Construction method of steel pipe pile, and steel pipe pile foundation

The steel pipe pile construction method with a blockage promoting member and controlled soil volume adjustment addresses penetration challenges in hard ground, ensuring supporting force and efficient construction by reducing press-fit resistance and construction load.

JP2024132537APending Publication Date: 2024-10-01NIPPON STEEL CORPORATION
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023043340
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-17
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing steel pipe pile construction methods face challenges in penetrating deeply into hard ground or when the pipe diameter is large, leading to insufficient supporting force and increased construction time due to high press-fit resistance, requiring heavy machinery.

Method used

A steel pipe pile construction method that includes a blockage promoting member on the inner surface, controlled soil volume adjustment, and rotational press-fitting, allowing the pipe to penetrate to a depth of 0.7 times its outer diameter with a closing member to ensure supporting force, and uses a drilling bit to reduce pressing force.

Benefits of technology

The method ensures necessary supporting force even with shallow penetration, reduces construction load, increases penetration speed, and minimizes noise and vibration, facilitating efficient and smooth construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024132537000001_ABST
    Figure 2024132537000001_ABST
Patent Text Reader

Abstract

To provide a construction method of a steel pipe pile that can ensure a necessary bearing capacity even when an embedded depth into a supporting layer is short.SOLUTION: In a construction method of a steel pipe pile in which a steel pipe pile 1 comprising a steel pipe body with an open tip portion and a blockage promoting member 5 on an inner surface of the tip portion of the steel pipe body 1A penetrates a ground: an in-pipe soil volume adjustment device 3 for adjusting an in-pipe soil volume inside the steel pipe body 1A is controlled until the tip of the steel pipe body 1A reaches a supporting layer G2 of the ground G; and the tip of the steel pipe body 1A penetrates the supporting layer G2 to a depth of at least 0.7 times an outer diameter dimension of the steel pipe body 1A.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a steel pipe pile construction method and a steel pipe pile foundation. [Background technology]

[0002] Conventionally, for example, Patent Document 1 has been disclosed as a technique relating to a construction method for steel pipe piles.

[0003] The construction method for steel pipe piles in Patent Document 1 involves driving a steel pipe pile having a steel pipe body with an open tip and a drilling bit that protrudes below the tip edge of the steel pipe body into the ground until it reaches the supporting layer, rotating it and pressing it into the supporting layer to a depth of at least about three times the diameter of the pile, and then blocking the tip of the steel pipe body with hard soil from the supporting layer through which the hole has been drilled. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2008-255695 A Summary of the Invention [Problem to be solved by the invention]

[0005] In the technology disclosed in Patent Document 1, the bearing capacity is ensured by rotating and pressing the steel pipe into the supporting layer to a depth of about three times or more the outer dimensions of the steel pipe. However, when the supporting layer of the steel pipe pile is a fairly hard ground, or when the outer diameter of the steel pipe pile is large and the vertical pressing resistance increases, it may be difficult to deeply embed the steel pipe pile into the supporting layer. In such cases, the steel pipe pile may not penetrate to the specified target depth and may stop shallow, and the degree of blockage at the tip of the pile may not be sufficiently ensured. As a result, in order to ensure the embedment to the target depth, a heavy machine with a larger output is required, and there is a problem that the workability is reduced, such as an increase in construction time. Therefore, a technology is required that can ensure the necessary bearing capacity even when the embedment depth into the supporting layer is short.

[0006] Therefore, the present invention has been devised in consideration of the above-mentioned circumstances, and its object is to provide a steel pipe pile construction method and a steel pipe pile foundation that can ensure the necessary bearing capacity even when the embedment depth into the supporting layer is short. [Means for solving the problem]

[0007] The construction method for a steel pipe pile according to the first invention is a construction method for a steel pipe pile in which a steel pipe body with an open tip and a blockage promoting member on the inner surface of the tip of the steel pipe body are penetrated into the ground, characterized in that an in-pipe soil volume adjustment means for adjusting the amount of soil inside the steel pipe body is controlled until the tip of the steel pipe body reaches the supporting layer of the ground, and the tip of the steel pipe body is penetrated into the supporting layer to a depth of at least 0.7 times the outer diameter dimension of the steel pipe body.

[0008] The construction method for a steel pipe pile of the second invention is characterized in that, in the first invention, the means for adjusting the amount of soil inside the pipe is controlled so that the top end of the soil inside the steel pipe body is positioned above the upper end of the blocking member.

[0009] The construction method for a steel pipe pile according to the third invention is characterized in that, in the first invention, the blockage promotion member is arranged within a range of twice the outer diameter dimension of the steel pipe body from the tip of the steel pipe body.

[0010] The construction method of a steel pipe pile according to the fourth invention is characterized in that, in the first invention, the blockage promoting member is composed of at least one of a roughening portion formed by roughening the inner surface of the steel pipe body, a rod-shaped protrusion portion formed by a rod-shaped member, a plate-shaped member formed by a plate material arranged perpendicular to the steel pipe axis of the steel pipe body and arranged in a ring shape when viewed from the steel pipe axial direction, and a partition plate arranged so as to separate the steel pipe cross section of the steel pipe body.

[0011] A fifth aspect of the present invention provides a method for installing a steel pipe pile according to the first aspect of the present invention, characterized in that the steel pipe pile is driven into the ground by rotary pressing.

[0012] The sixth invention relates to a method for constructing a steel pipe pile, wherein in the first invention, the steel pipe pile has a drilling bit fixed to protrude downward beyond the tip of the steel pipe body.

[0013] The steel pipe pile construction method of the seventh invention is characterized in that, in controlling the soil volume adjustment means in the second invention, the position of the top end of the soil in the steel pipe body is measured, and if the measured position of the top end is lower than the lower limit of a control range that is preset based on the position of the upper end of the blockage promotion member, soil is poured into the steel pipe body by the soil volume adjustment means in the pipe, and if the measured position of the top end is higher than the upper limit of the control range, soil is discharged from the steel pipe body by the soil volume adjustment means in the pipe.

[0014] The steel pipe pile construction method of the eighth invention is characterized in that, in the first invention, adjustment of the soil volume inside the pipe by the soil volume adjustment means inside the pipe is terminated when the tip of the steel pipe body is penetrated into the supporting layer.

[0015] The steel pipe pile foundation according to a ninth aspect of the present invention is constructed by penetrating the ground using the steel pipe pile construction method according to any one of the first to eighth aspects of the present invention. Effect of the Invention

[0016] In the first to ninth inventions, the means for adjusting the amount of soil inside the pipe is controlled until the tip of the steel pipe body reaches the bearing layer of the ground, and the tip of the steel pipe body is penetrated into the bearing layer to a depth of 0.7 times or more of the outer diameter dimension D of the steel pipe body. As a result, when the tip of the steel pipe body reaches the bearing layer, for example, if it is determined that the amount of soil inside the pipe is clearly small, the device for adjusting the amount of soil inside the pipe can be controlled to add soil inside the pipe. Therefore, when the tip of the steel pipe body penetrates into the bearing layer to a depth of 0.7 times or more of the outer diameter dimension D of the steel pipe body, the tip of the steel pipe body can be effectively blocked by the blocking promotion member. As a result, the necessary bearing capacity can be secured even if the embedment depth of the steel pipe body into the bearing layer is short.

[0017] In particular, in the second invention, when controlling the soil volume adjustment means in the pipe, the top end of the soil in the steel pipe body is positioned above the upper end of the plugging promotion member. This makes it possible to prevent a shortage of soil volume in the pipe when the tip of the steel pipe body reaches the supporting layer. This allows the plugging promotion member to plug the tip of the steel pipe body more effectively.

[0018] In particular, in the third invention, the plugging-promoting member is attached within a range of twice the outer diameter of the steel pipe body from the tip of the steel pipe body. This makes it possible to obtain the effects of the plugging-promoting member efficiently and economically. Therefore, even if the embedment depth into the supporting layer is shortened, the necessary bearing capacity can be secured.

[0019] In particular, in the fourth invention, the clogging promoting member is composed of at least one of a roughening portion formed by roughening the inner surface of the steel pipe body, a rod-shaped protrusion formed by a rod-shaped member, a plate-shaped member formed by a plate material arranged perpendicular to the steel pipe axis of the steel pipe body and arranged in a ring shape when viewed from the steel pipe axial direction, and a partition plate arranged to partition the steel pipe cross section of the steel pipe body. Therefore, it is possible to increase the degree of clogging at the tip of the steel pipe body and promote tip clogging.

[0020] In particular, in the fifth aspect of the present invention, the steel pipe pile is driven into the ground by rotary pressing, which makes it possible to suppress noise and vibration to the surrounding area during construction.

[0021] In particular, the sixth invention has a drilling bit that is fixed to protrude downward from the tip of the steel pipe body. This allows the ground to be disturbed while being excavated, making it possible to reduce the pressure input required to penetrate the steel pipe body. This reduces the construction load when driving the steel pipe pile into the ground, and further increases the penetration speed.

[0022] In particular, in the seventh invention, when controlling the soil volume adjustment means inside the pipe, the position of the top end of the soil inside the steel pipe body is measured, and if the measured top end position is lower than the lower limit of a control range that is preset based on the position of the upper end of the blockage promotion member, soil is poured into the steel pipe body by the soil volume adjustment means inside the pipe. This makes it possible to ensure the degree of blockage at the tip of the pile required to exert sufficient bearing capacity. Furthermore, it is possible to prevent the top end of the soil inside the steel pipe body from being positioned lower than the blockage promotion member. This makes it possible to more reliably ensure the required bearing capacity.

[0023] In particular, in the seventh invention, when controlling the in-pipe soil volume adjustment means, the position of the top end of the soil inside the steel pipe body is measured, and if the measured top end position is higher than the upper limit of the control range, the in-pipe soil volume adjustment means discharges soil from the steel pipe body. This reduces the construction load when driving the steel pipe pile into the ground, further increases the penetration speed, and enables smooth construction.

[0024] In particular, in the eighth invention, when the tip of the steel pipe body penetrates the supporting layer, the adjustment of the amount of soil inside the pipe by the soil amount adjustment means inside the pipe is completed. In other words, after the tip of the steel pipe body penetrates the supporting layer, there is no need to perform a process of putting soil into the pipe or discharging soil from the pipe. This allows for smooth construction. [Brief description of the drawings]

[0025] [Figure 1] FIG. 1 is a diagram showing an example of a steel pipe pile used in the embodiment. [Diagram 2] FIG. 2 is a diagram illustrating a step of penetrating a steel pipe pile into the ground in the steel pipe pile construction method according to the embodiment. [Diagram 3] FIG. 3 is a diagram illustrating a step of penetrating a steel pipe pile into the ground in the construction method for a steel pipe pile according to the embodiment. [Figure 4] FIG. 4 is a diagram illustrating a step of penetrating a steel pipe pile into the ground in the construction method for a steel pipe pile according to the embodiment. [Diagram 5] FIG. 5 is a diagram illustrating a step of penetrating a steel pipe pile into a bearing layer in a construction method for a steel pipe pile according to an embodiment. [Figure 6] FIG. 6(a) is a diagram showing a first modified example of a steel pipe pile used in the embodiment, and FIG. 6(b) is a diagram showing a second modified example of a steel pipe pile used in the embodiment. [Figure 7] FIG. 7 is a diagram showing a third modified example of a steel pipe pile used in the embodiment. [Figure 8] FIG. 8(a) is a diagram showing a fourth modified example of a steel pipe pile used in the embodiment, and FIG. 8(b) is a diagram showing the steel pipe pile of FIG. 8(a) as viewed from the axial direction of the steel pipe. [Figure 9] FIG. 9(a) is a diagram showing a fifth modified example of a steel pipe pile used in the embodiment, and FIG. 9(b) is a diagram showing the steel pipe pile of FIG. 9(a) as viewed from the axial direction of the steel pipe. [Figure 10] FIG. 10(a) is a diagram showing a sixth modified example of a steel pipe pile used in the embodiment, and FIG. 10(b) is a cross-sectional view of the steel pipe pile of FIG. 10(a) taken along the axial direction of the steel pipe. [Figure 11] Figure 11(a) is a diagram showing a seventh modified example of a steel pipe pile used in the embodiment, Figure 11(b) is a diagram showing an eighth modified example of a steel pipe pile used in the embodiment, and Figure 11(c) is a diagram showing a ninth modified example of a steel pipe pile used in the embodiment. [Figure 12] FIG. 12(a) is a diagram showing a tenth modified example of a steel pipe pile used in the embodiment, and FIG. 12(b) is a diagram showing an eleventh modified example of a steel pipe pile used in the embodiment. [Figure 13] FIG. 13 is a diagram for explaining the soil push-through test in a pipe. [Figure 14] FIG. 14 shows the results of the soil push-out test in the pipe of Example 1, with the push-out resistance force at 0.1D push-in on the vertical axis and the installation range on the horizontal axis. [Figure 15] FIG. 15 shows the analysis results of Example 2, with the punching resistance strength on the vertical axis and the embedment depth into the supporting layer on the horizontal axis. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0026] Hereinafter, a construction method for a steel pipe pile and an embodiment of a steel pipe pile foundation to which the present invention is applied will be described in detail with reference to the drawings.

[0027] As shown in Fig. 1, the steel pipe pile 1 is a steel pipe pile comprising a steel pipe body 1A with an open tip and a blockage promoting member 5 on the inner surface of the tip of the steel pipe body 1A, and is driven into the ground. The steel pipe pile 1 has the blockage promoting member 5, so that the blockage of the tip of the steel pipe body 1A can be promoted when the steel pipe pile 1 is driven into the supporting layer. The outer diameter D of the steel pipe body 1A is, for example, about 400 mm to 3000 mm.

[0028] The clogging promoting member 5 is composed of a rod-shaped protrusion, for example a steel bar, formed in a clockwise spiral shape in the depth direction (downward in the figure when viewed from above). In this case, the frictional force inside the pipe generated between the soil inside the pipe and the inner surface of the steel pipe body 1A is improved, so clogging of the tip of the steel pipe body 1A can be promoted. The clogging promoting member 5 is formed, for example, continuously from the tip of the steel pipe body 1A.

[0029] Moreover, the clogging promoting member 5 is preferably attached, for example, within a range of twice (2D) the outer diameter dimension D of the steel pipe body 1A from the tip of the steel pipe body 1A. This allows clogging of the tip of the steel pipe body 1A to be promoted efficiently and economically. On the other hand, when the clogging promoting member 5 is attached within a range of more than twice (2D) the outer diameter dimension D of the steel pipe body 1A from the tip of the steel pipe body 1A, it is considered that the clogging promoting effect of the clogging promoting member 5 tends to saturate. Furthermore, when the clogging promoting member 5 is attached within a range of more than twice (2D) the outer diameter dimension D of the steel pipe body 1A from the tip of the steel pipe body 1A, the attachment length of the clogging promoting member 5 becomes longer, which may increase the manufacturing load.

[0030] The steel pipe pile 1 may be formed by forming a rolled coil having a blockage promoting member 5 formed in advance into a cylindrical shape, for example, as in the case of a spiral steel pipe. The steel pipe pile 1 may also be formed by welding a steel bar to the inner surface of a steel pipe formed in advance into a cylindrical shape, or by piling up a weld metal to later attach the blockage promoting member 5 composed of a rod-shaped protrusion. In this way, the order of installation of the blockage promoting member 5 is arbitrary.

[0031] The steel pipe pile 1 may further have a drilling bit 1B fixed to protrude downward from the tip of the steel pipe body 1A. By having the drilling bit 1B, the ground G is disturbed while being excavated, so that the pressure input required to penetrate the steel pipe body 1A can be reduced. Therefore, the construction load when penetrating the steel pipe pile 1 can be reduced, and the penetration speed can be further increased.

[0032] It is preferable that the drilling bit 1B protrudes radially from the outer surface of the steel pipe body 1A by 12 mm or less. This prevents the drilling bit from disturbing the ground around the pile as it penetrates, and reduces the effect on the friction around the steel pipe pile 1.

[0033] The drilling bit 1B may be fixed to the outer surface of the steel pipe body 1A, the inner surface of the steel pipe body 1A, or the steel pipe tip surface of the steel pipe body 1A. The drilling bit 1B may be fixed so as to extend parallel to the tangent direction of the steel pipe annular portion of the steel pipe body 1A, or may be fixed so as to extend at an angle to the tangent direction. The shape of the drilling bit 1B may be any shape and may be appropriately changed depending on the ground conditions.

[0034] <An example of steel pipe pile construction method> Next, an example of a method for constructing a steel pipe pile will be described. As shown in Fig. 2, the method for constructing a steel pipe pile involves rotating a steel pipe pile 1 with a rotary press-in device 2 and pressing it downward to penetrate the ground G by a rotary press-in method. This allows construction while suppressing noise and vibration to the surrounding area. In the present invention, the steel pipe pile 1 may be penetrated into the ground by a method that applies vibration or impact, for example.

[0035] The ground G on which the steel pipe pile 1 is to be constructed is composed of, for example, a relatively soft layer G1 from the ground surface side, and a hard supporting layer G2 located below the soft layer G1.

[0036] Here, the bearing layer G2 refers to a layer that has sufficient strength and rigidity to support a structure, and can generally be selected based on boring data obtained in advance on the site where the structure will be constructed. Even if the bearing layer is determined in advance at the design stage, differences in ground strength may occur due to the undulations of the bearing layer and the existence of unconfirmed strata in areas where boring has not been performed, so the bearing layer may be reselected during construction. The conditions of ground strength required for the bearing layer vary depending on various design guidelines, but for example, according to the "Highway Bridge Specifications and Commentary (2017)," as a general guideline for a bearing layer, an N value of about 20 or more for a clayey soil layer and an N value of about 30 or more for a sand or gravel layer can be considered a bearing layer. A soft layer G1 is a relatively soft ground that is not a bearing layer G2.

[0037] First, in the method of constructing a steel pipe pile, a steel pipe pile 1 is attached to a rotary press-in device 2 and penetrated into a weak layer G1 of ground G.

[0038] As shown in Figures 3 and 4, in the construction method for a steel pipe pile, the pipe soil volume adjustment device 3 is controlled so that the top end S1 of the soil inside the steel pipe body 1A is positioned above the upper end of the blockage promotion member 5 until the tip of the steel pipe body 1A reaches the supporting layer G2 of the ground G.

[0039] The in-pipe soil volume adjustment device 3 adjusts the soil volume inside the steel pipe body 1A and can discharge soil from inside the steel pipe body 1A and can input soil into the steel pipe body 1A. A bucket is used as the in-pipe soil volume adjustment device 3, for example. A wire is attached to the bucket and is connected to a lifting device such as a crane (not shown). The bucket is raised and lowered by the lifting device and is configured to be able to open and close while suspended from the lifting device.

[0040] In the steel pipe pile construction method, when controlling the soil volume adjustment device 3, the position of the top end S1 of the soil inside the steel pipe body 1A is measured. The position of the top end S1 of the soil inside the pipe can be measured directly, for example, by hanging a length measuring device such as a tape measure inside the steel pipe body 1A. The position of the top end S1 of the soil inside the pipe may be calculated as the soil height H inside the pipe, which is the distance from the tip of the steel pipe body 1A to the top end S1 of the soil inside the pipe. The soil height H inside the pipe can be calculated by subtracting the value measured by a length measuring device such as a tape measure hung from the top end of the steel pipe body 1A from the total length of the steel pipe body 1A.

[0041] In the steel pipe pile construction method, if the measured position of the top end S1 is outside a control range that is preset based on the position of the upper end of the blockage promotion member 5, the soil volume adjustment device 3 in the pipe at least performs either the addition or removal of soil into the steel pipe body 1A.

[0042] Here, the length from the tip of the steel pipe body 1A to the upper end of the clogging promotion member 5 is designated as P, with a margin of clearance α. For example, the lower limit Q1 of the control range of the soil height H inside the pipe is set in advance to a length longer than the length P by the margin of clearance α (Q1=P+α). The margin of clearance α can be set appropriately, for example to 200 mm. By having the margin of clearance α, it is possible to prevent the top end S1 of the soil inside the pipe from being positioned lower than the upper end of the clogging promotion member 5.

[0043] In addition, an upper limit Q2 of the control range of the soil height H inside the pipe is preset to a value larger than the lower limit Q1. The upper limit Q2 may be, for example, the lower limit Q1 + the outer diameter D of the steel pipe body 1A (Q2 = Q1 + D). Alternatively, the upper limit Q2 may be, for example, three times (3D) the outer diameter D of the steel pipe body 1A.

[0044] In the steel pipe pile construction method, if the measured position of the top end S1 is lower than the lower limit Q1 of the control range, soil is poured into the steel pipe body 1A by the in-pipe soil volume adjustment device 3 so that the top end S1 is positioned within the control range, and the steel pipe body 1A continues to penetrate into the ground G. In the steel pipe pile construction method, if the measured position of the top end S1 is higher than the upper limit Q2 of the control range, soil is discharged from the steel pipe body 1A by the in-pipe soil volume adjustment device 3 so that the top end S1 is positioned within the control range, and the steel pipe body 1A continues to penetrate into the ground G.

[0045] On the other hand, in the steel pipe pile construction method, when the measured position of the top end S1 is within the control range (Q1≦H≦Q2), the in-pipe soil volume adjustment device 3 does not load or discharge soil, and the steel pipe body 1A continues to penetrate into the ground G. In this way, the control by the in-pipe soil volume adjustment device 3 includes cases where soil is loaded into the steel pipe body 1A, where soil is discharged from the steel pipe body 1A, and where soil is not loaded or discharged from the steel pipe body 1A.

[0046] In this manner, in the steel pipe pile construction method, the inside soil volume adjustment device 3 of the steel pipe body 1A is controlled so that the top end S1 of the soil inside the steel pipe body 1A is positioned above the upper end of the blockage promotion member 5 until the tip of the steel pipe body 1A reaches the supporting layer G2 of the ground G. Then, in the steel pipe pile construction method, the position of the top end S1 of the soil inside the steel pipe body 1A is positioned above the blockage promotion member 5 when the tip of the steel pipe body 1A reaches the supporting layer G2 of the ground G.

[0047] Next, as shown in Fig. 5, in the steel pipe pile construction method, after the tip of the steel pipe body 1A reaches the supporting layer G2, the adjustment of the soil volume in the pipe by the in-pipe soil volume adjustment device 3 is terminated. In other words, after the tip of the steel pipe body 1A reaches the supporting layer G2, only the penetration of the steel pipe body 1A is performed without the in-pipe soil volume adjustment device 3 inputting and discharging soil. Then, in the steel pipe pile construction method, after the tip of the steel pipe body 1A reaches the supporting layer G2, the tip of the steel pipe body 1A is penetrated into the supporting layer G2 to a depth of 0.7 times or more the outer diameter dimension D of the steel pipe body 1A, and the tip of the steel pipe body 1A is blocked.

[0048] The embedment depth of the steel pipe body 1A into the supporting layer G2 is preferably 0.7 times or more and 2.5 times or less of the outer diameter dimension D of the steel pipe body 1A. This allows the embedment depth into the supporting layer G2 to be shorter than in the past, making construction easier.

[0049] This completes one example of the steel pipe pile construction method. According to the steel pipe pile construction method, a steel pipe pile foundation can be constructed by penetrating the steel pipe pile 1 into the ground G.

[0050] Here, if the tip of the steel pipe body 1A penetrates into the supporting layer G2 while the top end S1 of the soil inside the pipe is positioned below the upper end of the clogging promoting member 5, there is a risk that the degree of clogging at the tip of the steel pipe body 1A will be insufficient due to a lack of soil inside the pipe. In addition, when judging whether the pipe has reached the supporting layer G2, the resistance in the vertical and rotational directions will be small and the change in resistance value will be minute, making it difficult to judge whether the pipe has reached the supporting layer G2.

[0051] In this regard, in the present embodiment, until the tip of the steel pipe body 1A reaches the supporting layer G2 of the ground G, the in-pipe soil volume adjustment device 3 is controlled, and the tip of the steel pipe body 1A penetrates into the supporting layer G2 to a depth of at least 0.7 times the outer diameter dimension D of the steel pipe body 1A, thereby blocking the tip of the steel pipe body 1A.

[0052] As a result, when the tip of the steel pipe body 1A reaches the bearing layer G2, if it is determined that the amount of soil inside the pipe is small, the soil amount adjustment device 3 can be controlled to add soil inside the pipe. Therefore, when the tip of the steel pipe body 1A penetrates into the bearing layer G2 to a depth of 0.7 times or more the outer diameter dimension D of the steel pipe body 1A, the tip of the steel pipe body 1A can be effectively blocked by the blockage promotion member 5. Therefore, even if the embedment depth of the steel pipe body 1A into the bearing layer G2 is short, the necessary bearing capacity can be secured.

[0053] In this embodiment, the soil volume adjustment device 3 is controlled so that the top end S1 of the soil inside the steel pipe body 1A is positioned above the upper end of the clogging promotion member 5. This makes it possible to prevent a shortage of soil volume inside the pipe when the tip of the steel pipe body reaches the supporting layer. This allows the tip of the steel pipe body to be more effectively blocked by the clogging promotion member.

[0054] In this embodiment, the clogging promotion member 5 is attached within a range of twice (2D) the outer diameter dimension D of the steel pipe body 1A from the tip of the steel pipe body 1A. This allows the effects of the clogging promotion member to be obtained efficiently and economically. Therefore, even if the embedment depth into the support layer G2 is shortened, the necessary support force can be secured.

[0055] In this embodiment, the clogging promoting member 5 is a rod-shaped protrusion formed by a rod-shaped member. This improves the frictional force inside the pipe generated between the soil inside the pipe and the inner surface of the steel pipe body 1A. This makes it possible to increase the degree of clogging at the tip of the steel pipe body 1A, and promote tip clogging.

[0056] In this embodiment, the steel pipe pile 1 is driven into the ground by rotary press-in, which allows construction to be performed while suppressing noise and vibration to the surrounding area.

[0057] In this embodiment, the drilling bit 1B is fixed to protrude downward from the tip of the steel pipe body 1A. This allows the ground G to be disturbed while being excavated, making it possible to reduce the pressure input required to penetrate the steel pipe body 1A. This reduces the construction load when the steel pipe pile 1 penetrates the ground G, and further increases the penetration speed.

[0058] In this embodiment, when controlling the in-pipe soil volume adjustment device 3, the position of the top end S1 of the soil inside the steel pipe body 1A is measured, and if the measured position of the top end S1 is lower than the lower limit Q1 of a control range that is preset based on the position of the upper end of the blockage promotion member 5, soil is poured into the steel pipe body 1A by the in-pipe soil volume adjustment device 3. This ensures the degree of blockage of the tip of the pile required to exert sufficient bearing capacity. Furthermore, it is possible to prevent the top end S1 of the soil inside the steel pipe body 1A from being positioned lower than the blockage promotion member 5. This makes it possible to more reliably ensure the required bearing capacity.

[0059] In this embodiment, when controlling the in-pipe soil volume adjustment device 3, the position of the top end S1 of the soil inside the steel pipe body 1A is measured, and if the measured position of the top end S1 is higher than the upper limit Q2 of the control range, soil is discharged from the steel pipe body 1A by the in-pipe soil volume adjustment device 3. This reduces the construction load when penetrating the steel pipe pile 1 into the ground G, further increases the penetration speed, and enables smooth construction.

[0060] In this embodiment, when the tip of the steel pipe body 1A penetrates the supporting layer G2, the adjustment of the amount of soil in the pipe by the soil amount adjusting device 3 is completed. In other words, after the tip of the steel pipe body 1A penetrates the supporting layer G2, there is no need to perform a process of putting soil into the pipe or discharging soil from the pipe. This allows for smooth construction.

[0061] In this embodiment, a method of using a bucket as the inside-pipe soil volume adjustment device 3 has been described. In the present invention, for example, a method of using a rod with a screw may also be used. In this case, the amount of soil inside the steel pipe body 1A can be adjusted by rotating a rod with a screw provided inside the steel pipe body 1A.

[0062] In addition, in the present invention, for example, an air lift device may be used as the in-pipe soil amount adjustment device 3. In this case, the soil amount in the steel pipe body 1A can be adjusted by discharging soil from inside the pipe through a rod of the air lift device provided inside the steel pipe body 1A. This air lift device may be configured to have, for example, an air pump provided at the end of the steel pipe pile 1 on the ground side, a hollow cylindrical rod connected to the air pump, and a discharge part that discharges the soil in the pipe sucked up by the rod to the outside.

[0063] In this embodiment, a method of using a tape measure has been described as a method of measuring the position of the top end S1 of the soil inside the pipe. In the present invention, when the soil amount adjustment device 3 inside the pipe is a bucket, the position of the top end S1 of the soil inside the pipe can also be measured based on the calculated movement distance of the tip of the bucket, calculated based on a certain initial position of the tip of the bucket and the position of the tip of the bucket when it comes into contact with the top end S1 of the soil inside the pipe.

[0064] In addition, in the present invention, when the soil volume adjustment device 3 inside the pipe is an air lift device, the position of the top end S1 of the soil inside the pipe can be measured based on the calculated moving distance by calculating the moving distance of the tip of the rod of the air lift device based on a certain initial position of the tip of the rod of the air lift device and the position of the tip of the rod of the air lift device when it comes into contact with the top end S1 of the soil inside the pipe.

[0065] In addition, in the present invention, when the pipe soil volume adjustment device 3 is a rod with a screw, the position of the top end S1 of the soil inside the pipe can be measured based on the calculated moving distance of the tip of the screw rod based on a certain initial position of the tip of the screw rod and the position of the tip of the screw rod when it comes into contact with the top end S1 of the soil inside the pipe.

[0066] In addition, in the present invention, when the pipe soil volume adjustment device 3 is connected to a wire and can be raised and lowered by a lifting device such as a crane, the movement distance of the pipe soil volume adjustment device 3 can also be calculated by, for example, continuously photographing the outer surface of the wire with an imaging device such as a camera at a specified interval, and counting the number of movements of the wire twists based on the captured images.

[0067] In addition, in the present invention, the pipe soil volume adjustment device 3 can measure the movement distance based on the number of rotations of a roll provided in the gripping part of a pile driver or the like that grips a rod with a screw or the rod of an air lift device.

[0068] In this embodiment, the case has been described where the clogging promoting member 5 is provided continuously from the tip of the steel pipe body 1A within a range from the tip of the steel pipe body 1A to twice the outer diameter dimension D of the steel pipe body 1A. In the present invention, as shown in Fig. 6(a), the clogging promoting member 5 may be provided at a distance from the tip of the steel pipe body 1A within a range from the tip of the steel pipe body 1A to twice the outer diameter dimension D of the steel pipe body 1A. In the present invention, as shown in Fig. 6(b), one or more clogging promoting members 5 may be provided intermittently at a distance from the tip of the steel pipe body 1A within a range from the tip of the steel pipe body 1A to twice the outer diameter dimension D of the steel pipe body 1A.

[0069] As shown in Fig. 7, the clogging promoting member 5 may be formed of a rod-shaped protrusion, for example a steel bar or other rod-shaped member, which is formed into a ring shape in a direction perpendicular to the depth direction (downward in the figure). In this case, the frictional force generated inside the pipe between the soil inside the pipe and the inner surface of the steel pipe body 1A is improved, so clogging of the tip of the steel pipe body 1A can be promoted. The clogging promoting member 5 may be formed, for example, as a single member or as multiple members spaced apart from the tip of the steel pipe body 1A.

[0070] Although not shown in the drawings, the clogging promoting member 5 may be formed, for example, by a roughening portion formed by roughening the inner surface of the steel pipe body 1A. Even in this case, the inner pipe friction force generated between the soil inside the pipe and the inner surface of the steel pipe body 1A is improved, so that clogging of the tip of the steel pipe body 1A can be promoted.

[0071] As shown in Figures 8 and 9, the clogging promoting member 5 may be formed, for example, from a plate material arranged perpendicular to the steel pipe axis of the steel pipe body 1A and may be configured as a plate-shaped member arranged in a ring shape when viewed from the steel pipe axial direction. In this case, compaction of the soil inside the pipe at the tip of the pile can be promoted, and clogging of the tip of the steel pipe body 1A can be promoted. For example, one clogging promoting member 5 may be formed, or multiple clogging promoting members 5 may be formed at a distance from the tip of the steel pipe body 1A.

[0072] As shown in Fig. 8(a), the clogging promoting member 5 may be configured by attaching a single plate-shaped member formed continuously in the circumferential direction of the steel pipe body 1A at different positions in the axial direction of the steel pipe. Even in this case, the plate-shaped member is arranged in a ring shape when viewed from the axial direction of the steel pipe as shown in Fig. 8(b).

[0073] 9(a), the clogging promoting member 5 may be configured by multiple plate-like members arranged at different positions in the circumferential direction of the steel pipe body 1A and attached at different positions in the axial direction of the steel pipe. Even in this case, they are arranged in a ring shape when viewed from the axial direction of the steel pipe, as shown in FIG. 9(b).

[0074] As shown in Figures 10, 11 and 12, the clogging promoting member 5 may be composed of a partition plate arranged to divide the cross section of the steel pipe of the steel pipe body 1A. Here, it is said that the ease of clogging is inversely proportional to the pile diameter, and the smaller the pile diameter, the more likely tip clogging occurs. When the clogging promoting member 5 is a partition plate, each part divided by the partition plate behaves like a small-diameter steel pipe equal to the cross-sectional area of ​​the part, and therefore clogging of the tip of the steel pipe body 1A can be promoted.

[0075] As shown in Fig. 10(a), the clogging promoting member 5 is arranged so as to divide, for example, the cross section of the steel pipe perpendicular to the steel pipe axis into two equal parts. Also, as shown in Fig. 10(b), the partition plate may be provided with a through hole 51. This can improve the frictional force generated between the soil inside the pipe and the inner surface of the steel pipe body 1A.

[0076] As shown in Fig. 11(a), the clogging promoting members 5 are arranged, for example, so as to divide the steel pipe cross section perpendicular to the steel pipe axis into four equal parts. As shown in Fig. 11(b), the clogging promoting members 5 are arranged, for example, so as to divide the steel pipe cross section perpendicular to the steel pipe axis into three equal parts. As shown in Fig. 11(c), the clogging promoting members 5 are arranged, for example, so as to divide the steel pipe cross section perpendicular to the steel pipe axis into six equal parts.

[0077] As shown in Fig. 12, the clogging promoting member 5 is composed of a tubular portion 52 having an outer diameter smaller than that of the steel pipe main body 1A, and a connecting plate portion 53 connecting the inner surface of the steel pipe main body 1A and the tubular portion 52. As shown in Fig. 12(a), for example, four connecting plate portions 53 may be arranged. As shown in Fig. 12(b), for example, three connecting plate portions 53 may be arranged.

[0078] Although the embodiment of the present invention has been described above, this embodiment is presented as an example and is not intended to limit the scope of the invention. Furthermore, the present invention can be implemented in various novel forms in addition to the above-mentioned embodiment. Therefore, the above-mentioned embodiment can be variously omitted, replaced, and modified without departing from the gist of the present invention. Such novel forms and modifications are included in the scope and gist of the present invention, and are included in the scope of the invention described in the claims and the equivalents of the invention described in the claims. EXAMPLES

[0079] In this example, the degree of punching resistance was evaluated. The punching resistance is a force that resists the pushing through of the soil inside the pipe due to friction acting between the inner surface of the steel pipe and the soil inside the pipe, and it is difficult to actually measure this friction. Therefore, in this example, a soil inside pipe push-through test was performed, and the load applied in the soil inside pipe push-through test was measured as the punching resistance. The degree of punching resistance was also evaluated by dividing the measured punching resistance by the clogging cross-sectional area of ​​the steel pipe. In this example, the attachment range of the rod-shaped protrusions (steel bars) serving as clogging promotion members was varied.

[0080] In this example, a model steel pipe was prepared as a specimen. As shown in FIG. 13, the soil push-out test in the pipe was carried out by placing a cylinder inside the steel pipe at the bottom, placing sand as the ground above the cylinder, and separating the start end of the spiral rod-shaped protrusion from the top end of the cylinder by 0.5D. After that, the steel pipe was loaded from above, and the push-out resistance was measured until the steel pipe was pushed 0.5D downward. The outer diameter D of the steel pipe pile was 101.6 mm, the plate thickness of the steel pipe pile was 5.7 mm, and the ground height was 350 mm.

[0081] FIG. 14 shows the results of Example 1, with the push-out resistance force at the time of 0.1D push-in plotted on the ordinate and the attachment range of the occlusion promoting member plotted on the abscissa.

[0082] It was confirmed that the punching resistance strength when pushing in 0.1D increases as the attachment range of the occlusion promoting member increases. When the attachment range is 1.0D, the punching resistance strength when pushing in 0.1D increases by about 20% compared to when the attachment range is 0.5D. Also, when the attachment range is 1.5D, the punching resistance strength when pushing in 0.1D increases by about 80% compared to when the attachment range is 0.5D. On the other hand, when the attachment range is 2.0D, the punching resistance strength when pushing in 0.1D increases by about 0.7 compared to when the attachment range is 1.5D, and the increase in punching resistance strength was slight.

[0083] Thus, when the attachment range is 0.5D or more and 2.0D or less, punching resistance strength can be effectively exerted. Furthermore, since a relationship can be confirmed in which the rate of increase in punching resistance strength decreases and reaches a peak value when the attachment range is 2.0D, it is considered that the clogging promotion effect of the clogging promotion member tends to saturate when the member is attached in a range exceeding twice (2D) the outer diameter dimension D of the steel pipe body from the tip of the steel pipe body. Based on the above results, in order to reduce the cost of attaching the clogging promotion member, it is desirable to attach the clogging promotion member within a range of twice the outer diameter dimension D of the steel pipe body from the tip of the steel pipe body.

[0084] In both cases, the spiral protrusions are attached near the tip of the steel pipe. Since the stress of the soil inside the pipe increases as it approaches the bottom end of the steel pipe pile, concentrating the spiral protrusions near the tip can efficiently exert push-out resistance. EXAMPLES

[0085] In this example, an FEM analysis was performed on the relationship between the embedded depth of a pile having a blockage promoting member and its bearing capacity performance. A steel pipe with an outer diameter D of 1000 mm and a plate thickness of 25 mm was used for the analysis. The influence of the presence or absence of a blockage promoting member in the pipe and the embedded depth on the bearing capacity performance was verified. A ring-shaped rod-shaped protrusion was set as the blockage promoting member. The blockage promoting member was placed at a position 0.5D and a position 1.0D from the tip of the steel pipe. For piles having a blockage promoting member (invention example), the embedded depth was verified in three cases: 1.3D (invention example 1), 2.7D (invention example 2), and 4D (invention example 3). For bare pipe piles without a blockage promoting member (reference example), the embedded depth was set to 3D.

[0086] FIG. 15 is a graph showing the relationship between the embedded depth of the pile into the supporting layer and the punching resistance. The dotted circle in FIG. 15 is an extrapolation. For the steel pipe having the blockage promoting member, three cases in which the analysis was performed were plotted, and an approximation curve (solid curve in FIG. 15) was drawn for the three plots. Referring to the approximation curve in this analysis, it can be seen that in order to achieve the same punching resistance as the reference example in which the embedded depth is 3D, the embedded depth of the pile having the blockage promoting member needs to be about 0.66D (see the dotted circle in FIG. 15). Also, referring to the approximation curve in this analysis, it can be seen that for the pile having the blockage promoting member, the punching resistance when the embedded depth is 1D is greater than the punching resistance of the reference example in which the embedded depth is 3D.

[0087] From the above analysis results, it was found that for piles having blockage-promoting members, by setting the embedment depth into the supporting layer to 0.7D or more, the degree of blockage of the soil inside the pipe increases, resulting in bearing capacity performance that is equivalent to or higher than that when the embedment depth of the bare steel pipe pile into the supporting layer is approximately 3D or more, and that the required bearing capacity of the steel pipe pile can be secured. [Explanation of symbols]

[0088] 1: Steel pipe pile 1A: Steel pipe body 1B: Drilling bit 2: Rotary press-fitting device 3:Intra-pipe soil volume adjustment device 5: Closure promoting member D: Outer diameter G: Ground G1: Soft layer G2: Support layer S1: Top of the soil inside the pipe

Claims

1. A method for constructing a steel pipe pile, comprising: a steel pipe body having an open tip; and a steel pipe pile having a blockage promoting member on the inner surface of the tip of the steel pipe body, the method comprising: A pipe soil amount adjusting means for adjusting the amount of soil in the steel pipe body is controlled until the tip of the steel pipe body reaches the supporting layer of the ground, The tip of the steel pipe body is inserted into the supporting layer to a depth of at least 0.7 times the outer diameter of the steel pipe body. A steel pipe pile construction method comprising the steps of:

2. A method for constructing a steel pipe pile according to claim 1, and controlling the soil amount adjustment means in the pipe so that the top end of the soil in the steel pipe body is positioned above the upper end of the clogging promotion member. A steel pipe pile construction method comprising the steps of:

3. A method for constructing a steel pipe pile according to claim 1, The clogging promoting member is provided within a range of twice the outer diameter of the steel pipe body from the tip of the steel pipe body. A steel pipe pile construction method comprising the steps of:

4. A method for constructing a steel pipe pile according to claim 1, The occlusion promoting member is A roughening portion formed by roughening the inner surface of the steel pipe body; A rod-shaped protrusion portion formed by a rod-shaped member; A plate-shaped member formed of a plate material arranged perpendicular to the steel pipe axis of the steel pipe body and arranged in a ring shape when viewed from the steel pipe axial direction; and A partition plate arranged to partition the steel pipe cross section of the steel pipe body; It must consist of at least one of the following: A steel pipe pile construction method comprising the steps of:

5. A method for constructing a steel pipe pile according to claim 1, The steel pipe pile is driven into the ground by rotary pressing. A steel pipe pile construction method comprising the steps of:

6. A method for constructing a steel pipe pile according to claim 1, The steel pipe pile has a drilling bit fixed to protrude downward from the tip of the steel pipe body. A steel pipe pile construction method comprising the steps of:

7. A method for constructing a steel pipe pile according to claim 2, When controlling the soil volume adjusting means in the pipe, Measure the position of the top end of the soil inside the steel pipe body, If the measured position of the top end is lower than the lower limit of a control range that is preset based on the position of the upper end of the clogging promotion member, soil is poured into the steel pipe body by the soil amount adjustment means in the pipe, When the measured position of the top end is higher than the upper limit of the control range, the soil amount adjusting means discharges soil from the steel pipe body. A steel pipe pile construction method comprising the steps of:

8. A method for constructing a steel pipe pile according to claim 1, When the tip of the steel pipe body is penetrated into the supporting layer, the adjustment of the soil amount in the pipe by the soil amount adjustment means in the pipe is terminated. A steel pipe pile construction method comprising the steps of:

9. A steel pipe pile foundation constructed by penetrating into the ground by the steel pipe pile construction method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Execution method of rotary press-in steel pipe pile

    JP2002167760A

  • Steel pipe pile for rotation press fit and press fit construction method using steel pipe pile

    JP2007284866A

  • Method of constructing steel pipe pile

    JP2008255695A