Removal method of foundation pile
The method uses a polymer aqueous solution with a superabsorbent polymer to efficiently cut and remove foundation piles, minimizing environmental disturbance and ensuring stable hole walls and proper backfilling.
Patent Information
- Application Number
- JP2023043771
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-20
- Publication Date
- 2024-10-03
AI Technical Summary
Existing methods for removing large diameter and long foundation piles cause environmental disturbances such as noise, vibration, and poor backfilling due to direct pulling or crushing, leading to hole wall instability and insufficient solidification.
A method involving a casing with a cutting bit and high-pressure water jet injection of a polymer aqueous solution containing a superabsorbent polymer, which cuts the pile horizontally without direct contact, stabilizes the hole wall, and facilitates efficient backfilling by using a separating agent to separate water and mud.
The method enhances cutting efficiency, minimizes environmental impact, stabilizes the hole wall, and ensures proper backfilling by reducing noise and vibration, and preventing hole wall collapse.
Smart Images

Figure 2024133803000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a foundation pile removal method for cutting existing foundation piles buried in the ground to a predetermined length and sequentially removing them, and more particularly to a method for cutting the foundation piles by spraying at high pressure an aqueous polymer solution containing a highly water-absorbent polymer that has absorbed water and swollen, and then removing the foundation piles. [Background technology]
[0002] Recently, in urban redevelopment projects, many construction projects involve the removal of foundation piles buried underground after the demolition of existing buildings. When removing existing foundation piles, the number of large diameter and long piles being removed is increasing due to the larger and taller buildings. Removal of such large diameter and long piles is difficult, and the most common removal methods are to cut the connection with the ground and then pull them out, or to crush and pulverize them using machinery. However, these methods have issues such as the impact on the surrounding environment (noise, vibration, etc.) and problems with backfilling.
[0003] Representative methods for removing existing foundation piles can be broadly divided into the direct pull-out method, edge cutting and pull-out method, and crushing and removal method. Of these, the direct pull-out method is intended for wooden piles and relatively thin PC piles, while the edge cutting and pull-out method and crushing and removal method are generally used for large diameter piles and long piles.
[0004] The edge cutting and extraction method is a method in which a rotary casing excavator or the like is used to drill holes in the ground around the pile while spraying water downward from the tip of a rotating casing tube, cutting the edge between the ground and the existing pile, and then extracting the pile. An example of a technique using this method is disclosed in Patent Document 1 below.
[0005] The crushing and removal method involves inserting a casing having a cutting bit at the tip into the ground around the pile using a full-circle rotary excavator or the like, rotating the casing while the cutter bit attached to the tip of the rod is in contact with the outer periphery of the foundation pile, cutting the foundation pile to a predetermined length, and lowering a hammer grab into the casing tube using a crawler crane or the like to grab and pull up the cut portion. An example of a technology that uses this method is disclosed in Patent Document 2 below. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2002-81066 A [Patent Document 2] JP 2019-11551 A Summary of the Invention [Problem to be solved by the invention]
[0007] However, the above-mentioned edge cutting and pulling method has the following problems. (1) When pulling up the piles, the balance between the water level in the tunnel and the groundwater level is lost, causing the original ground to loosen and the hole walls to collapse. (2) In the case of large diameter and long piles, they cannot be directly pulled out by crane, etc. and require crushing and cutting work on the ground, which generates noise, vibration, dust, etc. and has a significant impact on the surrounding environment. (3) The collapse of the hole walls prevents backfill material such as liquefied treated soil from being sufficiently filled up to the tip of the pile, resulting in problems such as poor solidification.
[0008] Furthermore, the above-mentioned crushing and removal method has the following problems. (1) The crushing and cutting is done inside the underground casing, but since the piles are directly crushed and cut by machinery, noise and vibration are transmitted through the ground and have an impact on the surrounding environment. (2) Cutting takes time due to insufficient rotational reaction force during cutting. In addition, the cutter bit bites into the pile body, bending the pile and damaging the casing due to the rotational reaction force.
[0009] Therefore, the main objective of the present invention is to provide a foundation pile removal method which increases the efficiency of pile cutting while minimizing the impact on the surrounding environment such as noise and vibration, stabilizes the hole wall after the pile is removed, and eliminates problems such as insufficient filling and poor solidification when backfilling. [Means for solving the problem]
[0010] In order to solve the above problems, the present invention according to claim 1 provides a foundation pile removal method for removing existing foundation piles buried in the ground, comprising: A preparation process of bringing in a casing equipped with a cutting bit for excavating ground at its tip and an injection nozzle for injecting a water jet at high pressure toward the inward side at its tip, and installing a high-pressure pump equipment for the water jet; A first step of inserting the casing into the ground while surrounding the foundation pile; A second step of cutting the foundation pile horizontally by rotating the casing while stopping the casing at a predetermined depth position and spraying a polymer aqueous solution containing a superabsorbent polymer from the spray nozzle; A third step of grabbing the upper side of the cut foundation pile with a hammer grab and lifting it upward to remove it; A foundation pile removal process in which the first step to the third step are repeated to remove the foundation pile over its entire length; When the casing is pulled up to the ground and recovered, a casing recovery process is performed to protect the hole wall with the aqueous polymer solution used to cut the foundation pile; The present invention provides a method for removing foundation piles, which comprises a backfilling step of adding a separating agent to the aqueous polymer solution to separate the solution into water and mud, and, if necessary, adding backfill soil to backfill the area.
[0011] In the invention described in claim 1 above, the foundation pile is cut horizontally by rotating the casing while spraying the aqueous polymer solution from the spray nozzle, so that the foundation pile can be cut without contact and the impact on the surrounding environment such as noise and vibration is kept extremely small compared to when mechanical cutting is performed by pressing a cutter bit.
[0012] In addition, because a viscous polymer aqueous solution is sprayed as the cutting agent, there is less diffusion due to air resistance compared to when water is sprayed, resulting in high cutting ability, which in turn increases the cutting efficiency of foundation piles.
[0013] In addition, an aqueous polymer solution, also known as a drilling stabilizer, is used to cut the foundation piles, which serves to protect the hole walls after the casing is removed, stabilizing the hole walls and making them less likely to collapse after the casing is removed.
[0014] After the casing is recovered, a separating agent is added to the polymer aqueous solution to separate it into water and mud, which reduces the size of the swollen gel and its viscosity, causing it to settle together with the adhering soil particles. This provides excellent replacement with the backfill soil, eliminating problems such as insufficient filling and poor solidification during backfilling.
[0015] The present invention according to claim 2 provides a method for removing foundation piles as described in claim 1, in which, at least when cutting reinforcing bars embedded in the foundation piles, a mineral-based abrasive is sprayed from the spray nozzle together with the aqueous polymer solution.
[0016] In the invention described in claim 2 above, when cutting the reinforcing bar portion embedded in the foundation pile, a mineral-based abrasive such as garnet, which is hard and highly durable, is sprayed together with an aqueous polymer solution.
[0017] The present invention according to claim 3 provides the foundation pile removal method according to claim 1, further comprising providing a jet nozzle at the tip of the casing for spraying a water jet downward to cut the ground.
[0018] In the invention described in claim 3 above, when excavating the ground by rotating the casing, a high-pressure water jet is used in combination to reduce friction and loosen the ground, thereby improving excavation efficiency.
[0019] The present invention according to claim 4 provides the foundation pile removal method according to claim 1, in which a single casing or a double casing is used as the casing.
[0020] In the invention described in claim 4 above, when a single casing is used, the mechanism is simple and easy to handle, and when a double casing is used, the outer casing is made non-rotating and the inner casing is rotated to excavate, allowing excavation with reduced friction with the ground and improving excavation efficiency.
[0021] As the present invention related to claim 5, there is provided a foundation pile removal method as described in claim 1, in which a U-shaped portion opening inward is formed at the tip portion of the casing, and the injection nozzle is accommodated within this U-shaped portion.
[0022] In the invention described in claim 5 above, a U-shaped portion opening toward the inward side is formed at the tip portion of the casing, and the injection nozzle is accommodated within this U-shaped portion, thereby preventing damage to the injection nozzle when the casing is rotated to excavate the ground. Effect of the Invention
[0023] As explained above in detail, according to the present invention, it is possible to increase the efficiency of pile cutting while suppressing the impact on the surrounding environment such as noise and vibration, to stabilize the hole wall after the pile is removed, and to eliminate problems such as insufficient filling and poor solidification when backfilling. [Brief description of the drawings]
[0024] [Figure 1] 1 is a cross-sectional view showing the state in which the foundation pile 1 has been exposed. [Diagram 2] FIG. [Diagram 3]2 is a vertical cross-sectional view of the tip portion of the casing 2. FIG. [Figure 4] FIG. 1 is an explanatory diagram of a flow velocity distribution concept. [Diagram 5] 4 is a cross-sectional view showing a process of removing the foundation pile 1. FIG. [Figure 6] 2 is a vertical cross-sectional view of the tip portion of the casing 2. FIG. [Figure 7] 2 is a vertical cross-sectional view of the tip portion of the casing 2. FIG. [Figure 8] 4 is a cross-sectional view showing a process of removing the foundation pile 1. FIG. [Figure 9] 4 is a cross-sectional view showing a recovery process of the casing 2. FIG. [Figure 10] FIG. 11 is a cross-sectional view after the casing 2 has been removed. [Figure 11] FIG. 2 is a cross-sectional view showing a backfilling step with backfill soil 15. [Figure 12] FIG. 2 is a cross-sectional view showing the completed backfilling state. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.
[0026] The foundation pile removal method according to the present invention is a method for removing an existing foundation pile 1 buried in the ground. The steps will be described below in order.
[0027] [Preparation process] When removing the foundation pile 1, as shown in FIG. 1, the ground surface is excavated in advance with a backhoe or the like to expose the upper end of the existing foundation pile 1.
[0028] Next, as shown in Figure 2, a casing 2 is brought in, which is equipped with a cutting bit 3 for excavating the ground at its tip, and as shown in Figure 3, which is equipped with an injection nozzle 4 at its tip for spraying a water jet at high pressure inward, and high-pressure pump equipment such as a high-pressure pump vehicle 12 for the water jet is installed.
[0029] As shown in FIG. 2, the casing 2 is attached to an auger that moves up and down along a leader suspended from the tip of a heavy machine 11 such as a crawler crane or crawler crane, and is rotated by the auger.
[0030] A plurality of cutting bits 3, 3... are provided at intervals around the periphery on the tip (lower end) edge of the casing 2, and can be penetrated into the ground by lowering the auger as the casing 2 rotates.
[0031] In addition, a jet nozzle (not shown) that sprays a water jet downward for cutting the ground may be provided at the tip of the casing 2, and used in combination with the cutting bit 3 to excavate the ground. This jet nozzle is provided separately from the jet nozzle 4 for cutting the foundation piles 1, and may spray only water or may spray an aqueous polymer solution containing a highly water-absorbent polymer.
[0032] 3, a U-shaped portion 5 opening inward is formed at the tip of the casing 2, and the injection nozzle 4 is housed in this U-shaped portion 5. By housing the injection nozzle 4 in the U-shaped portion 5, damage to the injection nozzle 4 when the casing 2 is used to excavate the ground can be prevented.
[0033] A high-pressure hose 6 for supplying the aqueous polymer solution 8 and the abrasive to the injection nozzle 4 is connected to the injection nozzle 4, and an insertion hole for inserting the high-pressure hose 6 is provided in the upper part of the U-shaped portion 5. That is, the high-pressure hose 6 extending from the high-pressure pump vehicle 12 on the ground extends along the outer periphery of the casing 2 in the axial direction and connects to the injection nozzle 4 through the insertion hole in the upper part of the U-shaped portion 5.
[0034] The casing 2 may be a single casing consisting of only the casing 2 equipped with the injection nozzle 4, or a double casing in which an outer casing 7 is concentrically arranged on the outside of the casing 2 equipped with the injection nozzle 4 as shown in Fig. 3. In the case of the double casing system, a cutting bit is attached to the tip of the inner casing, and a helical earth-discharging screw is provided on the outer periphery of the inner casing, and excavation and earth-discharging are performed by rotating the inner casing.
[0035] The superabsorbent polymer sprayed from the spray nozzle 4 is a hydrophilic polymer particle having a crosslinked structure, has a water absorption capacity of about 10 to 500 times its own weight, and is characterized by being difficult to release water even when pressure is applied. The water absorption action of such a water-absorbent polymer is exerted by an osmotic pressure caused by an ion concentration difference between the inside and outside of the polymer. Therefore, the electric conductivity of the solvent mixed and stirred with the superabsorbent polymer can be adjusted by adding an electrolyte such as sodium chloride, and the mass ratio of absorbed water to the mass of the polymer particles (hereinafter referred to as water absorption ratio) can be changed. Note that water is used as the solvent, and tap water can be preferably used, particularly at cutting sites.
[0036] The type of superabsorbent polymer is not particularly limited, and it is preferably considered that the superabsorbent polymer is at least one type selected from the group consisting of starch-based, cellulose-based, and synthetic polymer-based polymers.
[0037] Among the above superabsorbent polymers, the synthetic polymer-based sodium polyacrylate superabsorbent polymer is particularly suitable for use because it is excellent in terms of both performance and cost.
[0038] Sodium polyacrylate superabsorbent polymer is a gel of partially crosslinked acrylic acid polymer sodium salt with a three-dimensional network structure, which is lightly crosslinked by adding a crosslinking agent to sodium acrylate (CH2=CH-COONa). Conventionally known crosslinking agents can be used as the crosslinking agent.
[0039] It is known that when the superabsorbent polymer sodium polyacrylate absorbs water, the carboxyl groups dissociate sodium ions into a gel-like form, and in pure water, the polymer swells to a degree that is 100 to 1,000 times its own weight.
[0040] In addition, when the amount of crosslinking agent added to the sodium polyacrylate superabsorbent polymer is increased relative to the amount of sodium acrylate, the resulting gel becomes harder and absorbs less water, whereas when the amount of crosslinking agent added is decreased, the resulting gel becomes softer and absorbs more water.
[0041] Further, as a special sodium polyacrylate superabsorbent polymer, there can be mentioned the use of a sodium polyacrylate superabsorbent polymer having a double structure of a shell and a core, in which the surface of a superabsorbent polymer polymerized with a crosslinking agent is further crosslinked.
[0042] In the case of sodium polyacrylate superabsorbent polymer with a dual shell-core structure, the thicker the outer shell, the harder the gel becomes and the less water it absorbs, whereas a thinner shell makes the gel softer and increases the amount of water it absorbs.
[0043] In addition, the shell and the core are usually crosslinked by an ester bond, but there are also sodium polyacrylate superabsorbent polymers in which the shell and the core are crosslinked by an ether bond, which has excellent alkali resistance and electrochemical resistance. In the present invention, it is more preferable to use a sodium polyacrylate superabsorbent polymer in which the shell and the core are crosslinked by an ether bond.
[0044] In addition to the above characteristics, the dissociation of sodium ions in the superabsorbent polymer sodium polyacrylate also depends on the conditions under which the gel is placed, such as pH and electrolyte concentration, so other superabsorbent polymers can be appropriately selected and used depending on the conditions of use.
[0045] The concentration of the aqueous polymer solution can be appropriately adjusted depending on the water absorption performance of the highly water-absorbent polymer, the ion concentration of the absorbed water, and the properties of the object to be cut.
[0046] In general, the viscosity tends to be high when a high water-absorbing polymer with high water-absorbing performance is used, and the viscosity tends to be low when a high water-absorbing polymer with low water-absorbing performance is used. Therefore, it is desirable to set the concentration so as to obtain a polymer aqueous solution of the desired clay, taking into consideration the water-absorbing performance of the high water-absorbing polymer to be used. By using the polymer aqueous solution of this embodiment, the potential region in the flow velocity distribution conceptual diagram shown in FIG. 4 can be made longer, and cutting efficiency can be improved.
[0047] In addition, in order to adjust the water absorption rate of the water-absorbing polymer, an electrolyte such as sodium chloride may be added to the aqueous polymer solution.
[0048] Furthermore, an abrasive can be added to the polymer aqueous solution. As the abrasive, for example, a mineral-based abrasive such as sand, silica sand, garnet, etc. can be used. When adding an abrasive to cut, different abrasives can be used depending on the cut part of the foundation pile 1. That is, when cutting the concrete part of the foundation pile 1, sand or silica sand can be used as the abrasive. On the other hand, as shown in FIG. 6, when sand or silica sand is used as the abrasive, it is difficult to cut the reinforcing bar 9 embedded in the foundation pile 1. Therefore, it is preferable to use a mineral-based abrasive when cutting at least the reinforcing bar 9 embedded in the foundation pile 1, that is, when cutting at least the outer periphery of the foundation pile 1, since the reinforcing bar 9 is usually embedded in the outer periphery of the foundation pile 1. As the mineral-based abrasive, garnet, which is hard and highly durable, can be suitably used. In addition, when cutting the concrete part, a mineral-based abrasive can be used as the abrasive.
[0049] The particle size of the abrasive is not particularly limited, but considering the fluidity of the polymer aqueous solution to which the abrasive is added and the cutting ability of the abrasive, the average particle size D 50In this case, the range of 320 to 570 μm is preferable.
[0050] Furthermore, in this embodiment, the abrasive-added polymer aqueous solution to which the abrasive is added may be directly sprayed, or the polymer aqueous solution consisting of a highly water-absorbent polymer and water may be mixed with the fluid abrasive prepared by adding the abrasive to the highly water-absorbent polymer that has absorbed water, and then mixed and sprayed at the tip of the spray nozzle. Such a mixed spray at the tip of the spray nozzle can be performed, for example, by using a nozzle with a double tube structure, by pumping the polymer aqueous solution into the inner tube and supplying the fluid abrasive to the outer tube, and then spraying the mixed solution. As the spray nozzle with the double tube structure, an abrasive nozzle generally used for cutting can be suitably used.
[0051] In addition, the highly absorbent polymer used in the above-mentioned fluid abrasive preferably has a small polymer particle size after absorbing water so that it does not easily separate after adding the abrasive.Specifically, a highly absorbent polymer having a polymer particle size of about 100 μm after absorbing water can be suitably used.By using a highly absorbent polymer having a small polymer particle size after absorbing water for the fluid abrasive, the fluid abrasive in which the abrasive is uniformly dispersed can be prepared.
[0052] [Foundation pile removal process] When the above-mentioned preparation process is completed, a removal process is performed to remove the foundation pile 1. In this removal process, the following first to third steps are repeated to remove the foundation pile 1 over its entire length.
[0053] (First Step) As shown in FIG. 5, in a state where the casing 2 is fitted around the foundation pile 1, the casing 2 is rotated by the auger attached to the heavy machine 11 and penetrated into the ground.
[0054] (Second step) The casing 2 is stopped at a predetermined depth position, and as shown in Figure 6, the foundation pile 1 is cut horizontally by rotating the casing 2 while spraying an aqueous polymer solution 8 containing a highly absorbent polymer together with an abrasive from the spray nozzle 4.
[0055] Such cutting of the foundation pile 1 by the water jet is performed over the entire cross section of the foundation pile 1. Also, as shown in Fig. 7, after cutting to a certain depth (radial position) by the water jet, a set of sear arrows 13 may be inserted between the foundation pile 1 and the casing 2 to cut the remaining cross section.
[0056] By adopting a cutting method using water jet technology, the impact on the surrounding environment, such as noise and vibration, can be kept extremely small compared to a method that cuts by mechanically contacting the foundation pile 1 directly. In addition, since there is no direct contact, the risk of casing damage and pile bending can be reduced.
[0057] Furthermore, since a viscous polymer aqueous solution 8 is sprayed as the spray material for cutting the piles, there is less diffusion due to air resistance compared to when water is sprayed, and the cutting ability is 1.5 to 2 times greater, improving the cutting efficiency.
[0058] In addition, since the inside of the drilled hole is filled with an aqueous polymer solution 8, which is also known as a drilling stabilizer, the stability of the excavated ground is improved compared to conventional bentonite-based stabilizers, a poor permeable layer is formed early, and the hole wall can be stabilized after the casing is removed.
[0059] (Third Step) As shown in FIG. 8, the upper side of the cut foundation pile 1 is grasped with a hammer grab 14 and pulled upward for removal. [Casing recovery process] Once the removal of the foundation piles 1 over their entire length has been completed, the casing 2 is pulled up to the ground and recovered by a crane device such as a crawler crane, as shown in Fig. 9. After the casing 2 is recovered, the hole is filled with the aqueous polymer solution 8 used to cut the foundation piles 1, as shown in Fig. 10, and this aqueous polymer solution 8 protects the hole wall, prevents the hole wall from collapsing, and stabilizes the hole wall.
[0060] [Backfilling process] By adding a separating agent to the aqueous polymer solution 8 that has accumulated in the hole, the superabsorbent polymer that has absorbed and swelled will release water, and the hole will be separated into water and mud containing the superabsorbent polymer that has released the water. This will reduce the viscosity of the aqueous solution, and the superabsorbent polymer will sink together with the adhering soil particles. Then, as shown in Figure 11, backfill soil 15 can be added as necessary to backfill the hole (Figure 12).
[0061] The separating agent has the effect of releasing water from a highly absorbent polymer that has absorbed water and swelled, and by adding divalent metal ions such as calcium chloride to increase the electrical conductivity of the solution, the water adsorbed in the polymer material is separated. [Explanation of symbols]
[0062] 1...foundation pile, 2...casing, 3...cutting bit, 4...spray nozzle, 5...U-shaped part, 6...high pressure hose, 7...periphery casing, 8...polymer aqueous solution, 9...reinforcing bar, 11...heavy machinery, 12...high pressure pump vehicle, 13...seri arrow, 14...hammer grab, 15...backfill soil
Claims
1. A foundation pile removal method for removing existing foundation piles buried in the ground, comprising: A preparation process of bringing in a casing equipped with a cutting bit for excavating ground at its tip and an injection nozzle for injecting a water jet at high pressure toward the inward side at its tip, and installing a high-pressure pump equipment for the water jet; A first step of inserting the casing into the ground while surrounding the foundation pile; A second step of cutting the foundation pile in a horizontal direction by rotating the casing while stopping the casing at a predetermined depth position and spraying a polymer aqueous solution containing a superabsorbent polymer from the spray nozzle; A third step of grabbing the upper side of the cut foundation pile with a hammer grab and lifting it upward to remove it; A foundation pile removal process in which the first step to the third step are repeated to remove the foundation pile over its entire length; When the casing is pulled up to the ground and recovered, a casing recovery process is performed to protect the hole wall with the aqueous polymer solution used to cut the foundation pile; This method for removing foundation piles comprises a backfilling step of adding a separating agent to the aqueous polymer solution to separate it into water and mud, and, if necessary, adding backfill soil to backfill the area.
2. 2. The foundation pile removal method according to claim 1, wherein a mineral abrasive is sprayed from said spray nozzle together with said aqueous polymer solution at least when cutting reinforcing bars embedded in said foundation pile.
3. 2. The foundation pile removal method according to claim 1, wherein the tip of the casing is provided with a jet nozzle for spraying a water jet downward for cutting the ground.
4. 2. The foundation pile removal method according to claim 1, wherein the casing is a single casing or a double casing.
5. 2. A foundation pile removal method according to claim 1, wherein a U-shaped portion opening inward is formed at the tip of said casing, and said injection nozzle is accommodated within said U-shaped portion.
Citation Information
Patent Citations
Pull-out method and device for foundation pile
JP2002081066A
Method for dismantling underground foundation pile
JP2019011551A
Cited By
Improved device for bridge pile foundation girdling
CN120159041A