Technical Problem

Existing trench half-elements face challenges in precise assembly due to small dimensional deviations, leading to labor-intensive and costly repairs or scrapping, as they require accurate positioning of numerous columns which can be affected by bending or production-related issues.

Method used

The design incorporates a base grid with columns featuring complementary connecting elements, including projections and receptacles, allowing for secure and precise connection of trench half-elements through a locking mechanism, ensuring accurate alignment and firm assembly even with slight inaccuracies.

Benefits of technology

This solution enables easy and secure connection of trench half-elements, ensuring precise assembly and reducing the need for costly repairs, while allowing for flexible connection configurations to form stable trench components and infiltration devices.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a trench half-element according to the preamble of claim 1. In addition, the invention also relates to a trench construction element and a receiving, storage or infiltration device which is constructed from trench construction elements.

[0002] Infiltration trenches, used for collecting, storing, or infiltrating fluids, especially rainwater, are assembled from individual elements. Specifically, trench half-elements are used, each featuring a base grid from which columns rise approximately vertically. Connecting devices are used to join the trench half-elements at the column tips, i.e., at the column ends opposite the base grid. The columns can either be loosely stacked on top of each other or joined using snap-fit ​​connections.

[0003] EP 2862982 A1 discloses a module for the construction of a retention basin, comprising columns arranged on a base grid and extending approximately perpendicularly from it. The columns have a surface at their end pointing away from the base grid, on which two adjacent, spaced-apart connecting elements are arranged, the connecting elements being congruent to each other. A first connecting element is designed as a projection, and a second connecting element as a corresponding opening in the surface. Several modules can be connected to each other in this way via the connecting elements at their columns, thus enabling the assembly of retention basins.

[0004] When assembling the half-elements to form the drainage channel, a large number of columns of the individual half-elements must be positioned relative to each other to ensure proper and precise assembly.

[0005] When even minor dimensional deviations occur, such as those resulting from unintentional bending of such a component or from frozen stresses originating from the production or storage of the component, it is no longer possible, or only with great difficulty, to construct a drainage trench. Such components are either scrap or require labor-intensive and costly rework.

[0006] This is where the invention comes in, which aims to provide a trench half-element that overcomes the aforementioned problems.

[0007] A further object of the present invention is to provide a trench construction element. Finally, it is also an object of the present invention to provide a collection, storage, or infiltration device constructed from trench construction elements.

[0008] The solution to the first problem is carried out according to claim 1.

[0009] Within the scope of the present invention, it was recognized that a trench half-element solves the problem of the present invention if it comprises a base grid and at least one column connected to the base grid and extending approximately perpendicularly from the base grid, which has a surface at its end opposite the base grid with a connecting element, wherein the connecting element is either a first connecting element having a projection extending from the surface, on the section adjacent to the surface of which an outer contact surface is formed, or wherein the connecting element is a second connecting element on which an inner contact surface approximately perpendicular to the surface is formed.wherein the first connecting element and the second connecting element have at least partially a complementary shape to each other and are designed to be pluggable together for joining two trench half-elements, wherein on the second connecting element an insertion ramp adjoining the approximately perpendicular inner contact surface formed towards the surface, which is inclined towards the surface and is bounded by an edge of a receiving opening, is formed on the inner contact surface formed approximately perpendicular to the surface, which is characterized in that a locking projection is formed on the projection, that the locking projection on the projection of the first connecting element on the column engages behind the edge of the second connecting element and thus secures the connection of the two trench half-elements, and that at least one fitting projection or at least one fitting receptacle is formed on the surfaces of the columns.

[0010] A fitting projection and / or a fitting recess on the surface of the column contributes in a special way to ensuring that when connecting one trench half element with another trench half element, the columns of the trench half elements are positioned exactly, thus enabling precise assembly.

[0011] The present invention particularly comprises a trench half-element which has a plurality of columns extending approximately perpendicularly from the base grid. According to the invention, a surface with a first connecting element or a second connecting element is formed at the ends of the columns opposite the base grid. In this way, trench half-elements are made available which have an arrangement of columns extending approximately perpendicularly from the base grid and at whose ends a surface with a first connecting element or a second connecting element is formed.

[0012] In particular, the infiltration trench half-element according to the invention can have an arrangement of columns that exhibits symmetry. In particular, such an arrangement can be...

[0013] Half-element comprising an arrangement of, for example, 4 x 3 columns, wherein the columns are arranged in a regular and, in particular, symmetrical arrangement, the symmetry of the arrangement relating to the formation of the first connecting elements and the second connecting elements at the ends of the columns.

[0014] In the present invention, the first connecting element and the second connecting element are provided to have a complementary shape, at least in sections. This measure ensures a particularly secure and firm connection of the trench half-element to another trench half-element.

[0015] According to the invention, the first connecting element has a projection extending from the surface, on which an outer contact surface is formed on its section adjacent to the surface.

[0016] This measure allows for a simple, secure, and precise connection of one trench half-element to another trench half-element.

[0017] Within the scope of the present invention, it can prove to be very advantageous if the projection is provided to have an end that is rounded or pointed.

[0018] This measure makes it very easy to connect two trench half-elements.

[0019] According to the invention, a locking projection is formed on the projection of the first connecting element. By providing a locking projection on the projection, a simple locking connection is formed between one half-element of a drainage channel and another half-element connected to it.

[0020] This makes it possible to ensure a particularly strong connection between one half-element of a trench and another half-element of a trench.

[0021] According to the invention, the second connecting element has an inner contact surface bounded by the surface and an insertion ramp adjoining it in the direction of the base grid, which is inclined relative to the surface and is bounded by an edge of a receiving opening.

[0022] A second connecting element designed in this way is particularly suitable for forming a secure connection with a first connecting element when the two are joined together. In this way, trench half-elements can be easily and securely connected.

[0023] In a highly preferred embodiment of the present invention, it can be provided that the outer contact surface of the first connecting element and the inner contact surface of the second connecting element have a complementary shape to each other.

[0024] This measure makes it possible to bring the outer contact surface formed on the first connecting element and the inner contact surface formed on the second connecting element into contact when the first connecting element and the second connecting element are joined together, so that an exact and secure positioning of the first connecting element and the second connecting element is achieved, which means that the trench half element is connected to another trench half element very firmly.

[0025] According to the invention, both fitting projections and fitting recesses are formed on the surfaces of the columns.

[0026] In the present invention, it may prove particularly advantageous if the rigolen half-element is provided to consist of or contain a polymer material, wherein the polymer material is preferably a thermoplastic polymer material, in particular a polyolefin, such as polyethylene, polypropylene, polybutylene or a copolymer of the aforementioned or a mixture of the aforementioned, or a polyvinyl chloride or a polyester or a polycarbonate.

[0027] The aforementioned polymer materials are easily molded, inert, durable, mechanically and chemically stable, resilient, and inexpensive. Rigolen half-elements can be easily formed from these polymer materials. This can be achieved, for example, through injection molding or other polymer processing and forming processes.

[0028] Alternatively, it is also possible that the infiltration trench half-element is manufactured using an additive manufacturing process, in particular in one piece, for example by a 3D printing process.

[0029] For this purpose, machine-readable three-dimensional models can be advantageously used for manufacturing.

[0030] The trench half-element can be manufactured wholly or partially using a line-by-line or layer-by-layer manufacturing process. In particular, the trench half-element can be manufactured wholly or partially line-by-line or layer-by-layer by material deposition.

[0031] A 3D data set can be used to great advantage during construction or manufacturing.

[0032] The solution to the further problem of the present invention, namely to provide a trench construction element, is achieved according to claim 6.

[0033] Within the scope of the present invention, it was discovered that a trench element is easily accessible if two trench half-elements are connected to each other as described above. This can be achieved by the first trench half-element having a first connecting element on at least one column and the second trench half-element having a second connecting element on at least one column, wherein the first connecting element and the second connecting element can be plugged together, thereby connecting the two trench half-elements to form the trench element.

[0034] Such trench elements can be formed in particular from similarly shaped trench half-elements in such a way that, in the case of a plurality of columns, each column is connected to a column of the further trench half-element, so that there are no unconnected columns in the two trench half-elements.

[0035] In another connection configuration, the first half-element of the trench, with its multiple columns, can be connected to a second half-element, also with multiple columns, in such a way that not all columns are connected to each other, leaving some columns unconnected. In this configuration, it is possible, for example, to create a "masonry composite" structure, where the half-elements are arranged so that each is connected to two other half-elements.

[0036] However, there are also other installation situations where more than two trench half-elements are connected to one trench half-element.

[0037] The last object of the present invention, namely to provide a receiving, storage or seepage device, is solved according to claim 8.

[0038] It was recognized in the present invention that a collection, storage or infiltration device is technically particularly enhanced when it is constructed from a plurality of trench elements as described above.

[0039] Such a collection, storage, or infiltration device can be used, in a particularly preferred manner, as a trench, retention basin, or storage basin. In a further development of the present invention, such a collection, storage, or infiltration device is surrounded by a fleece to prevent soil from being washed into the device from the outside or solids from the interior from entering the soil.

[0040] The present invention finds widespread application in the field of rainwater management. However, the invention can also be used to great advantage in industrial applications, swimming pools, agriculture and fish farming, as well as in other areas.

[0041] Further important features and advantages of the invention will become apparent from the dependent claims, the figures and the associated figure description.

[0042] The present invention is described with reference to the attached figures as follows.

[0043] This shows: Fig. 1 a schematic perspective view of a column of a trench half-element with a first connecting element; Fig. 2 a schematic perspective view of a column of a trench half-element with a second connecting element; Fig. 3 a schematic cross-sectional view of the positioning of the first connecting element and the second connecting element for connecting two trench half-elements; Fig. 4 a schematic cross-sectional view of the insertion of the first connecting element into the second connecting element when connecting two trench half-elements; Fig. 5 a schematic cross-sectional view of two trench half-elements connected to each other by the first connecting element and the second connecting element; Fig. 6 a schematic perspective view of a trench half-element.

[0044] In the Fig. 1 In a schematic perspective view, a column 1 of a trench half-element 18 with a first connecting element 5 is shown.

[0045] Column 1 of the trench half-element 18, which is not shown here, is in the Fig. 1 Only partially shown, in particular the end 3 of column 1 is shown. The trench half-element 18 is in Fig. 6 depicted.

[0046] At the end 3 of column 1 of the trench half-element 18, a surface 4 is formed on which a first connecting element 5 is arranged. The first connecting element 5 is formed on the surface 4 of column 1 centrally to its cross-section at the end 3 of column 1.

[0047] The first connecting element 5 has a projection 6 that rises from the surface 4. The projection 6 has a cylindrical surface. The end 14 of the projection 6 is rounded. A detent projection 13 is provided on the projection 6.

[0048] At the base of the projection 6, which directly adjoins the surface 4 of the column 1, an outer contact surface 7 is formed, shaped as a cylindrical surface. The outer contact surface 7 of the first connecting element 5 is approximately perpendicular to the surface 4 of the column 1.

[0049] On surface 4, four fitting recesses 16 are provided in the form of openings through surface 4. The four fitting recesses 16 on surface 4 of column 1 are angularly spaced 90° from their immediate neighbors. All four fitting recesses 16 are of the same size.

[0050] In the Fig. 2 A schematic perspective view shows a column 1 of a trench half-element 18 with a second connecting element 8. Here too, only the end 3 of column 1 of the trench half-element 18, which is not shown itself, is depicted.

[0051] At the end 3 of column 1 of the trench half-element 18 a surface 4 is formed on which a second connecting element 8 is arranged.

[0052] The second connecting element 8 is formed at the end 3 of the column 1 on the surface 4 of the column 1, centered on its cross-section.

[0053] The second connecting element 8 on the surface 4 of the column 1 has an inner contact surface 10, which is designed as a cylindrical shell surface and is approximately perpendicular to the surface 4 of the column 1.

[0054] The inner contact surface 10 of the second connecting element 8 is complementary to the outer contact surface 7 of the first connecting element 5 according to Fig. 1 shaped. This allows the first connecting element and the second connecting element 8 to be plugged together.

[0055] The inner contact surface 10 of the second connecting element 8 of the column 1 is adjoined by an insertion ramp 9 in the direction of the base grid 2, which in Fig. 2 The insertion ramp 9 is formed as a conical section surface. The insertion ramp 9 is bounded by a rim 12 that surrounds a receiving opening 11.

[0056] Alternatives to such an insertion ramp 9 in the form of a conical segment surface, which are not shown, are also suitable pyramid segment surfaces, spherical segment surfaces or ellipsoidal segment surfaces or those which are composed proportionally of the aforementioned.

[0057] The second connecting element 8 of the column 1 of the trench half-element 18 is dimensioned such that the first connecting element 5 of the column 1 of the trench half-element 18 can be inserted into it.

[0058] This allows the first connecting element 5 of column 1 of a trench half-element 18 and the second connecting element 8 of column 1 of an adjacent other trench half-element 18 to be joined together, thus connecting the trench half-elements 18 to each other.

[0059] Four fitting projections 15 are formed on the surface 4 of the column 1 of the trench half-element 18. The fitting projections 15 on the surface 4 of the column 1 are cylindrical and have an angular distance of 90° to their respective immediate neighbors.

[0060] The fitting projections 15 are dimensioned such that they fit into the fitting recesses 16 on the surface 4 of the column 1 according to Fig. 1 They are pluggable. All 15 mounting protrusions are the same size.

[0061] In the Fig. 3 A schematic cross-sectional view of the positioning of the first connecting element 5 and the second connecting element 8 for the connection of two trench half-elements 18 is shown.

[0062] To connect two trench half-elements 18, the two columns 1, 1 of the adjacent trench half-elements 18, which are arranged such that the ends 3 of the columns 1 of the two trench half-elements 18 point towards each other, and of which one column 1 has a first connecting element 5 and one column 1 has a second connecting element 8, are to be positioned such that the projection 6 of the first connecting element 5 on the column 1 of one trench half-element 18 is approximately opposite the receiving opening 11 of the second connecting element 8 on the column 1 of the adjacent trench half-element 18.

[0063] As the two half-elements of the trench 18 are brought further closer together, the projection 6 can easily be moved in the direction of the receiving opening 11 with the aid of the insertion ramp 9, whereby the end 14 of the projection 6 can slide along the insertion ramp 9 in the direction of the receiving opening 11 and is guided to it.

[0064] Particularly in the case of an inaccurate positioning of column 1 of the trench half-element with the first connecting element 5 and column 1 of the trench half-element 18 with the second connecting element 8, a simple connection can then take place.

[0065] Such inaccurate positioning can be caused by fundamental errors on the part of the personnel installing such trench half-elements, but also by faulty products that, for example, have production-related stresses, are otherwise bent, or have undergone minor shape changes.

[0066] In the Fig. 4 The schematic cross-sectional view shows the insertion of the first connecting element 5 into the second connecting element 8 when connecting two trench half-elements 18.

[0067] The reference symbols in the Fig. 4 correspond to those from the preceding figures.

[0068] The projection 6 of the first connecting element 5 is shown in the illustration according to Fig. 4 already penetrated a certain distance through the receiving opening 11 of the second connecting element 8 into the free space 17 of the column 1.

[0069] The columns 1 are hollow inside and have a free space 17.

[0070] This results in a centering when the two trench half-elements 18 are positioned and the first connecting element 5 is inserted into the second connecting element 8, which causes the fitting projections 15 on the trench half-element 18 with the second connecting element 8 to be aligned in such a way that they are opposite the fitting receptacles 16 on the trench half-element 18 with the first connecting element 5.

[0071] In the Fig. 5 Figure 1 shows a schematic cross-sectional view of two trench half-elements 18 connected to each other by the first connecting element 5 and the second connecting element 8.

[0072] Here, the projection 6 of the first connecting element 5 is fully inserted into the receiving opening 11 of the second connecting element 8. The outer contact surface 7 of the first connecting element 5 is in contact with the inner contact surface 10 of the second connecting element 8.

[0073] The fitting projections 15 on the surface 4 of the column 1 with the second connecting element 8 are inserted into the fitting receptacles 16 on the surface 4 of the column 1 with the first connecting element 5, which is not shown.

[0074] The locking projection 13 on the projection 6 of the first connecting element 5 on the column 1 engages behind the edge 12 of the second connecting element 8 and thus secures the connection of the two trench half-elements 18.

[0075] The two half-elements of the trench 18 are thereby locked together and thus form the trench construction element 19.

[0076] In the Fig. 6 A schematic perspective view of a trench half-element 18 is shown. The trench half-element 18 includes a plurality of columns 1 extending approximately perpendicularly from a base grid 2 in one direction.

[0077] The in Fig. 6 The depicted trench half-element 18 has three rows of columns 1 in the spatial direction x. In the spatial direction y, four rows of columns 1 are formed.

[0078] In this way, 18 are attached to the trench half-element according to Fig. 6 twelve pillars 1 formed.

[0079] The columns 1 have on their surface 4, which are formed at the end 3 of the columns 1, either a first connecting element 5 or a second connecting element 8.

[0080] In the execution according to Fig. 6 The three columns of each row in the spatial direction x uniformly have either a first connecting element 5 or a second connecting element 8.

[0081] In this way, the in Fig. 6 The half-element of the culvert 18 shown forms a mirror plane which runs through the center of the middle columns 1, which are arranged in the spatial direction x, in the spatial direction y.

[0082] It is understood that other arrangements are also possible with regard to the formation of the first connecting elements 5 or the second connecting elements 8 on the columns 1, with symmetrical arrangements being preferred.

[0083] From the trench half-element 18, a trench construction element 19 for the construction of a receiving, storage or infiltration device 20 can be easily formed by connecting the first connecting elements 5 with the second connecting elements 8 to another similar trench half-element 18, which is rotated by 180° around the x-axis (spatial direction x) or by 180° around the y-axis (spatial direction y).

[0084] For this purpose, a trench half-element 18 can be connected to another trench half-element 18 in such a way that there are no unused first connecting elements 5 or second connecting elements 8.

[0085] In another connection technique, a trench half-element 18 can also be connected to another trench half-element 18 in such a way that first connecting elements 5 and / or second connecting elements 8 are still unused on both trench half-elements 18, so that a "masonry composite" is possible.

[0086] In a "masonry composite", a trench half-element 18 is connected to at least two further trench half-elements 18, resulting in increased stability of the trench construction element 19 and thus of the receiving, storage or infiltration device 20 to be constructed in this way.

[0087] The trench half-elements 18 are shaped in such a way that they can be stacked on top of each other in a space-saving manner, with each column 1 of a lower trench half-element 1 being inserted into the free space 17 of a column 1 of a trench half-element 18 arranged above it.

Claims

1. French drain half-element (18), comprising a base grate (2) and a plurality of columns (1), which are connected to the base grate (2), project approximately perpendicularly away from the base grate (2), and each have, at the end (3) opposite the base grate (2), a surface (4), on which there is arranged in each case either a first connection element (5) or a second connection element (8), wherein the first connection element (5) comprises a protrusion (6) protruding from the surface, on which protrusion there is formed an outer contact face (7) on the portion of the protrusion adjacent to the surface (4), and wherein on the second connection element (8) there is formed an inner contact face (10) disposed approximately perpendicularly to the surface (4), wherein the first connection element (5) and the second connection element (8) c, at least in portions, a mutually complementary form, wherein, to join together two French drain half-elements, the first (5) and second connection elements (8) are each configured such that they can be plugged together, wherein, on the second connection element (8) on the inner contact face (10) disposed approximately perpendicularly to the surface (4), there is formed an insertion bevel (9), which adjoins the inner contact face in the direction of the base grate (2) and which is inclined relative to the surface (4) and is delimited by an edge (12) of a receiving opening (11), characterised in that a detent protrusion (13) is formed on the protrusion (6), and in that at least one mating protrusion (15) or at least one mating receptacle (16) is formed on each of the surfaces (4) of the columns (1).

2. French drain half-element (18) according to claim 1, characterised in that the mating protrusions (15) are sized such that they can be plugged into the mating receptacles (16).

3. French drain half-element (18) according to any one of the preceding claims, characterised in that the protrusion (6) has an end (14) that is rounded or pointed.

4. French drain half-element (18) according to any one of the preceding claims, characterised in that the outer contact face (7) of the first connection element (5) and the inner contact face (10) of the second connection element (8) have a mutually complementary form.

5. French drain half-element (18) according to any one of the preceding claims, characterised in that it is made of a polymer material or contains such a material, wherein the polymer material is preferably a thermoplastic polymer material, in particular a polyolefin, for example polyethylene, polypropylene, polybutylene or a copolymer of the aforementioned materials or a blended composition of the aforementioned materials, or a polyvinylchloride or a polyester or a polycarbonate.

6. French drain component (19) formed of two interconnected French drain half-elements (18) according to any one of claims 1 to 5, wherein the first (5) and second connection elements (8) of the two French drain half-elements (18) are plugged together in each case and connect the two French drain half-elements (18) to one another.

7. French drain component (19) formed of two interconnected French drain half-elements (18) according to any one of claims 1 to 5, wherein the detent protrusion (13) on the protrusion (6) of the first connection element (5) on the column (1) in each case engages behind the edge (12) of the second connection element (8) and thus secures the connection of the two French drain half-elements (18).

8. Receiving, storage or infiltration device (20) formed of a plurality of French drain components (19) according to claim 7.