Mobile guide pipe for concrete wall pouring
By designing a movable and retractable concrete wall pouring duct and combining it with solar power, the problems of low efficiency, high cost and safety hazards in duct construction were solved, and an efficient and safe duct installation and pouring process was achieved.
Patent Information
- Application Number
- CN202522356107.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-06
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-06
AI Technical Summary
In the construction of ultra-high and ultra-thick concrete shear wall guide pipes, the installation and dismantling processes are limited by equipment characteristics, construction space and time window, resulting in low pouring efficiency, unstable quality and high cost, as well as safety hazards.
A mobile guide tube was designed, comprising a main frame system, a horizontal transmission mechanism, a vertical pulley lifting mechanism, and an overall horizontal moving mechanism. Powered by solar panels, it enables free movement, extension, and reuse, avoiding frequent assembly and disassembly.
It improves installation efficiency, saves labor and material costs, reduces safety hazards, ensures uniform material cutting, avoids defects in areas with dense steel reinforcement, and shortens the construction period.
Smart Images

Figure CN224955448U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of industrial and civil building technology, and in particular to a mobile conduit for concrete wall pouring. Background Technology
[0002] Currently, in the construction of ultra-high and ultra-thick concrete shear wall guide pipes, the installation and removal of the guide pipes are crucial steps connecting "equipment preparation," "pouring progress," and "subsequent procedures." However, the operation is limited by factors such as equipment characteristics (rigidity, segmented splicing), construction space (high altitude, areas with dense reinforcement), and time window (needing to coordinate with the pouring rhythm), which can easily lead to a series of drawbacks that directly affect pouring efficiency and wall quality. Furthermore, the time and labor costs required for installation and removal will increase, resulting in problems such as inconvenient installation and unstable installation.
[0003] Specifically, conventional construction work requires the installation of steel guide pipes, which need to be assembled in sections during installation. This is time-consuming, labor-intensive, and extremely difficult to fix, while also being costly. Improper operation can create hidden quality problems for subsequent pouring and easily delay the construction period. In addition, the removal of the guide pipes must be completed "after pouring to the specified height" and "before the concrete initially sets". The operation must take into account both "speed and force". If not properly controlled, it can easily disturb the poured concrete, thereby causing structural defects. Utility Model Content
[0004] The purpose of this utility model is to provide a mobile guide pipe for concrete wall pouring, which can freely extend and retract vertically, move forward and backward, and move horizontally as a whole. At the same time, the solar panel can meet the power supply requirements without the need for additional power connection.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: A mobile guide pipe for concrete wall pouring includes: a main frame system, a horizontal transmission mechanism, a vertical pulley lifting mechanism, an overall horizontal moving mechanism, and a guide pipe body and a solar panel. The main frame system includes: a crossbeam, and a bracket connected to the crossbeam via a connector, wherein the solar panel is installed at the junction of the bracket and the crossbeam; The transverse horizontal transmission mechanism includes: a motor with a switch installed at one end of the crossbeam, and the motor is connected to a pulley; a pulley is also provided at the other end of the crossbeam away from the motor; the two pulleys are fitted with the same belt, and a slider is provided between the two pulleys; the slider is connected to the guide tube body. The vertical pulley lifting mechanism includes: a motor installed between the two crossbeams, and the motor is connected to a winch, on which a steel wire rope is wound; the free end of the steel wire rope is connected to the bottom of the guide tube body through a guide pulley; The overall horizontal movement mechanism includes: casters mounted on the bottom of the four brackets; The conduit body includes: a double-layered wire-reinforced geotextile and a stainless steel receiving hopper that is matched and connected to the top of the double-layered wire-reinforced geotextile.
[0006] In practical applications, a reinforcing beam is connected between two adjacent supports via a connector, and the reinforcing beam is distributed perpendicularly to the crossbeam.
[0007] The solar panel is fixed to the bracket with bolts, and the edge of the solar panel is aligned with the edge of the bracket.
[0008] Specifically, the double-layered geotextile is fixed to the inside of the stainless steel receiving hopper by bolting the edges.
[0009] Furthermore, the crossbeams, supports, reinforcing beams, and connectors of the main frame system are all made of aluminum profiles.
[0010] Compared with the prior art, the movable guide pipe for concrete wall pouring described in this utility model has the following advantages: The mobile guide pipe for concrete wall pouring provided by this utility model has a horizontal transmission mechanism, a vertical pulley lifting mechanism, and an overall horizontal moving mechanism, which allows it to move and extend freely, thus avoiding frequent assembly and disassembly and effectively saving labor costs. Because the device can move and extend freely and can be reused along with the guide pipe body, material costs are effectively saved. At the same time, the device's free movement and extension eliminates the need for fixed concrete pouring points, ensuring uniform pouring and preventing "holes" in areas with dense reinforcement. Furthermore, this device eliminates the need for personnel to enter the wall for construction, effectively reducing safety hazards. The device is simple and quick to operate, greatly improving installation efficiency and shortening the construction period. Attached Figure Description
[0011] Figure 1 A schematic diagram of the structure of the movable guide pipe for concrete wall pouring provided in an embodiment of this utility model; Figure 2 A schematic diagram of the transverse horizontal transmission mechanism in a movable guide pipe for concrete wall pouring provided in an embodiment of this utility model; Figure 3 A schematic diagram of the vertical pulley block lifting mechanism in a movable guide pipe for concrete wall pouring provided in an embodiment of this utility model; Figure 4 A schematic diagram of the structure of the guide tube body in the movable guide tube for concrete wall pouring provided in the embodiment of this utility model.
[0012] Figure label: 1-Main frame system; 11-Crossbeam; 12-Connector; 13-Bracket; 14-Reinforcing beam; 2-Horizontal transmission mechanism; 21-Motor; 22-Pulley; 23-Belt; 3-Vertical pulley block lifting mechanism; 31-Windlass; 32-Wire rope; 4-Integral horizontal moving mechanism; 41-Universal casters; 5-Conduit body; 51-Double-layer wire-reinforced geotextile; 52-Stainless steel receiving hopper; 6-Solar panels. Detailed Implementation
[0013] For ease of understanding, the following description, in conjunction with the accompanying drawings, provides a detailed description of the movable guide pipe for concrete wall pouring provided in the embodiments of this utility model.
[0014] This utility model embodiment provides a movable guide pipe for concrete wall pouring, such as... Figures 1-4 As shown, it includes: a main frame system 1, a horizontal transmission mechanism 2, a vertical pulley lifting mechanism 3, an overall horizontal moving mechanism 4, a duct body 5, and a solar panel 6. The main frame system 1 includes: a crossbeam 11, and a bracket 13 connected to the crossbeam 11 via a connector 12, and a solar panel 6 is installed at the junction of the bracket 13 and the crossbeam 11. The transverse horizontal transmission mechanism 2 includes: a motor 21 with a switch installed at one end of the crossbeam 11, and the motor 21 is connected to a pulley 22; the other end of the crossbeam 11 away from the motor 21 is also provided with a pulley 22; the two pulleys 22 are fitted with the same belt 23, and a slider is provided between the two pulleys 22; the slider is connected to the guide tube body 5; The vertical pulley block lifting mechanism 3 includes: a motor installed between two crossbeams 11, and the motor is connected to a winch 31, on which a steel wire rope 32 is wound; the free end of the steel wire rope 32 is connected to the bottom of the guide tube body 5 through a guide pulley; The overall horizontal movement mechanism 4 includes: casters 41 mounted on the bottom of the four brackets 13; The conduit body 5 includes: a double-layer wire-reinforced geotextile 51, and a stainless steel receiving hopper 52 that is matched and connected to the top of the double-layer wire-reinforced geotextile 51.
[0015] Compared with the prior art, the movable guide pipe for concrete wall pouring described in this embodiment of the utility model has the following advantages: The mobile guide pipe for concrete wall pouring provided in this embodiment of the utility model is equipped with a horizontal transmission mechanism 2, a vertical pulley lifting mechanism 3, and an overall horizontal moving mechanism 4. Therefore, it can move and extend freely, avoiding frequent assembly and disassembly, and effectively saving labor costs. Because the device can move and extend freely, and can be reused in conjunction with the guide pipe body 5, material costs are effectively saved. At the same time, the device can move and extend freely without fixed requirements for concrete pouring points, thus ensuring uniform pouring and preventing "holes" in areas with dense reinforcement. Furthermore, this device eliminates the need for personnel to enter the wall for construction, effectively reducing safety hazards. The device is simple and quick to operate, greatly improving installation efficiency and shortening the construction period.
[0016] In practical applications, such as Figures 1-4 As shown, a reinforcing beam 14 can be connected between two adjacent supports 13 via a connector 12, and the reinforcing beam 14 is preferably distributed perpendicularly to the crossbeam 11.
[0017] Among them, such as Figures 1-4 As shown, the solar panel 6 can be fixed to the bracket 13 with bolts, and the edge of the solar panel 6 can preferably be aligned with the edge of the bracket 13 to avoid exceeding the range of the bracket 13; according to the circuit design diagram of the solar power supply system, the lines connecting the solar panel 6 with the energy storage battery, controller and various electrical components (motor, switch) are provided.
[0018] Specifically, such as Figures 1-4 As shown, the above-mentioned double-layer wire-reinforced geotextile 51 can be fixed to the inside of the stainless steel receiving hopper 52 by means of bolt pressing.
[0019] Furthermore, such as Figures 1-4 As shown, the crossbeams 11, supports 13, reinforcing beams 14, and connectors 12 of the main frame system 1 can preferably be made of aluminum profiles.
[0020] Solar power system commissioning: Under natural light conditions, monitor the power generation of solar panel 6, the voltage and charge of the energy storage battery. Even under weak light conditions, the energy storage battery can meet the short-term operating needs of the equipment. If the power supply is unstable, check the installation angle of solar panel 6, whether the wiring connection is normal, or adjust the charging parameters of the energy storage battery. Horizontal transmission mechanism debugging: The guide tube body 5 is moved laterally along the horizontal track by the control system to test the operation. If the positioning accuracy does not meet the requirements, the control parameters of motor 21 or the tension of belt 23 need to be adjusted. Vertical pulley block lifting mechanism debugging: Control the longitudinal extension and retraction of the guide tube body 5, and test the lifting and lowering stability of the guide tube body 5 at different height positions. If the lifting and lowering is not stable, the speed of the winch 31 or the position of the guide pulley needs to be adjusted.
[0021] The above description is merely a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this utility model should be included within the protection scope of this utility model. Therefore, the protection scope of this utility model should be determined by the protection scope of the claims.
Claims
1. A movable guide pipe for pouring concrete walls, characterized in that, include: The main frame system includes a horizontal transmission mechanism, a vertical pulley lifting mechanism, an overall horizontal moving mechanism, as well as the duct body and solar panels. The main frame system includes: a crossbeam, and a bracket connected to the crossbeam via a connector, wherein the solar panel is installed at the junction of the bracket and the crossbeam; The transverse horizontal transmission mechanism includes: a motor with a switch installed at one end of the crossbeam, and the motor is connected to a pulley; a pulley is also provided at the other end of the crossbeam away from the motor; the two pulleys are fitted with the same belt, and a slider is provided between the two pulleys; the slider is connected to the guide tube body. The vertical pulley lifting mechanism includes: a motor installed between the two crossbeams, and the motor is connected to a winch, on which a steel wire rope is wound; the free end of the steel wire rope is connected to the bottom of the guide tube body through a guide pulley; The overall horizontal movement mechanism includes: casters mounted on the bottom of the four brackets; The conduit body includes: a double-layered wire-reinforced geotextile and a stainless steel receiving hopper that is matched and connected to the top of the double-layered wire-reinforced geotextile.
2. The movable guide pipe for concrete wall pouring according to claim 1, characterized in that, A reinforcing beam is connected between two adjacent supports by a connector, and the reinforcing beam is distributed perpendicularly to the crossbeam.
3. The movable guide pipe for concrete wall pouring according to claim 1 or 2, characterized in that, The solar panel is fixed to the bracket with bolts, and the edge of the solar panel is aligned with the edge of the bracket.
4. The movable guide pipe for concrete wall pouring according to claim 1, characterized in that, The double-layer wire-reinforced geotextile is fixed to the inside of the stainless steel receiving hopper by bolt pressing.
5. The movable guide pipe for concrete wall pouring according to claim 2, characterized in that, The main frame system's crossbeams, supports, reinforcing beams, and connectors are all made of aluminum profiles.
