A rapid installation device for borehole stress gauges in roadway side filling bodies without coal pillars

The rapid installation device for borehole stress gauges in roadway backfill in pillarless mining has solved the problem of difficult construction for stress monitoring of roadway backfill in pillarless mining, achieving rapid and accurate stress monitoring and reducing construction difficulty and maintenance costs.

CN224957497UActive Publication Date: 2026-11-10SHAANXI COAL IND GRP SHENMU NINGTIAOTA MINING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522543448.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-28
Publication Date
2026-11-10
Estimated Expiration
2035-11-28

Smart Images

  • Figure CN224957497U_ABST
    Figure CN224957497U_ABST
Patent Text Reader

Abstract

This utility model discloses a rapid installation device for a borehole stress gauge in a coal pillarless roadway side-side filling body, comprising an inner tube and a flexible layer. The flexible layer covers the outer circumference of the inner tube, and the inner tube is movable relative to the flexible layer along its axial direction. This rapid installation device for a coal pillarless roadway side-side filling body eliminates the need for traditional drilling, significantly reducing the cumbersome preparation work such as drilling rig setup and water supply pipeline connection. It also avoids drilling in high-strength roadway side-side filling bodies, reducing construction difficulty and labor intensity. Simultaneously, it reduces the need for operators to perform high-intensity physical labor underground, lowering safety risks associated with construction. Since drilling is unnecessary, the installation process is faster, meeting the needs of real-time monitoring and improving the accuracy and efficiency of stress monitoring. The device has strong adaptability; furthermore, the reduction in traditional drilling also lowers maintenance costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of coal mine stress gauge installation equipment, specifically to a rapid installation device for a borehole stress gauge in a roadway without coal pillars and beside the roadway filling body. Background Technology

[0002] With the continuous advancement of coal mining technology and the increasing awareness of environmental protection in my country, pillarless roadway retention mining, as a green mining technology, has demonstrated significant advantages in improving coal resource recovery rates, reducing roadway excavation workload, and alleviating the tension in mine mining succession. However, during pillarless roadway retention mining, the stress changes of the roadway backfill, as a key structure for isolating the goaf and supporting the roadway roof, directly affect the stability and safety of the roadway. Therefore, real-time monitoring and data analysis of the roadway backfill are crucial to ensuring the safety of pillarless roadway retention mining.

[0003] Currently, stress monitoring of roadway backfill mainly relies on borehole stress gauges. Installing these gauges requires drilling into the roadway backfill, a process characterized by numerous preparation steps, construction difficulties, high labor intensity, and low efficiency. Utility Model Content This utility model aims to at least partially solve one of the technical problems in the related art.

[0004] Therefore, embodiments of this utility model propose a rapid installation device for a borehole stress gauge of a roadway side filling body in a coal pillar-free roadway. The rapid installation device for borehole stress gauges of the coal pillar-free roadway side filling body according to this utility model includes an inner tube and a flexible layer. The flexible layer covers the outer circumferential surface of the inner tube, and the inner tube is movable relative to the flexible layer along its axial direction.

[0005] In some embodiments, the flexible layer includes a first lubricating layer and a first thin film layer, and the inner tube, the first lubricating layer and the first thin film layer are arranged sequentially from the inside to the outside.

[0006] In some embodiments, the flexible layer further includes a second lubricating layer and a second thin film layer, wherein the inner tube, the first lubricating layer, the first thin film layer, the second lubricating layer, and the second thin film layer are arranged sequentially from the inside to the outside.

[0007] In some embodiments, the outer diameter of the inner tube is D, and the thickness of the first lubricating layer is M, wherein 17M≤D≤21M.

[0008] In some embodiments, the thickness of the second lubricating layer is N, where N > M.

[0009] In some embodiments, 8.5N ≤ D ≤ 10.5N.

[0010] In some embodiments, the first lubricating layer and / or the second lubricating layer is a lubricating grease layer.

[0011] In some embodiments, the inner tube is a rigid tube.

[0012] In some embodiments, the inner tube is a steel pipe.

[0013] In some embodiments, the first film layer and the second film layer are plastic film layers.

[0014] The rapid installation device for borehole stress gauges in roadway side filling bodies without coal pillars, as described in this embodiment, significantly reduces the need for traditional drilling, thus minimizing cumbersome preparation work such as drilling rig setup and water supply pipeline connection. It also avoids drilling in high-strength roadway side filling bodies, reducing construction difficulty and labor intensity. Furthermore, it reduces the need for operators to perform high-intensity physical labor underground, lowering safety risks associated with construction. The elimination of drilling allows for faster installation, meeting the needs of real-time monitoring and improving the accuracy and efficiency of stress monitoring. The device can be adjusted according to the strength and process requirements of different roadway side filling bodies, exhibiting strong adaptability. In addition, the reduction of traditional drilling also lowers maintenance costs. Attached Figure Description

[0015] Figure 1 This is an installation diagram of the rapid installation device for the borehole stress gauge of the roadway side filling body in the coal pillar-free roadway according to an embodiment of this utility model.

[0016] Figure 2 This is a schematic diagram of the structure of the rapid installation device for the borehole stress gauge of the roadway side filling body without coal pillars, according to an embodiment of this utility model.

[0017] Figure label: 100. Rapid installation device for borehole stress gauge of roadway side filling body without coal pillar; 1. Inner tube; 2. Flexible layer; 201. First lubrication layer; 202. First thin film layer; 203. Second lubrication layer; 204. Second thin film layer. Detailed Implementation

[0018] The embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, and should not be construed as limiting the present invention.

[0019] like Figure 1 and Figure 2As shown, the quick installation device 100 for borehole stress gauge of coal pillarless roadway side filling body in this embodiment of the present invention includes an inner tube 1 and a flexible layer 2. The flexible layer 2 covers the outer circumferential surface of the inner tube 1, and the inner tube 1 is movable relative to the flexible layer 2 along its axial direction.

[0020] The rapid installation device 100 for a borehole stress gauge in a roadway-side backfill body without coal pillars, according to this embodiment of the invention, consists of an inner tube 1 and a flexible layer 2. The inner tube 1 is located at the center, and the flexible layer 2 covers the outer circumference of the inner tube 1. The inner tube 1 can move axially relative to the flexible layer 2. During installation, the entire installation device is first placed into the roadway-side backfill body, at which point the inner tube 1 and the flexible layer 2 together form a whole. As the roadway-side backfill body solidifies, the inner tube 1 is pulled out from the flexible layer 2, reserving space for the installation of the stress gauge. The stress gauge is pushed into the reserved hole in the flexible layer 2, and initial pressure is applied to the stress gauge to ensure good contact between it and the reserved hole.

[0021] Because traditional drilling is unnecessary, the system significantly reduces the tedious preparation work such as setting up drilling rigs and connecting water supply pipelines. It also avoids drilling in high-strength roadway backfill, reducing construction difficulty and labor intensity. Furthermore, it reduces the need for operators to perform strenuous physical labor underground, lowering safety risks associated with construction. The elimination of drilling also allows for faster installation, meeting the needs of real-time monitoring and improving the accuracy and efficiency of stress monitoring. The device can be adjusted to suit the strength and process requirements of different roadway backfills, demonstrating strong adaptability. In addition, the reduction in traditional drilling also lowers maintenance costs.

[0022] In some embodiments, the flexible layer 2 includes a first lubricating layer 201 and a first thin film layer 202, with the inner tube 1, the first lubricating layer 201 and the first thin film layer 202 arranged sequentially from the inside to the outside.

[0023] like Figure 2 As shown, the flexible layer 2 includes a first lubrication layer 201 and a first thin film layer 202 from the inside out. The inner tube 1 is located in the innermost layer. The first lubrication layer 201 is tightly attached to the inner tube 1, and the first thin film layer 202 covers the outside. After the entire installation device is placed into the roadway filling body, when the inner tube 1 is pulled out, the first lubrication layer 201 and the first thin film layer 202 work together to ensure that the inner tube 1 can move smoothly. After the inner tube 1 is pulled out, the stress gauge is pushed into the first thin film layer 202 through the reserved hole and pressure is applied to ensure good contact between the stress gauge and the reserved hole.

[0024] The presence of the first lubrication layer 201 reduces friction during the extraction of the inner tube 1, making it easier to pull the inner tube 1 out of the flexible layer 2. The lubrication layer improves extraction efficiency, reduces installation time, and further enhances the rapid response capability of the entire monitoring system. The first thin film layer 202 provides additional protection against contamination or damage to the lubrication layer, while ensuring its long-term effectiveness. The first thin film layer 202 also acts as a seal, preventing materials from the roadway backfill from entering the lubrication layer, ensuring its cleanliness and effectiveness. This multi-layered design can be adjusted according to different geological conditions and material properties to adapt to different roadway backfill environments. Through this design, the reliability and stability of the entire installation device are enhanced, thereby ensuring the accuracy of stress monitoring data.

[0025] In some embodiments, the flexible layer 2 further includes a second lubricating layer 203 and a second thin film layer 204, with the inner tube 1, the first lubricating layer 201, the first thin film layer 202, the second lubricating layer 203 and the second thin film layer 204 arranged sequentially from the inside to the outside.

[0026] like Figure 2 As shown, the flexible layer 2, from the inside out, includes an inner tube 1, a first lubrication layer 201, a first thin film layer 202, a second lubrication layer 203, and a second thin film layer 204. This layered structure design allows each layer to play a specific role, jointly ensuring the smooth installation of the stress gauge and the accuracy of monitoring.

[0027] After the installation device is placed into the roadway filling body, during the extraction process of the inner tube 1, the first and second lubrication layers 203 work together to reduce friction, making the movement of the inner tube 1 smoother. After the inner tube 1 is extracted, the stress gauge is pushed into the reserved hole formed by the first thin film layer 202 and the second thin film layer 204, and pressure is applied to make the stress gauge make tight contact with the reserved hole.

[0028] The dual lubrication layers (first lubrication layer 201 and second lubrication layer 203) further reduce the friction between the inner tube 1 and the flexible layer 2, making the inner tube 1 easier to extract and reducing construction difficulty. Due to the reduced friction, the extraction efficiency of the inner tube 1 is improved, thereby shortening installation time and increasing construction speed. The first thin film layer 202 and the second thin film layer 204 provide additional protection against contamination or damage to the lubrication layer, ensuring its effectiveness. The dual thin film layers provide better sealing, preventing materials or other impurities from the roadside backfill from entering the lubrication layer and keeping it clean. The multi-layered design improves the overall reliability of the device, ensuring the accuracy and stability of the stress gauge in complex and changing environments. Due to the improved lubrication and protection performance, the service life of the entire installation device is extended, reducing the frequency of maintenance and replacement.

[0029] In some embodiments, the outer diameter of the inner tube 1 is D, and the thickness of the first lubricating layer 201 is M, wherein 17M≤D≤21M.

[0030] In other words, the outer diameter of the inner tube 1 is between 17 and 21 times the thickness of the first lubricating layer 201. During installation, the dimensional ratio between the inner tube 1 and the first lubricating layer 201 ensures that the interaction between the inner tube 1 and the lubricating layer is appropriate when the inner tube 1 is pulled out, so that it is neither too thin to cause difficulty in pulling out, nor too thick to cause waste of the lubricating layer.

[0031] By maintaining an appropriate dimensional ratio, the friction between the inner tube 1 and the lubrication layer can be optimized, ensuring smooth and stable extraction of the inner tube 1. A suitable dimensional ratio helps improve extraction efficiency and reduces installation time and workload. Optimized design avoids the use of excessive lubrication layer material, thus reducing manufacturing costs. With a suitable dimensional ratio, the lubrication layer provides sufficient lubrication, reducing wear on the inner tube 1 during extraction. An appropriate dimensional ratio enhances the structural stability of the entire installation device, making it more reliable in mining environments. Adjusting the value of M allows for adaptation to different geological conditions and the strength of the roadway backfill, resulting in better adaptability of the installation device. Optimized design between the inner tube 1 and the lubrication layer helps ensure that the stress gauge can accurately measure stress changes in the roadway backfill after installation.

[0032] In some embodiments, the thickness of the second lubricating layer 203 is N, where N > M, that is, the second lubricating layer 203 is thicker than the first lubricating layer 201.

[0033] The second lubrication layer 203 is thicker than the first lubrication layer 201, providing a more durable lubrication effect, reducing friction between the inner tube 1 and the flexible layer 2, and decreasing resistance during extraction. The presence of the second lubrication layer 203 makes the extraction of the inner tube 1 smoother, thus improving installation efficiency. The thicker lubrication layer better protects the inner tube 1 and the first lubrication layer 201, preventing damage caused by friction or external pressure during extraction. Lubrication layers of varying thicknesses can adapt to different geological conditions and the physical properties of the roadway backfill, making the installation device more adaptable. A thicker lubrication layer reduces wear during long-term use, thereby extending the service life of the entire installation device. The addition of the second lubrication layer 203 helps improve the overall reliability of the device, ensuring the accuracy and stability of the stress gauge in complex and changing environments.

[0034] In some embodiments, 8.5N≤D≤10.5N. There is a specific proportional relationship between the outer diameter D of the inner tube 1 and the thickness N of the second lubricating layer 203, that is, 8.5N≤D≤10.5N. In other words, the outer diameter of the inner tube 1 is between 8.5 and 10.5 times the thickness of the second lubricating layer 203.

[0035] By setting the ratio of the outer diameter of the inner tube 1 to the thickness of the second lubrication layer 203, the gap between the inner tube 1 and the flexible layer 2 can be optimized, preventing excessive friction between them and avoiding an excessively large gap that could affect stability. A suitable ratio helps improve the efficiency of inner tube 1 extraction, reducing installation time and workload. An appropriate ratio enhances the structural stability of the entire installation device, making it more reliable in mining environments. Adjusting the value of N allows for adaptation to different geological conditions and the strength of the roadway backfill, thus improving the adaptability of the installation device. Precise dimensional design reduces unnecessary material usage and lowers costs. Optimized design between the inner tube 1 and the lubrication layer helps ensure that the stress gauge can accurately measure stress changes in the roadway backfill after installation. Maintaining a reasonable dimensional ratio ensures the stability and reliability of the installation device during long-term use.

[0036] In some embodiments, the first lubricating layer 201 and / or the second lubricating layer 203 are lubricating grease layers.

[0037] Lubricating grease is a commonly used lubricating material with good lubrication properties. It can form a thin film between friction surfaces, reducing friction and wear. When the installation device is placed in the roadway filling body, the lubricating grease layer can provide the necessary lubrication, making the extraction of inner tube 1 smoother.

[0038] The lubricating grease layer significantly reduces the coefficient of friction between the inner tube 1 and the flexible layer 2, decreasing resistance during extraction. The presence of the lubricating grease layer makes the extraction of the inner tube 1 smoother, thus improving installation efficiency. The lubricating grease layer reduces wear between the inner tube 1 and the flexible layer 2, extending the service life of the device. The lubricating grease layer can be adjusted according to different geological conditions and the physical properties of the roadway backfill to adapt to different construction environments. The lubricating grease layer reduces labor intensity during construction and improves construction safety. The presence of the lubricating grease layer helps ensure that the stress gauge can accurately measure stress changes in the roadway backfill after installation. Due to the good lubrication properties of the lubricating grease layer, the frequency of maintenance and replacement of the device can be reduced, thereby lowering maintenance costs.

[0039] In some embodiments, the inner tube 1 is a rigid tube.

[0040] Rigid tubes are typically made of high-strength, wear-resistant materials such as steel, alloys, or other composite materials. These tubes possess high rigidity and strength, enabling them to maintain their shape and stability during extraction. When the installation device is placed within the roadway-side backfill, the rigid tube maintains its shape during extraction, unaffected by external pressure or deformation.

[0041] Rigid tubes maintain their shape during extraction, ensuring unaffected extraction performance by external pressure or deformation. The shape stability of the rigid tube facilitates smoother extraction of the inner tube 1, improving installation efficiency. The strength and rigidity of the rigid tube enhance the structural stability of the entire installation device, making it more reliable in mining environments. Rigid tubes can be adjusted to suit different geological conditions and the strength of the roadway backfill, adapting to various construction environments. The shape stability of the rigid tube helps ensure that the stress gauge can accurately measure stress changes in the roadway backfill after installation. The wear resistance of the rigid tube reduces the frequency of device maintenance and replacement, thus lowering maintenance costs. The use of rigid tubes reduces labor intensity during construction and improves construction safety.

[0042] In some embodiments, the inner tube 1 is a steel pipe.

[0043] Steel pipe is a commonly used structural material with high strength, rigidity, and wear resistance. It can withstand significant pressure and weight and is not easily deformed. When the installation device is placed in the roadway filling body, the steel pipe, as the inner tube 1, can maintain its shape and stability, and the extraction effect will not be affected by external pressure or deformation.

[0044] In some embodiments, the first film layer 202 and the second film layer 204 are plastic film layers.

[0045] The plastic film layer is a lightweight, soft, and somewhat tough material commonly used for packaging and protection. It provides a certain degree of isolation and cushioning. When the installation device is placed in the roadway backfill, the plastic film layer can protect the internal lubrication layer and inner tube 1, preventing the entry of materials from the roadway backfill or other impurities.

[0046] The plastic film layer isolates the material of the roadway backfill, preventing it from contaminating or damaging the internal lubrication layer and inner tube 1. The plastic film layer possesses a certain degree of toughness, providing cushioning during extraction and reducing direct contact and friction between the inner tube 1 and the flexible layer 2. The plastic film layer is lightweight and easy to process, allowing for cutting and shape adjustment according to different design requirements. It can be adjusted to suit various geological conditions and the physical properties of the roadway backfill to adapt to different construction environments. The isolation and protection provided by the plastic film layer helps ensure that the stress gauge can accurately measure stress changes in the roadway backfill after installation. Due to the protective effect of the plastic film layer, the frequency of maintenance and replacement of the device can be reduced, thereby lowering maintenance costs.

[0047] In the description of this utility model, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.

[0048] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this utility model, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0049] In this utility model, unless otherwise explicitly specified and limited, the terms "installation," "connection," "joining," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between them; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0050] In this utility model, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "on top of," and "over" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0051] In this utility model, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of this utility model. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Furthermore, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0052] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. A quick installation device of borehole stress meter for coal pillar free gateway side filling body, characterized in that, Comprise: an inner tube (1); and a flexible layer (2) coated on the outer circumferential surface of the inner tube (1), the inner tube (1) being movable relative to the flexible layer (2) along its axial direction.

2. The rapid installation device of the borehole stress meter of the coal pillar free gateway side packing body according to claim 1, characterized in that, The flexible layer (2) comprises a first lubricating layer (201) and a first film layer (202), and the inner tube (1), the first lubricating layer (201) and the first film layer (202) are arranged in order from inside to outside.

3. The rapid installation device of borehole stress meter for coal pillar free gateway side packing body according to claim 2, characterized in that, The flexible layer (2) further comprises a second lubricating layer (203) and a second film layer (204), and the inner tube (1), the first lubricating layer (201), the first film layer (202), the second lubricating layer (203) and the second film layer (204) are arranged in order from inside to outside.

4. The rapid installation device of the borehole stress meter of the no-pillar gateway-side packing body according to claim 3, characterized in that, The outer diameter of the inner tube (1) is D, the thickness of the first lubricating layer (201) is M, and 17M≤D≤21M.

5. The rapid installation device of borehole stress meter for coal pillar free gateway side packing body according to claim 4, characterized in that, The thickness of the second lubricating layer (203) is N, and N>M.

6. The rapid installation device of borehole stress meter for coal pillar free gateway side packing body according to claim 5, characterized in that, 8.5N≤D≤10.5N.

7. The rapid installation device of borehole stress meter for coal pillar free gateway side packing body according to claim 3, characterized in that, The first lubricating layer (201) and / or the second lubricating layer (203) is a lubricating grease layer.

8. The rapid installation device of borehole stress meter for coal pillar free gateway side packing body according to claim 1, characterized in that, The inner tube (1) is a rigid tube.

9. The rapid installation of borehole stress meter in coal pillar free gateway side packing body according to claim 8, characterized in that, The inner tube (1) is a steel tube.