Humidity adjustment cabinet
The humidity control system addresses dust clog issues in spray nozzles by using a water guide pipe to clear clogs from the air injection ports, ensuring efficient humidity adjustment without requiring large air pumps.
Patent Information
- Application Number
- JP2023044846
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-22
- Publication Date
- 2024-10-04
AI Technical Summary
Existing humidity control systems in storage warehouses face challenges in effectively removing dust clogs from the air injection ports of spray nozzles without using large, high-pressure air pumps, which are cumbersome and inefficient.
A humidity control system with a two-fluid spray nozzle that includes a water guide pipe and valve to direct water through the air supply pipe, allowing water to be sprayed from the air injection port to clear dust clogs, eliminating the need for high-pressure air pumps.
Effectively removes dust from the air injection ports of spray nozzles using a simple structure, maintaining humidity control without increasing the system's size or complexity.
Smart Images

Figure 2024134582000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a humidity adjustment cabinet that can adjust the humidity inside the cabinet by spraying water in a mist form from a two-fluid spray nozzle that has a water nozzle for spraying water and an air nozzle for spraying air. [Background technology]
[0002] Patent Document 1 discloses an invention of a storage facility for thawing, maturing and fermenting bread dough. This storage facility includes a storage chamber capable of storing bread dough, a cooling device for cooling the storage chamber, a heating device for heating the storage chamber, a humidifying device for humidifying the storage chamber, and a circulation fan for circulating air in the storage chamber. In this storage facility, the temperature of the storage chamber is controlled by operating the cooling device or the heating device, and the humidity is controlled by operating the cooling device and the humidifying device. The humidifying device of this storage facility includes a spray nozzle, which is a two-fluid nozzle that sprays water in a mist form, a water supply pipe that supplies water from a water supply source to the spray nozzle, an air supply pipe that supplies air to the spray nozzle, and an air pump that sends air in a pressurized state to the spray nozzle through the air supply pipe.
[0003] The spray nozzle is a double cylinder, with a water nozzle at the tip of the inner cylinder, and an air nozzle formed by a gap between the inner and outer cylinders. When spraying water in mist form from the spray nozzle, the water supply valve installed in the water supply pipe is opened and the air pump is operated, so that water is sprayed from the water nozzle of the spray nozzle and air is sprayed from the air nozzle, and the water is sprayed in mist form in front of the spray nozzle. If dust clogs the air nozzle of the spray nozzle, it becomes impossible to spray air, and there is a risk that the water will not be misted in front of the spray nozzle. For this reason, in this storage facility, air is sprayed without spraying water to remove dust that has clogged the air nozzle. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-026913 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the storage (humidity control storage) of Patent Document 1, in order to remove dust stuck in the air nozzle of the spray nozzle, air is sprayed without spraying water to remove the dust stuck in the air nozzle. In order to remove the dust stuck in the air nozzle of the spray nozzle, an air pump is operated to spray air from the air nozzle of the spray nozzle to remove the dust, but the air pump cannot provide sufficient pressure and the dust stuck in the air nozzle cannot be removed. If a high-pressure air pump is used, the dust stuck in the air nozzle can be removed, but since the high-pressure air pump is large, it cannot be placed in the machine room of the storage, and even if it can be placed in the machine room, there is a problem that the storage becomes large. The present invention aims to remove dust from the air nozzle with a simple structure in a humidity control storage that can adjust the humidity inside the storage by spraying water in a mist from a two-fluid spray nozzle having a water nozzle for spraying water and an air nozzle for spraying air. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems, the present invention provides a humidity control cabinet comprising a storage cabinet for storing items and a humidifying device for humidifying the inside of the storage cabinet, the humidifying device comprising a two-fluid spray nozzle having a water nozzle for spraying water and an air nozzle for spraying air, a water supply pipe for supplying water to the spray nozzle, an air supply pipe for supplying air to the spray nozzle, and an air pump for sending air to the spray nozzle via the air supply pipe, characterized in that the humidity control cabinet is provided with a water conduit for directing water from the water supply pipe to the air supply pipe, and a water conduit valve for passing or blocking water supplied from the water supply pipe through the water conduit to the air supply pipe.
[0007] In the humidity control cabinet constructed as described above, a water guide pipe that guides water from the water supply pipe to the air supply pipe and a water guide valve that passes or blocks water supplied from the water supply pipe through the water guide pipe to the air supply pipe are provided, so that water can be sprayed from the air outlet of the spray nozzle by opening the water guide valve to guide the water from the water supply pipe to the air supply pipe, and the sprayed water can remove dust that has clogged the air outlet of the spray nozzle. In this way, dust that has clogged the air outlet of the spray nozzle can be removed with a simple structure without using a large high-pressure air pump.
[0008] The humidity adjustment cabinet constructed as described above is provided with a humidity adjustment program for adjusting the humidity inside the cabinet, and it is preferable to control the water guide valve to open so as to pass water supplied from the water supply pipe through the water guide pipe to the air supply pipe when the humidity adjustment program is not being executed. Since the water guide valve is controlled to open so as to pass water supplied from the water supply pipe through the water guide pipe to the air supply pipe when the humidity adjustment program is not being executed, and the water in the water supply pipe is guided to the air supply pipe, dust clogging the air outlet of the spray nozzle can be removed without affecting the humidity adjustment inside the cabinet by the humidity adjustment program. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a front view of a dough conditioner which is one embodiment of a humidity adjustment chamber of the present invention. [Diagram 2]2 is a longitudinal cross-sectional view taken along the left-right direction of the front part of FIG. 1. [Diagram 3] This is a cross-sectional view taken along line AA. [Figure 4] FIG. 2 is a schematic diagram of the cooling, heating and moistening devices of the dough conditioner. [Diagram 5] BB cross-sectional view. [Figure 6] FIG. 1 is a schematic diagram of a humidification device. [Figure 7] FIG. 2 is an enlarged cross-sectional view of a portion of the spray nozzle. [Figure 8] FIG. 2 is a block diagram showing a control device. [Figure 9] 1 is a schematic diagram of a humidifier when a water pipe is branched downstream of a water supply valve. FIG. [Figure 10] 1 is a schematic diagram of a humidifier when a water supply valve is provided in a water supply pipe. [Figure 11] FIG. 11 is a schematic diagram of a humidifier when a water guide valve is provided in a water guide pipe. [Figure 12] FIG. 2 is an enlarged cross-sectional view of a portion of a spray nozzle that sprays water and air from one nozzle. BEST MODE FOR CARRYING OUT THEINVENTION
[0010] An embodiment of a humidity control chamber of the present invention will be described below with reference to the accompanying drawings as an embodiment of a dough conditioner. The dough conditioner 10 of the present invention performs the steps of freezing, retarding, preheating, and proofing in order before baking bread dough. The dough conditioner 10 performs temperature control according to each step when performing each of the above steps, and performs humidity control in addition to temperature control during the preheating and proofing steps.
[0011] 1 and 2, the dough conditioner 10 includes a storage 12 for storing dough (stored items) in the housing 11 except for the right side, and a machine chamber 13 on the right side of the housing 11. As shown in Fig. 3, a front opening 12a for inserting and removing a tray carrying dough is provided in the front of the storage 12, and a door 14 for opening and closing the front opening 12a is provided so as to be freely opened and closed.
[0012] As shown in Figures 2 to 4, a partition plate 15 is provided on the right side and bottom of the storage cabinet 12, and a duct passage 16 is formed on the right side and bottom of the storage cabinet 12 separated by the partition plate 15 to send temperature- and humidity-controlled air to the storage cabinet 12. As shown in Figures 2 and 3, the duct passage 16 includes a vertical duct passage 16a disposed on the right side of the storage cabinet 12 and a horizontal duct passage 16b disposed on the bottom of the storage cabinet 12. The upper part of the vertical duct passage 16a protrudes toward the machine room 13, and a temperature control space 16c is formed in this portion to accommodate an evaporator 25 of the cooling device 20 and a heater 31 of the heating device 30, which will be described later, to cool or heat the air and control the temperature.
[0013] As shown in Figs. 2 and 4, a circulation fan 17 is attached to the upper part of the partition plate 15 arranged on the right side of the storage 12, and the air in the storage 12 is guided to the duct passage 16 by the circulation fan 17, as shown by the two-dot chain arrow in Fig. 4. The air guided to the duct passage 16 is cooled or heated in the temperature control space 16c to adjust the temperature, and is sent to the left side of the storage 12 through the vertical duct passage 16a and the horizontal duct passage 16b. As shown in Figs. 4 and 5, a temperature sensor 18 is provided in the temperature control space 16c, and the temperature sensor 18 detects the temperature in the storage 12 by detecting the temperature of the air passing through the temperature control space 16c. A humidity sensor 19 is provided in the temperature control space 16c, and the humidity sensor 19 detects the humidity in the storage 12 by detecting the humidity of the air passing through the temperature control space 16c.
[0014] As shown in Fig. 2, Fig. 4 and Fig. 5, an evaporator 25 of a cooling device 20 for cooling the inside of the storage 12 is disposed in the temperature-controlled space 16c. The cooling device 20 cools the inside of the storage 12 by cooling the air in the storage 12 passing through the temperature-controlled space 16c. The cooling device 20 uses a well-known refrigeration circuit and includes a compressor 21 for compressing a refrigerant, a condenser 22 for cooling the compressed refrigerant gas, a dryer 23 for removing moisture contained in the liquefied refrigerant, a capillary tube (expansion means) 24 for expanding the liquefied refrigerant, and an evaporator 25 for vaporizing the expanded liquefied refrigerant to cool the inside of the storage 12. The evaporator 25 is disposed in the temperature-controlled space 16c of the duct passage 16, and other parts are disposed in the machine room 13. In this cooling device 20, the refrigerant gas compressed by the compressor 21 is cooled in the condenser 22 to become a liquefied refrigerant, and the liquefied refrigerant passes through the dryer 23, expands in the capillary tube 24, and is sent to the evaporator 25, and the air in the temperature control space 16c is cooled by the cold generated when the refrigerant vaporizes in the evaporator 25. Note that, although a capillary tube is used as the expansion means, the present invention is not limited to this, and an expansion valve such as an electronic expansion valve may also be used.
[0015] As shown in Figs. 2, 4 and 5, a heating device 30 for heating the inside of the storage 12 is disposed in the temperature-controlled space 16c. The heating device 30 heats the inside of the storage 12 by heating the air in the storage 12 passing through the temperature-controlled space 16c. The heating device 30 includes a heater 31 for heating the air in the temperature-controlled space 16c and a bracket 32 for attaching the heater 31 to the temperature-controlled space 16c. The heater 31 is attached to the lower side of the evaporator 25 of the cooling device 20 by the bracket 32. The heater 31 is a glass tube heater, and not only can it efficiently heat the air in the temperature-controlled space 16c by radiant heat, but also has a function as a defrost heater for the evaporator 25 disposed above.
[0016] 2, 4 and 5, a spray nozzle 50 of a humidifier 40 is disposed in the vertical duct passage 16a of the duct passage 16, and the humidifier 40 humidifies the inside of the storage shed 12 by spraying water in a mist. As shown in Fig. 6, the humidifier 40 includes the spray nozzle 50 that sprays water in a mist, a water supply pipe 41 that supplies water to the spray nozzle 50 from a water supply source such as a water line, an air supply pipe 42 that supplies air to the spray nozzle 50, and an air pump 43 that sends pressurized air to the spray nozzle 50 via the air supply pipe 42.
[0017] As shown in FIG. 7, the spray nozzle 50 is a two-fluid type spray nozzle having a water nozzle 51a for spraying water and an air nozzle 52a for spraying air, and sprays water in the form of a fine mist by spraying air into the sprayed water. The spray nozzle 50 includes an inner cylinder 51 having a substantially cylindrical shape and an outer cylinder 52 arranged outside the inner cylinder 51 with a gap therebetween. As shown in FIG. 6, the water supply pipe 41 is connected to the inner cylinder 51, and the tip opening of the inner cylinder 51 serves as a water nozzle 51a for spraying water. The air supply pipe 42 is connected to the outer cylinder 52, and the gap formed between the tip opening of the outer cylinder 52 and the outer peripheral surface of the inner cylinder 51 serves as an air nozzle 52a for spraying air. The tip opening of the outer cylinder 52 is located rearward of the tip opening of the inner cylinder 51 (upstream in the direction in which the water and air flow), and the water sprayed from the water injection port 51a is mixed with the air sprayed from the rear air injection port 52a and sprayed as a fine mist.
[0018] 4 and 6, a pressure reducing valve 41a and a water supply valve 41b are provided in the water supply pipe 41, and water from the water supply source is depressurized by the pressure reducing valve 41a and then sprayed from the water outlet 51a of the spray nozzle 50 by opening the water supply valve 41b. An air pump 43 is connected to the air supply pipe 42, and air in the machine room 13 is sprayed from the air outlet 52a of the spray nozzle 50 through the air supply pipe 42 by the operation of the air pump 43. The air intake of the air pump 43 is disposed in the temperature control space 16c, and an air filter 43a is provided at the intake. The air filter 43a prevents dust from being included in the air sent out from the air pump 43.
[0019] As shown in Fig. 4 and Fig. 6, a water guide pipe 44 for guiding water from the water supply pipe 41 is connected to the air supply pipe 42, and the water guide pipe 44 branches off between the pressure reducing valve 41a and the water supply valve 41b of the water supply pipe 41 and is connected to the air supply pipe 42. A water guide valve 45 consisting of a three-way valve is provided in the air supply pipe 42, and the water guide pipe 44 is connected to the air supply pipe 42 by this water guide valve 45. When the water guide valve 45 is opened so that the upstream side and the downstream side of the air supply pipe 42 are connected to each other, air sent from the air pump 43 can be sprayed from the air injection port 52a of the spray nozzle 50. When the water guide valve 45 is opened so that the water guide pipe 44 is connected to the downstream side of the air supply pipe 42, water from the water supply source is supplied from the water supply pipe 41 through the water guide pipe 44 to the air supply pipe 42, and water sent from the water supply source can be sprayed from the air injection port 52a of the spray nozzle 50 through the water guide pipe 44. In addition, a drain pipe 46 is connected to the water supply pipe 41 downstream of the water supply valve 41b, and a drain valve 47 is interposed in the drain pipe 46. By opening the drain valve 47, the water remaining in the water supply pipe 41 is discharged from the drain pipe 46.
[0020] As shown in FIG. 8, the dough conditioner 10 includes a control device 60, which is connected to the circulation fan 17, the temperature sensor 18, the humidity sensor 19, the cooling device 20, the heating device 30, and the humidifying device 40 (the water supply valve 41b, the air pump 43, the water guide valve 45, and the drain valve 47). The control device 60 includes a microcomputer (not shown), which includes a CPU, a RAM, a ROM, and a timer (all not shown) connected via a bus. The control device 60 includes a temperature control program for controlling the temperature in the storage 12, and controls the operation of the cooling device 20 or the heating device 30 based on the temperature detected by the temperature sensor 18. The control device 60 also includes a humidity control program for controlling the humidity in the storage 12, and controls the operation of the cooling device 20 or the humidifying device 40 based on the humidity detected by the humidity sensor 19.
[0021] The control device 60 has a fermentation program stored in the ROM for sequentially executing the processes of freezing (freezing), retarding (refrigerating), preheating, and proofing (fermentation) of the dough in the storage 12. The dough conditioner 10 is also capable of selectively executing at least one of the processes of freezing (freezing), retarding (refrigerating), preheating, and proofing (fermentation). The control device 60 is controlled to execute a temperature adjustment program during freezing (freezing) and retarding (refrigerating), and is controlled to execute a temperature adjustment program and a humidity adjustment program during preheating and proofing (fermentation).
[0022] In the freezing (freezing) process, the temperature in the storage 12 is controlled to -5°C by a temperature regulation program, and in the retard (refrigeration) process, the temperature in the storage 12 is controlled to 0°C to 2°C by a temperature regulation program. In the preheating process, the temperature in the storage 12 is controlled to 15°C to 18°C by a temperature regulation program, and the humidity in the storage 12 is controlled to 75 to 80% by a humidity regulation program. In the proofing (fermentation) process, the temperature in the storage 12 is controlled to 28°C to 35°C by a temperature regulation program, and the humidity in the storage 12 is controlled to 75 to 85% by a humidity regulation program. Note that the temperature and humidity are merely examples, and can be changed depending on the type of bread dough to be fermented, etc.
[0023] The control when the fermentation program is executed will be described below. In the freezing (freezing) process, the control device 60 executes a temperature adjustment program, and when the temperature sensor 18 detects a set upper limit temperature higher than the set temperature of -5°C of the storage 12 (the set upper limit temperature is set, for example, 1°C higher than the set temperature, and the same applies below), the control device 60 operates the cooling device 20, and when the temperature sensor 18 detects a set lower limit temperature lower than the set temperature of -5°C of the storage 12 (the set lower limit temperature is set, for example, 1°C lower than the set temperature, and the same applies below), the control device 60 stops the operation of the cooling device 20. The air in the storage 12 is circulated between the storage 12 and the duct passage 16 by the circulation fan 17, and by executing the temperature adjustment program in the freezing (freezing) process, the air in the storage 12 is cooled by heat exchange with the evaporator 25 of the cooling device 20 in the temperature control space 16c of the duct passage 16, and the temperature in the storage 12 is controlled to be the set temperature of the freezing (freezing) process.
[0024] Three hours after the freeze (refrigeration) process is started, the control device 60 executes the retard (refrigeration) process. In the retard (refrigeration) process, the control device 60 executes a temperature adjustment program, and operates the cooling device 20 when the temperature sensor 18 detects an upper set limit temperature higher than 2°C, which is the set temperature of the storage 12, and stops the operation of the cooling device 20 when the temperature sensor 18 detects a lower set limit temperature lower than 2°C, which is the set temperature of the storage 12. The air inside the storage 12 is circulated between the storage 12 and the duct passage 16 by the circulation fan 17, and by executing the temperature adjustment program in the retard (refrigeration) process, the air inside the storage 12 is cooled by heat exchange with the evaporator 25 of the cooling device 20 in the temperature control space 16c of the duct passage, and the temperature inside the storage 12 is controlled to be the set temperature of the retard (refrigeration) process.
[0025] When a predetermined time has elapsed since the retard (refrigeration) process was started, the control device 60 executes the preheating process. In the preheating process, which is executed in an environment where the room temperature is higher than the set temperature of 18°C, the control device 60 executes a temperature adjustment program, and controls the cooling device 20 to operate when the temperature detected by the temperature sensor 18 detects an upper set limit temperature higher than 18°C, which is the set temperature of the storage 12, and controls the cooling device 20 to stop operating when the temperature detected by the temperature sensor 18 detects a lower set limit temperature lower than 18°C, which is the set temperature of the storage 12.
[0026] In the preheating process, which is performed in an environment where the room temperature is equal to or lower than the set temperature of 18°C, the control device 60 executes a temperature adjustment program to control the heater 31 to operate when the temperature sensor 18 detects a lower set limit temperature lower than 18°C, which is the set temperature of the storage 12, and controls the heater 31 to stop operating when the temperature sensor 18 detects an upper set limit temperature higher than 18°C, which is the set temperature of the storage 12. The air in the storage 12 is circulated between the duct passage 16 by the circulation fan 17, and by executing the temperature adjustment program in the preheating process, the air in the storage 12 is cooled or heated by heat exchange with the evaporator 25 of the cooling device 20 or the heater 31 of the heating device 30 in the temperature-controlled space 16c of the duct passage 16, and the temperature in the storage 12 is controlled to be the set temperature of the preheating process.
[0027] In the preheating step, the control device 60 executes a humidity adjustment program, and when the humidity sensor 19 detects a lower limit humidity setting lower than 75% (the lower limit humidity setting is set, for example, 5% lower than the set humidity, and the same applies below), the control device 60 operates the air pump 43 and controls the water supply valve 41b to open for the spray time of 2 seconds, and water is sprayed in mist form from the spray nozzle 50 into the vertical duct passage 16a. After a predetermined waiting time, the control device 60 operates the air pump 43 and controls the water supply valve 41b to open for the spray time of 2 seconds, and water is sprayed in mist form from the spray nozzle 50 into the vertical duct passage 16a until the humidity sensor 19 detects a higher limit humidity setting lower than 75% (the lower limit humidity setting is set, for example, 5% higher than the set humidity, and the same applies below). The air inside the storage cabinet 12 is circulated between the storage cabinet 12 and the duct passage 16 by a circulation fan 17, and by executing a humidity control program in the preheating process, the air inside the storage cabinet 12 is humidified by water sprayed from the spray nozzles 50 in the vertical duct passage 16a, and the humidity inside the storage cabinet 12 is controlled to be the set humidity in the preheating process.
[0028] When two hours have passed since the start of the preheating process, the control device 60 executes the proofing (fermentation) process. In the proofing (fermentation) process, the control device 60 executes a temperature adjustment program, and controls the heater 31 to operate when the temperature sensor 18 detects a lower set limit temperature lower than 35°C, which is the set temperature of the storage 12, and controls the heater 31 to stop operating when the temperature sensor 18 detects an upper set limit temperature higher than 35°C, which is the set temperature of the storage 12. The air in the storage 12 is circulated between the duct passage 16 by the circulation fan 17, and by executing the temperature adjustment program in the proofing (fermentation) process, the air in the storage 12 is heated by heat exchange with the heater 31 of the heating device 30 in the temperature control space 16c of the duct passage 16, and the temperature in the storage 12 is controlled to be the set temperature of the preheating process.
[0029] In the proofing (fermentation) process, the control device 60 executes a humidity adjustment program, and when the humidity sensor 19 detects a lower limit humidity setting lower than 85% (the lower limit humidity setting is set, for example, 5% lower than the set humidity, and the same applies below), the control device 60 operates the air pump 43 and controls the water supply valve 41b to open for the spray time of 2 seconds, and water is sprayed in mist form from the spray nozzle 50 into the vertical duct passage 16a. After a predetermined waiting time, the control device 60 operates the air pump 43 and controls the water supply valve 41b to open for the spray time of 2 seconds, and water is sprayed in mist form from the spray nozzle 50 into the vertical duct passage 16a until the humidity sensor 19 detects a higher limit humidity setting lower than 85% (the lower limit humidity setting is set, for example, 5% higher than the set humidity, and the same applies below). The air inside the storage cabinet 12 is circulated between the storage cabinet 12 and the duct passage 16 by a circulation fan 17, and by executing a humidity control program in the proofing (fermentation) process, the air inside the storage cabinet 12 is humidified by water sprayed from the spray nozzles 50 in the vertical duct passage 16a, and the humidity inside the storage cabinet 12 is controlled to be the set humidity for the proofing (fermentation) process.
[0030] In this dough conditioner 10, at the start of the fermentation program and at the start of the freezing process, the drain valve 47 is controlled to be opened to drain the water remaining in the water supply pipe 41. By draining the water remaining in the water supply pipe 41, it is possible to prevent the water remaining in the water supply pipe 41 from freezing when the freezing process is performed. In addition, at the start of the fermentation program and at the start of the freezing process, the water valve 45 consisting of a three-way valve is controlled to be opened for 10 seconds so that the water supply pipe 44 communicates with the downstream side of the air supply pipe 42. Water sent from the water supply source to the water supply pipe 41 is sent to the air supply pipe 42 through the water supply pipe 44, and the water sent to the air supply pipe 42 is sprayed from the air injection port 52a of the spray nozzle 50. The air injection port 52a of the spray nozzle 50 is cleaned including clogging with dust by the injected water, so that the air injection port 52a of the spray nozzle 50 can remove clogging with dust that remains even when air is injected.
[0031] In this embodiment, at the start of the fermentation program and at the start of the freezing process when only the freezing process is performed, the water guide valve 45 is controlled to open for 10 seconds so that the water guide pipe 44 communicates with the downstream side of the air supply pipe 42, and the air injection port 52a of the spray nozzle 50 cleans clogging caused by dust with the injected water. The present invention is not limited to this, and the water guide valve 45 may be controlled to open for 10 seconds so that the water guide pipe 44 communicates with the downstream side of the air supply pipe 42 every certain time (for example, 6 hours) when the fermentation program of the dough conditioner 10 is not being performed, and the air injection port 52a of the spray nozzle 50 cleans clogging caused by dust with the injected water.
[0032] In this embodiment, the water guide pipe 44 is branched from the upstream side of the water supply valve 41b in the water supply pipe 41, but this is not limited thereto. As shown in FIG. 9, the water guide pipe 44 may be branched from the downstream side of the water supply valve 41b in the water supply pipe 41. When the water guide pipe 44 is branched from the downstream side of the water supply valve 41b in the water supply pipe 41, the water supply valve 41b is opened and the water guide valve 45 is controlled to be opened for 10 seconds so that the water guide pipe 44 and the downstream side of the air supply pipe 42 are in communication with each other. Since water is sprayed not only from the air nozzle 52a of the spray nozzle 50 but also from the water nozzle 51a, the water nozzle 51a and the air nozzle 52a of the spray nozzle 50 can be washed at the same time.
[0033] Also, as long as the water guide valve 45 is one that allows or blocks the passage of water supplied from the water supply pipe 41 through the water guide pipe 44 to the air supply pipe 42, it may be one in which the water guide valve 45 is a three-way valve provided in the water supply pipe 41 as shown in Fig. 10. Similarly, as shown in Fig. 11, the water guide valve 45 may be an electromagnetic valve provided in the water guide pipe 44. In these cases, by providing a check valve 48 upstream of the connection of the air supply pipe 42 to the water guide pipe 44, it is possible to prevent the water delivered from the water guide pipe 44 from flowing into the air pump 43.
[0034] The dough conditioner 10 constructed as described above comprises a storage compartment 12 for storing items such as bread dough, and a humidifier 40 for humidifying the inside of the storage compartment 12. The humidifier 40 comprises a two-fluid spray nozzle 50 having a water nozzle 51a for spraying water and an air nozzle 52a for spraying air, a water supply pipe 41 for supplying water to the spray nozzle 50, an air supply pipe 42 for supplying air to the spray nozzle 50, and an air pump 43 for sending air to the spray nozzle 50 via the air supply pipe 42.
[0035] As shown in Fig. 12, in the two-fluid type spray nozzle 50A that sprays water and air from the same nozzle 50Aa, the water and air are mixed and sprayed from the nozzle 50Aa, so that the nozzle 50Aa is less likely to be clogged with dirt such as dust. In contrast, the spray nozzle 50 used in the dough conditioner 10 of this embodiment is a two-fluid type spray nozzle having a water nozzle 51a that sprays water and an air nozzle 52a that sprays air, and there was a risk that dirt such as dust would be clogged in the air nozzle 52a. If dirt such as dust is clogged in the air nozzle 52a, air cannot be sprayed sufficiently, and air cannot be sprayed into the water sprayed from the water nozzle 51a, so that water cannot be sprayed in a mist form from the spray nozzle 50.
[0036] The dough conditioner 10 is provided with a water guide pipe 44 for leading water from the water supply pipe 41 to the air supply pipe 42, and a water guide valve 45 for passing or blocking water supplied from the water supply pipe 41 to the air supply pipe 42 through the water guide pipe 44. By opening the water guide valve 45 to pass water supplied from the water supply pipe 41 to the air supply pipe 42 through the water guide pipe 44, the water can be sprayed from the air injection port 52a of the spray nozzle 50, and dust clogged in the air injection port 52a of the spray nozzle 50 can be removed by the sprayed water. In this way, dust clogged in the air injection port 52a of the spray nozzle 50 can be removed with a simple structure without using a large high-pressure air pump, so that the dough conditioner 10 can be prevented from becoming large by arranging a large air pump in the machine room 13.
[0037] The dough conditioner 10 also includes a humidity control program for controlling the humidity inside the storage 12, and the humidity control program is executed in the preheating and proofing steps of the fermentation program. When the humidity control program is executed in the preheating and proofing steps, the water guide valve 45 is not controlled to be opened so as to pass water supplied from the water supply pipe 41 through the water guide pipe 44 to the air supply pipe 42, and when the humidity control program is not executed in the preheating and proofing steps, the water guide valve 45 is controlled to be opened so as to pass water supplied from the water supply pipe 41 through the water guide pipe 44 to the air supply pipe 42. In this embodiment, when the humidity control program is not executed, such as when the fermentation program is started or when only the freezing step is started, the water guide valve 45 is controlled to be opened so that the water guide pipe 44 and the air supply pipe 42 are in communication with each other, and the water in the water supply pipe 41 is guided to the air supply pipe 42 through the water guide pipe 44. This makes it possible to remove dust clogging the air injection port 52a of the spray nozzle 50 without affecting the humidity control in the storage 12 when a humidity control program such as preheating and proofing (fermentation) is being executed. [Explanation of symbols]
[0038] 10...humidity control cabinet (dough conditioner), 12...storage cabinet, 40...humidifier, 41...water supply pipe, 42...air supply pipe, 43...air pump, 44...water conduit, 45...water conduit valve, 50...spray nozzle, 51a...water nozzle, 52a...air nozzle.
Claims
1. A storage unit for storing items; A humidifying device for humidifying the inside of the storage compartment, The humidifier is a humidity adjusting chamber including a two-fluid type spray nozzle having a water nozzle for spraying water and an air nozzle for spraying air, a water supply pipe for supplying water to the spray nozzle, an air supply pipe for supplying air to the spray nozzle, and an air pump for sending air to the spray nozzle through the air supply pipe, a water supply pipe for guiding water from the water supply pipe to the air supply pipe; a water valve for allowing or blocking the passage of water supplied from the water supply pipe through the water guide pipe to the air supply pipe.
2. In the humidity control cabinet according to claim 1, A humidity control program is provided for controlling the humidity inside the storage unit, This humidity control cabinet is characterized in that when the humidity control program is not being executed, the water guide valve is controlled to open so as to pass water supplied from the water supply pipe through the water guide pipe to the air supply pipe.
Citation Information
Patent Citations
Storage
JP2020026913A
