Comprehensive protection and management system for dangerous rock masses on steep slopes
By using a combination of shallow anchor bolts, protective cables, grouting mortar, and anti-sliding bodies on steep slopes, along with vegetation troughs and water collection systems, a multi-layered protection system is formed, which solves the problems of insufficient adaptability and stability of traditional measures and achieves comprehensive treatment of steep slopes.
Patent Information
- Application Number
- CN202522512020.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-26
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-26
AI Technical Summary
Traditional high and steep slope protection measures lack adaptability, may damage the environment, and are insufficient in terms of stability and durability, making them unable to effectively protect slope safety in the long term.
A combination of shallow anchor bolts, protective cables, grout, anti-slip material, and deep anchor bolts is used to reinforce giant dangerous rocks, and combined with vegetation troughs and water collection systems, a multi-layered protection system is formed.
This approach enables adaptive treatment based on the cross-section of the slope section, improving slope stability and ecological protection, reducing the risk of geological disasters, improving the environment, and effectively managing rainwater.
Smart Images

Figure CN224955113U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of protection and management of dangerous rock masses on steep slopes, and in particular to a comprehensive protection and management system for dangerous rock masses on steep slopes. Background Technology
[0002] In the field of protection and management of dangerous rock masses on steep slopes, traditional protective measures often have certain limitations. For example, some methods may only be applicable to specific types of dangerous rock masses and lack adaptability to different types of dangerous rock masses; or they may cause significant environmental damage during construction, which is detrimental to ecological protection; and some methods may be insufficient in terms of stability and durability, and cannot effectively protect slope safety in the long term.
[0003] With the acceleration of urbanization and the continuous expansion of infrastructure construction, the stability problem of steep slopes has become increasingly prominent. These slopes are often susceptible to erosion and damage due to complex geological conditions and variable climate, leading to the formation of unstable rock masses. The existence of unstable rock masses not only threatens the safety of people's lives and property, but also has a serious impact on the surrounding environment.
[0004] Traditional slope protection measures, such as simple rock anchoring and concrete pouring, often cannot meet the complex requirements of steep slopes. These methods may be effective in the short term, but over time, due to the lack of comprehensive consideration of the overall stability of the slope, the protective effect may decline, or even trigger more serious geological disasters.
[0005] Therefore, there is an urgent need for a new comprehensive protection and management system for steep slopes and unstable rock masses. This system should be able to adopt appropriate treatment methods according to different slope sections, while possessing advantages such as structural stability, environmental friendliness, and high construction efficiency. This system should comprehensively consider factors such as slope stability, ecological protection, and stormwater management, providing a comprehensive and effective protection and management solution for steep slopes. Utility Model Content
[0006] The purpose of this utility model is to provide a comprehensive protection and management system for dangerous rock masses on steep slopes that solves the above-mentioned technical problems.
[0007] To address the aforementioned technical problems, this utility model provides a comprehensive protection and management system for dangerous rock masses on steep slopes. This system is applicable to giant dangerous rocks, small dangerous rocks, and slopes. Shallow anchor rods are installed at the upper and lower ends of the giant dangerous rocks, and protective cables are connected to these anchor rods so that the cables are fitted over the outside of the giant dangerous rocks. Cracks between the giant dangerous rocks and the slope are filled with grout. Anti-sliding bodies are installed at the lower end of the giant dangerous rocks and at the junction with the slope surface. Hollow anti-sliding rods are installed within these anti-sliding bodies. Anchor holes are drilled in the middle of the giant dangerous rocks, and hollow deep anchor rods are installed. An anchoring plate is installed at the top of the deep anchor rods.
[0008] Furthermore, a protective net is installed on the outside of the small dangerous rock using shallow anchor bolts, and a splitting rod is installed by drilling holes inside the small dangerous rock.
[0009] Furthermore, the slope surface is provided with a first platform and a second platform, and each platform is provided with several platform poles at intervals, with platform mesh installed on the platform poles.
[0010] Furthermore, vegetation troughs are inclinedly arranged on the slope surface, and the vegetation troughs are evenly distributed at intervals.
[0011] Furthermore, the protective cable includes a first protective cable and a second protective cable, which are connected and installed via a connector and wrapped around and fixed to the giant dangerous rock.
[0012] Furthermore, the anti-slip rod has an anti-slip anchoring end at its end, and the deep anchor rod has a tie anchoring end at its end.
[0013] Furthermore, the vegetation trough includes vegetation, planting soil and a water collection trough, and a permeable geotextile is provided at the junction of the planting soil and the water collection trough.
[0014] Furthermore, gravel is installed inside the water collection trough, and a water collection pipe and a water collection plate are installed inside the gravel. The water collection pipe is located in the middle of the water collection plate. The water collection pipe and the water collection plate are used to collect rainwater into the water collection trough.
[0015] The beneficial effects of this utility model are as follows: 1. Adaptive treatment methods are adopted according to different types of slope sections, making the protection and management system more scientific, reasonable, and adaptable.
[0016] 2. The combination of in-situ reinforcement and targeted removal effectively improved the stability of dangerous rock masses on steep slopes and reduced the risk of geological disasters.
[0017] 3. A comprehensive treatment system for giant unstable rocks, consisting of protective cables, caulking grout, anti-sliding bodies, and deep anchors, has been adopted, forming a multi-layered protective structure and enhancing the overall stability of the slope.
[0018] 4. The protective greening system formed by the platform's dense netting, curtain netting, and vegetation troughs not only protects the slope but also achieves greening and improves the ecological environment.
[0019] 5. By installing water collection troughs, water collection pipes, and water collection plates, rainwater can be effectively managed, soil erosion can be reduced, and water sources can be provided for vegetation. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the treatment of dangerous rocks on steep slopes according to this utility model; Figure 2 This is a schematic diagram of the overall protection and greening of steep slopes; Figure 3 for Figure 1 Schematic diagram of the treatment plan for medium and large-sized dangerous rocks; Figure 4 for Figure 1 Schematic diagram of the treatment plan for small and medium-sized dangerous rocks; Figure 5 This is a schematic diagram of a vegetation trough. Figure 6 This is a schematic diagram of the water collection plate and water collection pipe; Figure 7 This is a schematic diagram of the platform poles and the platform mesh.
[0021] The attached diagram lists the components represented by each number as follows: In the diagram: 1. Slope surface; 2. Giant unstable rock; 3. Small unstable rock; 4. Deep anchor bolt; 5. Tie anchor end; 6. Anchor plate; 7. Anti-slip anchor end; 8. Joint grout; 9. Protective cable; 10. Anti-slip body; 11. Anti-slip rod; 12. Shallow anchor bolt; 13. Anchor bolt; 14. Protective net; 15. Splitting rod; 16. First protective cable; 17. Second protective cable; 18. Anchor hole; 19. Connector; 20. First platform; 21. Second platform; 22. Platform pole; 23. Platform dense net; 24. Curtain net; 25. Upright pole; 26. Anchoring concrete; 27. Fixing frame; 28. Water collection trough; 29. Planting soil; 30. Crushed stone; 31. Permeable geotextile; 32. Water collection board; 33. Water collection pipe; 34. Vegetation. Detailed Implementation
[0022] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model are within the protection scope of the present utility model.
[0023] Those skilled in the art should understand that in the disclosure of this utility model, the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the above terms should not be construed as a limitation of this utility model.
[0024] It is understood that the term "a" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element can be one, while in another embodiment, the number of the element can be multiple, and the term "a" should not be understood as a limitation on the number.
[0025] like Figures 1-7 The present invention provides a comprehensive protection and treatment system for dangerous rock masses on steep slopes, and its construction process can be carried out by the following steps: Step 1: In-situ reinforcement of giant unstable rock 2: For the section of the slope with giant unstable rocks, in-situ reinforcement was carried out first to ensure the stability of the slope. S11, Installation of shallow anchor bolts 12: Shallow anchor bolts 12 are installed at the upper and lower ends of the giant dangerous rock 2 to provide fixing points for the subsequent protective cable 9 and anti-slip body 10; S12, Installation of protective cable 9: The protective cable 9 is installed by connecting the shallow anchor bolt 12 and the anchor bolt 13. The protective cable 9 includes a first protective cable 16 and a second protective cable 17, which are connected and installed by a connector 19 and wrapped and fixed to the giant dangerous rock 2. S13, Grouting 8 injection: Grouting 8 is injected into the crack between the giant unstable rock 2 and the slope to fill the crack and enhance the overall stability of the slope. S14. Anti-slide body 10 pouring and anti-slide rod 11 setting: At the lower end of the giant unstable rock 2 and at the junction with the slope surface 1, anti-slide body 10 is poured, and hollow anti-slide rod 11 is set in the anti-slide body 10 to form the anti-slide anchor end 7 of the end of the anti-slide rod 11 formed by pouring concrete in the anti-slide rod 11. S15. Drilling and concrete pouring of deep anchor bolt 4: Drill anchor hole 18 in the middle of giant unstable rock 2 and install hollow deep anchor bolt 4. Pour concrete into deep anchor bolt 4 to form deep tie anchor end 5. Install anchor plate 6 at the top of deep anchor bolt 4.
[0026] Step 2: Targeted removal of small, dangerous rocks 3: For the small dangerous rock slope section, a targeted removal method is adopted, first implementing protective measures, and then breaking up and removing the rocks; S21, Installation of protective netting 14: Install protective netting 14 by connecting shallow anchor bolts 12 and anchor bolts 13, and wrap and fix small dangerous rocks 3 to form protection; S22, Installation and Removal of Splitting Rod 15: The small dangerous rock is split, broken and removed by drilling holes in the small dangerous rock 3.
[0027] Step 3: Installation of the overall protection system: After dealing with the giant dangerous rock 2 slope section and the small dangerous rock 3 slope section, a protective greening system consisting of platform dense net 23, curtain net 24, and vegetation trough was set up for most of the slope sections. S31, Platform and Platform Rod 22 Installation: The slope is equipped with a first platform 20 and a second platform 21. Several platform rods 22 are installed at intervals on each platform. The platform rods 22 are installed in a drilling and insertion manner into the slope. S32, Platform mesh 23 installation: Platform mesh 23 is installed on platform pole 22 to buffer small gravel blocks on slope surface 1; S33, Installation and fixing of curtain net 24: The curtain net 24 is set in sections, and each section of the curtain net 24 is installed and fixed by uprights 25, anchoring concrete 26, and fixing frame 27; Step 4: Setting up the greening system: S41. Vegetation trough setup: The vegetation troughs are set at an angle on the slope surface 1 and are evenly distributed at intervals. The vegetation troughs include vegetation 34, planting soil 29 and water collection troughs 28. S42. Installation of permeable geotextile 31 and water collection system: Permeable geotextile 31 is installed at the junction of planting soil 29 and water collection trough 28. Crushed stone 30 is installed in water collection trough 28. Water collection pipe 33 and water collection plate 32 are installed in crushed stone 30. Water collection pipe 33 is located in the middle of water collection plate 32. The function of water collection pipe 33 and water collection plate 32 is to collect rainwater into water collection trough 28.
[0028] This utility model is not limited to the above-described preferred embodiments. Anyone can derive other forms of products under the guidance of this utility model. However, regardless of any changes made in their shape or structure, any technical solution that is the same as or similar to this application falls within the protection scope of this utility model.
Claims
1. A comprehensive protection and management system for dangerous rock masses on steep slopes, applicable to giant dangerous rocks (2), small dangerous rocks (3), and slopes, characterized in that: Shallow anchor rods (12) are installed at the upper and lower ends of the giant boulders (2). The shallow anchor rods (12) are connected to the protective cable (9) so that the protective cable (9) is sleeved on the outside of the giant boulders (2). The cracks between the giant boulders (2) and the slope are filled with grout (8). At the lower end of the giant boulders (2) and the junction with the slope surface (1), an anti-sliding body (10) is installed. A hollow anti-sliding rod (11) is installed inside the anti-sliding body (10). Anchor holes (18) are drilled in the middle of the giant boulders (2) and a hollow deep anchor rod (4) is installed. An anchor plate (6) is installed at the top of the deep anchor rod (4).
2. The comprehensive protection and management system for dangerous rock masses on steep slopes according to claim 1, characterized in that: A protective net (14) is installed on the outside of the small dangerous rock (3) by shallow anchor rods (12), and a splitting rod (15) is installed by drilling a hole inside the small dangerous rock (3).
3. The comprehensive protection and management system for dangerous rock masses on steep slopes according to claim 1, characterized in that: The slope surface (1) is provided with a first platform (20) and a second platform (21), and a number of platform poles (22) are set at intervals on each platform, and platform mesh (23) is installed on the platform poles (22).
4. The comprehensive protection and management system for dangerous rock masses on steep slopes according to claim 1, characterized in that: Vegetation troughs are inclinedly arranged on the slope surface (1), and the vegetation troughs are evenly distributed at intervals.
5. The comprehensive protection and management system for dangerous rock masses on steep slopes according to claim 1, characterized in that: The protective cable (9) includes a first protective cable (16) and a second protective cable (17), which are connected and installed by a connector (19) and wrapped and fixed to the giant dangerous rock (2).
6. The comprehensive protection and management system for dangerous rock masses on steep slopes according to claim 1, characterized in that: The anti-slip rod (11) has an anti-slip anchoring end (7) at its end, and the deep anchor rod (4) has a tie anchoring end (5) at its end.
7. The comprehensive protection and management system for dangerous rock masses on steep slopes according to claim 4, characterized in that: The vegetation trough includes vegetation (34), planting soil (29) and water collection trough (28), and a permeable geotextile (31) is provided at the junction of the planting soil (29) and the water collection trough (28).
8. The comprehensive protection and management system for dangerous rock masses on steep slopes according to claim 7, characterized in that: The water collection trough (28) is filled with gravel (30), and a water collection pipe (33) and a water collection plate (32) are installed inside the gravel (30). The water collection pipe (33) is located in the middle of the water collection plate (32). The water collection pipe (33) and the water collection plate (32) are used to collect rainwater into the water collection trough (28).