Sheave for construction and construction method using sheave for construction
The construction metal wheel addresses the inefficiency of the pulling method by using rotary clamping plates and intermediate rollers to minimize snagging, ensuring smooth conveyance and maintaining high work efficiency in electric wire replacement.
Patent Information
- Application Number
- JP2023043688
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-20
- Publication Date
- 2024-10-03
AI Technical Summary
The existing pulling method for replacing electric wires is inefficient due to frequent snagging of the metal wheel on sleeves attached to the old wire, leading to interruptions and decreased work efficiency.
A construction metal wheel with a pair of rotary clamping plates and rotating bodies, including intermediate rollers, designed to minimize snagging by allowing the wheel to revolve and support obstacles like sleeves, ensuring smooth conveyance of electric wires.
The construction metal wheel significantly reduces the chances of snagging, maintaining high work efficiency during the electric wire replacement process.
Smart Images

Figure 2024133745000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a construction metal cart that guides an electric wire when transporting the electric wire in electric wire construction work using a drawing method, and a construction method for replacing an electric wire, etc., using such a construction metal cart. [Background technology]
[0002] A known method for replacing electric wires such as overhead train lines is the "pulling out method," in which the old wire is connected to a new wire and then pulled out. The following describes an example of replacing a feeder wire, which is used to supply power to electric railways, using the pulling out method.
[0003] Fig. 11 is a schematic diagram of an example of train equipment as seen from the direction of travel of a train (not shown). When viewed from the side of the train (not shown) in the direction of travel, components such as the beam 3, tower section 4, and part of the insulator 8 are hidden by utility poles 2, 2' and cannot be seen. In Fig. 11, components such as contact wires that are commonly used as train equipment have been omitted for simplification.
[0004] The electric wire 10 is suspended by a structure 1 consisting mainly of electric poles 2, 2' and a beam 3 stretched between these electric poles 2, 2'. A tower section 4 is provided above the beam 3, and in this tower section 4, the electric wire 10 is suspended via insulators 8 in a state in which it is arranged in a space inside the tower section 4 where the wire can be passed.
[0005] The replacement work of the electric wire 10 suspended as described above by the pulling-out method will be described with reference to Fig. 12. Fig. 12 is a schematic diagram of an example of train equipment as seen from the side of a train (not shown) in the direction of travel. Fig. 12 shows a schematic diagram of the replacement of the electric wire 10 suspended across four pairs of electric poles 2, 2' with a new one by the pulling-out method.
[0006] A new electric wire 10 is wound around a delivery drum 19 mounted on a delivery vehicle 18. The new electric wire 10 and the old wire are connected at the position indicated by the cross in FIG. 12, and the old wire is pulled out as the winding drum 17 mounted on the winding vehicle 16 winds up the old wire, and the new electric wire 10 is replaced from left to right in the drawing. The replacement work of electric wires using the pulling method is disclosed in, for example, a patent document (JP Patent Publication No. 2022-114185). [Patent Document 1] Patent Publication No. 2022-114185 Summary of the Invention [Problem to be solved by the invention]
[0007] In the above-mentioned drawing method, a metal wheel 11 is temporarily provided below the insulator 8, and the electric wire 10 is transported using the metal wheel 11.
[0008] The electric wire 10 (old wire) being wound may have a sleeve (not shown) or the like attached to its outer periphery, and such a sleeve may get caught on the pulley 11. If the tension when pulling out the electric wire 10 (old wire) is unable to withstand such a caught force, the pulley 11 freezes, preventing the entire electric wire 10 from being transported and interrupting the operation.
[0009] During such interruptions in work, a worker would manually move the sleeve over the pulley 11 to remove the snagging and resume the transport of the electric wire 10. If the pulley 11 frequently becomes caught on obstacles such as a sleeve attached to the electric wire 10, the work efficiency of the drawing method drops, which is a problem. [Means for solving the problem]
[0010] In order to solve such problems, the construction trolley of the present invention has two sets of rotor holding structures consisting of a pair of rotating clamping plates that rotate around a first axis and a number of rotors that are held between the pair of rotating clamping plates in a freely rotatable state around a number of axes parallel to the first axis, and is characterized in that a number of intermediate rollers that rotate around a number of axes parallel to the first axis are arranged between the two sets of rotor holding structures.
[0011] In addition, the construction trolley according to the present invention is characterized in having two sets of the rotating body holding structures and a pair of frames that rotatably hold a plurality of the intermediate rollers.
[0012] In addition, the construction trolley of the present invention is characterized in that a rotating support shaft parallel to the first shaft is arranged within a virtual plane formed halfway between the two first shafts of the two sets of rotating body holding structures, and the frame hanging structure rotates around the rotating support shaft.
[0013] In addition, the construction trolley of the present invention is characterized in that the axes that serve as the rotation centers of each rotating body in one of the rotating body holding structures are arranged at equal intervals around the first axis.
[0014] In addition, the construction trolley according to the present invention is characterized in that the number of rotors in one of the rotor holding structures is five.
[0015] In addition, the construction trolley of the present invention is characterized in that the rotating body is a wheel having no irregularities on its outer periphery.
[0016] In addition, the construction trolley according to the present invention is characterized in that the rotating body is a wheel having an uneven outer periphery.
[0017] In addition, the construction trolley according to the present invention is characterized in that it is provided with a vertical roller that rotates around a second axis perpendicular to the first axis.
[0018] In addition, the construction trolley according to the present invention is characterized in that the vertical rollers are arranged on the side of the rotating body holding structure on which the intermediate rollers are not provided.
[0019] In addition, the construction method using the construction metal cart of the present invention is characterized in that it has two sets of rotor holding structures consisting of a pair of rotating clamping plates that rotate around a first axis and a plurality of rotors held between the pair of rotating clamping plates in a freely rotatable state around a plurality of axes parallel to the first axis, and replaces electric wires using a construction metal cart in which a plurality of intermediate rollers that rotate around a plurality of axes parallel to the first axis are arranged between the two sets of rotor holding structures. Effect of the Invention
[0020] The construction trolley of the present invention has two sets of rotor holding structures each including a plurality of rotors, and between the two sets of rotor holding structures are arranged a plurality of intermediate rollers which rotate about a plurality of axes parallel to a first axis. Therefore, with this construction trolley of the present invention, even if an obstacle such as a sleeve is provided on the electric wire 10, the rate at which the electric wire 10 gets caught during the transport operation can be significantly reduced, making it possible to avoid a decline in the efficiency of the pulling method.
[0021] In addition, according to the method using the construction trolley of the present invention, the rate at which the electric wire gets caught on obstacles such as sleeves when replacing the electric wire can be significantly reduced, making it possible to avoid the drop in work efficiency of the pulling method. [Brief description of the drawings]
[0022] [Figure 1] FIG. 1 is a diagram illustrating a construction trolley 100 according to a first embodiment of the present invention. [Diagram 2] FIG. 1 is a perspective view of a construction trolley 100 according to a first embodiment of the present invention. [Diagram 3] FIG. 2 is a perspective view showing some of the components, such as a frame 120, of the construction trolley 100 according to the first embodiment of the present invention. [Figure 4]1 is a diagram for explaining the position of a wheel 140 when an electric wire 10 not provided with an obstacle S such as a sleeve is transported by a construction cart 100. FIG. [Diagram 5] FIG. 1 is a diagram illustrating the transportation of an electric wire 10 by a construction cart 100 according to a first embodiment of the present invention. [Figure 6] FIG. 2 is a diagram illustrating a seesaw motion of the construction trolley 100 according to the present invention. [Figure 7] 11 is a diagram for explaining the load of the electric wire 10 including the obstacle S acting on each rotating body holding structure 130. FIG. [Figure 8] FIG. 11 is a perspective view showing some of the components, such as a frame 120, of a construction trolley 100 according to a second embodiment of the present invention. [Figure 9] FIG. 11 is a perspective view of a wheel 150 having projections and recesses used in a construction trolley 100 according to a second embodiment of the present invention. [Figure 10] FIG. 11 is a diagram illustrating the transportation of a wire 10 by a construction cart 100 according to a second embodiment of the present invention. [Figure 11] FIG. 2 is a schematic diagram showing an example of train equipment as viewed from the direction of travel of a train (not shown). [Figure 12] FIG. 1 is a schematic diagram illustrating an example of a pulling method. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a diagram for explaining a construction metal car 100 according to a first embodiment of the present invention. FIG. 1(A) is a side view of the construction metal car 100. When the construction metal car 100 according to the first embodiment of the present invention is used for re-covering work by the drawing method described in FIG. 12, the construction metal car 100 seen from the side in the traveling direction of a train (not shown) is as shown in FIG. 1(A). When the construction metal car 100 according to the present invention is used within the space of the tower section 4 (see FIG. 11) where the line can be passed, the allowable dimension in the height direction of the construction metal car 100 is about 350 mm to 450 mm. However, the size of the construction metal car 100 according to the present invention is not limited to this.
[0024] Moreover, Fig. 1(B) is a diagram showing the main rotating components provided inside the construction trolley 100. The vertical rollers 180 of the construction trolley 100 are also rotating components, but are not shown in Fig. 1(B). Fig. 1(B) is also a side view of the construction trolley 100. Hereinafter, the material constituting the construction trolley 100 is a rigid material such as metal, unless otherwise specified.
[0025] Fig. 2 is a perspective view of the construction trolley 100 according to the first embodiment of the present invention, and Fig. 3 is a perspective view showing some of the components, such as the frame 120, of the construction trolley 100 according to the first embodiment of the present invention. When illustrating the construction trolley 100 in the figures from Fig. 2 onwards, fastening members such as bolts and nuts are omitted, and instead, axes passing through the centers of the fastening members are shown. Also, please note that in the figures from Fig. 2 onwards, some configurations are not shown as appropriate to make it easier to see the electric wire 10 passing between the frames 120, 120'.
[0026] The construction trolley 100 according to the present invention is suitable as a trolley used to guide the electric wire 10 in electric wire construction (particularly electric wire re-laying construction), but its use is not limited thereto. The construction trolley 100 according to the present invention has, as its main rotating elements, two sets of rotor holding structures 130 and a number of intermediate rollers 170 provided between them. These configurations are shown in FIG. 1(B). Furthermore, in the construction trolley 100 according to the present invention, these rotating elements are adapted to support the load of the electric wire 10.
[0027] The two sets of rotating body holding structures 130 and the multiple intermediate rollers 170 are rotatably held by a pair of frames 120, 120'. Each of the frames 120, 120' is provided with multiple through holes for supporting the respective shafts. With this structure, the two sets of rotating body holding structures 130 and the multiple intermediate rollers 170 rotate relatively around the shafts of the pair of frames 120, 120'.
[0028] The electric wire 10 is transported on two sets of rotating body holding structures 130 rotatably provided between a pair of frames 120, 120' and on a plurality of intermediate rollers 170 provided between them.
[0029] One rotating body holding structure 130 includes a pair of rotating clamping plates 135, 135' that rotate around a certain axis (hereinafter, this axis will be referred to as the "first axis 131"), and a number of rotating bodies that are held between the pair of rotating clamping plates 135, 135' in a freely rotatable state around a number of axes 141 parallel to the first axis 131.
[0030] In the construction trolley 100 according to the first embodiment, a wheel 140 having no irregularities on its outer periphery can be used as the rotating body held between the pair of rotating clamping plates 135, 135'. The wheel 140 can be made of a material such as rubber having an axle hole through which a bolt nut or the like serving as the axle 141 is inserted. The wheel 140 provided in the rotating body holding structure 130 all have the same standards in terms of dimensions, etc. Furthermore, the two sets of rotating body holding structures 130 are all made to the same standards.
[0031] Each of the rotating clamping plates 135, 135' has a plurality of through holes for supporting the respective shafts. With this structure, the wheel 140 rotates relatively around the shaft of the pair of rotating clamping plates 135, 135'.
[0032] Here, focusing on the wheel 140, the wheel 140 rotates relative to the pair of rotating clamping plates 135, 135' (this rotation is also referred to as "rotation on its axis"). In addition, the wheel 140 rotates around the axis of the rotating clamping plates 135, 135' (the same as the first axis 131 of the rotor holding structure 130) in conjunction with the rotation of the pair of rotating clamping plates 135, 135' (this rotation is also referred to as "revolution").
[0033] In addition, in the construction cart 100 of the first embodiment, the number of wheels 140 clamped between the pair of rotating clamping plates 135, 135' is five, but there is no particular limit to the number of wheels 140 clamped between the pair of rotating clamping plates 135, 135' as long as it is three or more.
[0034] The shafts 141 which are the rotation centers of the wheels 140 in one rotating body holding structure 130 are arranged at equal intervals around the first shaft 131 of the rotating clamping plates 135, 135'. The state of the shafts 141 arranged at equal intervals around the first shaft 131 is shown in the rotating clamping plates 135, 135' on the right side of Fig. 1(B) . In Fig. 1(B) , the circumferential distances C between adjacent shafts 141 are all equal.
[0035] The intermediate roller 170 is held so as to be sandwiched between a pair of frames 120, 120' so as to be rotatable about an axis 171 parallel to the first axis 131. All of the multiple intermediate rollers 170 are of the same specification, and are held by the frames 120, 120' so that all of the multiple intermediate rollers 170 are flush with each other.
[0036] In the construction trolley 100 of the present invention, the intermediate roller 170 can be composed, for example, of a cylindrical base material having an axial hole through which a bolt nut or the like as the shaft 171 is inserted, and a flexible material such as rubber provided around the outer periphery of the cylindrical base material.
[0037] In this embodiment, the number of intermediate rollers 170 provided between the two sets of rotating body holding structures 130 is five, but there is no particular limit to the number of intermediate rollers 170 provided. What is important is that a group of the intermediate rollers 170 between the two sets of rotating body holding structures 130 is configured to be able to sufficiently bear the load of the electric wire 10 including the obstacle S such as a sleeve.
[0038] When comparing the diameter of the wheel 140 used in the rotating body holding structure 130 (the diameter when the wheel 140 is viewed as a right circular cylinder) with the diameter of the intermediate roller 170 (the diameter when the intermediate roller 170 is viewed as a right circular cylinder), the former diameter is made larger than the latter diameter. One of the reasons for this is to reduce the weight of the construction trolley 100 as a whole by reducing the weight of the intermediate roller 170.
[0039] Moreover, when comparing the maximum height of the wheel 140 used in the rotor holding structure 130 with the height of the plurality of flush intermediate rollers 170, the former is set to be higher than the latter. The difference between the two heights is indicated as D in Fig. 1(B). One of the reasons for setting it in this way is to allow the plurality of intermediate rollers 170 to bear the load of an obstacle S, such as a sleeve, pulled up by the rotor holding structure 130 on the entrance side when the electric wire 10 is transported.
[0040] On the other hand, when the electric wire 10 where no obstacle S such as a sleeve is attached is transported by the construction trolley 100, the dimensional relationship between the intermediate rollers 170 and the wheel wheels 140 in the rotating body holding structure 130 is determined so that the intermediate rollers 170 and two of the wheel wheels 140 in each rotating body holding structure 130 [two of the multiple (five) wheel wheels 140 at the highest position] are flush (see FIG. 4). In the construction trolley 100 according to the present invention, such a dimensional relationship allows the electric wire 10 where no obstacle S is attached to be transported smoothly on a completely flat surface.
[0041] In the construction trolley 100 according to the present invention, the electric wire 10 is transported while entering through one of the two sets of rotating body holding structures 130 and exiting through the other rotating body holding structure 130. In the electric wire 10 transported in this manner, the rotating body holding structure 130 on the upstream side in the traveling direction is sometimes referred to as the entrance side rotating body holding structure 130, and the rotating body holding structure 130 on the downstream side is sometimes referred to as the exit side rotating body holding structure 130.
[0042] In each of the two sets of rotor holding structures 130 constituting the construction trolley 100 according to the present invention, a pair of vertical rollers 180 rotating about a second axis 182 perpendicular to the first axis 131 are arranged facing each other on the side where the intermediate roller 170 is not provided. In other words, a total of four vertical rollers 180 are provided on one construction trolley 100.
[0043] The vertical rollers 180 are rotatably attached to the vertical roller holding structures 127. The vertical roller holding structures 127 are attached to the left and right of each of the frames 120, 120' as viewed in Fig. 1. By providing a pair of vertical rollers 180 at each of the entrance and exit sides of the construction trolley 100, it becomes possible to regulate the meandering of the electric wire 10 in the left-right direction perpendicular to the traveling direction.
[0044] A suspension structure 110 is attached to the upper part of each of the frames 120, 120'. This suspension structure 110 allows rotating elements such as rollers for transporting the electric wire 10, which are provided in the frames 120, 120' of the construction trolley 100, to be suspended from the insulators 8, etc.
[0045] The suspension structure 110 is provided with a pair of bridge plates 112, 112', and a suspension hole 113, 113' is provided in the center of each of the bridge plates 112, 112'. Holes for mounting accessories such as the insulator 8 are arranged in the space between the bridge plates 112, 112', and fastening members such as bolts and nuts are inserted into the holes and the suspension holes 113, 113', so that the construction trolley 100 is suspended from the insulator 8, etc.
[0046] In this specification, the central axis of the fastening members such as bolts and nuts used to suspend the construction trolley 100 is referred to as the pivot shaft 111. The construction trolley 100 is adapted to rotate around this pivot shaft 111. To illustrate this, in FIG. 1(A), the entire construction trolley 100 rotates in the directions (a) and (b). The pivot shaft 111 is parallel to the first axis 131.
[0047] In the construction trolley 100 according to the present invention, a plane formed at the middle of the two sets of rotor holding structures 130 and equidistant from the first shafts 131 is defined as a virtual plane (a plane perpendicular to the paper including x-x' in FIG. 1(A)). The pivot shaft 111 is disposed in parallel with the first shafts 131 within this virtual plane.
[0048] The basic structure of the construction trolley 100 is mirror-symmetrical with respect to the virtual plane. In other words, the construction trolley 100 is made equal in weight to the left and right of the virtual plane. The suspension structure 110 of the frames 120, 120' of the construction trolley 100 rotates around the pivot 111, but in the absence of external force, the left and right sides are balanced and the trolley remains stationary in an equilibrium state as shown in FIG.
[0049] Next, the transportation of the electric wire 10 by the construction cart 100 according to the present invention configured as described above will be described with reference to Fig. 5. In Fig. 5, (A) to (E) show the order of time. Fig. 5 also shows the electric wire 10 moving from right to left on the page. Tension is applied to the electric wire 10 in the direction of the arrow by a winding machine (not shown) or the like.
[0050] An obstacle S such as a sleeve is attached to the electric wire 10, and there is a risk of the obstacle S getting caught, particularly when passing through the construction trolley 100. Fig. 5(A) shows the state in which the obstacle S attached to the electric wire 10 enters the rotor holding structure 130 on the entrance side of the construction trolley 100.
[0051] At this time, there is a possibility that the front end of the obstacle S will ride up onto the wheel 140 of the rotating body holding structure 130, and the electric wire 10 will move forward solely by the rotation (spinning) of the wheel 140. On the other hand, there is also a possibility that the front end of the obstacle S will hit the wheel 140 of the rotating body holding structure 130, and the electric wire 10 will not move forward solely by the rotation (spinning) of the wheel 140.
[0052] In such a case, in the construction trolley 100 of the present invention, as shown in Figures 5(A) to 5(B), the wheel 140 revolves around the first axis 131, thereby preventing snagging.
[0053] If, in the state of Fig. 5(A), the front end of the obstacle S hits the wheel 140 of the rotating body holding structure 130 and the force of the getting caught exceeds the previous tension, as shown in Fig. 6, the entire construction trolley 100 acts like a seesaw (the left side of the page goes up and the right side goes down) around the pivot 111, and the front end of the obstacle S climbs over the wheel 140, and the obstacle S is no longer caught at P. In this way, the construction trolley 100 of the present invention can significantly reduce the rate at which the electric wire 10 gets caught during the transport operation, making it possible to avoid a drop in the efficiency of the pulling method.
[0054] When the obstacle S attached to the electric wire 10 climbs over the wheel 140 of the rotor holding structure 130 on the entrance side, the electric wire 10 advances as shown in Fig. 5(C) → Fig. 5(D) while the load of the electric wire 10 and the obstacle S is supported by the intermediate roller 170. The obstacle S, the load of which is supported by the intermediate roller 170, then enters the rotor holding structure 130 on the exit side, climbs over it and exits the construction trolley 100, but the possibility of the obstacle S getting caught in the rotor holding structure 130 on the exit side is much smaller than the possibility of the obstacle S getting caught in the rotor holding structure 130 on the entrance side. This will be explained with reference to Fig. 7.
[0055] 7(A) shows the load applied to the entrance-side rotating body holding structure 130, and Fig. 7(B) shows the load applied to the exit-side rotating body holding structure 130. In the wheel 140 that hits the obstacle S of the entrance-side rotating body holding structure 130, a load W1 is applied to Q, but this load W1 is due to the gravity of the obstacle S and the electric wire 10 to the right of Q on the page, and has a corresponding magnitude.
[0056] On the other hand, referring to Fig. 7(B), a load W2 is applied to R of the wheel 140 that hits the obstacle S of the rotor holding structure 130 on the exit side. Because part of the gravity of the obstacle S and the electric wire 10 is supported by the intermediate roller 170, the load W2 applied to R is significantly less than the load W1 applied to Q on the entrance side. This makes it very unlikely that the obstacle S will get caught on the rotor holding structure 130 on the exit side. Thus, according to the construction trolley 100 of the present invention, since multiple intermediate rollers 170 are provided, it is possible to reduce the rate at which the electric wire 10 gets caught during the transport operation.
[0057] As shown in FIG. 5(D) to FIG. 5(E), the obstacle S attached to the electric wire 10 passes through the rotor holding structure 130 on the outlet side and is transported.
[0058] As described above, the construction trolley 100 of the present invention has two sets of rotating body holding structures 130 including a plurality of rotating bodies (wheels 140), and a plurality of intermediate rollers 170 rotating around a plurality of axes 171 parallel to the first axis 131 are arranged between the two sets of rotating body holding structures 130.Therefore, with the construction trolley 100 of the present invention, even if an obstacle S such as a sleeve is provided on the electric wire 10, the rate at which the electric wire 10 gets caught during the transportation operation can be significantly reduced, making it possible to avoid a decline in the efficiency of the pulling method.
[0059] Furthermore, according to the method using the construction trolley 100 of the present invention, the rate at which the electric wire 10 gets caught on an obstacle S such as a sleeve when replacing the electric wire 10 can be significantly reduced, making it possible to avoid a drop in the work efficiency of the pulling-out method.
[0060] Next, a second embodiment of the present invention will be described. In the following description, the differences from the previous embodiment will be mainly described. Figure 8 is a perspective view showing some of the components such as the frame 120 of the construction trolley 100 according to the second embodiment of the present invention in a see-through manner.
[0061] In the construction cart 100 according to the second embodiment, a wheel 150 with an irregular outer periphery is used as the rotating body held between a pair of rotating clamping plates 135, 135'. This wheel 150 is set to rotate about an axis 151 parallel to the first axis 131.
[0062] 9 is a perspective view of a wheel 150 having projections and recesses used in a construction trolley 100 according to a second embodiment of the present invention. The wheel 150 can be composed of a substantially cylindrical base material 154 having an axle hole 155 through which a bolt nut or the like serving as an axle 151 is inserted. A plurality of mounting recesses 156 are provided on the outer periphery of the base material 154, and a convex member 158 is fixed to each of the mounting recesses 156.
[0063] Next, the transportation of the electric wire 10 by the construction trolley 100 according to the second embodiment configured as described above will be described with reference to Fig. 10. Fig. 10(A)->(B) shows the state in which an obstacle S passes through the rotor holding structure 130 on the entrance side. Fig. 10 also shows the state in which the electric wire 10 advances from right to left on the page. Tension is applied to the electric wire 10 in the direction of the arrow by a winding machine (not shown) or the like.
[0064] In the construction trolley 100 according to the second embodiment, as the electric wire 10 advances, the obstacle S attached to the electric wire 10 comes into contact with the convex member 158 of the wheel 150 in the rotor holding structure 130 on the entrance side (FIG. 10(A)). In this manner, the obstacle S pushes the wheel 150, causing the wheel 150 of the rotor holding structure 130 on the entrance side to revolve (FIG. 10(B)). In this manner, in the construction trolley 100 according to the second embodiment, by providing unevenness on the outer periphery of the wheel 150, the revolution of the wheel 150 is actively encouraged, thereby preventing the obstacle S from getting caught.
[0065] According to the construction trolley 100 of the second embodiment described above, even if an obstacle S such as a sleeve is provided on the electric wire 10, the rate at which the electric wire 10 gets caught during transportation can be significantly reduced, making it possible to avoid a decline in the work efficiency of the pulling method.
[0066] Furthermore, in the construction trolley 100 of the second embodiment, a wheel 150 having projections and recesses is used, which actively induces the wheel 150 to revolve, thereby preventing the electric wire 10 from getting caught during transport operations.
[0067] In addition, according to the method using the construction trolley 100 of the second embodiment, the rate of getting caught on obstacles S such as sleeves when replacing the electric wire 10 can be significantly reduced, making it possible to avoid a drop in the work efficiency of the pulling-out method.
[0068] In the above explanation, an example has been described in which the construction trolley 100 of the present invention is used to guide electric wires in electric wire construction work involving the pulling method, etc., but the use of the construction trolley 100 of the present invention is not limited to this, and it can also be used in construction work such as optical fiber for communication.
[0069] The construction cart 100 according to the present invention is suitable for use primarily in a method for replacing electric wires, but is not limited to this method and can also be used for other methods. The construction cart 100 according to the present invention can also be used for construction such as laying new electric wires. [Explanation of symbols]
[0070] 1...Structure 2, 2' Utility pole 3. Beam 4. Yagura Club 8...Insulator 10... Electric wire (feeder wire) 11...Golden car 16. Winding vehicle 17....Winding drum 18. Sending vehicle 19. Delivery drum 100···Construction cart 110...Suspension structure 111...Rotation shaft 112, 112'...cross plate 113, 113'... Hanging hole 120, 120'... frame 127...Vertical roller holding structure 130 Rotating body holding structure 131...1st axis 135, 135'... Rotating clamping plate 140···(without unevenness) Wheel (rotating body) 141··· axis (parallel to the first axis) 150···(uneven) wheel (rotating body) 151··· axis (parallel to the first axis) 154...Base material 155... Shaft hole 156 Mounting recess 158... Convex member 170···Intermediate roller 171 (parallel to the first axis) axis 180···Vertical roller 182...2nd axis S... Obstacles
Claims
1. The rotating body holding structure has two sets of a pair of rotating clamping plates that rotate around a first axis, and a plurality of rotating bodies that are held between the pair of rotating clamping plates in a state in which they can freely rotate around a plurality of axes parallel to the first axis, A construction trolley characterized in that a plurality of intermediate rollers rotating around a plurality of axes parallel to the first axis are arranged between the two sets of rotating body holding structures.
2. 2. The construction trolley according to claim 1, further comprising a pair of frames that rotatably hold two sets of the rotating body holding structures and a plurality of the intermediate rollers.
3. The construction trolley described in claim 2, characterized in that a rotating support shaft parallel to the first shaft is arranged within a virtual plane formed halfway between the two first shafts of the two sets of rotating body holding structures, and the frame hanging structure rotates around the rotating support shaft.
4. The construction trolley according to claim 1 or 2, characterized in that the axes that serve as the centers of rotation of each of the rotors in one of the rotor holding structures are arranged at equal intervals around the first axis.
5. 3. The construction trolley according to claim 1 or 2, characterized in that the number of rotors in one rotor holding structure is five.
6. 3. A construction trolley as claimed in claim 1 or 2, characterized in that the rotating body is a wheel having an outer periphery without any irregularities.
7. 3. The construction trolley according to claim 1 or 2, characterized in that the rotating body is a wheel having an uneven outer periphery.
8. 3. The construction trolley according to claim 1 or 2, further comprising a vertical roller that rotates about a second axis perpendicular to the first axis.
9. The construction trolley according to claim 8, wherein the vertical roller is arranged on a side of the rotating body holding structure on which the intermediate roller is not provided.
10. The rotating body holding structure has two sets of a pair of rotating clamping plates that rotate around a first axis, and a plurality of rotating bodies that are held between the pair of rotating clamping plates in a state in which they can freely rotate around a plurality of axes parallel to the first axis, This construction method is characterized by using a construction cart in which a number of intermediate rollers rotating around a number of axes parallel to a first axis are arranged between two sets of the rotating body holding structures, and the electric wire is replaced.
Citation Information
Patent Citations
Series two-wheel warehouse
JP1983112408A
Anti-back wheel
JP1996168128A
Extension method for transmission line
JP2002159111A
Roller Unit For Laying Cables In A Plant For Laying Cables And Plant For Laying Cables Comprising The Roller Unit
US20210273423A1
