A hydraulic grab bucket for trenches 100 meters deep

By designing a slender frame and a 360-degree rotating hoisting joint, combined with a correction push rod and a sliding frame, the problems of burying the hydraulic grab bucket and adjusting its position during the construction of a 100-meter deep trench were solved, achieving efficient and safe ultra-deep trench construction.

CN224955176UActive Publication Date: 2026-11-10SHANGHAI JINTAI ENG MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522097941.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-29
Publication Date
2026-11-10
Estimated Expiration
2035-09-29

AI Technical Summary

Technical Problem

Traditional hydraulic grabs are prone to burying in ultra-deep trenches of hundreds of meters in length, and the grab's position cannot be flexibly adjusted, resulting in low construction efficiency and safety hazards.

Method used

The design features a slender frame, equipped with a 360-degree rotating hoisting joint and a correction push rod, combined with a sliding frame and a rotating device to ensure the stability and flexibility of the grab bucket in ultra-deep trenches.

Benefits of technology

It effectively reduces the risk of burying buckets, improves construction efficiency and safety, adapts to complex geological conditions and confined environments, and achieves efficient and reliable excavation of 100-meter deep trenches.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955176U_ABST
    Figure CN224955176U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of engineering machinery, and more particularly to equipment for diaphragm wall construction. Specifically, it is a hydraulic grab bucket for trenches up to 100 meters deep. Its slender frame design meets the requirements of trenches up to 100 meters deep, significantly reducing the risk of bucket burial. Simultaneously, the lifting joint achieves 360-degree rotation via a rotating device, greatly enhancing operational flexibility. The device also includes a sliding frame, a correction push plate, and a push rod, further improving the grab bucket's positioning accuracy and construction stability, making it particularly suitable for ultra-deep diaphragm wall construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of engineering machinery, and in particular to equipment for the construction of underground continuous walls, specifically a hydraulic grab bucket for trenches up to 100 meters deep. Background Technology

[0002] With the continuous development of underground space, the demand for ultra-deep diaphragm wall construction is increasing. Traditional hydraulic grab buckets, when applied to ultra-deep trench construction (hundreds of meters in length), are prone to burying due to insufficient frame length, leading to low construction efficiency and even safety accidents. Furthermore, existing grab buckets mostly have fixed lifting joints, making it difficult to flexibly adjust the grab bucket's position and adapt to complex geological conditions and confined construction environments. Utility Model Content

[0003] The present invention aims to solve the above-mentioned technical problems and provide a hydraulic grab bucket that is structurally reliable, efficient in construction, and suitable for operations in trenches up to 100 meters deep.

[0004] To achieve the above objectives, the present invention adopts the following technical solution. A hydraulic grab bucket for a 100-meter deep trench includes a frame, a grab bucket head assembly, a cutting side plate, a hydraulic cylinder, a balance plate, a rotating device, a lifting device, and a control box. The frame is a slender structure with a specially designed axial length, which enables the machine to meet the requirements of operating in ultra-deep trenches of hundreds of meters, thereby effectively reducing the risk of bucket burial. The upper part of the lifting device is connected to a hoisting joint, which is rotatably connected to the frame through a rotating device. The rotating device is configured to drive the hoisting joint to achieve a 360-degree horizontal rotation relative to the frame.

[0005] Furthermore, in the hydraulic grab bucket used in the 100-meter deep trench described above, the rotating device includes a slewing bearing and a swing cylinder. The inner ring of the slewing bearing is fixedly connected to the frame, and the outer ring is fixedly connected to the hoisting joint. The swing cylinder drives the outer ring of the slewing bearing to rotate relative to the inner ring, thereby realizing the flexible steering of the grab bucket.

[0006] Furthermore, in the hydraulic grab bucket used in the 100-meter deep trench, a sliding frame is provided on the side of the frame. The sliding frame can slide along the wear-resistant slide rail inside the frame to assist the grab bucket in opening, closing and positioning in the trench, thereby improving construction accuracy.

[0007] Furthermore, in the hydraulic grab bucket used in the 100-meter deep trench, the lower part of the frame is equipped with a correction push plate and a push rod. The correction push plate is connected to the push rod and is used to fine-tune the attitude of the grab bucket during the lowering or lifting process to prevent deviation and ensure construction safety.

[0008] The hydraulic grab bucket for 100-meter deep trenches proposed in this utility model effectively reduces the risk of bucket burial during the excavation process by lengthening the frame and optimizing its slenderness ratio. Furthermore, the use of a detachable sliding frame and push rod correction mechanism ensures the grab bucket's verticality meets the requirements of deep trench operations, thus completely eliminating the risk of bucket burial. Additionally, a ball bearing hoisting joint is installed on the upper part of the frame to facilitate frame turning, allowing for precise cutting of hard rock or joints, or repositioning to adapt to operations in confined areas. Therefore, this utility model proposes a hydraulic grab bucket for 100-meter deep trenches that combines high efficiency, reliability, and green construction. Attached Figure Description

[0009] Figure 1 This is a schematic diagram of the overall structure of the hydraulic grab bucket of this utility model.

[0010] Figure 2 This is a cross-sectional structural diagram of the rotating device in this utility model. Detailed Implementation

[0011] To further illustrate the technical means and effects of the present invention in achieving its intended purpose, the following detailed description of the specific implementation methods, structures, features, and effects of the present invention, in conjunction with the accompanying drawings and preferred embodiments, is provided below.

[0012] Example 1 This embodiment provides a hydraulic grab bucket for trenches up to 100 meters deep. Its design is mainly aimed at the construction environment of ultra-deep underground continuous walls, solving the problems of grab buckets easily getting buried and lacking operational flexibility in the prior art. 1. Assembly and debugging of hydraulic grab bucket The hydraulic grab mainly includes the following key components: grab head assembly (1), cutting side plate (2), oil cylinder (3), balance plate (4), frame (5), rotating device (6), lifting device (7), control box (8), sliding frame (9), correction push plate (10), push rod (11), etc. Before actual construction, the following assembly and debugging steps need to be completed: (1) Assembly of the frame The frame (5) is the supporting structure for the entire hydraulic grab bucket, and its axial length is designed to meet the requirements of deep trench operations up to 100 meters. During assembly, the various sections of the frame are first connected sequentially with high-strength bolts, and the sealing and stability of the connection points are ensured. To prevent the bucket from being buried during ultra-deep trench construction, the total length of the frame is customized according to the actual trench depth, usually set to 80 to 120 meters.

[0013] (2) Installation of grab head assembly and cutting side plate The grab head assembly (1) and the cutting side plate (2) adopt a modular design and are fixed to the lower two sides of the frame (5) respectively during installation. The cutting side plate (2) is driven by a hydraulic cylinder (3) and can complete the opening and closing actions when the grab is inserted into the slot. The grab head assembly (1) is responsible for contacting the bottom of the slot to perform cutting and crushing operations. The cutting side plate is used to scrape the slot wall when the frame moves up and down.

[0014] (3) Installation of rotating device and lifting joint The rotating device (6) is one of the key innovations of the hydraulic grab bucket, and its function is to achieve 360-degree horizontal rotation of the lifting joint. The lifting joint is connected to the frame (5) through the slewing bearing (6). The inner ring of the slewing bearing is fixed to the upper part of the frame, and the outer ring is connected to the lifting joint. The swing cylinder (1) drives the outer ring of the slewing bearing to rotate, thereby enabling the lifting joint to achieve all-round adjustment. During installation, the lubrication system and sealing performance of the slewing bearing need to be checked, and its rotation accuracy and load-bearing capacity need to be verified by simulated loading test.

[0015] (4) Assembly of the balance plate and sliding frame The balance plate (4) is installed in the middle of the frame (5) to maintain overall stability during grab operation. The sliding frame (9) is fixed in the middle of the frame by a guide rail structure and can slide along the axial direction of the frame to assist in the precise positioning of the grab in the slot. The sliding accuracy of the sliding frame directly affects the construction effect of the grab, so the lubrication of the guide rail and the stroke limit device need to be checked during debugging.

[0016] (5) Installation and commissioning of the correction device The correction push plate (10) and push rod are installed at the lower part of the frame (5) to adjust the attitude of the grab bucket during lowering or lifting, preventing the grab bucket from deviating due to geological changes or equipment shaking. The push rod is hydraulically driven, and its extension stroke is adjusted according to the trench width and geological conditions. During commissioning, it is necessary to simulate the correction action of the grab bucket at different offset angles to ensure that the hydraulic system of the push rod responds quickly and operates smoothly.

[0017] (6) Connection between the control box and the hydraulic system The control box (8) is the central unit of the hydraulic grab, responsible for coordinating the actions of various components. During installation, the hydraulic lines of actuators such as the cylinder (3), swing cylinder, and push rod need to be connected to the control box, and the sealing and pressure stability of the entire hydraulic system need to be checked. During commissioning, the logic and response speed of the control system are verified by simulating operating commands under different working conditions.

[0018] 2. Actual operation procedure of hydraulic grab bucket After assembly and debugging, the hydraulic grab bucket is ready for use. The following are its specific operating procedures for construction in 100-meter deep trenches: (1) Grab bucket in place Before construction begins, the grab bucket host lifts the hydraulic grab bucket using the lifting device (7) and adjusts the direction of the grab bucket using the rotating device (6) to align it with the pre-set slot. During the lowering of the grab bucket, the operator adjusts the extension and retraction of the push rod through the control box (8) so that the correction push plate (10) corrects the posture of the grab bucket in real time, ensuring that the grab bucket can be inserted vertically into the slot.

[0019] (2) Grabbing operation When the grab approaches the bottom of the trough, the hydraulic cylinder (3) drives the sliding frame (9) push rod, causing the grab head assembly (1) to simultaneously contact the bottom of the trough and begin the cutting operation. When grabbing materials, the balance plate (4) maintains the stability of the grab through its own counterweight design, preventing the grab from tilting due to uneven material distribution. The sliding frame (9) slowly slides down along the guide rail of the frame (5), assisting the grab in positioning and grabbing actions within the trough.

[0020] (3) Lifting and Turning After the grab is completed, the hydraulic cylinder (3) drives the grab head assembly (1) to close and lift the material. The lifting device (7) slowly lifts the grab bucket with a wire rope, and the rotating device (6) can adjust the direction of the grab bucket as needed to align it with the unloading position. Throughout the lifting process, the correction push plate (10) and push rod continuously monitor and correct the posture of the grab bucket to prevent material from spilling due to shaking.

[0021] (4) Cyclic operation After completing one grab and unloading operation, the hydraulic grab bucket repeats the above-mentioned positioning, grabbing, lifting and turning operation process until the entire deep trench is completed. During the construction process, the operator can monitor the operating status of each component in real time through the control box (8) and adjust parameters such as cylinder pressure and push rod stroke according to geological conditions to optimize the operation efficiency.

[0022] The grab bucket mentioned in the example above has shown significant advantages in practical applications: 1. Adaptability to ultra-deep trench operations: After the overall frame is lengthened, its slenderness ratio is controlled between L / D = 20 and 25, which can maintain sufficient longitudinal stiffness in deep trenches of hundreds of meters, significantly reduce deflection, and avoid the phenomena of "bucket jamming" and "bucket burying".

[0023] Extendable sliding frames (9) are added to both sides of the frame to form a rolling pair with the trench wall, which plays a guiding and friction-reducing role, so that the lateral offset of the grab bucket within a 100 m stroke meets the verticality specification requirements of ultra-deep underground continuous walls.

[0024] 2. Mobility of the 360° rotating hoisting joint The slewing bearing (6) adopts a ball bearing structure, which can withstand the overturning load generated by the weight of the 100-meter steel rope and the grab bucket; the swing cylinder (1-1) is controlled by a proportional valve, which can achieve stepless speed regulation.

[0025] The rotating device is equipped with a dual structure of dustproof ring and rotary seal between itself and the frame, which can prevent mud backflow and hydraulic oil leakage in boreholes up to 100 m deep, thereby improving bearing life.

[0026] 3. Dynamic correction and attitude maintenance Two sets of correction push plates (10) and push rods are symmetrically arranged at the lower end of the frame. They can be controlled in a closed loop by displacement sensors to complete single-sided correction in a short time, ensuring that the verticality of the grab bucket is controlled in real time.

[0027] The correction system is linked with the rotating device: when the grab bucket is detected to be tilted in a certain direction, the system first calls the rotating device to adjust the cutting direction, and then the push rod makes fine adjustments to achieve "coarse + fine" two-stage correction, which greatly reduces energy consumption.

[0028] 4. Construction efficiency and economy Descending the entire machine to a depth of 100 meters in one go can improve overall work efficiency; Because the risk of burying the bucket is reduced, there is no need to configure an additional "rescue grab bucket" on site; The rotary hoisting joint can be quickly disassembled, enabling "one machine, multiple tanks" assembly line operation and reducing the number of on-site handling operations.

[0029] 5. Safety and Reliability The slewing bearing (6) is equipped with a two-way mechanical locking mechanism, which automatically locks when the hydraulic system loses pressure, preventing the grab bucket from rotating freely at a height of 100 meters and eliminating safety hazards.

[0030] The widened frame adopts segmented flange connection, each segment is 6 m long, and can be bolted on site. No large welding is required, which facilitates transportation and avoids fatigue cracks caused by residual welding stress.

[0031] As can be seen from the above, this hydraulic grab bucket, through optimized structural design and a highly efficient hydraulic control system, achieves both high efficiency and safety in trench construction up to 100 meters deep. Actual testing has shown that its grabbing efficiency, positioning accuracy, and equipment stability are superior to traditional hydraulic grab buckets, making it particularly suitable for ultra-deep trench construction projects such as diaphragm walls. The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present invention. Any simple modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the scope of the present invention.

Claims

1. A hydraulic grab bucket for a 100-meter deep trench, comprising: Frame (5); The grab head assembly (1) and the cutting side plate (2) are located at the lower end of the frame (5); The hydraulic cylinder (3) drives the opening and closing of the grab head assembly (1); A lifting device (7) located at the top of the frame (5) for connecting the hoisting joint; Its features are: The frame (5) is a slender structure, which is composed of multiple segments arranged along the axial direction and connected in sequence by high-strength bolts. The slenderness ratio L / D of the whole machine is in the range of 20~25, thereby meeting the requirements of ultra-deep trench operation at the hundred-meter level and reducing the risk of burying buckets.

2. The hydraulic grab for a hundred-meter deep trench according to claim 1, characterized in that, The lifting device (7) and the frame (5) are provided with a ball bearing (6) and a swing cylinder (1-1). The inner ring of the slewing bearing (6) is fixed to the frame (5), and the outer ring is fixed to the hoisting joint. The swing cylinder (1-1) drives the outer ring of the slewing bearing (6) to rotate relative to the inner ring, thereby driving the hoisting joint to rotate steplessly and maintain its position at any angle through a two-way mechanical locking mechanism.

3. Hydraulic grab for a hundred-meter deep trench according to claim 1 or 2, characterized in that, The side of the frame (5) is provided with a sliding frame (9), which can slide along the wear-resistant slide of the frame (5) to assist the grab bucket in lifting and positioning in the slot.

4. The hydraulic grab for a hundred-meter deep trench according to claim 3, characterized in that, The lower part of the frame (5) is provided with a correction push plate (10) and a push rod (11). The correction push plate (10) is connected to the push rod (11) and is used to fine adjust the attitude of the grab bucket during the lowering or lifting process to prevent deviation.