A multi-channel combustible gas detector simultaneous calibration device

By using a multi-channel combustible gas detector simultaneous calibration device, the detection end of the detector and the pipeline under test can be quickly connected by a docking device and a drive component, which solves the problem of cumbersome operation in the multi-channel calibration process and achieves efficient batch testing.

CN224985448UActive Publication Date: 2026-11-17XINJIANG KEHUA TIMES TESTING TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202621507315.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2026-09-23
Publication Date
2026-11-17
Estimated Expiration
2036-09-23

AI Technical Summary

Technical Problem

Existing combustible gas detectors have cumbersome connection operations during multi-channel calibration, making it difficult to meet the efficiency requirements of batch testing.

Method used

A multi-channel combustible gas detector simultaneous calibration device was designed. The device enables rapid sealing connection between the detector's detection end and the pipeline under test through a docking device. The drive component drives the bracket to slide, so that the limit pin and the guide groove cooperate, which is converted into the axial feed and circumferential rotation of the sleeve, realizing the automatic tightening and disassembly of the joint and valve.

Benefits of technology

It improves the calibration efficiency of multi-channel combustible gas detectors, reduces manual operation, and enables batch synchronous calibration of multiple pipelines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985448U_ABST
    Figure CN224985448U_ABST
Patent Text Reader

Abstract

This utility model belongs to the technical field of oil and gas detection equipment, and discloses a multi-channel combustible gas detector simultaneous calibration device, including detectors and docking devices that cooperate with each other. The docking device includes: a frame; a sleeve with a through groove arranged along its axial direction, and a guide groove arranged spirally in the circumferential direction on the side wall of the sleeve; a limiting pin, fixed on the frame, with one end of the limiting pin being a mating end for insertion into the guide groove to guide the sleeve to move along the trajectory of the guide groove; a connector, located in the through groove and slidable along the axial direction of the through groove, with one end of the connector having an internal thread, and the free end communicating with the detection end of the detector through a pipe; a bracket, located on the frame and slidable along the direction of the limiting pin, with the top end of the sleeve rotatably mounted on the bracket; and a driving assembly for driving the bracket to slide along the direction of the limiting pin, so that the mating end of the limiting pin engages with the guide groove. This utility model solves the problem of rapid docking between the detection end of the detector and the pipeline to be tested.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This solution belongs to the technical field of oil and gas detection equipment, specifically involving a multi-channel combustible gas detector simultaneous calibration device. Background Technology

[0002] In industries such as petrochemicals, flammable gases such as methane, propane, and butane are widely present. These gases are highly flammable and explosive, and leaks can easily cause major safety accidents such as fires and explosions. Therefore, it is essential to detect and inspect flammable gases. Typical core verification items include indication error, response time, zero drift, and range drift.

[0003] Because chemical production systems typically employ a distributed layout with multiple pipelines and nodes, different process sections and pipelines often handle different types and concentration ranges of flammable gas media, resulting in a multi-channel parallel gas detection network. Inspecting individual pipelines sequentially is inefficient; therefore, batch simultaneous calibration is necessary to reduce the overall calibration time.

[0004] See the existing publication (announcement) document CN207037895U, which discloses an interlocking protection device for a gas alarm calibration device. The device mainly includes components such as a solenoid valve, a gas delivery pipeline, a gas alarm, a relay, and calibration interfaces. The gas delivery pipeline connects to multiple standard gas cylinders and can deliver standard gas to the gas alarm to be calibrated. Several calibration interfaces are arranged on the pipeline, which can be connected to the detection probes of the gas alarm to complete the calibration operation.

[0005] For example, the aforementioned gas detection device connects to the probe of the gas alarm being tested via a detection interface. However, in actual connection, to ensure a stable and leak-proof connection, the interface and probe are mostly fastened with threads. When calibrating multiple channels, workers typically need to manually disassemble and reassemble multiple threads, a cumbersome process that makes it difficult to quickly meet the needs of batch testing, resulting in low efficiency. Utility Model Content

[0006] The purpose of this solution is to provide a multi-channel combustible gas detector simultaneous calibration device to solve the problem of rapid connection between the detector's detection end and the pipeline under test.

[0007] To achieve the above objectives, this solution provides a multi-channel combustible gas detector simultaneous calibration device, comprising mutually cooperating detectors and a docking device, wherein the docking device includes: frame; A sleeve, wherein the sleeve is provided with a through groove arranged along its axial direction, and the side wall of the sleeve is provided with a guide groove arranged spirally in the circumferential direction; A limiting pin is fixedly mounted on the frame, and one end of the limiting pin is a mating end, used to insert into the guide groove to guide the sleeve to move along the trajectory of the guide groove; The connector is located in the through groove and can slide along the axial direction of the through groove. One end of the connector is provided with an internal thread for threaded connection with the valve of the pipeline to be tested, and the free end is connected to the detection end of the detector through a pipeline. The bracket is mounted on the frame and can slide along the direction of the limiting pin; the top end of the sleeve is rotatably mounted on the bracket. A driving component is used to drive the bracket to slide along the direction of the limiting pin, so that the mating end of the limiting pin engages with the guide groove.

[0008] The principle and effect of this solution are as follows: A sealing connection is achieved between the detector's detection end and the valve of the pipeline under test via a docking device. Then, the valve of the pipeline under test is opened, allowing gas from the pipeline to be delivered to the detector for calibration through the connector and pipe. During the docking operation, the valve of the pipeline under test is first fixed in the corresponding position on the frame. The drive assembly drives the support to slide along the direction of the limit pin, thereby inserting the limit pin into the guide groove on the side wall of the sleeve. This converts the linear axial movement of the support into the axial feed and circumferential rotation of the sleeve. Since the connector in the through groove can slide axially along the through groove, it drives the connector to rotate around the same circumference, thus engaging and tightening the internal thread of the connector end with the external thread of the valve, completing the sealing connection between the valve of the pipeline under test and the connector. After calibration, the drive assembly reverses and drives the support to move backward, allowing the sleeve to engage with the limit pin a second time, and then rotates the sleeve in the opposite direction, thereby loosening the connector from the valve and completing the disassembly. In this solution, the tightening and loosening of the joint and valve can be achieved simply by moving the drive bracket axially, avoiding the need for manual connection of the joint and valve sequentially, thus improving the connection efficiency.

[0009] Furthermore, the side wall of the sleeve is provided with a limiting groove that cooperates with the limiting pin. There are two sets of the limiting grooves arranged symmetrically, and they are located at the top and bottom of the side wall of the sleeve, respectively. The limiting grooves are arranged in a direction parallel to the axis of the sleeve. One end of the limiting groove is connected to the guide groove, and the other end penetrates the end face of the top or bottom of the sleeve.

[0010] The principle and effect of this solution are as follows: In the initial stage when the drive component drives the sleeve to feed axially, the mating end of the limit pin first enters the axially extending limit groove from the opening of the limit groove on the end face of the sleeve. At this time, the limit groove plays a corrective and guiding role for the sleeve, constraining the sleeve to move only in a straight line, while ensuring the coaxiality of the sleeve and the valve under test. As the sleeve continues to move axially, the limit pin travels along the limit groove to the position where it connects with the guide groove, and then naturally transitions into the spiral guide groove. At this time, the limit pin and the spiral guide groove cooperate to convert the linear motion of the sleeve into axial feed plus circumferential rotational motion, thereby driving the threaded connection between the connector and the valve, avoiding the alignment error and jamming problem when the limit pin directly connects to the spiral groove.

[0011] Furthermore, the connection end between the pipe and the joint is connected to a rotary joint, and the rotating end of the rotary joint is coaxially rotatably connected to the free end of the joint.

[0012] The principle and effect of this solution are as follows: during the process of threaded connection and disassembly of the joint following the rotation of the sleeve, the rotating joint can keep the pipe connected to the detector at the rear end fixed and will not twist with the joint, thus avoiding the situation of pipe entanglement, pulling and deformation.

[0013] Furthermore, a sliding groove is provided inside the through groove, the sliding groove is arranged along the axial direction of the through groove, and the side wall of the joint is slidably connected to the sliding groove.

[0014] The principle and effect of this solution are as follows: the groove is used to provide positioning and guidance for the axial movement of the joint, so as to avoid displacement and dislocation during the movement process.

[0015] Furthermore, the sidewall of the connector is provided with a rubber layer.

[0016] The principle and effect of this solution are as follows: the rubber layer is used to increase the friction coefficient between the side wall of the joint and the contact surface of the groove. When the end of the joint abuts against the end face of the valve of the pipeline under test and is subjected to a reverse pushing force, the friction force generated by the contact surface cancels the reverse force, constraining the joint from easily sliding backward and giving way. This allows the joint to complete the threaded engagement with the valve during the rotation of the sleeve, thereby avoiding the problem of the joint being passively pushed back after being resisted by the valve during the docking process and failing to complete the threaded engagement normally.

[0017] Furthermore, both ends of the through groove are provided with limiting parts, which are matched with the two ends of the connector for limiting.

[0018] The principle and effect of this solution is to limit the maximum travel of the connector and prevent it from dislodging.

[0019] Furthermore, the frame is equipped with a clamp for holding the pipeline to be tested, which, after holding the pipeline to be tested, makes the valve and the connector coaxial.

[0020] The principle and effect of this solution are as follows: during operation, the pipe to be tested is clamped with a fixture to constrain and position the pipe and ensure that the valve at the end of the pipe is coaxially aligned with the connector.

[0021] Furthermore, the number of fixtures is several groups arranged along the length of the frame, and each group includes several fixtures.

[0022] The principle and effect of this solution is that it can perform batch testing on multiple pipelines under test simultaneously.

[0023] Furthermore, the drive assembly includes a cylinder, the piston rod of which is fixedly connected to the bracket, and the cylinder body is arranged along a sliding direction parallel to the bracket.

[0024] The principle and effect of this solution are as follows: during operation, the extension and retraction of the cylinder piston rod drives the support to move linearly back and forth along a predetermined trajectory, driving the sleeve to complete axial feeding. With the help of the limit pin and guide groove, the joint and the valve under test can be automatically screwed and locked, and disassembled and separated.

[0025] Furthermore, the number of sleeves is equal to the number of each set of clamps; a support plate is provided on the frame, the support plate can slide along the length of the frame, the bracket is slidably mounted on the support plate, and the cylinder body of the cylinder is fixedly mounted on the support plate.

[0026] The principle and effect of this scheme are: to make the number of sleeves correspond one-to-one with the number of single clamps, to match a single sleeve joint with a valve to be tested, and to enable simultaneous connection and verification of multiple pipelines. Attached Figure Description

[0027] Figure 1 This is a schematic diagram of the overall structure of the multi-channel combustible gas detector simultaneous calibration device of this utility model; Figure 2 This is a schematic diagram of the docking device of this utility model; Figure 3 This is a schematic diagram of the structure of the sleeve, connector, and valve of this utility model. Figure 4 This is a schematic diagram of the internal structure of the sleeve, connector, and valve of this utility model.

[0028] The corresponding labels in the attached drawings are named as follows: Detector 1, docking device 2, frame 21, support plate 211, sleeve 22, through groove 221, guide groove 222, limiting groove 223, slide 224, limiting part 225, limiting pin 23, joint 24, pipe 241, bracket 25, drive assembly 26, cylinder 261, rotary joint 27, clamp 28, pipeline to be tested 3, valve 31. Detailed Implementation

[0029] The embodiments of this utility model are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this utility model, and should not be construed as limiting this utility model.

[0030] In the description of this utility model, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.

[0031] Furthermore, features specified as "first" or "second" may explicitly or implicitly include one or more of those features, used to distinguish and describe features, without any order or emphasis. In the description of this utility model, unless otherwise stated, "multiple" means two or more.

[0032] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0033] The following is in conjunction with the appendix Figure 1-4 This invention describes a multi-channel combustible gas detector simultaneous calibration device, comprising a detector 1 and a docking device 2 that cooperate with each other. The detector 1 is existing equipment and will not be described in detail here. The docking device 2 is used to achieve rapid sealing and docking between the detector 1 and the valve 31 of the pipeline 3 to be tested, enabling batch synchronous calibration of multiple pipelines.

[0034] Please continue reading. Figure 1 and Figure 2The docking device 2 includes a frame 21, on which clamps 28 are provided for holding the pipes 3 to be tested. The clamps 28 adopt a claw-type structure, and the clamping surface is provided with an anti-slip pad to avoid scratching the outer wall of the pipes 3 to be tested during the clamping process. This constrains the position of the pipes 3 to be tested, ensuring that the valve 31 at the end of the pipes 3 to be tested is coaxial with the docking structure described below, avoiding docking misalignment caused by axial misalignment. The number of clamps 28 is three sets arranged at intervals along the length of the frame 21. Each set includes three clamps 28 arranged side by side at intervals, which can simultaneously clamp and fix multiple pipes 3 to be tested, realizing batch synchronous verification of multiple pipes 3 to be tested. The top of the frame 21 is provided with a linear guide pair (not shown) along its length. The support plate 211 is slidably mounted on the frame 21 through the linear guide pair and can slide as a whole along the length of the frame 21 to adjust the working position of the docking device 2 and adapt to the three sets of pipes 3 to be tested in different positions. The surface of the support plate 211 is provided with sliding guide rails (not shown) in a direction parallel to the axis of the sleeve 22. The bracket 25 is mounted on the support plate 211 through the sliding guide rails. The top of the support plate 211 is also fixedly mounted with a drive assembly 26. The drive assembly 26 is a cylinder 261. The cylinder body of the cylinder 261 is fixedly mounted on the support plate 211, and the cylinder body of the cylinder 261 is fixedly mounted in a sliding direction parallel to the bracket 25. The piston rod end of the cylinder 261 is fixedly connected to the bracket 25. During operation, the cylinder 261 drives the bracket 25 to slide in a direction parallel to the axis of the sleeve 22 through the extension and retraction of the piston rod.

[0035] Please continue reading. Figures 2-4The lower part of the bracket 25 is rotatably mounted with several sleeves 22 via bearings. The number of sleeves 22 corresponds one-to-one with the number of clamps 28 in each set. In this embodiment, there are three sleeves 22, and each sleeve 22 corresponds to the docking operation of one pipeline 3 to be tested. The sleeve 22 has a through groove 221 extending along its axial direction inside, and the inner wall of the through groove 221 has a sliding groove 224 extending along its axial direction. The two ends of the through groove 221 are integrally formed with limiting parts 225, which can form a bidirectional limiting on the axial sliding stroke of the connector 24 to limit the maximum movement range of the connector 24 and avoid the problem of the connector 24 dislodging. The sleeve 22 has guide grooves 222 extending spirally in the circumferential direction on its sidewalls. Simultaneously, the sleeve 22 also has two sets of symmetrically arranged limiting grooves 223 on its sidewalls. The two sets of limiting grooves 223 are located at opposite ends of the guide grooves 222, and are arranged parallel to the axis of the sleeve 22. One end of the limiting groove 223 is smoothly connected to the guide groove 222, and the other end penetrates the end face of the corresponding end of the sleeve 22. Limiting pins 23 are fixedly installed on the frame 21 at positions corresponding to each sleeve 22. One end of the limiting pin 23 is a mating end, extending towards the sleeve 22, and the mating end can abut against the guide groove 222 and the limiting groove 223. In the initial stage of the axial feeding of the sleeve 22 along with the bracket 25, the mating end of the limiting pin 23 first enters the axially extending limiting groove 223 from the opening of the limiting groove 223 at the lower end of the sleeve 22. At this time, the limiting groove 223 guides the sleeve 22, constraining the sleeve 22 to move only in a straight line and avoiding helical feeding, while making the sleeve 22 coaxial with the valve 31 under test. As the sleeve 22 continues to move axially, the limiting pin 23 travels along the limiting groove 223 to the position where it communicates with the guide groove 222, and then naturally transitions into the helical guide groove 222. At this time, the limiting pin 23 and the helical guide groove 222 cooperate, converting the linear motion of the sleeve 22 into axial feeding and circumferential rotational motion. As the sleeve 22 continues to move axially downward, the limiting pin 23 moves to the contact point between the upper limiting groove 223 and the guide groove 222. At this position, the limiting pin 23 has two movement paths: either it continues to spiral along the guide groove 222, or it enters the limiting groove 223. However, since the limiting groove 223 is set in a direction parallel to the axis of the sleeve 22 (in the same direction as the extension and retraction of the piston rod of the cylinder 261), and the guide groove 222 is spirally set circumferentially along the side wall of the sleeve 22, when the cylinder 261 pushes the sleeve 22 axially, the thrust is parallel to the limiting groove 223. If the limiting pin 23 continues to advance in the spiral direction of the guide groove 222, it must overcome the resistance of axial movement and circumferential rotation at the same time. Therefore, under the action of the cylinder 261, the limiting pin 23 will choose the vertical path with less resistance to enter the limiting groove 223. At this time, no spiral feeding movement will occur, avoiding over-engagement of the joint 24 and the valve 31.

[0036] Please continue reading. Figure 3 and Figure 4The connector 24 is disposed within the through groove 221. A raised ridge is integrally formed on the side wall of the connector 24 corresponding to the position of the sliding groove 224. The raised ridge is embedded in the sliding groove 224 to form a sliding fit. The sliding groove 224 provides positioning and guidance for the axial movement of the connector 24, constraining the connector 24 to only slide linearly axially along the through groove 221. When the end of the connector 24 abuts against the end face of the valve 31 in the pipeline under test, it will be subjected to a reverse thrust. To allow the connector 24 to be screwed into the valve 31, a rubber layer is fitted on the outer wall of the connector 24 to increase the friction coefficient between the side wall of the connector 24 and the contact surface of the sliding groove 224. The friction force generated by the contact surface counteracts the reverse force of the valve 31, constraining the connector 24 from sliding backward and allowing the sleeve 22 to rotate during operation, enabling the connector 24 to complete the threaded connection with the valve 31. The end of connector 24 facing the pipeline 3 under test has an internal thread for engaging with the external thread of valve 31 in the pipeline 3. The other end of connector 24 is connected to pipeline 241 via rotary connector 27. The rotating end of rotary connector 27 is interference-fitted with the end of connector 24, and the fixed end of rotary connector 27 is sealed to pipeline 241. The other end of pipeline 241 is connected to the detection end of detector 1. During the process of connecting and disconnecting the threaded joints as connector 24 rotates with sleeve 22, rotary connector 27 allows connector 24 to rotate freely to achieve docking and locking, while pipeline 241 connected to detector 1 at the rear remains fixed and will not twist with connector 24, thus avoiding entanglement, bending, pulling and deformation of the pipeline. It should be noted that since the sleeve 22 achieves circumferential rotation through axial movement and engagement with the guide groove 222 of the helix via the limiting pin 23, to prevent the guide groove 222 from directly jamming with the limiting pin 23, those skilled in the art need to make adaptive adjustments to the spacing between adjacent threads of the guide groove 222. That is, the spacing between adjacent threads needs to be set to be larger. However, the thread engagement between the internal thread of the connector 24 and the external thread of the valve 31 only requires the connector 24 to rotate along the axial direction of the sleeve 22, thus it will not affect the thread engagement between the internal thread of the connector 24 and the external thread of the valve 31. Simultaneously, to ensure that the internal thread of the connector 24 and the external thread of the valve 31 are tightened properly, the number of threads in the guide groove 222 needs to be no less than the number of internal threads in the connector 24.

[0037] During operation, the multiple test pipelines 3 are first clamped and fixed on the corresponding fixtures 28, ensuring that the valves 31 and connectors 24 at the ends of the test pipelines 3 are coaxially aligned. The position of the support plate 211 is adjusted and locked. Then, the cylinder 261 is started, and the piston rod of the cylinder 261 extends, driving the bracket 25 and all sleeves 22 to advance axially synchronously. The limiting pin 23 first enters the limiting groove 223 to straighten and guide the sleeves 22, and then transitions into the guide groove 222, driving all sleeves 22 to advance and rotate synchronously. At this time, the connector 24 is constrained by the sliding groove 224 to move axially and rotate, converting the rotational motion of the sleeves 22 into the threaded engagement action of the connector 24 and the valve 31, thereby quickly completing the synchronous docking of the multiple connectors 24 and the valves 31. After docking is completed, the gas circuit switch valve of the pipeline to be tested 3 is opened, and the gas to be tested is delivered to the detector 1 through the connector 24 and the pipeline 241, so that the multi-channel synchronous verification operation can be completed. After the verification is completed, the gas circuit switch valve is closed, the piston rod of the control cylinder 261 is retracted, and the sleeve 22 is driven to move in the opposite direction, so that the connector 24 and the valve 31 are automatically and synchronously released, so that the disassembly can be completed quickly, and the support plate 211 is moved to the next set of pipelines to be tested 3 for subsequent verification operations.

[0038] The above descriptions are merely embodiments of this utility model, and common knowledge regarding specific structures and characteristics is not elaborated upon here. It should be noted that those skilled in the art can make various modifications and improvements without departing from the structure of this utility model, and these should also be considered within the scope of protection of this utility model. These modifications will not affect the effectiveness of the implementation of this utility model or the practicality of the patent. The scope of protection claimed in this application shall be determined by the content of its claims, and the specific embodiments described in the specification can be used to interpret the content of the claims.

Claims

1. A simultaneous testing device for multi-channel combustible gas detectors, comprising a detector (1) and a docking device (2) cooperating with each other, characterized in that, The docking device (2) includes: Rack (21); Sleeve (22), the sleeve (22) is provided with a through groove (221) arranged along its axial direction, and the side wall of the sleeve (22) is provided with a guide groove (222) arranged in a circumferential spiral direction. Limiting pin (23), the limiting pin (23) is fixed on the frame (21), and one end of the limiting pin (23) is a mating end, used to insert into the guide groove (222) to guide the sleeve (22) to move along the trajectory of the guide groove (222); The connector (24) is located in the through groove (221) and can slide along the axial direction of the through groove (221). One end of the connector (24) is provided with an internal thread for threaded connection with the valve (31) of the pipeline (3) to be tested. The free end is connected to the detection end of the detector (1) through the pipe (241). The bracket (25) is mounted on the frame (21) and can slide along the direction of the limiting pin (23). The top end of the sleeve (22) is rotatably mounted on the bracket (25). The drive assembly (26) is used to drive the bracket (25) to slide along the direction of the limiting pin (23) and make the mating end of the limiting pin (23) engage with the guide groove (222).

2. The multi-channel combustible gas detector simultaneous calibration device according to claim 1, characterized in that: The sleeve (22) has a limiting groove (223) on its side wall that cooperates with the limiting pin (23). The limiting groove (223) is arranged in two symmetrical sets and is located at the top and bottom of the side wall of the sleeve (22). The limiting groove (223) is arranged in a direction parallel to the axis of the sleeve (22). One end of the limiting groove (223) is connected to the guide groove (222), and the other end passes through the end face of the top or bottom of the sleeve (22).

3. The multi-channel combustible gas detector simultaneous calibration device according to claim 1, characterized in that: The connection end of the pipe (241) and the connector (24) is connected to a rotary joint (27), and the rotating end of the rotary joint (27) is coaxially rotatably connected to the free end of the connector (24).

4. The multi-channel combustible gas detector simultaneous calibration device according to claim 1, characterized in that: The through groove (221) is provided with a sliding groove (224), the sliding groove (224) is arranged along the axial direction of the through groove (221), and the side wall of the connector (24) is slidably connected to the sliding groove (224).

5. The multi-channel combustible gas detector simultaneous calibration device according to claim 4, characterized in that: The sidewall of the connector (24) is provided with a rubber layer.

6. The multi-channel combustible gas detector simultaneous calibration device according to claim 4, characterized in that: The two ends of the through groove (221) are provided with limiting parts (225), and the limiting parts (225) are matched with the two ends of the connector (24).

7. The multi-channel combustible gas detector simultaneous calibration device according to claim 1, characterized in that: The frame (21) is provided with a clamp (28) for clamping the pipeline (3) to be tested. After the clamp (28) clamps the pipeline (3) to be tested, the valve (31) and the connector (24) are coaxial.

8. The multi-channel combustible gas detector simultaneous calibration device according to claim 7, characterized in that: The number of clamps (28) is several groups arranged along the length of the frame (21), and each group includes several clamps (28).

9. The multi-channel combustible gas detector simultaneous calibration device according to claim 8, characterized in that: The drive assembly (26) includes a cylinder (261), the piston rod of the cylinder (261) is fixedly connected to the bracket (25), and the cylinder body of the cylinder (261) is arranged in a sliding direction parallel to the bracket (25).

10. The multi-channel combustible gas detector simultaneous calibration device according to claim 9, characterized in that: The number of sleeves (22) is equal to the number of each set of clamps (28); a support plate (211) is provided on the frame (21), the support plate (211) can slide along the length direction of the frame (21), the bracket (25) is slidably provided on the support plate (211), and the cylinder body of the cylinder (261) is fixedly provided on the support plate (211).

Citation Information

Patent Citations

  • Gaseous alarm calibrating installation interlocking protection device

    CN207037895U