Method for communicating control information
The method addresses the inefficiencies in 5G network slice switching by using simultaneous band part and time switch indicators in control information, reducing latency and ensuring compatibility with URLLC service demands.
Patent Information
- Application Number
- FR2023003470
- Authority / Receiving Office
- FR · FR
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-06
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing communication methods in 5G networks struggle to efficiently switch between different service slices with varying latency and reliability requirements, such as URLLC and eMBB, due to suboptimal band part switching mechanisms that require waiting for new control information, which is not compatible with the strict latency demands of URLLC services.
A communication method that includes transmitting control information with simultaneous band part indicators and time switch indicators to facilitate seamless switching between active band parts, allowing for efficient data transmission and reception across different slices without waiting for additional control signals.
This approach reduces latency by enabling immediate band part switching, ensuring that the network can meet the stringent latency requirements of URLLC services while maintaining compatibility with 5G specifications, thus enhancing the overall performance of 5G networks.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Title of the invention: Method for communicating control information Scope of the invention
[0001] The present invention relates to the field of digital communications. Within this field, the invention relates more particularly to the use of control information within a telecommunications system.
[0002] The invention applies in particular, but not exclusively, to the transmission of control information in a mobile network, for example of the 5G type and subsequent as specified by 3GPP and / or O-RAN. Previous art
[0003] The so-called 5G network includes significant developments compared to the previous generation known as 4G.
[0004] Among these, network slicing should be noted. This slicing was introduced to meet the requirements of the services that the 5G network must provide. These services include highly reliable, low-latency services known as URLLC (Ultra Reliable and Low Latency Communications), high-speed services known as eMBB (enhance Mobile Broadband), and high-density node services known as mMTC (massive Machine Type Communications), as well as V2X (Vehicle-to-Everything) and HMTC (High-Performance MTC) services. Slicing allows the network to be divided into logical slices that are isolated from each other. Each slice is dedicated to a service and has radio resources. A slice is identified by its identifier, S-NSSAI (Single Network Slice Selection Assistance Information). A single terminal, UE (User Equipment), can be associated with up to eight slices simultaneously.The terminal connected to the network transmits the S-NSSAI identifier of the slice / service it wants to access.
[0005] With regard to the evolution of numerology, multiple subcarrier spacings (SCS) have been introduced, as shown in [Table 1] established from Table 4.2-1 of specification TS38.211 vl5.10.0.
[0006] [Tables 1] P 0 1 2 3 4 SCS (kHz) A / -2z'x 15(½] 15 30 60 120 240 OFDM Symbol Duration (ps) 71.35 35.68 17.84 8.92 4.46 TTI Duration (ms) 1 0.5 0.25 0.125 0.0625
[0007]
[0008] The subcarrier spacing (SCS) is flexible. Increasing the numeric range, i.e., the spacing (SCS), allows for a reduction in the OFDM symbol duration as well as the Time Transmission Interval (TTI), and therefore reduces latency for very time-sensitive services. Transmissions between a transmitter and a receiver are organized into frames, each containing subframes whose duration depends on the numerology, for example, 10 subframes of 1 ms each. The number of slots per subframe depends on the numerology, the chosen spacing between subcarriers, SCS, and each slot contains a number of consecutive OFDM symbols as indicated in the part paragraph 4.3.2 of TS 38.211 vl7.4.0.
[0009] Concurrently with the evolution of numerology, the concept of a Bandwidth Part (BWP) was introduced to allow the implementation of different numerologies. A Bandwidth Part (BWP) is a set of contiguous Physical Resource Blocks (PRBs) associated with a numerology. A Physical Resource Block (PRB) is the smallest radio resource that can be allocated to a User Equipment (UE). The UE scans the radio resources allocated to it within a Bandwidth Part (BWP) to receive data intended for it in the Downlink (DL) direction. The network can configure the UE with four Bandwidth Part (BWP)s in the Downlink direction and the same number in the Uplink (UL) direction, but only one Bandwidth Part (BWP) is active at any given time in the Downlink (DL) direction and only one in the Uplink (UL) direction.
[0010] When the terminal, UE, requires a new service, for example, switching from an eMBB service to a URLLC service, the active bandwidth portion, BWP, is not necessarily the most suitable for the URLLC service. Switching can then occur to another bandwidth portion, typically one associated with a higher numeric range to reduce the delay for this latency-intensive service. The bandwidth portion switching mechanism ensures that the active bandwidth portion, BWP, is the most suitable for the requirements of the routine service.
[0011] The fastest way among several possibilities to perform a switchover is the switchover based on downlink control information, DCI, (Downlink Control Information, DCLbased BWP switching).
[0012] The DCI can take several formats, from format 0_0 to format 4_2 as shown in [table 2] established from table 7.3.1-1 of specification TS 38.212 v 17.4.0, associated with different scheduling for the downward or upward direction.
[0013] [Tables2] DCI Format Usage Format 0_0 Upstream scheduling PUSCH with reduced over-signaling Format 0_1 Upstream scheduling PUSCH Format 0_2 Upstream scheduling PUSCH with reduced over-signaling Format l_0 Downstream scheduling PDSCH with reduced over-signaling Format 1_1 Downstream scheduling PDSCH Format 1_2 Downstream scheduling PDSCH with reduced over-signaling Format 4_2 Downstream scheduling PDSCH
[0014] The control information, DCI, is transmitted in a control channel, PDCCH (Physical Downlink Control Channel) which the terminal receives at the same frequency as the data intended for it.
[0015] The DCI includes a lot of control information. For the 0_l and 1_1 formats associated respectively with upstream and downstream scheduling without reduced overhead format for dynamically allocating time and frequency resources for the data channel, PDSCH or PUSCH, the DCI includes among other information: MCS (Modulation and Coding Scheme), BWP indicator, Frequency domain resource assignment, Time domain resource assignment (K0 / K2), .... And in addition for the 1_1 format: PDSCH-to-HARQ-ACK return timing indicator (Kl).
[0016] The decoding of control information, DCI, provides in particular to the terminal the temporal and frequency location of the radio resources to be scanned.
[0017] The "resource in the time domain" field enables the terminal, UE, to determine the KO value for a DCI format 1_1, in accordance with paragraphs 5.1.2.1 and 5.1.2.1.1 of specification TS38.214 vl5.16.0 and to determine the K2 value for a DCI format 0_l, in accordance with paragraphs 6.1.2.1 and 6.1.2.1.1 of specification TS38.214 V15.16.0.
[0018] The "PDSCH-to-HARQ-ACK return timing indicator" field of the DCI format 1_1, enables the terminal, UE, to determine the value of Kl in accordance with paragraph 9.2.3 and Table 9.2.3-1 of specification TS38.213 vl5.15.0.
[0019] KO gives the offset in number of slots between the reception of control information, DCI, and the scheduling of downlink radio resources for the transmission, via the data channel, PDSCH, of data intended for the UE terminal.
[0020] Kl gives the offset in number of slots between the scheduling of radio resources for the downlink, PDSCH, and the uplink of the ACK / NACK for the same UE terminal.
[0021] Thus, if the DCI format is 1_1, the terminal determines that the data transmitted in the downlink channel PDSCH and intended for it are scheduled KO slots after receiving the control information, DCI, and that it must transmit in the uplink channel PUSCH an ACK / NACK after Kl slots after receiving the control information, DCI.
[0022] K2 gives the offset in number of slots between the reception of control information, DCI, and the scheduling of radio resources for the uplink, PUSCH.
[0023] Thus, if the DCI format is 0_l, the terminal determines that the data it must transmit in the upstream channel, PUSCH, are scheduled K2 slots after receiving the control information, DCI.
[0024] According to the example illustrated in [Fig. 1], the control channel, PDCCH, which includes the control information, DCI, corresponding to the format 1_1, is received in slot 0. KO gives the offset, in number of slots, three in the example, to determine slot number three in the example, which contains the data channel, PDSCH, with the data intended for the terminal. Kl gives the offset, in number of slots, five in the illustration, relative to the slot containing the data that determines slot number 8 in the example, during which the terminal must acknowledge receipt, ACK / NACK, of the data carried in slot number three.
[0025] According to the example illustrated in [Fig. 2], the control channel, PDCCH, which includes the control information, DCI, corresponding to the format 0_l, is received at slot 0. K2 gives the offset in number of slots, three in the example, from the reception of the control information, DCI, so that the terminal orders the data it has to transmit on the upstream channel, PUSCH, to slot 3 in the example.
[0026] The "resource in the frequency domain" field of the DCI allows the terminal, UE, to identify the block resources allocated to it in the part of the band identified by the BWP indicator for the transmission of the data intended for it.
[0027] When the terminal decodes the received control information (DCI), the BWP indicator tells it which band portion (BWP) should be activated. If this BWP indicator has changed, the terminal must switch between band portions within a certain time in accordance with the DCL-based BWP switching mechanism, since the DCI determines which band portion (BWP) to scan.
[0028] The switchover time between BWP strip parts is indicated in [Table 3] established from Table 8.6.2-1 of specification TS38.133 vl5.20.0.
[0029] [Tables3] P Slot NR Length (ms) Switchover Delay BWP TBWPswiichDelay (slots) Type 1 Type 2 0 1 1 3 1 0.5 2 5 2 0.25 3 9 3 0.125 6 18
[0030] A terminal, UE, connected to the network and associated with several bandwidths receives data relating to these different bandwidths. In a known manner, the terminal, UE, scans the same portion of the bandwidth for these different services to receive its data. This mechanism is not optimal when the services have very different requirements, for example, low latency and high reliability for a URLLC service and high throughput for an eMBB service. Indeed, meeting these requirements necessitates different numerologies, which is not compatible with the same portion of the bandwidth.
[0031] Alternatively, as illustrated in Figures 3 and 4, it is known that control information, DCI, including a different band portion indicator, BWP1, BWP2, is sent before each transmission associated with a different service, Servi, Serv2, so that the terminal switches the active band between transmissions associated with different services. Figures 3 and 4 illustrate the switching between active bands, BWP1, BWP2, respectively in the downlink, DL DCI, and uplink, UL DCI.
[0032] This mode is time-consuming because the terminal must wait for a DCI, i.e., several slots (several milliseconds), before it can switch to the active band and subsequently receive its data, as illustrated in [Fig. 5]. According to this illustration, the terminal, UE, receives data on slice 1 in the BWP1 band portion. It must wait an Atl time to receive a new DCI indicating a new band portion, BWP2, before it can switch from the active band portion, from BWP1 to BWP2, and receive data associated with slice 2 on the PRB radio resources Slice2. Before switching, the terminal cannot receive data from this slice 2 on the PRB radio resources Slice2 associated with it.Similarly, to switch back to the BWP1 band portion, the terminal, UE, must wait a time At2 to receive a new DCI indicating the BWP1 band portion before it can switch from the active band portion, from BWP2 to BWP1, and receive data associated with the slice (slice 12) on the Slicel PRB radio resources. Before switching, the terminal cannot receive data from this slice 1 on its associated Slicel PRB radio resources. The base station, BS, determines the terminal's scheduling by sending DCIs to Atl, At2, to try to maintain performance levels (KPIs) for each slice. Such a mechanism is not compatible with a URLLC service that tolerates a maximum latency of one millisecond. Main features of the invention.
[0033] The present invention relates to a communication method which comprises: - transmission to a first transmission interval of control information including a first part-of-band indicator to transmit data associated with a first slice via the first part-of-band,
[0034] such that: - the control information transmitted to the first transmission interval further includes a second band portion indicator to transmit or receive, via this second band portion, data associated with a second slice and a first time switch indicator to switch the active band portion between the first band portion and the second band portion.
[0035] The invention further relates to a communication method which comprises: - reception at a first transmission interval of control information comprising a first band portion indicator to receive data associated with a first slice via the first band portion,
[0036] such that: - the control information received at the first transmission interval further includes a second band portion indicator for receiving or transmit, via this second part of the band, data associated with a second slice and a first time-switching indicator to switch from the active part of the band between the first part of the band and the second part of the band.
[0037] The invention further relates to a telecommunications device comprising at least one transmitter and one receiver; the device is adapted for: - receive, at a first transmission interval, control information including a first band portion indicator, a second band portion indicator and a first time-switching indicator to switch the active band portion between the first band portion and the second band portion, - receive or transmit data associated with a first slice via the first part of the band and, after switching from the active part of the band, data associated with a second slice via the second part of the band.
[0038] The invention further relates to a telecommunications device comprising at least one transmitter and one receiver; the device is adapted for: - transmit to a first transmission interval control information including a first band portion indicator, a second band portion indicator and a first time-switching indicator to switch the active band portion between the first band portion and the second band portion, - transmit data associated with a first slice via the first part of the band and, after switching the active part of the band, data associated with a second slice via the second part of the band.
[0039] The invention further relates to a telecommunications system comprising a base station and a terminal for implementing a communication method according to the invention.
[0040] The transmission of control information enables the scheduling of one or more terminals. The entity responsible for this transmission can be a base station, a base station controller, or a specific entity called a scheduler. The terminal(s) to be scheduled are connected to a core network via an access network to which the scheduler belongs. The terminal(s) are connected to different services or bands, each corresponding to a QoS flow. The scheduler determines, for a given terminal, the values of the switching time indicators J1, J2, ..., based in particular on the qualities associated with the QoS flows and the radio performance of the transmission channel between the access network and this terminal, to ensure a switching delay between active bands that is compatible with the latency requirements of the services to which the terminal is connected. by simultaneously transmitting two band part indicators, only one of which is active at a given transmission interval, and a time indicator of the transmission interval at which the active band part switch should take place, the method shortens the latency time compared to a mechanism that requires waiting for a new transmission of control information to trigger an active band part switch.
[0041] According to one embodiment, the method further comprises: - before the transmission of control information, receipt of an identifier of the first tranche and an identifier of the second tranche for the association of the same terminal to these first and second tranches.
[0042] According to one embodiment, the control information transmitted at the first transmission interval further includes a first time offset indicator after the first transmission interval to transmit data associated with the first slice via the first part of the tape and the switching of the active part of the tape occurs after the scheduling of the data associated with the first slice and transmitted via the first part of the tape.
[0043] According to one embodiment, the method further comprises: - before receiving the control information, transmission of an identifier of the first tranche and an identifier of the second tranche for the association of the same terminal to the first and second tranches.
[0044] According to one embodiment, the first part of the tape and the second part of the tape respectively benefit from different numerologies.
[0045] According to one embodiment, the control information is carried by the same control channel.
[0046] According to one embodiment, the data associated with the first tranche and the data associated with the second tranche are received or transmitted in the same shared received data channel or the same shared transmitted data channel.
[0047] According to one embodiment, the data associated with the first tranche and the data associated with the second tranche are associated with services of different types.
[0048] According to one embodiment, the data associated with one of the slices is associated with a service of a type requiring high reliability and low latency, i.e., URLLC.
[0049] The optional features presented above in the context of the communication method may optionally be applied to the devices, the software application and the support memory of the software application according to the invention. List of figures
[0050] Other features and advantages of the invention will become more apparent upon reading the following description of embodiments, given by way of simple illustrative and non-limiting examples, and attached drawings, including:
[0051] [Fig-1] [Fig. 1] is a diagram illustrating the scheduling of a terminal for a received DCI in 1_1 format described with regard to the prior art,
[0052] [Fig.2] [Fig.2] is a diagram illustrating the scheduling of a terminal for a DCI received in format 0_l as described in relation to prior art,
[0053] [Fig.3] [Fig.3] is a scheduling diagram illustrating the switching of a terminal between active bands in the downlink direction, DL DCI, described with regard to the prior art,
[0054] [Fig.4] [Fig.4] is a scheduling diagram illustrating the switching of a terminal between active bands in the upstream direction, UL DCI, described with regard to the prior art,
[0055] [Fig.5] [Fig.5] is a diagram illustrating an implementation of an example prior art scheduling of a terminal connected via a dual-service base station,
[0056] [Fig.6] [Fig.6] is a diagram of a telecommunications network,
[0057] [Fig.7] [Fig.7] is a protocol exchange diagram,
[0058] [Fig.8] [Fig.8] is a diagram of a time-frequency grid corresponding to a temporal and frequency segmentation of the radio resources of the transmission channel,
[0059] [Fig.9] [Fig.9] is a diagram illustrating an implementation by a suitable terminal of an embodiment of a process according to the invention,
[0060] [Fig. 10] [Fig. 10] is a diagram illustrating an implementation of an example of scheduling according to the invention of a terminal connected via a dual-service base station,
[0061] [Fig. 11] [Fig. 11] is a diagram of an embodiment of a base station according to the invention,
[0062] [Fig. 12] [Fig. 12] is a diagram of an embodiment of a terminal according to the invention,
[0063] [Fig. 13] [Fig. 13] is a diagram of a telecommunications network in an O-RAN context. Description of specific embodiments
[0064] The invention relates to a telecommunications network illustrated in [Fig. 6] with a service-oriented architecture such as a 5G network. Thus, the network is divided into slices, which are separate and independent from the terminal's perspective. Each slice is a logical entity associated with a service, for example URLLC, eMBB, etc. A slice is identified by its identifier, S-NSSAI.
[0065] The SYS telecommunications network comprises a core network CN and an access network with at least one base station BS, referred to as a gNB in the 5G network. The base station can be implemented with a single piece of hardware or distributed across several Hardware equipment. The core network includes a central logical entity called the AMF (Access and Mobility Function). The AMF is responsible, among other things, for control signaling between the core network and the TAL terminals. The functionalities between the AMF and a TAL terminal are sometimes called NAS (Non-Access Stratum), as opposed to the functionalities called AS (Access Stratum) between the access network and a terminal.
[0066] Figure 7 schematically illustrates certain protocol exchanges for the implementation of work of a process 11 according to the invention.
[0067] Once it has detected a cell that is associated with a base station, the terminal locks onto that cell and then accesses the cell following a protocol called RACH. Without limitation, the cell is considered to be the base station.
[0068] During an initial attachment procedure, the terminal performs a registration request (RRC setup) by providing a list of S-NSSAI identifiers for the services it wishes to request ("requested NSSAI"). The AMF finalizes the registration by providing the terminal, in a message ("allowed NSSAI"), with the list of S-NSSAI identifiers for the services, i.e., the slices it is authorized to request. According to the 5G specifications, the number of identifiers allowed for a terminal is limited to eight. The base station is informed of the list of S-NSSAI identifiers allowed for the terminal.
[0069] A similar mechanism occurs during a reconfiguration request known as "RRC reconfiguration" during which an update is made to the list of authorized S-NSSAI identifiers for the terminal.
[0070] The specifications of a 5G network distinguish several states for a terminal: "RRC_idle", RRC_idle and RRC_connected. In the RRC_connected state, or more commonly called connected, the connection is established between the terminal and the core network, and data exchange is possible between the base station and the terminal.
[0071] Establishing a connection from a terminal is done according to a protocol that may be based on functionalities of the NAS control plane, between the terminal and the AMF, and on functionalities of the radio resource control plane, known as RRC (Radio Resource Control). Establishing a connection includes establishing at least one PDU data session with an S-NSSAI identifier selected by the terminal and transmitted to the base station. In connection with the AMF, the base station returns the accepted S-NSSAI identifier to the terminal.
[0072] For a connected terminal, there are one or more PDU sessions, each with one or more QoS flows and radio data bearers. IP packets are mapped by the core network to QoS flows according to QoS requirements. And the QoS flows are mapped to radio data bearers by the access network. The terminal can observe the QoS Flow Identifiers (QFIs) associated with the packets Downstream data streams are received to determine which IP stream is mapped to which QoS stream and which radio data bearer, and to use a similar mapping for the upstream direction. When the base station informs the terminal that the PDU session has been established, it returns a message to the terminal that includes the S-NSSAI identifier of the accepted slice, as well as information such as the QFI identifier of the stream, the quality requirement (QoS) of the stream, the 5Qi (5G Quality Indicator) which takes into account the maximum supported delay, the priority for the stream, and the type of service (video, voice, etc.). A PDU session can contain multiple QoS streams. Each QoS stream can carry multiple Service Data Streams (SDFs), also called traffic streams, provided they meet the same requirements. A slice can carry multiple QoS streams, but a QoS stream can only be carried by one slice.
[0073] Transmissions between the access network base station and the terminal take place in a channel that is shared among the various terminals connected to the core network. In other words, the time-frequency resources of the transmission channel are dynamically shared among users, whether in Time Division Duplex (TDD) or Frequency Division Duplex (FDD) mode. Transmissions are scheduled in both the uplink and downlink directions and follow scheduling decisions orchestrated according to a time-based timing, typically by slot, one slot per transmission time interval (TTI), according to the 5G network technical specifications. When the access network implements multi-carrier modulation such as OFDM, the radio resources of the transmission channel are represented by a time-frequency grid, as illustrated in Figure 8.Each element of the grid is named a resource element, RE (Resource Element) and is identified by a time index l and a frequency index k. A multicarrier symbol is identified by a time index I.
[0074] The scheduling of a terminal consists of assigning it resource elements from this grid, generally one or more blocks, PRB (Physical Resource Blocks) of resource elements identified for example by a number of contiguous resource blocks, a start time interval and a first subcarrier when the blocks are contiguous.
[0075] Given that the frequency spectrum is very broad, the 5G network specifications introduced the concept of a band portion, B WP. A band portion, B WP, is a set of contiguous blocks of physical resources, PRB (Physical Resource Block) associated with a numerology.
[0076] Thus, the scheduling of a terminal is accompanied by the indication of the active band portion, which specifies the frequency range where the resource elements are located. assigned to the terminal, which therefore the terminal must scan on the downlink for reception and which the terminal uses on the uplink for transmission. There can be two different active band indications, one for the downlink, one for the uplink.
[0077] Scheduling information is transmitted 6 by the base station to the terminal via a control channel. According to the 5G network specifications, this control information is included in the DCI and transported via the PDCCH channel.
[0078] Scheduling can take into account channel quality information (CSI Channel State Information, CQI Channel Quality Indicator) between the base station and the terminal to allocate more or fewer resource elements to a scheduled terminal.
[0079] According to the invention, the scheduling takes into account the network's slicing and, more specifically, the fact that the terminal may simultaneously request several services associated with different slices, for example, a URLLC service and an eMBB service, which may have very different latency and / or throughput requirements. The NSSAI set designates the identifiers of the slices requested by a terminal.
[0080] Thus, during a transmission to a first transmission interval of control information, this information includes a first BWP1 band portion indicator for the transmission of data associated with a first slice via this first active BWP1 band portion. And, according to the invention, the control information transmitted to the first transmission interval further includes at least: - a second BWP2 band portion indicator for transmission, i.e., to transmit or receive, via this second BWP2 band portion, data associated with a second slice and - a first time-based switching indicator J1 to switch the active band portion between the first band portion BWP1 and the second band portion BWP2.
[0081] An implementation by a suitable terminal of an embodiment of a method according to the invention is schematically illustrated in [Fig. 9]. The terminal is suitable in that it implements the reception method 21 according to the invention, in which the control information, received 211 at a first transmission interval via a dedicated control channel, comprises 212: - a first BWP1 band portion indicator for data transmission associated with a first slice via this first active BWP1 band portion and, in addition, at least: - a second BWP2 band part indicator for a transmission, i.e., to transmit or receive, via this second part of the BWP2 band, data associated with a second slice and - a first time-based switching indicator J1 to switch the active band portion between the first band portion BWP1 and the second band portion BWP2.
[0082] Without limitation, the value of the switching time indicator J1 can be determined as a number of transmission intervals (slots) from the transmission interval (slot) of receiving the control information. This value can also be determined relative to another event, for example, a data reception or a data transmission.
[0083] Of course, the control information transmitted at the first transmission interval may include more than two band part indicators and / or more than one time switch indicator to switch successively from active band part without waiting for a new transmission of control information, each band part being associated with a slice of S-NSSAI identifier.
[0084] According to one embodiment, the control information transmitted at the first transmission interval may further include a second time-switch indicator J2 for switching the active band portion between the second band portion BWP2 and the first band portion BWP1, with J2>JL
[0085] The base station determines the number of bandwidth indicators and time-switching indicators to be transmitted within a single transmission interval based on various parameters chosen from at least: the number of services (bands) to which the terminal is connected, the number of QoS streams and their associated 5QI qualities, and the type of traffic stream. The base station may also use performance indicators such as radio link quality (CSI, CQI, etc.) information between the terminal and the base station. Furthermore, the base station may request that the terminal provide indicators on the received signal level, the modulation and coding scheme (MCS) it uses, the signal-to-noise ratio (SNR), and the signal-to-noise plus interference ratio (SNIR).
[0086] Using this information, parameters and indicators, the base station can possibly perform traffic predictions by slice to determine the control information to be communicated to the terminal in a dedicated control channel.
[0087] The base station determines the values of the switching time indicators J1, J2,..., depending in particular on the 5QI qualities associated with the QoS flows and radio performance to ensure a switching delay between active bands that is compatible with the latency requirements of the services to which the terminal is connected.
[0088] To determine the control information to be transmitted, the base station can establish a QoS flow matrix for the terminal.
[0089] The control information transmitted at the first transmission interval may further include a first KO time offset indicator after the first transmission interval for data reception on the first part of the BWP1 band.
[0090] The control information transmitted at the first transmission interval may further include a second time offset indicator Kl which gives the offset in number of slots between the scheduling of radio resources for the downlink, PDSCH, and the uplink of the ACK / NACK for the same UE terminal.
[0091] The switchover to J1 of the active band portion then occurs after the scheduling of the data associated with the first slice and transmitted via the first band portion BWP1.
[0092] In the case of scheduling a terminal for uplink transmission, the control information transmitted in the first transmission interval may further include a first time offset indicator K2 after the first transmission interval for data transmission, via the first part of the BWP1 band, in the uplink. K2 gives the offset, in number of slots, between the reception of the control information, DCI, and the scheduling of radio resources for the uplink, PUSCH.
[0093] Figure 10 schematically illustrates an implementation of a scheduling example according to the invention of a terminal connected via a base station to two services, a first service (slice) eMBB associated with a first portion of the BWP1 band and a second service (slice) URLLC associated with a second portion of the BWP2 band. To ensure low latency for the second URLLC service, it benefits from a higher priority than the first eMBB service and from a portion of the BWP2 band different from the portion of the BWP1 band allocated to the first eMBB service.
[0094] According to this illustrated example, the base station maintains an up-to-date flow matrix and associated parameters that it collects. At time t = T0, the base station transmits, via a control channel, PDCCH, dedicated to the terminal, a DCI based on this matrix which includes a first band portion indicator BWP2 with a time-switch indicator / 1 = T0 to switch from the active band portion immediately, i.e., during the current time slot with time index Δ = Δ0. The terminal receiving the dedicated control channel, which had the active band portion BWP1 before T0, switches at T0 to the band portion BWP2, which becomes the active portion. The DCI transmitted at T0 further includes a second band portion indicator BWP1 with a time-switch indicator / 2 = T3 to switch from the active band portion at the time slot with time index t = T3. After switching the active band portion from BWP1 to BWP2, the The terminal receives data from the 2nd service on radio resources, PRB Slice 2, which are part of the active band portion BWP2. After switching the active band from BWP2 to BWP1, the terminal receives data from the 1st service at two different times on radio resources, PRB Slice 1, which are part of the active band portion BWP1.
[0095] At time t = Tx, the base station transmits, via the dedicated control channel, PDCCH, a matrix-based DCI comprising a first band part indicator B WP2 with a first switching time indicator J1 to switch from the active band part immediately, i.e., during the current time slot with time index t = Tx, and a second switching time indicator J2 to switch from the active band part to the time slot with time index t — Tx + y = z. The terminal that had the active band part BWP1 before Tx switches at Tx to the active band part BWP2. The DCI transmitted at Tx further comprises a second band part indicator BWP1 with a switching time indicator J3 = Tx + y to switch from the active band part to the time slot with time index t — Tx + y.
[0096] Of course, the terminal can have n > 2 active services and the DCI can contain more than two BWP2 band part indicators and more than one time switchover indicator.
[0097] The method allows for more efficient switching between active bandwidth segments by transmitting one or more switching timing indicators in advance, within the same dedicated control channel, for example PDCCH / DCI, to switch between active bandwidth segments instead of waiting for a new dedicated control channel, for example PDCCH / DCI. The method thus contributes to a reduction in latency and therefore ensures the expected quality of a URLLC service.
[0098] This method has the advantage of being terminal-compatible since it does not require the terminal to simultaneously activate two different numerology bands. Indeed, the single active band portion at any given time according to the method is associated with a single numerology and is therefore compatible with the multi-carrier processing specified in the 3GPP 5G system technical specifications, at least up to release 17.
[0099] An implementation of the process in accordance with the technical specifications of a 5G network requires only the addition of a few fields to the dedicated control channel, PDCCH / DCI, but does not require modification of the size of the DCI since the latter includes variable-sized fields whose size can be adjusted.
[0100] The implementation detailed above is not limiting, at the base station level, the number of terminals connected via this base station and taken into account by the method. The latter can be implemented with several terminals and, for each terminal, the base station determines the dedicated control channel, PDCCH / DCI, to be transmitted in the same way as for a single terminal.
[0101] The [Fig. 11] is a simplified diagram of the structure of an embodiment of a BS base station according to an embodiment of the invention.
[0102] The BS base station comprises at least one microprocessor pP_BS, the operation of which is controlled by the execution of a program whose instructions enable the implementation of a method according to the invention, a MEM_BS memory, an EM_BS transmitter, and a RE_BS receiver, which are connected to each other by means of, for example, a bus. Of course, the constituent elements of the BS base station may be connected by means of a connection other than a bus.
[0103] The pP_BS microprocessor controls the operations of the BS base station. The MEM_BS storage unit stores at least the program for implementing the method according to an embodiment of the invention to be executed by the pP_BS processor, and various data, such as parameters and / or indicators, NSSAI, 5QI, associated with a terminal, UE, used for calculations performed by the pP microprocessor, intermediate data from calculations performed by the pP microprocessor, etc. The pP_BS microprocessor can be formed from any known and suitable hardware or software, or from a combination of hardware and software. For example, the pP_BS microprocessor can be formed from dedicated hardware such as a processing circuit, or from a programmable processing unit such as a central processing unit (CPU) that executes a program stored in its memory.
[0104] MEM_BS memory can be formed by any suitable means capable of storing the program or programs and data in a manner readable by a microprocessor. Examples of MEM_BS memory include non-transient storage media such as semiconductor memory devices, and magnetic, optical, or magneto-optical recording media loaded into a microprocessor-driven read / write unit.
[0105] At initialization, the program code instructions are, for example, loaded into a buffer before being executed by the uPBS microprocessor. The pP_BS microprocessor controls the various components of the BS base station.
[0106] Thus, by executing the instructions, the pP_BS microprocessor enables the BS base station to implement the process according to an embodiment of the invention, which comprises: - transmission, implemented by the transmitter EM_BS, to a first transmission interval, TTI, of control information, DCI, including a first band portion indicator, BWP1, to transmit data associated with a first slice via the first band portion, BWP1,
[0107] such as: - the control information, DCI, transmitted at the first transmission interval, TTI, further include a second band portion indicator, BWP2, to transmit by the transmitter EM_BS or receive by the receiver BS_RE, via this second band portion, BWP2, data associated with a second slice and a first time-switching indicator, Jl, to switch the active band portion between the first band portion, BWP1, and the second band portion, BWP2.
[0108] The EM_BS transmitter can transmit pilot signals, for example DMRS, so that the terminal can determine the downlink quality. The RE_BS receiver can receive pilot signals, for example SRS, from a terminal to determine the uplink quality and, conversely, deduce the downlink quality. Other techniques well known to those skilled in the art are possible for estimating both the uplink and downlink channels.
[0109] The [Fig. 12] is a simplified diagram of the structure of an embodiment of an TAL terminal according to an embodiment of the invention.
[0110] The NTAL terminal comprises at least one microprocessor pP_TAL, the operation of which is controlled by the execution of a program whose instructions enable the implementation of a communication method according to the invention, a memory MEM_TAL, a transmitter EM_TAL, and a receiver RE_TAL, which are connected to each other by means of, for example, a bus. Of course, the constituent elements of the NTAL terminal may be connected by means of a connection other than a bus.
[0111] The pP_TAL microprocessor controls the operations of the TAL terminal. The MEM_TAL storage unit stores at least the program for implementing the method according to an embodiment of the invention to be executed by the pP_TAL processor, and various data, such as parameters and / or indicators, NSSAI, 5QI, used for calculations performed by the pP_TAL microprocessor, intermediate data from calculations performed by the pP_TAL microprocessor, etc. The pP_TAL microprocessor can be formed from any known and suitable hardware or software, or from a combination of hardware and software. For example, the pP_TAL microprocessor can be formed from dedicated hardware such as a processing circuit, or from a programmable processing unit such as a central processing unit (CPU) that executes a program stored in its memory.
[0112] MEM_TAL memory can be formed by any suitable means capable of storing the program or programs and data in a computer-readable manner. Examples of MEM_TAL memory include non-transient storage media such as semi-transient memory devices conductors, and magnetic, optical or magneto-optical recording media loaded into a microprocessor-controlled read and write unit.
[0113] At initialization, the program code instructions are, for example, loaded into a buffer before being executed by the pP_TAL microprocessor. The pP_TAL microprocessor controls the various components of the TAL terminal.
[0114] Thus, by executing the instructions, the pP_TAL microprocessor enables the TAL terminal to implement the communication process which, according to one embodiment of the invention: - reception, by the RE_TAL receiver, at a first transmission interval, TTI, of control information, DCI, comprising a first band portion indicator, BWP1, to receive data associated with a first slice via the first band portion, BWP1,
[0115] such that: - the control information, DCI received at the first transmission interval, TTI, further include a second band portion indicator, BWP2, to receive by the receiver RE_TAL or transmit by the transmitter EM_TAL, via this second band portion, BWP2, data associated with a second slice and a first time switch indicator, Jl, to switch the active band portion between the first band portion, BWP1, and the second band portion, BWP2.
[0116] The EM_TAL transmitter can transmit pilot signals, for example SRS, so that the base station can determine the uplink quality. The RE_TAL receiver can receive pilot signals, for example DMRS, from a base station to determine the downlink quality and, conversely, deduce an uplink quality. The terminal can then send an estimate of the downlink quality back to the base station. Other techniques well known to those skilled in the art are possible for estimating both the uplink and downlink channels.
[0117] In the context of a telecommunications network with an O-RAN type access network, illustrated by [Fig. 13], the communication process in its base station version can be implemented by an entity called RIC (RAN Intelligent Controller) or “near-RT RIC” (near-RealTime RIC).
[0118] In this O-RAN context, the base station is disaggregated into several entities: Non-RT RIC, near-RT RIC, O-CU-CP, O-CU-UP, O-DU, O-RU. Interfaces are defined between these different entities: Al between the Non-RT RIC and near-RT RIC entities, E2 between the near-RT RIC and O-CU-CP / O-CU-UP entities, El between O-CU-CP and O-CU-UP, Fl between the O-CU-CP / O-CU-UP and O-DU entities, Open FH between the O-DU and O-RU entities.
[0119] Each entity is responsible for specific functions and a protocol layer. In particular, the O-RU entity is responsible for the lower physical layer, the O-DU entity is responsible for the upper physical layer and layer 2 with the MAC protocol and scheduling. The RICs are controllers that execute algorithms. Algorithms with a timescale of 10 ms to 1 second run at the "near-RT RIC" level, while algorithms with a timescale greater than 1 second run at the "Non-RT RIC" level.
[0120] Since the determination of control information (DCI) must be compatible with very restrictive latency times, it is performed at the "near-RT RIC" level. This entity receives input data from the terminal (TAL), slice indicators (N-SSAI) provided by the AMF, parameters, and quality indicators (5QI), which allow it to construct a flow matrix. The matrix then determines the DCI and its format for transmission to the terminal.
Claims
Claims
1. A communication method comprising: - transmitting at a first transmission interval (TTI) control information (DCI) comprising a first band part indicator (BWP1) for transmitting data associated with a first slice of a communication network via the first band part (BWP1), characterized in that: - the control information (DCI) transmitted at the first transmission interval (TTI) further comprises a second band part indicator (BWP2) for transmitting or receiving, via this second band part (BWP2), data associated with a second slice of said communication network and a first switching time indicator (Jl) for switching the active band part between the first band part (BWP1) and the second band part (BWP2).
2. The method of claim 1, further comprising: - before the transmission of the control information, reception of an identifier of the first section of said communication network and an identifier of the second section of said communication network for the association of the same terminal with these first and second sections of said communication network.
3. Method according to claim 1, such that the control information (DCI) transmitted at the first transmission interval (TTI) further comprises a first time offset indicator (KO) after the first transmission interval for transmitting data associated with the first slice of said communication network via the first band part (BWP1) and such that the active band part switchover occurs after the scheduling of the data associated with the first slice of said communication network and transmitted via the first part of the band (BWP1).
4. Communication method comprising: - receiving at a first transmission interval (TTI) control information (DCI) comprising a first band part indicator (BWP1) for receiving data associated with a first slice of a communication network via the first band part (BWP1), characterized in that: - the control information (DCI) received at the first transmission interval (TTI) further comprises a second band part indicator (BWP2) for receiving or transmitting, via this second band part (BWP2), data associated with a second slice of said communication network and a first switching time indicator (Jl) for switching the active band part between the first band part (BWP1) and the second band part (BWP2).
5. Method according to the preceding claim, further comprising: - before receiving the control information, transmitting an identifier of the first slice of said communication network and an identifier of the second slice of said communication network for the association of the same terminal with the first and second slices of said communication network.
6. Method according to one of claims 1 to 5, such that the first band part (BWP1) and the second band part (BWP2) respectively benefit from different numerologies.
7. Method according to one of claims 1 to 6, such that the control information (DCI) is carried by the same control channel (PDCCH).
8. Method according to one of claims 1 to 7, such that the data associated with the first slice of said communication network and the data associated with the second slice of said communication network are received or transmitted in the same shared channel (PDSCH, PUSCH) of received data or the same shared channel (PUSCH, PDSCH) of transmitted data.
9. Method according to one of claims 1 to 8, such that the data associated with the first slice of said communication network and the data associated with the second slice of said communication network are associated with services of different types.
10. Method according to one of claims 1 to 9 such that the data associated with one of the slices of said communication network are associated with a service of the type requiring high reliability and low latency, i.e., URLLC.
11. Telecommunication device (TAL) comprising at least one transmitter (EM_TAL) and one receiver (RE_TAL), the device is adapted to: - receive, at a first transmission interval (TTI), control information (DCI) comprising a first band part indicator (BWP1), a second band part indicator (BWP2) and a first switching time indicator (Jl) for switching the active band part between the first band part (BWP1) and the second band part (BWP2), - receive or transmit data associated with a first slice of a communication network via the first band part (BWP1) and, after switching the active band part, data associated with a second slice of said communication network via the second band part (BWP2).
12. Telecommunication device (BS) comprising at least one transmitter (EM_BS) and one receiver (RE_BS), the device is adapted to: - transmit at a first transmission interval (TTI) control information (DCI) comprising a first band part indicator (BWP1), a second band part indicator (BWP2) and a first switching time indicator (Jl) for switching the active band part between the first band part (BWP1) and the second band part (BWP2), - transmit data associated with a first slice of a communication network via the first band part (BWP1) and, after active band part switchover, data associated with a second slice of said communication network via the second band part (BWP2).
Citation Information
Patent Citations
Bandwidth part switching method and apparatus
EP4221320A1
Uplink transmissions using multiple active resources
US20200145169A1
Bandwidth part switching method and apparatus
WO2022077179A1
