A construction structure for using lattice columns in foundation pits for steel structure support

By using lattice columns and horizontal transfer beams from the demolished foundation pit during steel structure construction, a stable support structure is formed, solving the problems of high rental costs for temporary support materials and insufficient roof load-bearing capacity, thus achieving the effects of low carbon emissions, environmental protection, and cost savings.

CN224955490UActive Publication Date: 2026-11-10CHINA CONSTR FIRST DIV GROUP CONSTR & DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522288785.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-29
Publication Date
2026-11-10
Estimated Expiration
2035-10-29

AI Technical Summary

Technical Problem

In existing steel structure construction, the rental cost of temporary support frames is high, and the load-bearing capacity of the podium roof is insufficient, making it difficult to meet the support requirements of the cantilevered steel structure.

Method used

The lattice columns removed from the foundation pit are used as supporting columns. Combined with horizontal transfer beams, the single-point concentrated load is converted into a line load. Horizontal transfer beams are set on the roof of the podium building, and the load is supported on the transfer beams to form a stable steel structure support structure.

Benefits of technology

It achieves the use of local materials, low carbon emissions and environmental protection, reduces construction costs, solves the problem of insufficient roof load-bearing capacity, and provides stable steel structure support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955490U_ABST
    Figure CN224955490U_ABST
Patent Text Reader

Abstract

This application discloses a construction structure for supporting steel structures using lattice columns in a foundation pit, comprising a core tube, a podium, a transfer beam, and multiple support columns. A cantilevered steel structure is installed around the periphery of the core tube, the podium is located at the bottom periphery of the core tube, and the transfer beam is located on the roof of the podium. Each support column is located around the periphery of the core tube, with its bottom supported by the transfer beam and its top supported by the cantilevered steel structure. Each support column includes multiple lattice columns removed from the foundation pit, each with a length of 4m to 5m. These lattice columns are sequentially arranged along the height of the core tube, with adjacent lattice columns connected. The construction structure for supporting steel structures using lattice columns in a foundation pit provided by this application utilizes multiple lattice columns removed from the foundation pit to form support columns, which are then used as formwork columns. Reusing the internal support lattice columns removed from the foundation pit as formwork columns for the steel structure offers advantages such as local material availability, low carbon footprint, environmental friendliness, and cost savings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, specifically to a construction structure for supporting steel structures using a lattice column in a foundation pit. Background Technology

[0002] During steel structure installation, due to large spans and heavy weights, segmented and grouped hoisting is often required, necessitating the installation of numerous temporary support frames. This is especially true for large cantilevered steel structures, where sufficiently stable temporary support frames must be installed at the cantilever ends. Current construction techniques commonly use temporary support frames such as circular tubular columns and lattice-type lantern columns. These materials are required in large quantities, and projects often resort to leasing them. However, leasing these support materials typically incurs significant costs, placing considerable pressure on project costs.

[0003] Furthermore, the towers of high-rise buildings often employ a core tube + steel frame structure, while the podium is mostly a concrete frame structure. When the tower's outer frame is a cantilevered steel structure, a temporary support frame needs to be erected on the podium roof before the installation of its ground floor steel structure, which places high demands on the load-bearing capacity of the podium roof. If the podium roof directly bears the concentrated load of a single point on the supporting columns, its load-bearing capacity is generally insufficient to meet the requirements.

[0004] In view of the above, this utility model is hereby proposed. Utility Model Content

[0005] To solve one of the above-mentioned technical problems, this utility model provides a construction structure for supporting steel structures using a lattice column in a foundation pit.

[0006] This application provides the following technical solution: A construction structure for supporting steel structures in foundation pits using lattice columns, comprising: Core tube, with cantilevered steel structures provided around its periphery; The podium building is located on the bottom periphery of the core tube; A transfer beam is provided on the roof of the podium building; Multiple support columns are provided, each of which is located around the core tube. Each support column is supported at the bottom by the transfer beam and at the top by the cantilevered steel structure. Each of the supporting columns includes multiple pit demolition grid columns, each with a length of 4m to 5m. The pit demolition grid columns are arranged sequentially along the height direction of the core tube, and adjacent pit demolition grid columns are connected.

[0007] Optionally, the support column includes multiple connectors; The connector is located between two adjacent foundation pit demolition grid columns and inside the two foundation pit demolition grid columns. The connector is welded to the two foundation pit demolition grid columns respectively to connect and fix the two adjacent foundation pit demolition grid columns.

[0008] Optionally, the lattice column for foundation pit demolition includes four first angle steels, which are respectively located at the four vertices of the quadrilateral; The two adjacent first angle steels are fixed together by welding with connecting plates; Each of the connecting pieces is respectively attached to the opposite first angle steel in the two adjacent foundation pit demolition grid columns, and the connecting pieces are welded to the opposite two first angle steels.

[0009] Optionally, the connector is a second angle steel; The two perpendicular plates of the second angle steel are respectively attached and welded to the two perpendicular plates of the first angle steel.

[0010] Optionally, the construction structure for supporting the steel structure in the foundation pit lattice column includes a cover plate, steel blocks, and jacks; The cover plate covers the top of the support column; The steel shim is fixed to the cover plate and supported by the cantilevered steel structure; The jack is mounted on the cover plate, and the jack and the steel pad are offset from each other.

[0011] Optionally, the cover plate includes a flat plate and a cross-shaped rib plate disposed on one side of the flat plate along the thickness direction; The cross-shaped stiffener is inserted into the inner cavity of the support column, and the flat plate is located at the top of the support column; The jack and the steel pad are both vertically connected to the plate.

[0012] Optionally, the steel block includes a middle plate and side plates located on both sides of the middle plate; The intermediate plate is vertically connected to the two side plates respectively; Two receiving spaces are formed between the middle plate and the side plate, and the two receiving spaces are respectively located on both sides of the middle plate along the thickness direction; The two jacks are located in their respective storage spaces.

[0013] Optionally, the transfer beam comprises two H-beams; The two H-beams are welded and fixed together, and the flanges on the same side of the two H-beams are located in the same plane; The support column is vertically welded to the flanges on top of the two H-beams.

[0014] Optionally, a hollow cavity and side openings are formed between the two H-beams; The transfer beam includes stiffening plates located inside the open cavity and welded to the two flanges of the H-beam.

[0015] Optionally, the roof of the podium building is provided with embedded parts; The conversion beam is welded to the embedded part, or the conversion beam is fixed to the embedded part by fasteners.

[0016] By adopting the above technical solution, this application has the following beneficial effects: First, the foundation pit lattice column provided in this application is used as a construction structure for steel structure support. It employs multiple foundation pit demolition lattice columns connected together to form a support column, which is then used as a formwork column. Reusing the internal support lattice columns demolished from the foundation pit as steel structure formwork columns has the advantages of using local materials, being low-carbon and environmentally friendly, and saving costs.

[0017] Secondly, a horizontal transfer beam is installed on the roof of the podium building, and the formwork is supported on the transfer beam, which converts the single-point concentrated load of the formwork column into a line load, thus solving the problem of insufficient roof bearing capacity. Attached Figure Description

[0018] The accompanying drawings, which form part of this application, are used to provide a further understanding of the present invention. The illustrative embodiments and descriptions of the present invention are used to explain the present invention, but do not constitute an undue limitation of the present invention. Obviously, the drawings described below are merely some embodiments; those skilled in the art can obtain other drawings based on these drawings without any creative effort.

[0019] Figure 1 A schematic diagram of the construction structure for steel structure support of the foundation pit lattice column provided in the embodiment is shown. Figure 2 Show Figure 1 A magnified view of a section at point A in the middle; Figure 3 The diagram shows a structural schematic of the supporting column of the construction structure provided in the embodiment, which is used for steel structure support in the foundation pit lattice column. Figure 4 The diagram shows a top view of the connection between adjacent foundation pit demolition lattice columns in the construction structure of the foundation pit lattice column used for steel structure support provided in the embodiment. Figure 5 This illustration shows a structural diagram of a foundation pit lattice column used for steel structure support in a construction structure for foundation pit demolition; Figure 6 The diagram shows a bottom view of the cover plate of the construction structure for steel structure support of the foundation pit lattice column provided in the embodiment. Figure 7The diagram shows a side view of the cover plate of the construction structure for steel structure support of the foundation pit lattice column provided in the embodiment. Figure 8 This is a side enlarged structural schematic diagram of the steel pad block of the construction structure for steel structure support of the foundation pit lattice column provided in the embodiment; Figure 9 The diagram shows a top enlarged structural schematic of the steel pad block of the construction structure used for steel structure support in the foundation pit lattice column provided in the embodiment; Figure 10 A schematic diagram of the transfer beam of the construction structure provided in the embodiment, which is used for steel structure support of the foundation pit lattice column, is shown. Figure 11 The diagram shows a structural schematic of the transfer beam with wing plates in the construction structure of the foundation pit lattice column used for steel structure support provided in the embodiment. Figure 12 The diagram shows a top perspective view of the construction structure provided in the embodiment, in which the transfer beam and the support column of the foundation pit lattice column are used for steel structure support. Figure 13 The diagram shows a structural schematic of the construction process of the foundation pit lattice column used for steel structure support provided in the embodiment.

[0020] In the diagram: 1. Core tube; 2. Podium; 21. Embedded part; 3. Transfer beam; 31. H-beam; 32. Central cavity; 33. Open cavity; 34. Wing plate; 4. Support column; 41. Demolition grid column for foundation pit; 41. First angle steel; 411. Connecting plate; 412. Connecting part; 42. Plate; 421. Cantilever steel structure; 5. Cover plate; 6. Flat plate; 61. Cross stiffener plate; 62. Steel pad; 7. Intermediate plate; 71. Side plate; 72. Jack; 8. Core tube connecting beam; 91. Inclined beam; 92. Detailed Implementation

[0021] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions in the embodiments will be clearly and completely described below with reference to the accompanying drawings. The following embodiments are used to illustrate this utility model, but are not intended to limit the scope of this utility model.

[0022] In the description of this utility model, it should be noted that the terms "upper", "lower", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0023] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation" and "connection" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0024] like Figures 1 to 13 As shown in the embodiment of this application, a construction structure for supporting steel structures using lattice columns in a foundation pit is provided, including a core tube 1, a podium 2, a transfer beam 3, and multiple support columns 4. A cantilevered steel structure 5 is provided around the periphery of the core tube 1, the podium 2 is located at the bottom periphery of the core tube 1, and the transfer beam 3 is located on the roof of the podium 2. Each support column 4 is located around the periphery of the core tube 1, with its bottom supported by the transfer beam 3 and its top supported by the cantilevered steel structure 5. Each support column 4 includes multiple foundation pit demolition lattice columns 41, each with a length of 4m to 5m. These foundation pit demolition lattice columns 41 are sequentially arranged along the height direction of the core tube 1, and adjacent foundation pit demolition lattice columns 41 are connected.

[0025] During the construction of the foundation pit, the foundation pit demolition lattice columns 41 are used. At the end of the foundation pit construction, these columns are removed and left idle. The foundation pit support lattice columns have high axial compressive bearing capacity, high stiffness, and good stability, fully meeting the standards for use as a formwork. However, the length of these support lattice columns is mostly 4m to 5m, which does not meet the length requirements of the formwork. The foundation pit lattice columns provided in this application are used in the construction structure for steel structure support. Multiple foundation pit demolition lattice columns 41 are connected to form support columns 4, which are then used as formwork columns. Reusing the internal support lattice columns removed from the foundation pit as steel structure formwork columns has the advantages of using locally sourced materials, low carbon emissions, environmental friendliness, and cost savings.

[0026] Furthermore, a horizontal transfer beam 3 is installed on the roof of the podium 2, and the formwork is supported on the transfer beam 3, which converts the single-point concentrated load of the formwork column into a line load, thus solving the problem of insufficient roof bearing capacity.

[0027] In some possible implementations, such as Figures 3 to 4As shown, the support column 4 includes multiple connectors 42. The connectors 42 are located between two adjacent foundation pit demolition grid columns 41, and are situated on the inner side of the two foundation pit demolition grid columns 41. The connectors 42 are welded to the two foundation pit demolition grid columns 41 respectively to connect and fix the two adjacent foundation pit demolition grid columns 41. Adding connectors 42 welded to the two adjacent foundation pit demolition grid columns 41 respectively can improve the connection stability between the two foundation pit demolition grid columns 41. The connectors 42 being located on the inner side of the foundation pit demolition grid columns 41 ensures a smooth outer surface and prevents interference with other structures during use.

[0028] In some possible implementations, the foundation pit demolition lattice column 41 includes four first angle steels 411, which are respectively located at the four vertices of a quadrilateral. Adjacent first angle steels 411 are welded together by connecting plates 412. Each connecting piece 42 is respectively attached to the opposite first angle steel 411 in two adjacent foundation pit demolition lattice columns 41, and the connecting piece 42 is welded to the opposite two first angle steels 411. The angle steels of the foundation pit demolition lattice column 41 are among the strongest components in the entire structure, and welding them to the first angle steels 411 during connection ensures structural strength.

[0029] In some possible implementations, the connector 42 is a second angle steel, with two perpendicular plates 421 of the second angle steel respectively bonded and welded to two perpendicular plates 421 of the first angle steel 411. The two plates 421 of the second angle steel are respectively bonded to the two plates 421 of the first angle steel 411 and welded to each other, further improving the strength of the connection.

[0030] In some possible implementations, such as Figures 7 to 9 As shown, the construction structure for supporting the steel structure in the foundation pit lattice column includes a cover plate 6, steel blocks 7, and jacks 8. The cover plate 6 covers the top of the supporting column 4, the steel blocks 7 are fixed to the cover plate 6, and the steel blocks 7 support the cantilevered steel structure 5. The jacks 8 are installed on the cover plate 6, and the jacks 8 and the steel blocks 7 are staggered.

[0031] The lattice column 41 for the foundation pit demolition is a hollow column. The top is covered with a cover plate 6 to increase the support area and ensure stable support for the steel pads 7 and jacks 8 above.

[0032] During normal support operations, jack 8 is not under load, and steel pads 7 are used for support between the demolished lattice column 41 and the cantilevered steel structure 5. Due to the pre-arching of the steel structure and its own weight, the steel structure will experience some settlement after the temporary supports are removed. To ensure stable settlement and uniform stress distribution, the support columns are unloaded in groups, steps, and with counter-bracing. When dismantling support column 4, jack 8 is raised so that it is supported between the demolished lattice column 41 and the cantilevered steel structure 5, and part of the steel pads 7 are cut off. Then, jack 8 is lowered further, and more steel pads 7 are cut off, repeating this operation multiple times until all the steel pads 7 have been cut off. In this way, the force is gradually released when dismantling support column 4, without causing abrupt changes in force or shape, ensuring structural stability.

[0033] During installation, cover plates 6 are pre-welded to the top of the columns. The elevation of each cover plate 6 is measured, and the bottom elevation of the steel beam is determined based on the steel structure design elevation and pre-camber value. Then, the height of the steel shims 7 is calculated. The shims are fabricated on-site and then welded to the steel cover plates 6 to ensure accurate installation of the steel structure. Jacks 8 are installed during unloading.

[0034] During construction, hydraulic jacks 8 are used to symmetrically unload temporary supports at 24 points in 6 groups. Before unloading, 5mm interval grids (flame cutting width) are marked on the upper end of the steel section. During unloading, jacks 8 are raised to tighten the lower surface of the component, cutting the steel section and transferring the supporting force to jacks 8. As jacks 8 descend, the steel section is cut accordingly. The height of the steel section should be controlled to be 5mm lower than the lifting surface of the jacks. Steel section pads 7 can be used as a safety reserve during unloading to prevent jack 8 malfunctions or instability.

[0035] Specifically, during construction, the unloading jack specification 8 should be as follows: the jack specification 8 should be greater than the support top reaction force value. For each of the four unloading points, the unloading jack specification 8 should be consistent, with the jack model 8 selected based on the maximum reaction force at all four points. Since the support reaction force differs for six unloading operations, the jack model 8 selected for each unloading operation will vary. When using the same specification jack 8 for unloading operations on site, it is essential to ensure that the jack model 8 is greater than the maximum support reaction force during the unloading process.

[0036] In some possible implementations, the cover plate 6 includes a flat plate 61 and a cross-shaped stiffening plate 62 disposed on one side of the flat plate 61 along its thickness direction. The cross-shaped stiffening plate 62 is inserted into the inner cavity of the support column 4, and the flat plate 61 is located at the top of the support column 4. The jack 8 and the steel block 7 are both vertically connected to the flat plate 61. The flat plate 61 increases the supporting area. The cross-shaped stiffening plate 62 acts as a reinforcing beam, increasing the strength of the cover plate 6, and also acts as a limiting rib. The cross-shaped stiffening plate 62, inserted into the inner cavity of the support column 4, restricts the position of the cover plate 6, ensuring the stability of the cover plate 6. Furthermore, the cross-shaped stiffening plate 62 can be welded to the inner wall of the inner cavity of the support column 4, further improving the connection firmness of the cover plate 6.

[0037] In some possible implementations, the steel block 7 includes a middle plate 71 and side plates 72 located on both sides of the middle plate 71. The middle plate 71 is vertically connected to the two side plates 72 respectively, forming two receiving spaces between the middle plate 71 and the side plates 72. The two receiving spaces are respectively located on both sides of the middle plate 71 along the thickness direction, and two jacks 8 are respectively located in the corresponding receiving spaces. The reserved receiving space to accommodate the jacks 8 ensures that the jacks 8 and the steel block 7 can be installed simultaneously. The two jacks 8 on both sides can ensure sufficient support force and stable support of the jacks 8.

[0038] In some possible implementations, such as Figures 10 to 12 As shown, the transfer beam 3 comprises two H-beams 31, which are welded and fixed together. The flanges 34 on the same side of the two H-beams 31 are located in the same plane. The support column 4 is vertically welded to the flanges 34 on the top of the two H-beams. The flanges 34 on both sides of the two H-beams 31 are welded separately, which facilitates material sourcing and results in good support stability for the transfer beam 3. Furthermore, it increases the support area, improves the conversion of concentrated loads into line loads, and solves the problem of insufficient roof bearing capacity.

[0039] In some possible implementations, a hollow cavity is formed between the two H-beams 31, and side openings 33 are located on both sides of the central cavity 32. The transfer beam 3 includes stiffening plates located within the openings 33 and welded to the two flanges 34 of the H-beams 31. The addition of flanges 34 can increase the strength of the transfer beam 3, further enhancing its support capacity and stability.

[0040] In some possible implementations, the roof of the podium 2 is provided with embedded parts 21, and the transfer beam 3 is welded to the embedded parts 21; alternatively, the transfer beam 3 is fixed to the embedded parts 21 by fasteners. Welding the transfer beam 3 to the embedded parts 21 ensures the firmness of the transfer beam 3.

[0041] In some possible implementations, the embedded part 21 includes an anchor plate and a plurality of anchor bars on the anchor plate. The anchor plate is embedded in the top slab of the podium 2. One end of the anchor bar is welded to the anchor plate, and the other end extends out of the top slab of the podium 2 to facilitate connection with other structures.

[0042] In some possible implementations, such as Figure 1 As shown, the construction structure for supporting the steel structure in the foundation pit lattice column includes a core tube connecting beam 91 and a diagonal bracing assembly. One end of the core tube connecting beam 91 is connected to the core tube 1, and the other end is connected to the support column 4. One end of the diagonal bracing assembly is connected to the top of the podium 2, and the other end is connected to the support column 4. The installation of the core tube connecting beam 91 and the diagonal bracing assembly can further improve the support stability of the support column 4.

[0043] In some possible implementations, the core tube connecting beam 91 is connected to the connecting plate 412 at one end of the core tube connecting beam 91 connected to the lattice column 41 of the foundation pit demolition. The core tube connecting beam 91 has a large width, which facilitates the connection on the connecting plate 412 and can increase the connection area and improve the connection strength.

[0044] In some possible implementations, the side of the inclined beam 92 group that connects to the grid column 41 of the foundation pit demolition is connected to the first angle steel 411, and the end of the inclined beam 92 group that connects to the podium 2 can be connected to the embedded part 21.

[0045] Furthermore, the diagonal bracing assembly includes two parallel diagonal braces, which are respectively connected to the outer surfaces of two first angle steels 411 on the same side.

[0046] The preferred embodiments disclosed above are merely illustrative of this application. These preferred embodiments do not exhaustively describe all details, nor do they limit the application to the specific implementations described. Clearly, many modifications and variations can be made based on the content of this specification. This specification selects and specifically describes these embodiments to better explain the principles and practical applications of this application, thereby enabling those skilled in the art to better understand and utilize this application. This application is limited only by the claims and their full scope and equivalents.

Claims

1. A construction structure for supporting steel structures in foundation pits using lattice columns, characterized in that, include: Core tube, with cantilevered steel structures provided around its periphery; The podium building is located on the bottom periphery of the core tube; A transfer beam is provided on the roof of the podium building; Multiple support columns are provided, each of which is located around the core tube. Each support column is supported at the bottom by the transfer beam and at the top by the cantilevered steel structure. Each of the supporting columns includes multiple pit demolition grid columns, each with a length of 4m to 5m. The pit demolition grid columns are arranged sequentially along the height direction of the core tube, and adjacent pit demolition grid columns are connected.

2. The construction structure for steel structure support using the lattice column in the foundation pit according to claim 1, characterized in that, The support column includes multiple connectors; The connector is located between two adjacent foundation pit demolition grid columns and inside the two foundation pit demolition grid columns. The connector is welded to the two foundation pit demolition grid columns respectively to connect and fix the two adjacent foundation pit demolition grid columns.

3. The construction structure for steel structure support using the lattice column in the foundation pit according to claim 2, characterized in that, The lattice column for the foundation pit demolition includes four first angle steels, which are respectively located at the four vertices of the quadrilateral. The two adjacent first angle steels are fixed together by welding with connecting plates; Each of the connecting pieces is respectively attached to the opposite first angle steel in the two adjacent foundation pit demolition grid columns, and the connecting pieces are welded to the opposite two first angle steels.

4. The construction structure for steel structure support using the foundation pit lattice column according to claim 3, characterized in that, The connecting component is a second angle steel; The two perpendicular plates of the second angle steel are respectively attached and welded to the two perpendicular plates of the first angle steel.

5. The construction structure for steel structure support using the lattice column in the foundation pit according to claim 1, characterized in that, Includes cover plate, steel pad block and jack; The cover plate covers the top of the support column; The steel shim is fixed to the cover plate and supported by the cantilevered steel structure; The jack is mounted on the cover plate, and the jack and the steel pad are offset from each other.

6. The construction structure for steel structure support using the foundation pit lattice column according to claim 5, characterized in that, The cover plate includes a flat plate and a cross-shaped rib plate disposed on one side of the flat plate along the thickness direction; The cross-shaped stiffener is inserted into the inner cavity of the support column, and the flat plate is located at the top of the support column; The jack and the steel pad are both vertically connected to the plate.

7. The construction structure for steel structure support using the lattice column in the foundation pit according to claim 6, characterized in that, The steel block includes a middle plate and side plates located on both sides of the middle plate; The intermediate plate is vertically connected to the two side plates respectively; Two receiving spaces are formed between the middle plate and the side plate, and the two receiving spaces are respectively located on both sides of the middle plate along the thickness direction; The two jacks are located in their respective storage spaces.

8. The construction structure for steel structure support using the lattice column in the foundation pit according to claim 1, characterized in that, The transfer beam comprises two H-beams; The two H-beams are welded and fixed together, and the flanges on the same side of the two H-beams are located in the same plane; The support column is vertically welded to the flanges on top of the two H-beams.

9. The construction structure for steel structure support using the lattice column in the foundation pit according to claim 8, characterized in that, A hollow cavity is formed between the two H-beams, and side openings are located on both sides of the central cavity; The transfer beam includes stiffening plates located inside the open cavity and welded to the two flanges of the H-beam.

10. The construction structure for steel structure support using the foundation pit lattice column according to any one of claims 1-9, characterized in that, The roof of the podium building is equipped with embedded parts; The conversion beam is welded to the embedded part, or the conversion beam is fixed to the embedded part by fasteners.