TRAM PLATFORM STRUCTURE
The use of prefabricated hybrid concrete modules with recycled tire rubber and a closed-loop water system addresses water wastage and maintenance challenges in tram platforms, promoting environmental sustainability and efficient rail replacement.
Patent Information
- Application Number
- FR2023005247
- Authority / Receiving Office
- FR · FR
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2043-05-26
AI Technical Summary
Traditional tram platform construction using bi-block concrete sleepers allows water infiltration into the base, leading to water wastage and necessitates disruptive rail maintenance, which is costly and time-consuming.
Implementing prefabricated modules made of hybrid concrete with recycled tire rubber for the platform's floor, incorporating removable rail coverings and a closed-loop water management system to collect and reuse infiltrating water for irrigation and temperature regulation.
Reduces water consumption, minimizes maintenance disruption, and enhances environmental sustainability by facilitating faster, cost-effective rail replacement and water recycling.
Smart Images

Figure 00000006_0000 
Figure 00000006_0001 
Figure 00000006_0002
Abstract
Description
Title of the invention: PLATFORM STRUCTURE FOR TRAMWAY
[0001] The present invention PLATFORM STRUCTURE FOR TRAMWAY concerns the construction of a more environmentally friendly tramway platform, by implementing a floor in prefabricated modules (7 and 8), in hybrid concrete from the recycling of used tires, by the possibility of allowing an operator-maintainer to replace a rail without breaking all the platform coverings, with a revaluation of infiltration water in the platform, and finally by creating oases of freshness on and around the tramway platform ([Fig.4]).
[0002] Nowadays, in the case of a planted tramway platform, whether watered or not, the construction of its floor is traditionally done with two-block concrete sleepers, placed every 75 or 60 cm depending on the route. These are laid on a concrete foundation slab, very often made track by track to allow water to infiltrate into the subgrade, and once adjusted, the sleepers are blocked by a concrete setting. In this case, the watering and rainwater are not reused.
[0003] The design according to PLATFORM STRUCTURE FOR TRAMWAY allows for the "floor" part to save time, by replacing for each of the tracks and without constraint in relation to the type of associated coating, the traditional sleepers by prefabricated modules (7 and 8) placed on a foundation slab (25) making any width of platform. Two types of prefabricated modules are used, the Standard prefabricated module (7) ([Fig.l] ) and the Technical prefabricated module (8) ([Fig.2] ). The Standard prefabricated module (7) for the current track, and the Technical prefabricated module (8) for the installation of sanitation, the connection of drains, the crossings of ducts and various networks.The prefabricated modules constructed from hybrid concrete, namely with concrete in which a percentage of sand has been replaced by rubber chips from used tires, will bring more flexibility to the structure of the railway track and improvements in sound and vibration on and around the said platform.
[0004] The choice to use recycled tires as material to participate in the construction of prefabricated modules was not made only on the basis of their recycling virtues, but above all to find a solution to this pollution that tires represent for our planet and in our landscapes.
[0005] To allow an operator-maintainer to save time on replacement of a rail with a vegetated and mineralized coating, in a minimum of time and at a lower cost for the community, the invention allows, through a removable rail covering (2 and 3), also made of recycled high-density rubber from tires, easier access to the rail attachment system without having to break the surrounding coatings ([Fig.3]).
[0006] To respond to the revaluation of water and the overconsumption of drinking water, used for watering, the first false good idea would be to abandon watering. Indeed, the freshness brought by the water has as its main objective to nourish the plants, but also, to ensure the temperature of the structure of the platform drops and to provide a fresh environment around our urban rail transport.
[0007] The objectives of PLATFORM STRUCTURE FOR TRAMWAY for the revalorization of water are ([Fig.4]): - Recover as much water as possible entering the platform, - Prevent its infiltration into the base of the form thanks to the foundation slab carried out across the entire width of the platform “create a barrier” - Connect all drains present on the platform and in excess widths to recovery and treatment basins placed under the platform. - Connected the pools to the closed circuit irrigation system. - Associate the watering system with a list of plants that have the particularity of naturally releasing freshness.
[0008] In the event that a client is not interested in the revaluation of infiltration water (because it is too expensive for their project), the foundation slab could be limited in width to the base of each of the single tracks.
[0009] List of platform components:
[0010] 1: Rail
[0011] 2: High density recycled rubber profile for green covering
[0012] 3: High density recycled rubber profile for mineral coating
[0013] 4: Rail joint
[0014] 5: Anchored saddle
[0015] 6: Wedging concrete
[0016] 7: Standard prefabricated module
[0017] 8: Technical prefabricated module
[0018] 9: Anchor key
[0019] 10: Drains
[0020] 11: Substratum
[0021] 12: Vegetation cover
[0022] 13: Set of refreshing plants
[0023] 14 Drip network
[0024] 15 Filling concrete
[0025] 16 Various sleeves
[0026] 17 Paving covering
[0027] 18 Concrete covering
[0028] 19 Water recovery and treatment basin
[0029] 20 Basin access manhole
[0030] 21 Drainage box
[0031] 22 Sanitation outlet
[0032] 23 Closing cover
[0033] 24 Gutter end closing plate
[0034] 25 Foundation slab
[0035] The accompanying drawings illustrate the invention: • [Fig.l] represents a perspective of the Standard prefabricated module • [Fig.2] represents a perspective of the prefabricated module Technique • [Fig.3] represents a cross-section of the track structure with the different rail coverings • [Fig.4] represents a cross-section, Track structure - vegetated surface with removable rail covering and basin under platform • [Fig.5] shows a cross-section, Track structure - mineralized coating (paving) with removable rail covering and rail joint • [Fig.6] shows a cross-section, Track structure - mineralized coating (uncirculated concrete) with removable rail covering and rail joint • [Fig.7] represents a perspective of the technical element with sanitation assembly and passage of ducts • [Fig.8] represents a perspective of the prefabricated technical module with passage of ducts • [Fig.9] represents a perspective of an assembly of 3 prefabricated modules
[0036] (2 standards - 1 technical)
[0037] With reference to these drawings, the invention shows that it is produced over the entire width of the platform, in single or double track, a foundation slab (25) on which prefabricated modules (7 and 8) are arranged. The prefabricated modules can accommodate the laying of railway track on saddles (5) ([Fig.3]). The shape of the prefabricated modules is compatible with all types of coverings that a tramway platform can accommodate ([Fig.5] and 6). To prevent transverse sliding of the prefabricated modules, anchor keys (9) are made on either side of the track once laid and adjusted ([Fig.3]).
[0038] All the drains (10) positioned on the platform and in the over-widths make it possible to collect all the water that will infiltrate, the drains will be connected to a sanitation network, which itself will be connected to recovery and treatment basins (19) installed under the platform and according to the needs linked to the longitudinal profile. After treatment, the water will be reinjected into the irrigation circuit. The presence of the irrigation will make it possible to refresh the structure of the platform, to nourish the planted plants and to create oases of freshness with the association of plants with naturally refreshing power ([Fig.4]).
[0039] For communities and operator-maintainers, maintenance and particularly the replacement of rails at intersections is not an operation without serious consequences. Indeed, during these works, commercial operations are significantly disrupted, which forces the operator, when possible, to put in place replacement buses for several weeks. The budget and commercial loss are then greatly impacted, which is why the invention provides for facilitating accessibility to the attachment system with the installation of removable high-density rubber rail coverings (2 and 3) ([Fig.3]).
[0040] The invention is particularly intended to ensure that tram platforms are even more environmentally friendly, by taking into account a construction method, a choice of material from recycling, a revaluation of water, faster maintenance for the replacement of a rail and at a lower cost.
Claims
Claims
1. Platform structure for a tram in hybrid concrete comprising a full platform width foundation slab on which are arranged standard prefabricated modules (7) and technical prefabricated modules (8), said modules serving to accommodate a laying of railway track on saddles (5), rails (1), anchor keys (9) on either side of the track, drains (10) positioned on said platform and in excess widths to collect the water which infiltrates into the drains (10) characterized in that the prefabricated modules are in hybrid concrete in which a percentage of concrete is replaced by rubber.
2. Structure according to claim 1 characterized in that the rubber comes from used tires.
3. Structure according to any one of claims 1 and 2 characterized in that the rails (1) are covered with high density rubber profiles (2 and 3) from the recycling of used tires, these profiles are removable to facilitate the replacement of the rails.
4. Structure according to any one of claims 1 to 3, characterized in that the drains (10) are connected to a sanitation network which is itself connected to recovery and treatment basins (19) installed under the platform structure, and in a closed circuit with the platform's watering network.
Citation Information
Patent Citations
Polyurethane-ballast bed damping system
CN113684728A
drainage device for trough-like structures
DE29807659U1
Supporting module for a prefabricated railway track, railway track, section and method for mounting railway tracks
EP2351884A1
Rail system
US20070176012A1
Process for producing an elastic railway track supporting slab
WO1996014470A1