Adjustable bridge hanging basket construction support device
By designing an adjustable bridge hanging basket construction support device, the problems of hanging basket swaying and unsuitable height of the protective frame were solved, providing stable support and a height-adjustable working platform, thus improving construction safety and operational efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SICHUAN CHUANJIAO ROAD & BRIDGE
- Filing Date
- 2025-06-26
- Publication Date
- 2026-06-26
AI Technical Summary
Existing bridge construction formwork cannot adjust the height of the protective frame according to the height of the workers, resulting in poor protective effectiveness or obstruction of operations. In addition, most formwork lacks a supporting structure, causing swaying, and the cost is high.
An adjustable bridge hanging basket construction support device was designed. It provides stable support by tightly fitting the bridge surface with a spiral rod and clamping plate. Combined with the adjustable support plate height and protective cover, it can meet the needs of construction workers of different heights and includes tool storage and sunshade functions.
This achieves stable fixation of the hanging basket, improves construction safety and operational comfort, reduces construction fatigue, and enhances the connection strength and protective effect of the supporting structure.
Smart Images

Figure CN224412351U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of adjustable bridge hanging basket construction support device, and in particular to an adjustable bridge hanging basket construction support device. Background Technology
[0002] Hanging baskets are the main equipment in cantilever construction. According to their structural forms, they can be divided into four types: truss type, cable-stayed type, steel type and hybrid type. The design principles of hanging baskets are: light weight, simple structure, strong and stable, easy to move forward and disassemble, strong reusability, small deformation after being stressed, etc. In addition, the space under the hanging basket is sufficient to provide a large construction working surface, which is conducive to the construction and operation of steel reinforcement and formwork.
[0003] Most of the hanging baskets used in existing bridge construction cannot effectively adjust the height of the protective fences and frames according to the different heights of the workers. When the workers are tall, the protective effectiveness of the protective frames is reduced. When the workers are short, they are easily blocked by the protective frames, which affects the normal operation of the equipment outside the hanging basket.
[0004] The existing patent (publication number: CN219218701U) provides a hanging basket device for bridge construction, relating to the technical field of bridge construction equipment. This hanging basket device includes a base, a top plate directly above the base, and four support columns arranged in a rectangular array fixedly installed between the base and the top plate. Each of the four support columns is slidably connected to a sliding cylinder, and a protective frame is provided between the four sliding cylinders. A pushing mechanism for raising and lowering the protective frame is provided on one side of the protective frame. A lifting ring is fixedly installed on the top of the top plate. During bridge construction, workers enter the protective frame, and the device is suspended by the lifting ring. By adjusting the pushing mechanism, the protective frame is raised and lowered, causing the sliding cylinders to slide up and down along the outside of the support columns. The protective height of the frame can be adjusted according to the height of the workers, ensuring optimal protection for all workers using the hanging basket.
[0005] To address the aforementioned issues, existing patents offer solutions. However, most existing hanging baskets lack a support structure at the bottom, which may cause the basket to sway during use. Furthermore, most existing hanging basket structures require a power source, resulting in higher manufacturing costs.
[0006] To address this, an adjustable bridge hanging basket construction support device is proposed. Utility Model Content
[0007] The purpose of this utility model is to provide an adjustable bridge hanging basket construction support device, which can solve the problem that most existing hanging baskets lack a support structure at the bottom, which may cause the hanging basket to sway during use, and that most existing hanging basket structures require a power source, resulting in high costs.
[0008] To achieve the above objectives, the present invention provides the following technical solution: an adjustable bridge hanging basket construction support device, comprising a support assembly, wherein a hanging basket assembly is provided on the top of the support assembly;
[0009] The support assembly includes a base plate, with two connecting frames fixedly connected to the top of the base plate. Each connecting frame has an adjustment groove at its bottom, and a spiral rod is rotatably connected to the front side of the inner wall of each adjustment groove. An adjustment block is threaded onto the surface of each spiral rod, and a clamping plate is fixedly connected to the bottom of each adjustment block. An auxiliary frame is fixedly connected to the top of the base plate, and the side of the auxiliary frame away from the base plate is fixedly connected to the rear side of the connecting frame. Several drainage holes are provided at the bottom of the base plate.
[0010] Preferably, the hanging basket assembly includes a hanging basket body, a protective cover is bolted to the surface of the hanging basket body, and a hook is fixedly connected to the top of the protective cover.
[0011] Preferably, a sliding groove is provided on the right side of the inner wall of the hanging basket body, a sliding block is slidably connected inside the sliding groove, a threaded rod is threadedly connected inside the sliding block, a support plate is fixedly connected to the left side of the sliding block, and an anti-slip plate is fixedly connected to the top of the support plate.
[0012] Preferably, a sunshade is fixedly connected to the top of the protective cover, and the sunshade is made of stainless steel.
[0013] Preferably, a box shell is fixedly connected to the bottom of the inner wall of the hanging basket body, and a tool box is slidably connected inside the box shell.
[0014] Preferably, a soft pad is fixedly connected to the inner wall of the toolbox, and an adjustment handle is fixedly connected to the right side of the toolbox.
[0015] Preferably, the bottom of the protective cover is fixedly connected to a snap-fit block, the bottom of the protective cover is provided with a sunshade cloth, and the top of the sunshade cloth is provided with a snap-fit groove for use with the snap-fit block.
[0016] Preferably, auxiliary rods are fixedly connected to the left and right sides of the inner wall of the protective cover, and the opposite sides of the two auxiliary rods are respectively bolted to the left and right sides of the hanging basket body.
[0017] Compared with the prior art, the beneficial effects of this utility model are:
[0018] 1. In this application, by adjusting the screw rod, the adjusting block and clamping plate are moved, which can closely fit the bridge surface and fix the hanging basket stably on the bridge, preventing the hanging basket from shaking during construction. The design of the auxiliary frame enhances the connection strength between the connecting frame and the base plate, further stabilizing the support structure, providing a reliable support foundation for the hanging basket, and ensuring construction safety and accuracy.
[0019] 2. In this application, the combined design of the sliding groove, sliding block, threaded rod, support plate and anti-slip plate on the right side of the inner wall of the hanging basket body allows construction workers to manually adjust the height of the support plate according to their own height, providing a comfortable and stable standing platform for construction workers of different heights, improving work efficiency and reducing construction fatigue. Attached Figure Description
[0020] Figure 1 This is an overall structural diagram of the adjustable bridge hanging basket construction support device of this utility model.
[0021] Figure 2 This is a schematic diagram of the structure of the support component of this utility model;
[0022] Figure 3 This is a schematic diagram of the structure of the hanging basket assembly of this utility model;
[0023] Figure 4 This is a disassembled schematic diagram of the casing and toolbox of this utility model;
[0024] Figure 5 This is a schematic diagram showing the disassembled components of this utility model.
[0025] In the diagram, 1. Support assembly; 101. Base plate; 102. Connecting frame; 103. Adjustment groove; 104. Spiral rod; 105. Adjustment block; 106. Clamping plate; 107. Auxiliary frame; 108. Drainage hole; 2. Hanging basket assembly; 201. Hanging basket body; 202. Protective cover; 203. Hook; 204. Sliding groove; 205. Sliding block; 206. Threaded rod; 207. Support plate; 208. Anti-slip plate; 209. Sunshade; 3. Box shell; 4. Tool box; 5. Soft pad; 6. Adjustment handle; 7. Snap-fit block; 8. Sunshade cloth; 9. Snap-fit groove; 10. Auxiliary rod. Detailed Implementation
[0026] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0027] Please see Figure 1-5 The present invention provides the following technical solution:
[0028] An adjustable bridge hanging basket construction support device includes a support component 1, and a hanging basket component 2 is provided on the top of the support component 1.
[0029] The support assembly 1 includes a base plate 101. Two connecting frames 102 are fixedly connected to the top of the base plate 101. Each connecting frame 102 has an adjustment groove 103 at its bottom. A spiral rod 104 is rotatably connected to the front side of the inner wall of each adjusting groove 103. An adjusting block 105 is threadedly connected to the surface of each spiral rod 104. A clamping plate 106 is fixedly connected to the bottom of each adjusting block 105. An auxiliary frame 107 is fixedly connected to the top of the base plate 101. The side of the auxiliary frame 107 away from the base plate 101 is fixedly connected to the rear side of the connecting frame 102. Several drainage holes 108 are provided at the bottom of the base plate 101.
[0030] In this embodiment: the support component 1 can support the hanging basket component 2 by contacting the bridge through its own structure. The hanging basket component 2 provides a protective and supportive platform for the user. By setting the base plate 101, connecting frame 102, adjusting groove 103, screw rod 104, adjusting block 105, and clamping plate 106, the clamping plate 106 is in contact with the surface of the bridge by the side of the connecting frame 102 opposite to it. Then, the screw rod 206 is manually adjusted so that the screw rod 206 is aligned with the adjusting block 105. Adjust the inner wall of the adjusting groove 103 to make the clamping plate 106 fit tightly with the bridge. Then, the connecting frame 102 supports the bottom plate 101, so that the bottom plate 101 supports the hanging basket assembly 2. By setting the auxiliary frame 107, the connection strength between the connecting frame 102 and the bottom plate 101 can be increased. By setting several drainage holes 108, rainwater can be discharged from the top of the bottom plate 101. The top of the bottom plate 101 is provided with an inclined groove, which can quickly make contact between the bottom of the hanging basket assembly 2 and the top of the bottom plate 101.
[0031] Specifically, such as Figure 3 As shown, the hanging basket assembly 2 includes a hanging basket body 201, a protective cover 202 is bolted to the surface of the hanging basket body 201, and a hook 203 is fixedly connected to the top of the protective cover 202.
[0032] Specifically, such as Figure 3 As shown, a sliding groove 204 is provided on the right side of the inner wall of the hanging basket body 201. A sliding block 205 is slidably connected inside the sliding groove 204. A threaded rod 206 is threadedly connected inside the sliding block 205. A support plate 207 is fixedly connected to the left side of the sliding block 205. An anti-slip plate 208 is fixedly connected to the top of the support plate 207.
[0033] Specifically, such as Figure 3As shown, a sunshade 209 is fixedly connected to the top of the protective cover 202. The sunshade 209 is made of stainless steel.
[0034] In this embodiment: by setting the hanging basket body 201, a working platform can be provided for the construction worker. By setting the protective assembly, the top of the hanging basket assembly 2 can be protected. By using the hook 203, the position of the protective cover 202 can be moved by the hoisting equipment. As the protective cover 202 moves, the position of the hanging basket body 201 also moves. By setting the sliding groove 204, sliding block 205, threaded rod 206, support plate 207 and anti-slip plate 208, the user can manually adjust the threaded rod 206 according to the situation, so that the threaded rod 206 adjusts the sliding block 205 on the inner wall of the sliding groove 204. Then, the height of the support plate 207 inside the hanging basket body 201 can be adjusted. After adjusting to a suitable position, the user can step on the top of the anti-slip plate 208. The adjustment can be made according to the user's height to improve work efficiency. By setting the sunshade 209, the effect of the top protective cover 202 can be improved.
[0035] Specifically, such as Figure 1 , Figure 4 As shown, a box shell 3 is fixedly connected to the bottom of the inner wall of the hanging basket body 201, and a tool box 4 is slidably connected inside the box shell 3.
[0036] Specifically, such as Figure 4 As shown, a soft pad 5 is fixedly connected to the inner wall of the tool box 4, and an adjustment handle 6 is fixedly connected to the right side of the tool box 4.
[0037] In this embodiment: by setting the shell 3, the tool box 4 can be placed. The tool box 4 can be used to store the tools. By setting the soft pad 5, the tools can be reduced from bumping against the inner wall of the tool box 4. By setting the adjustment handle 6, the tool box 4 can be easily disassembled from the inner wall of the shell 3.
[0038] Specifically, such as Figure 5 As shown, a snap-fit block 7 is fixedly connected to the bottom of the protective cover 202, and a sunshade cloth 8 is provided at the bottom of the protective cover 202. A snap-fit groove 9 is provided on the top of the sunshade cloth 8 to cooperate with the snap-fit block 7.
[0039] Specifically, such as Figure 5 As shown, auxiliary rods 10 are fixedly connected to the left and right sides of the inner wall of the protective cover 202, and the opposite sides of the two auxiliary rods 10 are respectively bolted to the left and right sides of the hanging basket body 201.
[0040] In this embodiment: by setting up the snap-fit block 7, the sunshade cloth 8 and the snap-fit groove 9, the height of the sunshade cloth 8 is manually adjusted so that the snap-fit block 7 contacts the inner wall of the snap-fit groove 9, and the sunshade cloth 8 is spliced with the protective cover 202. The sunshade cloth 8 reduces the sun's exposure to construction workers. By setting up the auxiliary rod 10, the connection strength between the protective cover 202 and the hanging basket body 201 can be improved.
[0041] Working principle: During bridge hanging basket construction, the support assembly 1 is first placed in a suitable position. By manually rotating the screw rod 104, the adjusting block 105 moves up and down along the screw rod 104 within the adjusting groove 103 using the screw transmission principle. This causes the clamping plate 106 to move closer to or away from the bridge surface until the clamping plate 106 is tightly fitted to the bridge, thus firmly fixing the support assembly 1 to the bridge. At this time, the connecting frame 102 and the auxiliary frame 107 work together to provide stable support for the hanging basket assembly 2. The drainage hole 108 at the bottom of the base plate 101 can drain rainwater in time, preventing water accumulation from affecting the stability of the support. In the hanging basket assembly 2, the hook 203 is connected to the hoisting equipment, which can realize the movement and positioning of the hanging basket body 201. Construction personnel can manually rotate the threaded rod 206 according to their own height. Rotation causes the sliding block 205, which is threadedly connected to it, to slide within the sliding groove 204, thereby adjusting the height of the support plate 207 and positioning the anti-slip plate 208 in a suitable position for easy standing operation by construction personnel. The sunshade 209 can block direct sunlight from entering the protective cover 202. If further sunshade is needed, the snap-fit groove 9 of the sunshade cloth 8 can be manually aligned with the snap-fit block 7 at the bottom of the protective cover 202 to install the sunshade cloth 8. During construction, tools can be placed in the tool box 4, and the soft pad 5 can prevent tools from colliding and being damaged. Construction personnel can easily pull the tool box 4 out of the box 3 to retrieve tools by adjusting the handle 6. In addition, the auxiliary rods 10 on both sides of the inner wall of the protective cover 202 enhance the connection strength between the protective cover 202 and the hanging basket body 201, ensuring the safety of construction personnel working inside the hanging basket body 201.
[0042] The above are merely preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. An adjustable bridge trolley construction support device comprising a support assembly (1), characterised in that: The top of the support component (1) is provided with a hanging basket component (2); The support assembly (1) includes a base plate (101). Two connecting frames (102) are fixedly connected to the top of the base plate (101). Adjustment grooves (103) are opened at the bottom of the two connecting frames (102). A spiral rod (104) is rotatably connected to the front side of the inner wall of the two adjustment grooves (103). Adjustment blocks (105) are threadedly connected to the surface of the two spiral rods (104). A clamping plate (106) is fixedly connected to the bottom of the two adjustment blocks (105). An auxiliary frame (107) is fixedly connected to the top of the base plate (101). The side of the auxiliary frame (107) away from the base plate (101) is fixedly connected to the rear side of the connecting frame (102). Several drainage holes (108) are opened at the bottom of the base plate (101).
2. The adjustable bridge trolley construction support device of claim 1, wherein: The hanging basket assembly (2) includes a hanging basket body (201), a protective cover (202) is bolted to the surface of the hanging basket body (201), and a hook (203) is fixedly connected to the top of the protective cover (202).
3. The adjustable bridge hanging basket construction support device according to claim 2, characterized in that: A sliding groove (204) is provided on the right side of the inner wall of the hanging basket body (201). A sliding block (205) is slidably connected inside the sliding groove (204). A threaded rod (206) is threadedly connected inside the sliding block (205). A support plate (207) is fixedly connected to the left side of the sliding block (205). An anti-slip plate (208) is fixedly connected to the top of the support plate (207).
4. The adjustable bridge hanging basket construction support device according to claim 2, characterized in that: The top of the protective cover (202) is fixedly connected to a sunshade (209), which is made of stainless steel.
5. An adjustable bridge hanging basket construction support device according to claim 2, characterized in that: The bottom of the inner wall of the hanging basket body (201) is fixedly connected to a box shell (3), and a tool box (4) is slidably connected inside the box shell (3).
6. An adjustable bridge hanging basket construction support device according to claim 5, characterized in that: The inner wall of the toolbox (4) is fixedly connected with a soft pad (5), and the right side of the toolbox (4) is fixedly connected with an adjustment handle (6).
7. An adjustable bridge hanging basket construction support device according to claim 2, characterized in that: The bottom of the protective cover (202) is fixedly connected to a snap-fit block (7), and the bottom of the protective cover (202) is provided with a sunshade cloth (8). The top of the sunshade cloth (8) is provided with a snap-fit groove (9) that cooperates with the snap-fit block (7).
8. An adjustable bridge hanging basket construction support device according to claim 2, characterized in that: The protective cover (202) has auxiliary rods (10) fixedly connected to the left and right sides of its inner wall. The two auxiliary rods (10) are respectively bolted to the left and right sides of the hanging basket body (201) on opposite sides.