve 1, thus completing the construction.
[0064] The above describes the subject matter technical solution of this utility model and its corresponding details. It is understood that the above description is only some implementation schemes of the subject matter technical solution of this utility model, and some details may be omitted in the specific implementation.
[0065] Furthermore, in some embodiments of the above utility model, multiple embodiments may be combined; however, due to space limitations, all such combinations will not be listed here. Those skilled in the art can freely combine the above embodiments according to their needs to achieve a better application experience.
[0066] When implementing the subject matter technical solution of this utility model, those skilled in the art can obtain other detailed configurations or drawings based on the subject matter technical solution and the accompanying drawings. Obviously, these details are still within the scope of the subject matter technical solution of this utility model without departing from it.
Claims
1. A construction tool for constructing gravel layer mixing piles, characterized in that: The device includes a sleeve (1) and a calibration seat, wherein the sleeve (1) is inserted into the calibration seat; the upper end of the sleeve (1) is provided with a guide wing (11) and a tail wing (12), wherein the tail wing (12) is located above the guide wing (11); the calibration seat is provided with a guide hole for guiding the sleeve (1), wherein a part of the sleeve (1) is inserted into the guide hole, and the calibration seat is also provided with a calibration groove that cooperates with the guide wing (11), wherein the guide wing (11) is inserted into the calibration groove from top to bottom.
2. The construction tool for pebble layer mixing pile construction according to claim 1, characterized in that: The bottom wall of the correction groove is a support wall, and the lower end face of the guide wing (11) is a positioning wall that contacts the support wall. The positioning wall is perpendicular to the axis of the sleeve (1).
3. The construction tool for pebble layer mixing pile construction according to claim 2, characterized in that: The guide vanes (11) are at least four in number.
4. The construction tool for pebble layer mixing pile construction according to claim 3, characterized in that: The tail fin (12) has at least four pieces, and the thickness of the tail fin (12) is greater than the thickness of the guide fin (11), and the cross-sectional shape of the tail fin (12) is trapezoidal.
5. The construction tool for pebble layer mixing pile construction according to claim 4, characterized in that: The guide vane (11) is offset from the tail fin (12), and both the guide vane (11) and the tail fin (12) are integral with the sleeve (1).
6. The construction tool for pebble layer mixing pile construction according to claim 5, characterized in that: The tail fin (12) is uniformly arranged along the circumference of the sleeve (1), and the guide fin (11) is uniformly arranged along the circumference of the sleeve (1).
7. The construction tool for pebble layer mixing pile construction according to claim 6, characterized in that: The sleeve (1) is provided with ribs (13), the ribs (13) and the sleeve (1) are an integral structure, and the ribs (13) are provided on the part of the sleeve (1) corresponding to the tail fin (12), and there is a gap between the tail fin (12) and the guide wing (11).
8. The construction tool for pebble layer mixing pile construction according to claim 7, characterized in that: The rib (13) includes a first rib arranged circumferentially along the sleeve (1) and a second rib arranged axially along the sleeve (1). The second rib and the first rib are arranged in a grid pattern on the sleeve (1). The cross-sectional shape of the first rib and the second rib is semi-circular.
9. The construction tool for pebble layer mixing pile construction according to claim 6, characterized in that: The depth of the correction groove is not less than the height of the guide vane (11).
10. The construction tool for pebble layer mixing pile construction according to claim 1, characterized in that: The calibration seat includes a seat body and a protrusion disposed on the seat body. The guide hole passes through the protrusion and the seat body. The calibration groove is disposed on the protrusion. The seat body is provided with an assembly hole.