Work machine and method of estimating remaining operating time for work machine

The system estimates remaining operating time for work machines by determining power requirements and prime mover capacity, enhancing operational planning and efficiency by providing real-time updates through a user interface.

GB2629336APending Publication Date: 2024-10-30CATERPILLAR INC
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
GB2023005581
Authority / Receiving Office
GB · GB
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-17
Publication Date
2024-10-30

AI Technical Summary

Technical Problem

Operators of work machines, such as wheel loaders, face challenges in estimating the remaining operating time due to varying power requirements across different operations and the need for real-time monitoring of prime mover capacity, which affects productivity planning.

Method used

A system comprising a controller with processors and memory to determine the power requirement for ongoing operations and estimate remaining operating time based on available prime mover capacity, displayed via a user interface, allowing for real-time updates and operator input.

Benefits of technology

Enables accurate and efficient estimation of remaining operating time, allowing operators to plan work operations effectively without impacting productivity, and can be retrofitted on existing machines, improving operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

A work machine configured to perform a number of work operations includes a controller. The controller includes one or more memories configured to store information pertaining to a power requirement for each of the number of work operations. The controller also includes one or more processors communicably coupled to the one or more memories. The one or more processors are configured to determine a first work operation 302 being performed by the work machine and retrieve the information pertaining to the power requirement for the first work operation 304. The one or more processors are also configured to determine an available operating capacity of a prime mover associated with the work machine 306 and estimate a remaining operating time for the work machine 308. The work machine also includes a user interface configured to receive information pertaining to the remaining operating time for the work machine 310 and display the remaining operating time thereon 312. The system may use historical data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a work machine and a method of estimating a remaining operating time for the work machine. Background

[0002] Generally, a work machine includes a prime mover, such as a battery module or an engine, which provides operating power to various components of the work machine. The work machine performs a number of work operations at a worksite that may eventually deplete an operating capacity (or available power) associated with the prime mover. For example, a wheel loader may include the battery module for its operational and mobility requirements. The battery module of the work machine may discharge after performing one or more work operations. It may be helpful for an operator to be aware of a remaining operating time of the work machine so that the operator can accordingly plan upcoming operations without impacting a productivity at the worksite.

[0003] U.S. Patent Number 7,299,114 describes a method as well as a device for determining the residual travel duration of a submarine, with which firstly for at least one certain travel situation a reference journey is carried out with which the power consumption of the submarine is detected as stored as a dependentdependent consumption profile. Later, for the same travel situation, the residual travel duration or a residual capacity of a battery given a predefined travel duration is determined on the basis of the stored consumption profile and the current battery data. Summary of the Disclosure

[0004] In an aspect of the present disclosure, a work machine is provided. The work machine is configured to perform a plurality of work operations. The work machine includes a controller. The controller includes one or more memories configured to store information pertaining to a power requirement for each of the plurality of work operations associated with the work machine. The controller also includes one or more processors communicably coupled to the one or more memories. The one or more processors are configured to determine a first work operation, from the plurality of work operations, being performed by the work machine. The one or more processors are also configured to retrieve, from the one or more memories, the information pertaining to the power requirement for the first work operation. The one or more processors are further configured to determine an available operating capacity of a prime mover associated with the work machine. The one or more processors are configured to estimate a remaining operating time for the work machine based on the power requirement for the first work operation and the available operating capacity of the prime mover. The work machine also includes a user interface communicably coupled to the one or more processors. The user interface is configured to receive information pertaining to the remaining operating time for the work machine and display the remaining operating time thereon.

[0005] In another aspect of the present disclosure, a method of estimating a remaining operating time for a work machine is provided. The work machine is configured to perform a plurality of work operations. The method includes determining, by one or more processors of a controller, a first work operation, from the plurality of work operations, being performed by the work machine. The method also includes retrieving, by the one or more processors, an information pertaining to a power requirement for the first work operation from one or more memories of the controller. The method further includes determining, by the one or more processors, an available operating capacity of a prime mover associated with the work machine. The method includes estimating, by the one or more processors, the remaining operating time for the work machine based on the power requirement for the first work operation and the available operating capacity of the prime mover. The method also includes receiving, by a user interface communicably coupled to the one or more processors, information pertaining to the remaining operating time for the work machine. The method further includes displaying the remaining operating time for the work machine on the user interface.

[0006] Other features and aspects of this disclosure will be apparent from the following description and the accompanying drawings. Brief Description of the Drawings

[0007] FIG. 1 is a schematic side view of a work machine, according to an embodiment of the present disclosure;

[0008] FIG. 2 is a block diagram of a system for estimating a remaining operating time for the work machine of FIG. 1, according to an embodiment of the present disclosure; and

[0009] FIG. 3 is a flowchart for a method of estimating the remaining operating time for the work machine of FIG. 1, according to an embodiment of the present disclosure. Detailed Description

[0010] Wherever possible, the same reference numbers will be used throughout the drawings to refer to the same or like parts.

[0011] Referring to FIG. 1, a schematic side view of an exemplary work machine 100 is illustrated. The work machine 100 is embodied as a wheel loader that may be used in industries, such as, construction, landscaping, agriculture, and the like. Alternatively, the work machine 100 may be embodied as a mining truck, a dozer, a fork lift, an excavator, a track-type tractor, a motor grader, and the like that may be used in various industries to perform one or more work operations, such as excavation, a loading operation, an unloading operation, a roading operation, or a load and carry operation for transporting materials from one location to another. The materials may include, for example, asphalt, debris, dirt, snow, feed, gravel, logs, raw minerals, recycled material, rock, sand, woodchips, and the like. It should be noted that each of the above mentioned work operations may have different power requirements. For example, the power requirement of a loading operation may be different from the power requirement of an unloading operation. Furthermore, power requirements of a particular work operation may also be governed by an operator in charge of the work operation. For example, a skilled operator may control the work machine 100 more efficiently and thus, the power requirement for a particular work operation may be lower. Moreover, power requirements of a particular work operation may also vary as per operator preferences.

[0012] The work machine 100 includes a frame 102. The frame 102 supports various components of the work machine 100. The work machine 100 also includes a hood 110 mounted on the frame 102. Further, the work machine 100 includes a prime mover 106 supported by the frame 102. The prime mover 106 may be disposed within the hood 110. The prime mover 106 may provide power to various components of the work machine 100 for operational and mobility requirements. The prime mover 106 may include a battery module, a fuel cell, and / or an engine. In some examples, the battery module may include one or more battery cells, such as, lithium titanate battery cells to provide power to the work machine 100. The fuel cell may include, for example, a hydrogen fuel cell. The engine may include, for example, an internal combustion engine.

[0013] The work machine 100 includes a pair of front wheels 112 and a pair of rear wheels 114. The front wheels 112 and the rear wheels 114 provide support and mobility to the work machine 100 on grounds. In other examples, the work machine 100 may include two or more pairs of front wheels 112 and / or the rear wheels 114. Alternatively, the work machine 100 may include tracks instead of the wheels 112, 114.

[0014] Further, the work machine 100 includes an operator cabin 108 supported by the frame 102. The operator cabin 108 may include one or more input modules / output modules that may enable the operator to control the work machine 100 during operation.

[0015] Further, the work machine 100 includes a user interface 120 (shown in FIG. 2). The user interface 120 may be mounted within the operator cabin 108. In other examples wherein the work machine 100 may be remotely controlled, the user interface 120 may be disposed at a remote operator station. The user interface 120 may include any Input / Output device. In an example, the user interface 120 may include a portable or handheld device. The user interface 120 may include, but is not limited to, a smart phone, a laptop, a tablet, and the like. The user interface 120 may include a display unit that may display various information associated with the work machine 100.

[0016] In an example, the user interface 120 may display information related to a particular work operation that is being performed by the work machine 100. For example, if the work machine 100 is performing a loading operation, the user interface 120 may display that the loading operation is in progress and may further display details related to the loading operation. In other example, the user interface 120 may display an available operating capacity of the prime mover 106 of the work machine 100. For example, if the prime mover 106 includes the engine, the user interface 120 may display a fuel consumption and / or remaining fuel level in a fuel tank of the work machine 100. Further, if the prime mover 106 includes the battery module or the fuel cell, the user interface 120 may display a state of charge of the battery module or the fuel cell.

[0017] In some examples, the user interface 120 may include an input device. The input device may allow the operator to input commands and / or information related to the work machine 100. In an example, as per application requirement, the input device allows the operator to select a particular work operation from the one or more work operations. Further, when a particular operator is in charge of the work machine 100, the input device may also allow operators to enter a unique operator code and password combination, a numeric code, and the like so that the work machine 100 may be configured according to the preferences of the operator. It should be noted that operator identification may also be established using a Radio-frequency identification (RFID) tag, a Bluetooth key, a mobile application, a Dallas key, and the like, without any limitations thereto.

[0018] The work machine 100 also includes a linkage assembly 116 coupled to the frame 102. The linkage assembly 116 is movably coupled to the frame 102. The linkage assembly 116 includes a pair of linkage arms 117 coupled to the frame 102 at one end thereof. The linkage assembly 116 further includes a work tool 118. The work tool 118 may be used to perform the one or more work operations. The work tool 118 is embodied as a bucket herein. Alternatively, the work tool 118 may be any other type of work tool known in the art, such as, a blade, a fork, a payload carrier that may be raised or lowered, and the like, without any limitations thereto. In some examples, power requirements of a particular work operation may also be governed by a type and a design of the work tool 118. For example, a shape, a size, and / or a weight of the work tool 118 may impact power requirements for the work operation. Thus, various factors, such as, a type of the work operation, the operator in charge of the work operation, and the work tool 118 being used for the work operation may have an impact on the power requirements for completing a particular work operation. Further, when a particular work operation is being performed, it may be helpful for operators to have a knowledge of a remaining operating time RI (shown in FIG. 2) for the work machine 100.

[0019] Referring to FIG. 2, a schematic block diagram of a system 200 for estimating the remaining operating time RI for the work machine 100 of FIG. 1 is illustrated. The system 200 includes a controller 202. The controller 202 includes one or more memories 204. The memories 204 store information pertaining to the power requirement for each of the number of work operations associated with the work machine 100. The memories 204 may include any means of storing information, including a hard disk, an optical disk, a floppy disk, ROM (read only memory), RAM (random access memory), PROM (programmable ROM), EEPROM (electrically erasable PROM), and / or other computer-readable memory media.

[0020] In some examples, the information pertaining to the power requirement for each of the number of work operations may be based on historical data accumulated for each of the number of work operations. More particularly, the historical data may be accumulated based on determination of power requirements during prior execution instances of the work operations. In other examples, the memories 204 may also store information related to one or more of driving / operating patterns of operators, different scenarios / conditions specific to work operations, identities of operators and their operational preferences, and the like. In some examples, the memories 204 may store power requirement for a work operation when a particular operator is in charge of the work operation. Further, the memories 204 may also store information pertaining to several types and designs of work tools (such as, the work tool 118 shown in FIG. 1) that may be coupled with the work machine 100. Moreover, the memories 204 may store power requirement for a work operation when a particular type of work tool is coupled with the work machine 100.

[0021] The controller 202 also includes one or more processors 206 communicably coupled to the one or more memories 204. It should be noted that the one or more processors 206 may embody a single microprocessor or multiple microprocessors for receiving various input signals and generating output signals. Numerous commercially available microprocessors may perform the functions of the one or more processors 206. Each processor 206 may further include a general processor, a central processing unit, an application specific integrated circuit (ASIC), a digital signal processor, a field programmable gate array (FPGA), a digital circuit, an analog circuit, a microcontroller, any other type of processor, or any combination thereof. Each processor 206 may include one or more components that may be operable to execute computer executable instructions or computer code that may be stored and retrieved from the one or more memories 204.

[0022] The one or more processors 206 determine a first work operation, from the number of work operations, being performed by the work machine 100. The one or more processors 206 also retrieve from the one or more memories 204, the information pertaining to the power requirement for the first work operation. Further, the one or more processors 206 determine an available operating capacity of the prime mover 106 (see FIG. 1) associated with the work machine 100. For example, the processors 206 may determine the state of charge of the battery cells or the fuel cell. Further, if the prime mover 106 includes the engine, the processors 206 may determine the remaining fuel level in the fuel tank of the work machine 100. The one or more processors 206 may be communicably coupled to one or more sensors, such as a fuel level sensor, a voltage sensor, a current sensor, and the like in order to determine the available operating capacity of the prime mover 106. Furthermore, the one or more processors 206 estimate the remaining operating time RI for the work machine 100 based on the power requirement for the first work operation and the available operating capacity of the prime mover 106.

[0023] Further, the processors 206 may determine the identity of the operator in charge of the work machine 100 and / or the type of work tool 118 associated with the work machine 100 to estimate the remaining operating time RI. For example, the processor 206 may retrieve information related to the power requirement of the first work operation based on operator in charge of the work operation and the work tool 118 that is being used to perform the work operation to estimate the remaining operating time RI. In an example, the memories 204 may store power requirements for each work operation corresponding to a number of operators. In another example, the memories 204 may store power requirements for each work operation corresponding to a number of work tools that may be coupled with the work machine 100. Further, the user interface 120 is communicably coupled to the one or more processors 206. The one or more processors 206 transmit information related to the remaining operating time RI to the user interface 120. Further, the user interface 120 receives the information pertaining to the remaining operating time RI for the work machine 100 and display the remaining operating time RI thereon.

[0024] In some examples, based on application requirements at a worksite, the operator may switch from the first work operation to a second work operation. The one or more processors 206 determine a switch from the first work operation to the second work operation based on an operator input II. The operator input II may be provided via the user interface 120 or any other input module associated with the work machine 100. In some examples, the second work operation may be different from the first work operation. In other examples, the second work operation may be same as the first work operation but may be performed using a different type of work tool or a different operator.

[0025] In examples wherein the processors 206 determine the switch from the first work operation to the second work operation, the processors 206 update the remaining operating time RI of the work machine 100 based on a power requirement for the second work operation and the available operating capacity of the prime mover 106. More particularly, as the processors 206 determine the switch from the first work operation to the second work operation, the processors 206 may retrieve the information pertaining to the power requirement for the second work operation from the one or more memories 204. Accordingly, the processors 206 may update the remaining operating time RI based on the power requirement for the second work operation and the available operating capacity of the prime mover 106. Further, the user interface 120 receives an updated remaining operating time R2 for the work machine 100. Moreover, the user interface 120 displays the updated remaining operating time R2 for the work machine 100 thereon.

[0026] In some examples, the system 200 may be automatically updated based on execution of various work operations by the work machine 100. More particularly, the one or more processors 206 determine a real-time power requirement for each work operation while a corresponding work operation is being performed. For example, the one or more processors 206 may determine the real-time power requirement for the first work operation while the first work operation is being performed. Further, the processors 206 determine if the realtime power requirement for one or more work operations is different from the power requirement stored in the one or more memories 204 for the said one or more work operations. Furthermore, the processors 206 update the one or more memories 204 to replace the power requirement for the said one or more work operations with the real-time power requirement if the real-time power requirement is different from the power requirement stored in the one or more memories 204. For example, the processors 206 may determine if the real-time power requirement for the first work operation (or the second work operation) is different from the power requirement stored in the one or more memories 204 for the first work operation. If the real-time power requirement of the first work operations is different from the power requirement of the first work operations as stored in the one or more memories 204, the processors 206 may update the one or more memories 204 to replace the power requirement for the first work operation with the real-time power requirement.

[0027] It is to be understood that individual features shown or described for one embodiment may be combined with individual features shown or described for another embodiment. The above described implementation does not in any way limit the scope of the present disclosure. Therefore, it is to be understood although some features are shown or described to illustrate the use of the present disclosure in the context of functional segments, such features may be omitted from the scope of the present disclosure without departing from the spirit of the present disclosure as defined in the appended claims. Industrial Applicability

[0028] The system 200 described herein may allow accurate estimation of the remaining operating time RI, R2 for the work machine 100. Further, the system 200 may allow the operator to determine if subsequent work operations may be performed based on the available operating capacity of the prime mover 106 of the work machine 100.

[0029] Further, the system 200 may update the remaining operating time RI for the work machine 100 while switching to other work operations. For example, if the operator switches from the first work operation to the second work operation, the system 200 may estimate and subsequently display the updated remaining operating time R2 on the user interface 120. Thus, according to the teachings of the present disclosure, the operator may be able to efficiently plan activities based on the remaining operating time RI, R2 without impacting a productivity at the worksite. The system 200 described herein may be cost-effective to implement and may be retrofitted on existing work machines. Further, the system 200 incorporates machine learning techniques as the system 200 involves real-time monitoring and updating of the power requirements for various work operations, which may further improve an efficiency with which the remaining operating time RI, R2 for the work machine 100 is estimated.

[0030] Referring to FIG. 3, a flowchart for a method 300 of estimating the remaining operating time RI for the work machine 100 of FIG. 1 is shown. The work machine 100 performs the number of work operations. With reference to FIGS. 1 to 3, at step 302, the one or more processors 206 of the controller 202 determine the first work operation, from the number of work operations, being performed by the work machine 100.

[0031] At step 304, the one or more processors 206 retrieve the information pertaining to the power requirement for the first work operation from one or more memories 204 of the controller 202. At step 306, the one or more processors 206 determine the available operating capacity of the prime mover 106 associated with the work machine 100. In some examples, the prime mover 106 includes the battery module, the fuel cell, and / or the engine. At step 308, the one or more processors 206 estimate the remaining operating time RI for the work machine 100 based on the power requirement for the first work operation and the available operating capacity of the prime mover 106. In some examples, the one or more processors 206 determine the identity of the operator of the work machine 100 and / or the type of work tool 118 associated with the work machine 100 to estimate the remaining operating time RI.

[0032] At step 310, the user interface 120 communicably coupled to the one or more processors 206 receives the information pertaining to the remaining operating time RI for the work machine 100. At step 312, the user interface 120 displays the remaining operating time RI for the work machine 100.

[0033] In some examples, the one or more processors 206 determines a switch from the first work operation to the second work operation based on the operator input II. Further, the one or more processors 206 update the remaining operating time RI of the work machine 100 based on the power requirement for the second work operation and the available operating capacity of the prime mover 106. Furthermore, the user interface 120 receives the updated remaining operating time R2 for the work machine 100. Moreover, the user interface 120 displays the updated remaining operating time R2 for the work machine 100.

[0034] In some examples, the one or more processors 206 determines the realtime power requirement for each work operation while the corresponding work operation is being performed. Further, the one or more processors 206 determine if the real-time power requirement for one or more work operations is different from the power requirement stored in the one or more memories 204 for the said one or more work operations. Furthermore, the one or more processors 206 update the one or more memories 204 to replace the power requirement for the said one or more work operations with the real-time power requirement if the real-time power requirement is different from the power requirement stored in the one or more memories 204.

[0035] While aspects of the present disclosure have been particularly shown and described with reference to the embodiments above, it will be understood by those skilled in the art that various additional embodiments may be contemplated by the modification of the disclosed machine, systems and methods without departing from the spirit and scope of the disclosure. Such embodiments should be understood to fall within the scope of the present disclosure as determined based upon the claims and any equivalents thereof.

Claims

1. A work machine configured to perform a plurality of work operations, the work machine comprising:a controller including:one or more memories configured to store information pertaining to a power requirement for each of the plurality of work operations associated with the work machine; andone or more processors communicably coupled to the one or more memories, wherein the one or more processors are configured to:determine a first work operation, from the plurality of work operations, being performed by the work machine;retrieve, from the one or more memories, the information pertaining to the power requirement for the first work operation;determine an available operating capacity of a prime mover associated with the work machine; andestimate a remaining operating time for the work machine based on the power requirement for the first work operation and the available operating capacity of the prime mover; anda user interface communicably coupled to the one or more processors, wherein the user interface is configured to receive information pertaining to the remaining operating time for the work machine and display the remaining operating time thereon.

2. The work machine of claim 1, wherein the information pertaining to the power requirement for each of the plurality of work operations is based on historical data accumulated for each of the plurality of work operations.

3. The work machine of claim 1, wherein the one or more processors are further configured to determine a switch from the first work operation to a second work operation based on an operator input.

4. The work machine of claim 3, wherein the one or more processors are further configured to update the remaining operating time of the work machine based on a power requirement for the second work operation and the available operating capacity of the prime mover.

5. The work machine of claim 4, wherein the user interface is further configured to receive an updated remaining operating time for the work machine, and wherein the user interface is configured to display the updated remaining operating time for the work machine thereon.

6. The work machine of claim 1, wherein the prime mover includes at least one of a battery module, a fuel cell, and an engine.

7. The work machine of claim 1, wherein the one or more processors are further configured to:determine a real-time power requirement for each work operation while a corresponding work operation is being performed;determine if the real-time power requirement for one or more work operations is different from the power requirement stored in the one or more memories for the said one or more work operations; andupdate the one or more memories to replace the power requirement for the said one or more work operations with the real-time power requirement if the real-time power requirement is different from the power requirement stored in the one or more memories.

8. The work machine of claim 1, wherein the one or more processors are further configured to determine at least one of an identity of an operator incharge of the work machine and a type of work tool associated with the work machine to estimate the remaining operating time.

9. A method of estimating a remaining operating time for a work machine, the work machine being configured to perform a plurality of work operations, wherein the method includes:determining, by one or more processors of a controller, a first work operation, from the plurality of work operations, being performed by the work machine;retrieving, by the one or more processors, an information pertaining to a power requirement for the first work operation from one or more memories of the controller;determining, by the one or more processors, an available operating capacity of a prime mover associated with the work machine;estimating, by the one or more processors, the remaining operating time for the work machine based on the power requirement for the first work operation and the available operating capacity of the prime mover;receiving, by a user interface communicably coupled to the one or more processors, information pertaining to the remaining operating time for the work machine; anddisplaying the remaining operating time for the work machine on the user interface.

10. The method of claim 9, further comprising determining, by the one or more processors, a switch from the first work operation to a second work operation based on an operator input.

11. The method of claim 10, further comprising updating, by the one or more processors, the remaining operating time of the work machine based on a power requirement for the second work operation and the available operating capacity of the prime mover.

12. The method of claim 11, further comprising:receiving, by the user interface, an updated remaining operating time for the work machine; anddisplaying the updated remaining operating time for the work machine on the user interface.

13. The method of claim 9, wherein the prime mover includes at least one of a battery module, a fuel cell, and an engine.

14. The method of claim 9, further comprising:determining, by the one or more processors, a real-time power requirement for each work operation while a corresponding work operation is being performed;determining, by the one or more processors, if the real-time power requirement for one or more work operations is different from the power requirement stored in the one or more memories for the said one or more work operations; andupdating, by the one or more processors, the one or more memories to replace the power requirement for the said one or more work operations with the real-time power requirement if the real-time power requirement is different from the power requirement stored in the one or more memories.

15. The method of claim 9, further comprising determining, by the one or more processors, at least one of an identity of an operator of the work machine and a type of work tool associated with the work machine to estimate the remaining operating time.

Citation Information

Patent Citations

  • Vehicle for work

    JP2021188669A

  • Electrically driven working machine having a plurality of operating modes

    US20230117372A1

  • Extended range of fuel cell machine

    WO2023081112A1

  • JP1986062969U

  • Battery-driven working machine and control method thereof

    JP1998317428A