A bridge pile foundation structure

By using a structural design that combines mechanical anchoring at the pile tip with active support on the pile side, the problems of low bearing capacity and easy attenuation of frictional resistance in traditional bridge pile foundations are solved, thus achieving high efficiency, stability and safety of bridge pile foundations.

CN224982225UActive Publication Date: 2026-11-17ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522664776.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-16
Publication Date
2026-11-17
Estimated Expiration
2035-12-16

AI Technical Summary

Technical Problem

Traditional bridge pile foundations rely on passive and inefficient methods to obtain the bearing capacity of the pile tip, and the source of pile side friction is singular and easily attenuated, posing safety hazards, especially in hard rock formations or water erosion environments.

Method used

The structural design adopts mechanical anchoring at the pile end and active support on the pile side. The anchoring components form a surface support at the pile end to enhance the end bearing capacity, and the side pressure components form multiple friction and pressure paths around the pile to enhance the stability and durability of the pile foundation.

Benefits of technology

It improves the vertical bearing capacity and stability of bridge pile foundations, enabling them to maintain high bearing capacity and safety redundancy under complex loads and water scouring conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982225U_ABST
    Figure CN224982225U_ABST
Patent Text Reader

Abstract

This utility model discloses a bridge pile foundation structure, which includes a pile cap, a buffer base on the top of the pile cap, multiple piles on the top of the pile cap, side pressure components on the outer circumference of the multiple piles, and an anchoring component at the bottom of the piles. The anchoring component includes a connecting plate, a hinge frame integrally formed on the top of the connecting plate, multiple hinge ears hinged at both ends of the top of the hinge frame, a driving wedge hinged to the inner side wall of the connecting plate, an anchoring block bolted to the outer side wall of the connecting plate, and multiple anchoring pins integrally formed on the outer circumference of the anchoring block. A driving rod is slidably connected inside the pile, and the driving rod is located on the top of the driving wedge. This bridge pile foundation structure improves the vertical bearing capacity and stability of the pile foundation through mechanical anchoring at the pile end. At the same time, through active support on the pile side, multiple friction and pressure paths are created, effectively resisting soil deterioration and erosion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of bridge pile foundation technology, specifically a bridge pile foundation structure. Background Technology

[0002] In highway bridge engineering, traditional pile foundations such as bored piles are the mainstream form of deep foundations. Their working principle mainly relies on the side friction between the concrete surface of the pile body and the soil of the borehole wall, as well as the end resistance provided by the soil at the pile tip. This interaction between the pile foundation and the soil is essentially passive, and its bearing capacity largely depends on the physical and mechanical properties of the undisturbed soil at the pile location.

[0003] While existing bridge pile foundation technologies offer numerous advantages, they still suffer from the following problems: The end bearing capacity of traditional pile foundations can only be improved by increasing the pile diameter or the depth of rock embedment. When encountering hard rock strata, drilling and rock embedding operations are inefficient and costly. In soil bearing strata, the end bearing capacity relies entirely on the passive reaction force of the finite soil below, unable to actively expand the pressure surface, resulting in limited and highly uncertain increases in bearing capacity. Secondly, the side friction of traditional pile foundations originates entirely from the static friction between the pile and the soil, its magnitude determined by the pile's surface area and soil properties. During long-term operation, the pile-soil interface may loosen due to material deterioration, groundwater level fluctuations, or vehicle vibrations. More importantly, for bridge piers in rivers, the scouring of the surrounding soil by the water flow directly leads to a significant reduction in side friction, and traditional pile foundation structures lack any internal mechanism to compensate for or enhance this capacity, posing a safety hazard. Utility Model Content

[0004] The purpose of this section is to outline some aspects of the embodiments of this utility model and to briefly introduce some preferred embodiments. Simplifications or omissions may be made in this section, as well as in the abstract and title of this application, to avoid obscuring the purpose of these documents; however, such simplifications or omissions should not be used to limit the scope of this utility model.

[0005] 1. Technical problems to be solved:

[0006] To address the problems of passive and inefficient methods for obtaining pile end bearing capacity and the single and easily attenuated source of pile side friction mentioned above, this utility model is proposed.

[0007] Therefore, the purpose of this utility model is to provide a bridge pile foundation structure that improves the vertical bearing capacity and stability of the pile foundation through mechanical anchoring at the pile end. At the same time, through active support on the pile side, multiple friction and pressure paths are created to effectively resist soil deterioration and erosion.

[0008] 2. Technical Solution:

[0009] To solve the above-mentioned technical problems, according to one aspect of the present invention, the present invention provides the following technical solution:

[0010] A bridge pile foundation structure includes a pile cap, a buffer base at the top of the pile cap, and multiple piles at the top of the pile cap. A side-pressure assembly is provided on the outer circumference of each pile. The side-pressure assembly includes a transmission block, one end of which is hinged to a transmission wheel, and the other end of which is welded to a side-pressure plate. A resistance-increasing plate is welded to the side wall of the side-pressure plate, and a check plate is integrally formed and connected to the top of the resistance-increasing plate. An anchoring assembly is provided at the bottom of each pile. The anchoring assembly includes a connecting plate, a hinge frame integrally formed and connected to the top of the connecting plate, and multiple hinge ears hinged to both ends of the top of the hinge frame. The piles are welded to the side walls of the multiple hinge ears. A driving wedge is hinged to the inner side wall of the connecting plate, and an anchoring block is bolted to the outer side wall of the connecting plate. Multiple anchor pins are integrally formed and connected to the outer circumference of the anchoring block. A driving rod is slidably connected inside the pile, and the driving rod is located on top of the driving wedge.

[0011] As a preferred embodiment of the bridge pile foundation structure of this utility model, the buffer base includes multiple rubber plates, and multiple steel plates are bonded to the top of the multiple rubber plates.

[0012] As a preferred embodiment of the bridge pile foundation structure of this utility model, the drive rod has multiple ratchet racks welded to its sidewall, multiple ratchet racks have multiple pawls meshing with their sidewalls, the multiple pawls have their sidewalls hinged to the pile foundation, the drive rod has multiple drive protrusions welded to its sidewall, the multiple drive protrusions are disposed above the multiple transmission wheels, and the bottom of the drive rod has multiple drive ramps.

[0013] In a preferred embodiment of the bridge pile foundation structure of this utility model, a hydraulic cylinder is inserted into the top of the pile foundation, an oil port connector is welded to the top of the hydraulic cylinder, a piston rod is inserted into the bottom of the hydraulic cylinder, a piston plate is welded to the bottom of the piston rod, and the bottom of the piston plate is connected to the drive rod by bolts.

[0014] As a preferred embodiment of the bridge pile foundation structure of this utility model, the bottom of the transmission block is provided with a receiving groove, and a shear pin is inserted into the inner circumference of the receiving groove, with the bottom of the shear pin inserted into the pile foundation.

[0015] In a preferred embodiment of the bridge pile foundation structure of this utility model, the bottom of the driving wedge is provided with a receiving groove, a shear pin is inserted into the inner circumference of the receiving groove, a support bar is inserted into the bottom of the shear pin, the top of the support bar is slidably connected to the driving wedge, and multiple support frames are welded to both ends of the support bar, with the pile foundation welded to the top of the multiple support frames.

[0016] In a preferred embodiment of the bridge pile foundation structure of this utility model, the cross-section of the resistance-increasing plate is a wavy line structure, and the cross-section of the anti-reverse plate is an obtuse triangular structure.

[0017] 3. Beneficial effects:

[0018] Compared with the prior art, the beneficial effects of this utility model are:

[0019] In this type of bridge pile foundation structure, the anchoring component of this utility model can expand the anchoring block and anchoring needle outward and downward under the action of the driving rod, forming a mechanically expanded anchoring disc in the bearing layer of the pile end. This structure transforms the traditional point end bearing into a surface support, and forms a strong mechanical interlock with the soil and rock through the anchoring needle, thereby improving the end bearing capacity and pull-out resistance of the pile foundation. This is crucial for ensuring that highway bridges do not settle under complex loads.

[0020] In this type of bridge pile foundation structure, the side pressure component of this utility model can simultaneously drive multiple sets of side pressure plates with resistance plates and anti-reverse plates to press laterally into the soil around the pile. This not only increases the contact area and friction between the pile and the soil, but more importantly, it forms multiple "local bearing rings" in the middle of the pile body, dispersing and transferring the upper load to deeper and more stable soil layers. Even if the surface soil around the pile fails due to water erosion or freeze-thaw cycles, these internal mechanical support rings can still provide effective bearing capacity, enhancing the durability and safety redundancy of the pile foundation. Attached Figure Description

[0021] To more clearly illustrate the technical solutions of the embodiments of this utility model, the present utility model will be described in detail below with reference to the accompanying drawings and detailed embodiments. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Among them:

[0022] Figure 1 This is a schematic diagram of the overall structure of a bridge pile foundation according to the present invention;

[0023] Figure 2 This is a schematic diagram of a bridge pile foundation structure according to the present invention;

[0024] Figure 3This is a schematic diagram of the internal structure of a bridge pile foundation according to the present invention;

[0025] Figure 4 This is a schematic diagram of the side pressure component structure of a bridge pile foundation according to the present invention;

[0026] Figure 5 This is a schematic diagram of an anchoring component for a bridge pile foundation structure according to the present invention.

[0027] The following are the labeling instructions in the diagram: 1. Buffer base; 11. Steel plate; 12. Rubber plate; 2. Foundation; 3. Pile foundation; 4. Side pressure assembly; 41. Anti-reverse plate; 42. Side pressure plate; 43. Transmission wheel; 44. Transmission block; 45. Resistance plate; 46. Shear pin one; 5. Anchoring assembly; 51. Hinge ear; 52. Hinge frame; 53. Connecting plate; 54. Anchoring plate; 55. Anchor pin; 56. Shear pin two; 57. Drive wedge; 58. Support frame; 59. Support bar; 6. Hydraulic cylinder; 61. Oil port connector; 62. Piston rod; 63. Piston plate; 7. Drive rod; 71. Ratchet; 72. Pawl; 73. Drive protrusion. Detailed Implementation

[0028] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings.

[0029] This utility model is described in detail with reference to the schematic diagrams. When describing the embodiments of this utility model, for ease of explanation, the cross-sectional views illustrating the device structure may be partially enlarged, not adhering to the usual scale. Furthermore, the schematic diagrams are merely examples and should not be construed as limiting the scope of protection of this utility model. In actual manufacturing, the three-dimensional spatial dimensions of length, width, and depth should be included.

[0030] The orientation or positional relationship indicated in the terminology is based on the orientation or positional relationship shown in the accompanying drawings and is only for the convenience of describing the present invention and simplifying the description. It is not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.

[0031] The term "connection method" should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0032] The embodiments of this utility model will now be described in further detail with reference to the accompanying drawings.

[0033] This utility model provides an overall structural schematic diagram of one embodiment of a bridge pile foundation structure, including:

[0034] Please see Figures 1-5 This embodiment of a bridge pile foundation structure includes a pile cap 2, a buffer base 1 on the top of the pile cap 2, and multiple pile foundations 3 on the top of the pile cap 2. A side pressure assembly 4 is provided on the outer circumference of the multiple pile foundations 3. The side pressure assembly 4 includes a transmission block 44. One end of the transmission block 44 is hinged to a transmission wheel 43, which contacts the inclined surface of a drive protrusion 73, converting the downward linear motion of the drive rod 7 into a force that pushes the side pressure plate 42 laterally. The other end of the transmission block 44 is welded to the side pressure plate 42. A resistance-increasing plate 45 is welded to the side wall of the side pressure plate 42. A check plate 41 is integrally formed and connected to the top of the resistance-increasing plate 45. An anchoring assembly 5 is provided at the bottom of the pile foundation 3. The anchoring assembly 5 includes a connecting plate 53. A hinge frame 52 is integrally formed and connected to the top of the connecting plate 53. Multiple hinge ears 51 are hinged to both ends of the top of the hinge frame 52. The pile foundation 3 is welded to the side wall of the multiple hinge ears 51. A drive wedge block 57 is hinged to the inner side wall of the connecting plate 53. An anchoring block 54 is bolted to the outer side wall of the connecting plate 53. Multiple anchoring needles 55 are integrally formed and connected to the outer circumference of the anchoring block 54 for piercing and squeezing the bearing layer to provide strong pull-out resistance. A drive insertion rod 7 is slidably connected inside the pile foundation 3. The drive insertion rod 7 is set on the top of the drive wedge block 57.

[0035] It is worth noting that, in order to buffer and absorb vibration energy from the top, the buffer base 1 specifically includes multiple rubber plates 12, and multiple steel plates 11 are bonded to the top of the multiple rubber plates 12. The steel plates 11 provide compressive strength and limit the lateral deformation of the rubber; the rubber plates 12 provide elasticity, bear vertical loads and adapt to the small rotation and expansion and contraction of the beam, playing a role in buffering and shock absorption. This "sandwich" structure can greatly improve the vertical stiffness and bearing capacity of the buffer base 1, while maintaining its horizontal flexibility.

[0036] Next, in order to improve the overall structural stability, specifically, multiple ratchet racks 71 are welded to the side wall of the drive rod 7, and multiple pawls 72 are engaged with the side wall of the multiple ratchet racks 71 to achieve mechanical anti-reverse in conjunction with the ratchet racks 71. The side wall of the multiple pawls 72 is hinged to the pile foundation 3. Multiple drive protrusions 73 are welded to the side wall of the drive rod 7, and the multiple drive protrusions 73 are set above the multiple transmission wheels 43. Multiple drive ramps are opened at the bottom of the drive rod 7.

[0037] Meanwhile, in order to provide the main driving force, specifically, a hydraulic cylinder 6 is inserted into the top of the pile foundation 3, and an oil port connector 61 is welded to the top of the hydraulic cylinder 6 for connecting an external oil pump. A piston rod 62 is inserted into the bottom of the external hydraulic cylinder 6, and a piston plate 63 is welded to the bottom of the piston rod 62. The bottom of the piston plate 63 is connected to the drive rod 7 by bolts.

[0038] Furthermore, in order to initially fix the transmission block 44, specifically, the bottom of the transmission block 44 is provided with a receiving groove, and a shear pin 46 is inserted into the inner circumference of the receiving groove to provide initial fixation and prevent the side pressure plate 42 from moving out on its own before use. The bottom of the shear pin 46 is inserted into the pile foundation 3.

[0039] It is worth noting that, in order to initially fix the drive wedge 57, specifically, the bottom of the drive wedge 57 is provided with a receiving groove 2, and a shear pin 2 56 is inserted into the inner wall of the receiving groove 2 to prevent the connecting plate 53 from unfolding naturally without power during the transportation of the pile foundation 3. A support bar 59 is inserted into the bottom of the shear pin 2 56, and the top of the support bar 59 is slidably connected to the drive wedge 57. Multiple support frames 58 are welded to both ends of the support bar 59, and the pile foundation 3 is welded to the top of the multiple support frames 58.

[0040] Finally, to enhance anchoring force, specifically, the cross-section of the resistance-increasing plate 45 is a wavy structure, which is equivalent to significantly increasing the contact surface area with the soil. The wavy "troughs" can also violently agitate and compact the surrounding soil during pressing, forming a high-density "compacted shell," thereby significantly improving lateral friction resistance, with an effect far superior to a smooth surface. The cross-section of the anti-reverse plate 41 is an obtuse-angled triangular structure, used to form an inclined slope. When the side pressure plate is pushed outward, the slope makes it easy to press into the soil; while when the soil reaction force tries to push it back, the acute side of the triangle will firmly lock the soil, forming a mechanical self-locking, achieving the anti-reverse effect of "easy to exit but difficult to enter."

[0041] In addition, the circuits, electronic components and modules involved in this utility model are all existing technologies, which can be fully implemented by those skilled in the art, and need not be elaborated upon. The content protected by this utility model does not involve any improvement to the internal structure and method.

[0042] Combination Figures 1-5 The specific usage process of a bridge pile foundation structure according to this embodiment is as follows:

[0043] 1: Prefabrication and pile driving: The side pressure component 4, anchoring component 5, drive rod 7 and shear pin are prefabricated in the pile foundation 3 in the factory. After being transported to the site, the pile foundation is driven to the predetermined elevation using conventional equipment. At this time, all moving parts are locked by the shear pin and kept in a retracted state to ensure a smooth pile driving process.

[0044] 2: Linkage expansion and bearing mechanism formation: Using standard hydraulic equipment in the existing technology, the drive rod 7 is connected and driven downward. The drive rod first cuts the shear pin and releases the constraint. Then, its bottom inclined surface pushes the drive wedge 57 of the anchoring component 5, causing the anchoring block 54 and the anchoring needle 55 to rotate outward and downward, forming a mechanical anchor at the pile end. At the same time, the inclined surface of the drive protrusion 73 on its side wall presses the transmission wheel 43 of the side pressure component 4, pushing the side pressure plate 42 with the resistance plate 45 and the anti-reverse plate 41 to extend laterally, forming a multi-level lateral support in the middle of the pile body.

[0045] 3: Mechanical self-locking and structural forming: When the drive rod 7 reaches the designed stroke, the ratchet 71 on it engages with the pawl 72 inside the pile body, forming a permanent mechanical lock to prevent retraction. At the same time, the anti-reverse plate structure on the side pressure plate also effectively resists soil rebound. After the hydraulic equipment is withdrawn, the foundation 2 can be poured and the superstructure can be constructed. At this point, a pile foundation structure with high bearing capacity and high safety redundancy officially enters the working state.

[0046] Although the present invention has been described above with reference to embodiments, various modifications can be made and components can be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the features in the embodiments disclosed in this invention can be combined with each other in any way. The lack of an exhaustive description of these combinations in this specification is merely for the sake of brevity and resource conservation. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A bridge pile foundation structure, characterized by, The system includes a foundation (2), a buffer base (1) on top of the foundation (2), and multiple piles (3) on top of the foundation (2). A side-pressure assembly (4) is provided on the outer circumference of each pile (3). The side-pressure assembly (4) includes a transmission block (44), a transmission wheel (43) hinged to one end of the transmission block (44), a side-pressure plate (42) welded to the other end of the transmission block (44), a resistance-increasing plate (45) welded to the side wall of the side-pressure plate (42), and an anti-reverse plate (41) integrally formed on the top of the resistance-increasing plate (45). An anchoring assembly (5) is provided at the bottom of each pile (3). The system includes a connecting plate (53), on the top of which is integrally formed and connected to a hinge frame (52). Multiple hinge ears (51) are hinged to both ends of the top of the hinge frame (52). The pile foundation (3) is welded to the side walls of the multiple hinge ears (51). A drive wedge (57) is hinged to the inner side wall of the connecting plate (53). An anchor block (54) is bolted to the outer side wall of the connecting plate (53). Multiple anchor pins (55) are integrally formed to the outer circumference of the anchor block (54). A drive rod (7) is slidably connected inside the pile foundation (3). The drive rod (7) is located on the top of the drive wedge (57).

2. A bridge pile foundation structure according to claim 1, characterised in that The buffer base (1) includes multiple rubber plates (12), and multiple steel plates (11) are bonded to the top of the multiple rubber plates (12).

3. A bridge pile foundation structure according to claim 2, characterised in that, The drive rod (7) has multiple ratchet racks (71) welded to its side wall, and multiple pawls (72) meshing with the side walls of the multiple ratchet racks (71). The side walls of the multiple pawls (72) are hinged to the pile foundation (3). The drive rod (7) has multiple drive protrusions (73) welded to its side wall, and the multiple drive protrusions (73) are located above the multiple transmission wheels (43). The bottom of the drive rod (7) has multiple drive ramps.

4. A bridge pile foundation structure according to claim 3, characterised in that, A hydraulic cylinder (6) is inserted into the top of the pile foundation (3), an oil port connector (61) is welded to the top of the hydraulic cylinder (6), a piston rod (62) is inserted into the bottom of the hydraulic cylinder (6), a piston plate (63) is welded to the bottom of the piston rod (62), and the drive rod (7) is connected to the bottom of the piston plate (63) by bolts.

5. A bridge pile foundation structure according to claim 4, characterised in that, The bottom of the transmission block (44) is provided with a receiving groove, and a shear pin (46) is inserted into the inner circumference of the receiving groove. The bottom of the shear pin (46) is inserted into the pile foundation (3).

6. A bridge pile foundation structure according to claim 5, characterised in that, The bottom of the drive wedge (57) is provided with a receiving groove 2, and a shear pin 2 (56) is inserted into the inner circumference of the receiving groove 2. A support bar (59) is inserted into the bottom of the shear pin 2 (56). The top of the support bar (59) is slidably connected to the drive wedge (57). Multiple support frames (58) are welded to both ends of the support bar (59). The pile foundation (3) is welded to the top of the multiple support frames (58).

7. The bridge pile foundation structure according to claim 6, characterized in that, The cross-section of the resistance-increasing plate (45) is a wavy line structure, and the cross-section of the anti-reverse plate (41) is an obtuse triangle structure.