A test fixture for the main control board of an electric hospital bed

By designing a test fixture for the main control board of an electric hospital bed, and adopting a structure of a bearing plate, a spring pressure plate, a side clamping plate, and an upper pressure plate, combined with an electric push rod and a tester, automated testing of the main control board of the electric hospital bed was realized. This solved the problems of low testing efficiency and poor accuracy in the existing technology, and improved the accuracy and reliability of the test.

CN224985769UActive Publication Date: 2026-11-17XIAMEN SETUO MEDICAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522440033.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-18
Publication Date
2026-11-17
Estimated Expiration
2035-11-18

AI Technical Summary

Technical Problem

The lack of automated testing in the current technology for the main control board of electric hospital beds leads to low efficiency, inaccurate test data, and a high risk of missed detections and misjudgments, thus failing to ensure the quality control of electric hospital beds.

Method used

A test fixture for the main control board of an electric hospital bed was designed. It adopts a structure of a bearing plate, a spring plate, side clamps, a front clamp, and an upper pressure plate. Combined with an electric push rod and a tester, it realizes the automated testing of the main control board and ensures the accurate contact and connection of the test points.

Benefits of technology

This technology enables efficient and accurate automated testing of the main control board of electric hospital beds, improving the accuracy and reliability of testing, reducing human error and the risk of missed detections, and ensuring comprehensive testing coverage and repeatable verification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985769U_ABST
    Figure CN224985769U_ABST
Patent Text Reader

Abstract

This application relates to a testing fixture for the main control board of an electric hospital bed, belonging to the technical field of main control board testing. It includes a base, a support seat fixedly connected to the top of the base, and a spring-loaded plate fixedly connected to the top of the support seat. By setting up a structure of a carrier plate, a spring-loaded plate, side clamps, a front clamp, and an upper pressure plate, this application achieves automated testing of the main control board of the electric hospital bed under test. During testing, the main control board to be tested is placed on the carrier plate, then the carrier plate is placed on the spring-loaded plate. Subsequently, the test probe abuts against the corresponding contact point of the carrier plate from below the spring-loaded plate, ensuring accurate contact with the test point on the main control board. Then, the upper pressure plate presses down and limits the main control board through a pressing block. Simultaneously, the side clamps and the front clamp, driven by a first and a second electric push rod, control the side test ports and the front test ports to accurately connect to the interface on the main control board, realizing the test connection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of main control board testing technology, and in particular to a testing fixture for the main control board of an electric hospital bed. Background Technology

[0002] As the core control component of an electric hospital bed, the stability and reliability of its performance directly affect the overall operation of the bed and the safety of the patient. Therefore, comprehensive and accurate testing of the main control board is crucial during the production and use of the electric hospital bed. This testing aims to verify the normal operation of the main control board's various functions, including but not limited to whether the circuit connections are good, the signal transmission is accurate, and the control commands can be effectively executed. Testing the main control board using professional testing fixtures can promptly identify potential problems, providing a basis for subsequent maintenance and improvements, thereby ensuring the safe and stable operation of the electric hospital bed.

[0003] Regarding the aforementioned technologies, current methods for testing the main control board of electric hospital beds often suffer from the drawback of not being able to automate the testing process. Specifically, traditional testing methods often require manual operation of the testing equipment, manual input of test commands, and recording of test results. This process is not only inefficient but also prone to inaccurate test data due to human factors. Furthermore, the lack of automated testing procedures makes it difficult to achieve comprehensive coverage and repeated verification, thereby increasing the risk of missed detections and misjudgments, which poses a potential threat to the quality control of the main control board of electric hospital beds. Utility Model Content

[0004] The purpose of this application is to provide a test fixture for the main control board of an electric hospital bed, which has the advantage of automated testing and solves the problems mentioned in the background art.

[0005] The electric hospital bed main control board test fixture provided in this application adopts the following technical solution: it includes a base, a support seat is fixedly connected to the top of the base, a spring pressure plate is fixedly connected to the top of the support seat, a bearing plate is provided on the top of the spring pressure plate, and an insertion interface is fixedly installed on the top of the bearing plate. A base plate is fixedly connected to the side of the base, a horizontal block is fixedly connected to the top of the base plate, a first electric push rod is fixedly installed on the side of the horizontal block, a side clamp is fixedly connected to one end of the first electric push rod, a plurality of side test interfaces are fixedly installed on the top of the side clamp, a vertical block is fixedly connected to the top of the base, a second electric push rod is fixedly installed on the side of the vertical block, a front clamp is fixedly connected to one end of the second electric push rod, a plurality of front test interfaces are fixedly installed on the side of the front clamp, a bracket is fixedly connected to the top of the base, a fixing plate is fixedly connected to the side of the bracket, a third electric push rod is fixedly installed on the top of the fixing plate, an upper pressure plate is fixedly connected to the bottom of the third electric push rod, and a plurality of pressing blocks are fixedly connected to the bottom of the upper pressure plate. By adopting the above technical solution, and by setting up a structure of a support plate, a spring-loaded plate, side clamps, a front clamp, and an upper pressure plate, the automated testing of the main control board of the electric hospital bed under test can be achieved. During testing, the main control board to be tested is placed on the support plate, and then the support plate is placed on the spring-loaded plate. Subsequently, the test probe abuts against the corresponding contact point of the support plate from below the spring-loaded plate to ensure accurate contact with the test point on the main control board. Then, the upper pressure plate presses down and limits the main control board through the pressing block. At the same time, the side clamps and the front clamp are driven by the first and second electric push rods to control the side test ports to accurately connect to the plug interface on the main control board to achieve test connection. Then, the test port is connected to an external tester, and the test program is started by controlling the tester. The corresponding main control board parameters will be displayed on the tester in real time. Then, the tester judges the corresponding parameters as OK or NG according to the preset pass / fail standards, thereby efficiently and accurately completing the testing of the main control board.

[0006] Preferably, a plurality of ejector pins are fixedly connected to the bottom of the upper pressure plate; By adopting the above technical solution and setting the ejector pin, when the upper pressure plate presses down to limit the main control board, the ejector pin can accurately abut against some key parts of the main control board that require additional pressure testing. This ensures that all parts of the main control board can be stably in the testing state during the test, avoiding inaccurate test data due to poor contact or uneven local force, and improving the accuracy and reliability of the test.

[0007] Preferably, a power button is fixedly installed on the top of the base, and a switch is fixedly installed on the side of the base; By adopting the above technical solution and setting up a power-on button and switch, operators can quickly start the power-on process of the test fixture after placing the main control board and completing the test connection, so that the test can be carried out in a timely manner. The side-mounted switch facilitates the overall power on / off control of the test fixture when needed. After the test is completed or when the equipment malfunctions and requires emergency power-off, the power can be quickly cut off to ensure operational safety and stable operation of the equipment.

[0008] Preferably, a plurality of silicone blocks are fixedly connected to the bottom of the base; By adopting the above technical solution and setting up silicone blocks, the silicone blocks can play a good role in cushioning and preventing slippage when the test fixture is placed on the workbench.

[0009] Preferably, the base has a storage cavity inside; By adopting the above technical solution and setting up a storage cavity, the wire harnesses related to the main control board test can be organized and placed in the storage cavity during the test process, avoiding the wire harnesses from being scattered messily outside, improving the cleanliness of the test site, and reducing the safety hazards caused by wire harness tangling.

[0010] Preferably, the material of the pressing block is silicone. By adopting the above technical solution and setting up a silicone pressing block, the silicone material can provide uniform and stable pressure when pressing the main control board due to its good elasticity and flexibility, thus avoiding damage to the main control board or inaccurate testing caused by uneven pressure.

[0011] Preferably, a sealing plate is snapped into the inside of the storage cavity, and two connecting blocks are fixedly connected to both sides of the sealing plate. The connecting blocks are connected to the internal threads of the base with screws. By adopting the above technical solution and setting a sealing plate and related connection structure, when the storage cavity does not need to store wire harnesses or needs to be cleaned and maintained, the screws can be unscrewed and the sealing plate can be taken out from the storage cavity through the connecting block, which is convenient and quick. When the storage cavity needs to be used to store wire harnesses, the sealing plate is fixed in the storage cavity through the connecting block and screws, which plays the role of sealing the storage cavity, preventing dust and debris from entering the storage cavity, and keeping the overall cleanliness and appearance of the test fixture.

[0012] Preferably, the top of the base is fixedly connected to two first support blocks, and the sides of each of the two first support blocks are fixedly connected to two first slide rods. One end of each of the four first slide rods is fixedly connected to the side of the support base. The front clamping plate is slidably connected to the surface of the first slide rods. The top of the base plate is fixedly connected to two second support blocks, and the sides of the second support blocks are fixedly connected to second slide rods. One end of each second slide rod is fixedly connected to the side of the support base. The side clamping plate is slidably connected to the surface of the second slide rods. By adopting the above technical solution, and by setting the first support block, the first slide rod, the second support block, and the second slide rod, a stable sliding track can be provided for the front clamping plate and the side clamping plate, so that the front clamping plate and the side clamping plate can slide along the predetermined direction, thereby more accurately clamping and positioning the main control board of the electric hospital bed, ensuring the stability of the main control board position during the test, and improving the accuracy and reliability of the test.

[0013] In summary, this application includes at least one of the following beneficial technical effects: This electric hospital bed main control board testing fixture, through the setting of a support plate, spring-loaded plate, side clamps, front clamps, and upper pressure plate structure, achieves automated testing of the main control board of the electric hospital bed under test. During testing, the main control board to be tested is placed on the support plate, and then the support plate is placed on the spring-loaded plate. Subsequently, the test probe abuts against the corresponding contact point of the support plate from below the spring-loaded plate to ensure accurate contact with the test point on the main control board. Then, the upper pressure plate presses down and limits the main control board through the pressing block. At the same time, the side clamps and the front clamps are driven by the first and second electric push rods to control the side test ports to accurately connect to the plug interface on the main control board to achieve test connection. Then, the test port is connected to an external tester, and the test program is started by controlling the tester. The corresponding main control board parameters are displayed on the tester in real time. Then, the tester judges the corresponding parameters as OK or NG according to the preset pass / fail standards, thereby efficiently and accurately completing the main control board testing. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the overall structure of this application; Figure 2 for Figure 1 A partial front view of the central base structure; Figure 3 for Figure 1 Schematic diagram of the medium-pressure connector from the front view; Figure 4 for Figure 1 Enlarged structural diagram at point A in the middle; Figure 5 for Figure 1 Enlarged structural diagram at point B.

[0015] In the picture: 1. Base; 2. Support base; 3. Bearing plate; 4. Base plate; 5. Horizontal block; 6. First electric push rod; 7. Side clamp plate; 8. Side test interface; 9. Vertical block; 10. Second electric push rod; 11. Front clamp plate; 12. Insertion interface; 13. Bracket; 14. Fixing plate; 15. Third electric push rod; 16. Upper pressure plate; 17. Crimping block; 18. Ejector pin; 19. Power button; 20. Switch; 21. Silicone block; 22. Sealing plate; 23. First support block; 24. First slide rod; 25. Second support block; 26. Second slide rod; 27. Storage cavity; 28. Silicone material; 29. ​​Spring pressure plate; 30. Connecting block; 31. Screw; 32. Front test interface. Detailed Implementation

[0016] The following is in conjunction with the appendix Figure 1 -Appendix Figure 5 This application will be described in further detail below.

[0017] Example 1: A test fixture for the main control board of an electric hospital bed, referring to... Figure 1 and Figure 4 It includes a base 1, a support seat 2 fixedly connected to the top of the base 1, a spring pressure plate 29 fixedly connected to the top of the support seat 2, a bearing plate 3 provided on the top of the spring pressure plate 29, and an insertion interface 12 fixedly installed on the top of the bearing plate 3. A base plate 4 is fixedly connected to the side of the base 1. A horizontal block 5 is fixedly connected to the top of the base plate 4. A first electric push rod 6 is fixedly installed on the side of the horizontal block 5. A side clamp 7 is fixedly connected to one end of the first electric push rod 6. Several side test interfaces 8 are fixedly installed on the top of the side clamp 7. A vertical block 9 is fixedly connected to the top of the base 1. A second electric push rod 10 is fixedly installed on the side of the vertical block 9. A front clamp 11 is fixedly connected to one end of the second electric push rod 10. Several front test interfaces 32 are fixedly installed on the side of the front clamp 11. A bracket 13 is fixedly connected to the top of the base 1. A fixing plate 14 is fixedly connected to the side of the bracket 13. A third electric push rod 15 is fixedly installed on the top of the fixing plate 14. An upper pressure plate 16 is fixedly connected to the bottom of the third electric push rod 15. Several pressing blocks 17 are fixedly connected to the bottom of the upper pressure plate 16. By setting the bearing plate 3, spring pressure plate 29, side clamp 7, front clamp 11 and upper... The pressure plate 16 structure enables automated testing of the main control board of the electric hospital bed under test. During testing, the main control board to be tested is placed on the support plate 3, and then the support plate 3 is placed on the spring pressure plate 29. Subsequently, the test probe abuts against the corresponding contact point of the support plate 3 from below the spring pressure plate 29 to ensure accurate contact with the test point on the main control board. Then, the upper pressure plate 16 presses down and limits the main control board through the pressing block 17. At the same time, the side clamping plate 7 and the front clamping plate 11 are driven by the first electric push rod 6 and the second electric push rod 10 to control the side test port and the front test port to accurately connect to the plug interface 12 on the main control board to achieve test connection. Then, the test port is connected to an external tester, and the test program is started by controlling the tester. The corresponding main control board parameters will be displayed on the tester in real time. Then, the tester judges the corresponding parameters as OK or NG according to the preset pass standard, thereby efficiently and accurately completing the test of the main control board.

[0018] Please see Figure 1 Several ejector pins 18 are fixedly connected to the bottom of the upper pressure plate 16. By setting the ejector pins 18, when the upper pressure plate 16 presses down to limit the main control board, the ejector pins 18 can accurately abut against some key parts of the main control board that require additional pressure testing. This ensures that all parts of the main control board are stably in the testing state during the test, avoiding inaccurate test data due to poor contact or uneven local force, and improving the accuracy and reliability of the test. A power-on button 19 is fixedly installed on the top of the base 1, and a switch 20 is fixedly installed on the side of the base 1. By setting the power-on button 19 and the switch 20, the operator can quickly start the power-on process of the test fixture after placing the main control board and completing the test connection, so that the test can be carried out in a timely manner. The switch 20 installed on the side can control the overall power supply of the test fixture when needed. After the test is completed or when the equipment malfunctions and requires emergency power cut-off, the power supply can be quickly cut off to ensure operational safety and stable operation of the equipment.

[0019] Please see Figure 1 and Figure 2 Several silicone blocks 21 are fixedly connected to the bottom of the base 1. By setting the silicone blocks 21, the silicone blocks 21 can play a good role in cushioning and anti-slip when the test fixture is placed on the workbench. The base 1 has a storage cavity 27 inside. By setting the storage cavity 27, the wire harnesses related to the main control board test can be organized and placed in the storage cavity 27 during the test, avoiding the wire harnesses from being scattered outside in a messy manner, improving the cleanliness of the test site, and reducing the safety hazards caused by wire harness tangling.

[0020] Please see Figure 1 , Figure 3 and Figure 5 The crimping block 17 is made of silicone material 28. By using silicone material 28 for the crimping block 17, its good elasticity and flexibility provide uniform and stable pressure when crimping the main control board, preventing damage to the main control board or inaccurate testing due to uneven pressure. A sealing plate 22 is snapped into the inside of the storage cavity 27. Two connecting blocks 30 are fixedly connected to both sides of the sealing plate 22. Screws 31 connect the connecting blocks 30 to the internal threads of the base 1. Through the sealing plate 22 and related connecting structures, when the storage cavity 27 is not needed for storing wire harnesses or when cleaning and maintenance of the inside of the storage cavity 27 is required, the screws 31 can be unscrewed, and the sealing plate 22 can be removed from the storage cavity 27 through the connecting blocks 30, which is convenient and quick. When the storage cavity 27 is needed to store wire harnesses, the sealing plate 22 is fixed inside the storage cavity 27 through the connecting blocks 30 and screws 31, thus sealing the storage cavity 27 and preventing dust and debris from entering the storage cavity 27, maintaining the test fixture. The overall design is neat and aesthetically pleasing. The top of the base 1 is fixedly connected to two first support blocks 23. Each of the two first support blocks 23 has two first sliding rods 24 fixedly connected to its side. One end of each of the four first sliding rods 24 is fixedly connected to the side of the support seat 2. The front clamping plate 11 is slidably connected to the surface of the first sliding rods 24. The top of the base plate 4 is fixedly connected to two second support blocks 25. The side of each second support block 25 has a second sliding rod 26 fixedly connected to its side. One end of each second sliding rod 26 is fixedly connected to the side of the support seat 2. The side clamping plate 7 is slidably connected to the surface of the second sliding rods 26. By setting the first support blocks 23, first sliding rods 24, second support blocks 25, and second sliding rods 26, a stable sliding track can be provided for the front clamping plate 11 and the side clamping plate 7, allowing them to slide along a predetermined direction. This more accurately clamps and positions the main control board of the electric hospital bed, ensuring the stability of the main control board's position during testing and improving the accuracy and reliability of the test.

[0021] The implementation principle of this application embodiment is as follows: First, the operator organizes the wire harness related to the main control board test, opens the sealing plate 22 of the storage cavity 27, puts the wire harness into the storage cavity 27, then reinstalls the sealing plate 22 and fixes the screws 31. Then, the operator turns on the main power supply of the test fixture through the switch 20 on the side of the base 1 to complete the equipment power-on preparation. Then, place the main control board of the electric hospital bed to be tested on the top of the support plate 3, so that the interface of the main control board is initially aligned with the plug interface 12 on the support plate 3. At the same time, the support plate 3 is stabilized by the spring pressure plate 29 at the bottom. The test needle under the spring pressure plate 29 is ready to abut against the corresponding contact point of the support plate 3. Then, the device is started. The second electric push rod 10 drives the front clamping plate 11 to slide along the first slide rod 24 toward the main control board. Then, the first electric push rod 6 drives the side clamping plate 7 to slide along the second slide rod 26 toward the main control board simultaneously, ensuring that the front clamping plate 11 and the side clamping plate 7 accurately clamp and position the main control board. At the same time, the test pin under the spring plate 29 abuts against the corresponding contact point of the bearing plate 3, thereby achieving accurate contact with the test point on the main control board. Subsequently, the third electric push rod 15 pushes the upper pressure plate 16 downward. Then, the silicone material 28 pressing block 17 at the bottom of the upper pressure plate 16 applies uniform and stable pressure to the main control board to achieve the downward pressure limit of the main control board. At the same time, the ejector pin 18 at the bottom of the upper pressure plate 16 accurately abuts against the key part of the main control board that requires additional pressure testing to ensure the stability of the test contact. During this process, the front test interface 32 on the front clamping plate 11 and the side test interface 8 on the side clamping plate 7 are simultaneously and accurately connected with the plug interface 12 on the main control board to establish a test connection path. Afterwards, the operator presses the power button 19 on the top of the base 1 to start the test process. Then, the tester connected to the front test interface 32 and the side test interface 8 starts to run the preset test program, collects and displays various parameters of the main control board in real time. Subsequently, the tester automatically analyzes the collected parameters according to the built-in pass standard, judges whether the main control board parameters meet the requirements, and generates a test result of OK (pass) or NG (fail). Finally, after the test, if an emergency power cut is required, the main power supply can be cut off by directly operating the switch 20 on the side of the base 1. If the test is completed normally, first use the equipment control to make the third electric push rod 15 drive the upper pressure plate 16 to reset, the second electric push rod 10 drive the front clamping plate 11 to reset, and the first electric push rod 6 drive the side clamping plate 7 to reset. Then take out the main control board after the test to complete the single test.

Claims

1. A test fixture for the main control board of an electric hospital bed, comprising a base (1), characterized in that: The top of the base (1) is fixedly connected to a support seat (2), the top of the support seat (2) is fixedly connected to a spring plate (29), the top of the spring plate (29) is provided with a bearing plate (3), and the top of the bearing plate (3) is fixedly installed with a plug interface (12). A base plate (4) is fixedly connected to the side of the base (1), a horizontal block (5) is fixedly connected to the top of the base plate (4), a first electric push rod (6) is fixedly installed on the side of the horizontal block (5), a side clamp (7) is fixedly connected to one end of the first electric push rod (6), a plurality of side test interfaces (8) are fixedly installed on the top of the side clamp (7), a vertical block (9) is fixedly connected to the top of the base (1), a second electric push rod (10) is fixedly installed on the side of the vertical block (9), and the second electric push rod (10) is fixedly installed on the side of the vertical block (9). One end of the base (1) is fixedly connected to a front clamp (11), and several front test interfaces (32) are fixedly installed on the side of the front clamp (11). A bracket (13) is fixedly connected to the top of the base (1), and a fixing plate (14) is fixedly connected to the side of the bracket (13). A third electric push rod (15) is fixedly installed on the top of the fixing plate (14), and an upper pressure plate (16) is fixedly connected to the bottom of the third electric push rod (15). Several pressing blocks (17) are fixedly connected to the bottom of the upper pressure plate (16).

2. The test fixture for the main control board of an electric hospital bed according to claim 1, characterized in that: The bottom of the upper pressure plate (16) is fixedly connected with several ejector pins (18).

3. The test fixture for the main control board of an electric hospital bed according to claim 1, characterized in that: A power button (19) is fixedly installed on the top of the base (1), and a switch (20) is fixedly installed on the side of the base (1).

4. The test fixture for the main control board of an electric hospital bed according to claim 1, characterized in that: Several silicone blocks (21) are fixedly connected to the bottom of the base (1).

5. The test fixture for the main control board of an electric hospital bed according to claim 1, characterized in that: The base (1) has a storage cavity (27) inside.

6. The test fixture for the main control board of an electric hospital bed according to claim 1, characterized in that: The material of the pressing block (17) is silicone (28).

7. The test fixture for the main control board of an electric hospital bed according to claim 5, characterized in that: The storage cavity (27) is fitted with a sealing plate (22), and two connecting blocks (30) are fixedly connected to both sides of the sealing plate (22). The connecting blocks (30) are connected to the internal threads of the base (1) by screws (31).

8. The test fixture for the main control board of an electric hospital bed according to claim 1, characterized in that: The top of the base (1) is fixedly connected to two first support blocks (23), and the sides of the two first support blocks (23) are fixedly connected to two first slide rods (24). One end of the four first slide rods (24) is fixedly connected to the side of the support seat (2). The front clamping plate (11) is slidably connected to the surface of the first slide rods (24). The top of the bottom plate (4) is fixedly connected to two second support blocks (25), and the sides of the second support blocks (25) are fixedly connected to second slide rods (26). One end of the second slide rods (26) is fixedly connected to the side of the support seat (2). The side clamping plate (7) is slidably connected to the surface of the second slide rods (26).