Partition structure and construction method of partition structure

The compartment structure with air mortar-filled ribs and gap fillers in flat decks addresses fire hazards by enhancing fire resistance and simplifying construction, using a flat deck and partitioning materials to prevent flame and smoke spread.

JP2024135554APending Publication Date: 2024-10-04SEKISUI CHEMICAL CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023046306
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-23
Publication Date
2024-10-04

AI Technical Summary

Technical Problem

Existing flat decks with protruding ribs in building structures pose a fire hazard due to hollow portions acting as pathways for flames and smoke, and injecting foam at construction sites is inefficient and costly.

Method used

A compartment structure using a flat deck with ribs filled with air mortar and partitioning materials like gypsum boards, where air mortar is injected into the ribs and sealed with gap fillers to enhance fire resistance and airtightness, and a construction method involving laying the flat deck, filling ribs with air mortar, and placing partitioning materials.

Benefits of technology

The structure provides excellent fire resistance and ease of on-site construction by using air mortar-filled ribs and gap fillers, preventing flame and smoke spread, while reducing the need for on-site heating and material wastage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024135554000001_ABST
    Figure 2024135554000001_ABST
Patent Text Reader

Abstract

To provide a partition structure which uses a flat deck, is excellent in fire resistance, and facilitates on-site construction, and a construction method of the partition structure.SOLUTION: A partition structure is provided with: a flat deck 11 having a flat part 11F and a plurality of ribs 12 protruding from one surface 11D of the flat part 11F and having cavities therein; a partition member 20 placed on the one surface 11D side of the flat deck 11; and an air mortar 30 filling at least one place inside the ribs 12.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a compartment structure in which a flat deck is used and a construction method for the compartment structure. [Background technology]

[0002] Conventionally, flat decks have been used to pour concrete in architectural structures such as reinforced concrete and steel-reinforced concrete (see, for example, Patent Document 1). The flat deck forms, for example, the base of a ceiling surface or a floor, and may be butted against a partition material such as gypsum board to form a partition structure together with the partition material. The partition material is generally attached to a support frame consisting of horizontal and vertical bars.

[0003] A flat deck may have a rib with an internal cavity protruding from one side to provide its own strength. When a rib with an internal cavity protruding from one side of the flat deck is provided, the hollow portion of the rib may become a passageway for flames and smoke in the event of a fire in the building, which may cause the fire to spread. To solve this problem, a flat deck has been proposed in which urethane foam is injected into the hollow portion of the rib (see, for example, Patent Document 2). Because there are economic issues with injecting urethane foam into all of the hollow spaces in the ribs, it is desirable to inject urethane foam at the construction site only into the areas where ribs are needed. However, if urethane foam is injected at the construction site into the areas where ribs are needed, it must be heated to promote foaming, which creates the problem of having to spend time and effort on heating at the construction site. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2017-110453 A [Patent Document 2] JP 2020-139321 A Summary of the Invention [Problem to be solved by the invention]

[0005] Therefore, an object of the present invention is to provide a compartment structure in which a flat deck is used, which has excellent fire resistance and is easy to construct on site, and a construction method for the compartment structure. [Means for solving the problem]

[0006] The gist of the present invention is as follows. [1] A partition structure comprising: a flat deck having a flat portion and a plurality of ribs protruding from one surface of the flat portion and having a cavity therein; a partition material arranged on the one surface side of the flat deck; and air mortar filling at least one portion inside the ribs. [2] The compartment structure described in [1], wherein the compartment material is one selected from the group consisting of gypsum board, extruded cement board, lightweight aerated concrete, precast concrete board and glass fiber reinforced concrete board. [3] A partition structure described in [1] or [2], wherein a plurality of cutouts are provided on the end surface of the partition material, and the end surface of the partition material is abutted against one surface of the flat deck so that the rib is positioned inside each of the cutouts. [4] The compartment structure described in [3], wherein the gap between the rib and the notch is filled with a gap filler. [5] The compartment structure described in [4], wherein the gap filling material is one selected from rock wool and glass wool. [6] A method for constructing a partition structure, comprising the steps of: laying a flat deck on an architectural structure, the flat deck having a flat portion and a plurality of ribs with internal cavities protruding from one side of the flat portion; filling at least one of the ribs of the flat deck laid on the architectural structure with air mortar; and placing a partition material on the one side of the flat deck. Effect of the Invention

[0007] According to the present invention, it is possible to provide a compartment structure in which a flat deck is used, which has excellent fire resistance and is easy to construct on site, and a construction method for the compartment structure. [Brief description of the drawings]

[0008] [Figure 1] 1 is a cross-sectional view showing an arrangement of a flat deck and partition materials in a compartment structure according to a first embodiment of the present invention. [Diagram 2] 1 is a perspective view showing a compartment structure according to a first embodiment of the present invention. [Diagram 3] FIG. 4 is a cross-sectional view showing the arrangement of a flat deck and partition materials in a compartment structure according to a second embodiment of the present invention. [Figure 4] A cross-sectional view showing the arrangement of a flat deck and partition materials in a compartment structure according to another embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] (First embodiment) [Parcel Structure] A compartment structure 10 according to a first embodiment of the present invention includes a flat deck 11, a compartment material 20, and air mortar 30, as shown in FIG.

[0010] The flat deck 11 has a flat portion 11F with an upper surface 11U being a flat surface or a flat surface with minute projections and recesses, and a plurality of ribs 12 are protrudingly provided on a lower surface 11D of the flat portion 11F. Each rib 12 is a protrusion with a cavity inside, and is arranged extending along the longitudinal direction, and both ends 12A, 12B in the longitudinal direction may be crushed and closed. The flat deck 11 can be obtained, for example, by roll forming or press forming a metal plate such as a steel plate or other material. The cross-sectional shape of the rib 12 of the flat deck 11 is a triangle consisting of a side surface 12S and a bottom surface 12D in FIG. 1, but is not particularly limited as long as a cavity is formed inside, and may be other shapes such as a rectangle, a circle, or an ellipse.

[0011] The flat deck 11 is laid on a building structure or the like and is used to form a floor structure, a roof structure, etc. As shown in Fig. 2, for example, both ends in the longitudinal direction of the flat deck 11 are placed on supports 14, 14 such as beams, and the flat deck 11 is erected between the supports 14, 14 to form a floor structure, a roof structure, etc. For example, concrete (not shown) is poured onto an upper surface 11U of the flat portion 11F of the flat deck 11.

[0012] The partition material 20 is a member for forming a partition in an architectural structure. Examples of the partition material 20 include gypsum board, extruded cement board, lightweight aerated concrete (ALC) board, precast concrete (PC) board, glass fiber reinforced concrete (GRC) board, lightweight wood wool cement board, wood chip cement board, metal sandwich panel, calcium silicate board, slate board, concrete, brick, glass, and metal board (e.g., aluminum, iron), etc. Among them, from the viewpoint of fire resistance and workability, it is preferable that the partition material 20 is one selected from the group consisting of gypsum board, extruded cement board, lightweight aerated concrete, precast concrete board, and glass fiber reinforced concrete board. In this embodiment, as shown in Fig. 2, a partition material 20 made of gypsum boards 21, 21 is shown. The gypsum boards 21, 21 can form a wall 25 in an architectural structure. A support frame 26 is provided on the wall 25 and installed in the architectural structure. The support frame 26 is a frame-shaped member made of, for example, horizontal bars extending horizontally and vertical bars extending vertically, and the gypsum boards 21, 21 are fixed to both sides of the support frame 26 by fixing members such as screws. The partition material 20 may be fixed to a support such as a support frame 26 so as to be in contact with the bottom surface 12D of the rib 12 (not shown), or it may be fixed without contact so as to leave a gap, as shown in FIG. 1. Furthermore, the support frame 26 may be omitted or another support may be used instead depending on the type of the partition material 20. Furthermore, the partition material 20 may be fixed to the bottom surface 12D of the rib 12.

[0013] The air mortar 30 is filled into the cavity inside each rib 12 of the flat deck 11. The air mortar 30 may be filled, for example, throughout the entire cavity inside the rib 12. The air mortar 30 may be injected from an injection port 13 provided on the side of the rib 12, for example, as shown in FIG. 2, and cured and hardened inside the rib 12. The number of injection ports 13 for injecting the air mortar 30 is not limited to one, and may be multiple, and it is preferable to provide multiple injection ports. Since the air mortar 30 generally does not have high fluidity, providing multiple injection ports 13 makes it easier to fill a wide range of the rib 12. When two injection ports 13 are provided, for example, they may be provided between the center and end portions in the longitudinal direction of the rib 12 so as to sandwich the center portion in the longitudinal direction of the rib 12. However, the position of the injection port 13 is not particularly limited, and may be other than this. Furthermore, the injection port 13 is not limited to being provided on the side surface of the rib 12 as shown in FIG.

[0014] The air mortar 30 is a material in which foamed air bubbles are mixed into a slurry-like mortar, and since it is in a slurry state at room temperature (23°C), it is possible to fill the inside of the rib 12 at room temperature. The air mortar 30 hardens by curing at room temperature, so heating work at the construction site can be omitted. The air mortar 30 filled inside the ribs 12 exhibits sealing properties against flames and smoke caused by a fire, etc., and ensures fire resistance and airtightness in the compartment structure 10. In addition, the air mortar 30 filled inside the ribs 12 also exhibits a function as a heat insulating layer, and can prevent the transmission of heat through the ribs 12.

[0015] In this embodiment, the compartment structure 10 may include a gap filling material 40. When the flat deck 11 is placed on the compartment material 20, a gap generally occurs between the flat deck 11 and the compartment material 20 due to variations in the height of the ribs 12, deformation of the ribs 12, variations in the surface of the compartment material 20 on which the flat deck 11 is placed, and the like. The gap filling material 40 fills the gap between the flat deck 11 and the compartment material 20 that occurs when the flat deck 11 is placed on the compartment material 20. Specifically, the gap filling material 40 fills at least the gap between the lower surface 11D of the flat portion 11 and the compartment material 20.

[0016] 1, for example, the partitioning material 20 is arranged so as not to contact the bottom surface 12D of the rib 12, and a gap may occur between the bottom surface 12D of the rib 12 and the partitioning material 20. In addition, as described above, the shape of the rib 12 of the flat deck 11 may be various, and even if the partitioning material 20 is fixed so as to contact the bottom surface 12D of the rib 12, a gap may occur between the bottom surface 12D of the rib 12 and the partitioning material 20 due to design error or manufacturing error of the rib 12. Therefore, it is preferable that the gap filling material 40 also fills the gap that occurs between the bottom surface 12D of the rib 12 and the partitioning material 20. 1, the gap filling material 40 may be used to fill the gaps between the underside 11D of the flat portion 11F and the outer surfaces (side surfaces 12S, bottom surfaces 12D) of the ribs 12 and the partition material 20. In this way, by filling the gaps that arise around the ribs 12 when the flat deck 11 is placed on the partition material 20 with the gap filling material 40, sealing properties against flames and smoke caused by a fire or the like are exhibited, and fire resistance and airtightness of the partition structure 10 are ensured.

[0017] From the viewpoint of enhancing fire resistance, the gap filling material 40 is preferably a fire-resistant material. The fire-resistant material means a material that exhibits performance equivalent to a fire-retardant material (hereinafter referred to as a "fire-retardant material") as defined in the Building Standards Act and the Enforcement Order of the Building Standards Act, but it is preferably a material that exhibits performance equivalent to a quasi-fire-retardant material (hereinafter referred to as a "semi-fire-retardant material"), and more preferably a material that exhibits performance equivalent to a fire-retardant material (hereinafter referred to as a "fire-retardant material"). The performance equivalent to a fire-retardant material means a material that exhibits a radiant heat intensity of 50 kW / m in a heat generation test using a cone calorimeter tester in accordance with ISO5660-1. 2 When heated at 40°C, the total heat generated after 5 minutes is 8MJ / m 2 In addition, performance equivalent to semi-noncombustible materials means that the total heat generated after 10 minutes is 8MJ / m 2 In addition, performance equivalent to non-combustible materials means that the total heat generated after 20 minutes is 8 MJ / m 2 This refers to the following:

[0018] Examples of the gap filling material 40 include inorganic fire-resistant materials and organic fire-resistant materials, and specific examples thereof include fire-resistant putty, fire-resistant fiber materials, and flame-retardant foams. The fireproof putty may be inorganic or organic, and may be a known heat-expandable or non-heat-expandable clay-like fireproof material. Also, it may be an organic binder containing a heat-expandable material, a flame retardant, or the like. Examples of fire-resistant fiber materials include rock wool and glass wool. Examples of the flame-retardant foam include urethane foam, phenol foam, styrene foam, PVC foam, and polyolefin foam such as polyethylene foam, and urethane foam is preferable. The urethane foam as the flame-retardant foam may be the same as the air mortar 30 filling the inside of the rib 12.

[0019] [Construction method of compartment structure] The construction method for the compartment structure according to this embodiment includes the following steps (A) to (C). (A) A process of laying a flat deck having a flat portion and a plurality of ribs protruding from one surface of the flat portion and having a cavity therein, on a building structure. (B) The process of filling the ribs of a flat deck laid on a building structure with air mortar. (C) A process of placing partition material on one side of the flat deck where the ribs are provided.

[0020] In this embodiment, in step (A), first, a flat deck 11 having ribs 12 formed thereon is prepared. Specifically, for example, the flat deck 11 is produced by a known method, and the injection port 13 is formed in the ribs 12 of the flat deck 11. The flat deck 11 having the injection port 13 formed therein is then laid on a building structure. For example, the flat deck 11 may be laid across supporting members 14, 14 such as beams, as shown in FIG.

[0021] In step (B), a slurry-like air mortar 30 is injected into the cavity inside the rib 12 of the flat deck 11 laid on the building structure through an injection port 13, and the air mortar 30 is cured and hardened inside the rib 12. Before installing a partition material such as a wall or a duct through which an insert passes, at least a portion of the rib 12 that interferes with the partition material or the duct may be cut and removed. In such a case, in step (B), a slurry-like air mortar 30 may be injected into the cavity inside the rib 12 from the cut surface of the rib 12, and the air mortar 30 may be cured and hardened inside the rib 12.

[0022] In step (C), the partition material 20 is placed on one surface of the flat deck 11 on which the ribs 12 are provided. Specifically, the gypsum board 21 is placed so that its upper end surface 21U faces the bottom surface 12D of the ribs 12 of the flat deck 11. Then, in this state, the gypsum board 21 may be attached to a support frame 26 installed inside the architectural structure by using fixing members such as screws.

[0023] After step (C), a step of filling gaps 23 between the underside 11D of the flat portion 11F and the outer surfaces (side surfaces 12S, bottom surfaces 12D) of the ribs 12 and the gypsum board 21 (compartment material 20) with gap filling material 40 may be included.

[0024] As described above, in this embodiment, by adopting a flat deck with air mortar 30 filled inside the ribs 12, a compartment structure 10 can be constructed that has excellent fire resistance and is easy to construct on site.

[0025] Generally, a plurality of flat decks are installed in a building, but it is not necessary to fill the ribs 12 of all the flat decks 11 with the air mortar 30, and it is sufficient to fill only the flat decks 11 that form the compartment structure with the air mortar 30. In this embodiment, the air mortar 30 is filled into the ribs 12 by on-site construction, so that it is possible to fill only the necessary flat decks 11 with the air mortar 30, and it is possible to prevent unnecessary filling of the air mortar 30.

[0026] Furthermore, the flat deck 11 is provided with a plurality of ribs 12, and although it is usually preferable to fill all of the ribs 12 with the air mortar 30, it is not necessary to fill all of the ribs 12 with the air mortar 30. For example, when a compartment structure is formed by only a portion of the flat deck 11, it is sufficient to fill only the ribs 12 in the portion that forms the compartment structure with the air mortar 30.

[0027] Furthermore, in the above description, it has been assumed that the air mortar 30 is filled throughout the entire rib 12, but it is not necessary to fill the entire rib 12 with the air mortar 30, and for example, the air mortar 30 may be filled only in a portion inside the rib 12. Specifically, it is sufficient that the entire cross section (cross section perpendicular to the longitudinal direction) of the rib 12 is filled with the air mortar 30, and the inside of the rib 12 may have a portion that is not filled with the air mortar 30. However, from the viewpoint of preventing flames from spreading and heat from propagating in the event of a fire, it is preferable that the entire cross section of the rib 12 is filled with air mortar 30 in as many areas as possible, and it is preferable that the entire cross section of the rib 12 is filled with air mortar 30 in the total length of each rib 12, for example, 50% or more of the total length of the rib 12 filled with air mortar 30.

[0028] Second embodiment Next, a second embodiment of the present invention will be described in detail. The second embodiment differs from the first embodiment in that, as shown in FIG. 3, a plurality of notches 22 are provided in the upper end surface 21U of the gypsum board 21 (compartment material 20), and a rib 12 is disposed inside each of the notches 22. Below, the differences between the first embodiment and the second embodiment will be described. Also, parts whose description is omitted are the same as those in the first embodiment. Also, in the following description, members having the same configuration as those in the first embodiment will be given the same reference numerals.

[0029] As shown in Figure 3, the gypsum board 21 has a plurality of notches 22 formed in its upper end surface 21U, and the upper end surface 21U is abutted against the lower surface 11D that constitutes one side of the flat deck 11 so that the ribs 12 are positioned inside each of the notches 22. A gap 23 is provided between the outer surface (side surface 12S, bottom surface 12D) of the rib 12 of the flat deck 11 and the notch 22, and the gap 23 is filled with a gap filling material 40.

[0030] As described above, in this embodiment, the same effects as in the first embodiment can be obtained. In addition, in this embodiment, a plurality of notches 22 are provided on the end face 21U of the partition material 20, and ribs 12 are arranged inside the notches 22, thereby narrowing the gaps 23 between the partition material 20 and the ribs 12, thereby reducing the amount of gap filling material 40 used and making it easier to fill the gaps with the gap filling material 40. In this embodiment, a configuration in which a gap is provided between the partitioning material 20 and the bottom surface 12D has been described as an example, but there does not have to be a gap between the partitioning material 20 and the bottom surface 12D.

[0031] (Other embodiments) The present invention is not limited to the configurations of the above-described embodiments, and any improvements and modifications may be made without departing from the technical spirit of the present invention. For example, in the second embodiment, the upper end surface 21U of the gypsum board 21 (compartment material 20) is abutted against the lower surface 11D constituting one side of the flat deck 11, but as shown in Fig. 4, the upper end surface 21U and the lower surface 11D may be arranged via a gap filling material 40. In this embodiment, the gap 23 between the lower surface 11D constituting one side of the flat deck 11 and the upper end surface 21U of the partition material 20 is filled with the gap filling material 40, so that good sealing can be achieved even if the shapes of the lower surface 11D constituting one side of the flat deck 11 and the upper end surface 21U of the partition material 20 do not match. In the first and second embodiments, the gap filling material 40 may be a fire-resistant putty, a fire-resistant fiber material, a flame-retardant foam, or the like, either singly or in combination. [Explanation of symbols]

[0032] 10 Compartment structure 11 Flat Deck 11F Flat area 11D Bottom surface (one side) 11U top 12 Ribs 13 Inlet 14 Support material 20 Partition material 21 Gypsum board 21U top surface 22 Cutout 23 Gap 25. Wall 26 Support frame 30 Air Mortar 40 Gap filling material

Claims

1. A flat deck having a flat portion and a plurality of ribs protruding from one surface of the flat portion and having a cavity therein; A partition material disposed on the one surface side of the flat deck; and air mortar filling at least one portion of the interior of the rib.

2. 2. The compartment structure according to claim 1, wherein the compartment material is one selected from the group consisting of gypsum board, extruded cement board, lightweight aerated concrete, precast concrete board, and glass fiber reinforced concrete board.

3. The compartment structure according to claim 1 , wherein a plurality of notches are provided on the end surface of the partition material, and the end surface of the partition material is abutted against one surface of the flat deck so that the rib is positioned inside each of the notches.

4. The compartment structure of claim 3 , wherein the gap between the rib and the notch is filled with a gap filler.

5. The compartment structure according to claim 4 , wherein the gap filling material is one selected from rock wool and glass wool.

6. A step of laying a flat deck having a flat portion and a plurality of ribs protruding from one surface of the flat portion and having a cavity therein, on a building structure; A step of filling at least one of the ribs of the flat deck laid on the building structure with air mortar; A construction method for a compartment structure, comprising the step of placing a compartment material on said one side of said flat deck.

Citation Information

Patent Citations

  • Reinforcing method for construction member

    JP1991151433A

  • Compound floor slab made of structural steel

    JP2000273997A

  • Partition structure, and construction method of the same

    JP2020139321A

  • Structure and construction method of structure

    JP2022133992A

  • Flat deck, structure and method for constructing the same

    JP2022138760A