Handling method of form of concrete mold device

By connecting foam members with hinges for integrated handling and transportation, the method addresses the inefficiencies of conventional top form assembly, reducing construction time and stabilizing the formwork device assembly process.

JP2024135965AActive Publication Date: 2024-10-04SHIMAKOGYO HD CO LTD

Patent Information

Application Number
JP2023046896
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-23
Publication Date
2024-10-04
Estimated Expiration
2043-03-23

AI Technical Summary

Technical Problem

The conventional method of transporting and assembling top forms for tunnel lining concrete formwork devices is cumbersome due to their large and heavy components, requiring separate handling and assembly at the construction site, which prolongs the construction period.

Method used

The method involves connecting foam members with hinges to facilitate integrated handling and transportation, allowing for assembly and disassembly of the formwork device on the ground, reducing the need for individual handling and site assembly.

Benefits of technology

This approach reduces the time required for handling and assembling the formwork device, thereby shortening the tunnel construction period and enabling stable, efficient transportation and assembly of the top forms.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024135965000001_ABST
    Figure 2024135965000001_ABST
Patent Text Reader

Abstract

To provide a handling method to shorten a construction period of liner concrete of a tunnel.SOLUTION: A handling method constructs liner concrete of a tunnel suing forms on support devices installed on a ground surface T1 of the tunnel. A center form member 211 and end part form members 212 configuring a form 21 at the outside of the concrete form device are connected with hinges 41. The form 21 is to be assembled on the support devices so as to be formed in an arch shape, being developed through rotation of hinges 41 at the outside of the support device. And, the form 21 is formed in an arch shape through rotation of the hinges by lifting up the center form member 211 of the form 21 in a developed state.SELECTED DRAWING: Figure 15
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a concrete formwork device having a form for forming secondary lining concrete (hereinafter referred to as lining concrete) on the inner circumferential surface of a tunnel. In particular, the present invention relates to a method for handling the form of the concrete formwork device. [Background technology]

[0002] For example, Patent Document 1 discloses a concrete formwork device having forms for forming tunnel lining concrete. The forms include an arch-shaped top form located at the top of the concrete formwork device, arc-shaped side forms located on both sides, and an arc-shaped invert form located below them. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-166312 A Summary of the Invention [Problem to be solved by the invention]

[0004] The top form is usually made up of a central foam member and a pair of end foam members connected to both ends. Since the arch diameter of the top form is large, it cannot be stored in the truck bed when laid down. Also, it is unstable when standing upright.

[0005] Therefore, in the past, when the top form was transported to the tunnel construction site, the central foam member and the pair of end foam members were loaded on the truck bed in a separated state. Therefore, the separated central foam member and end foam members were individually unloaded from the truck bed at the tunnel construction site, and then joined by workers at the site to form the top form. Then, the top form was assembled to the formwork device. However, since the central foam member and end foam members are large and heavy for workers, the joining work was time-consuming and almost painful.

[0006] Therefore, in the past, this increased the amount of work required at the tunnel construction site, which led to a longer construction period for the tunnel. [Means for solving the problem]

[0007] The method of handling forms for a concrete formwork device of the present invention is characterized in that, during at least one of the construction and dismantling of a concrete formwork device in which a tunnel lining concrete is formed using a form on a support device installed on the ground of a tunnel, a plurality of form members constituting the form are handled while being connected by hinges.

[0008] Here, handling of the form does not include handling of the form when it is attached to the concrete form apparatus. Furthermore, construction and dismantling of the concrete form apparatus includes transportation of the form and the form members that compose the form for construction and dismantling, and movement between processes.

[0009] In the above method, the foam to be handled is handled in a state where multiple foam members are connected by hinges. Therefore, multiple foam members can be handled as a whole during truck transportation, etc., reducing the labor required for loading and unloading the foam. Therefore, the time required for handling the concrete formwork device in tunnel construction can be shortened. Effect of the Invention

[0010] According to the present invention, the time required to handle the concrete formwork device can be shortened, thereby providing the effect of shortening the construction period for tunnel construction. [Brief description of the drawings]

[0011] [Figure 1] Front cross-sectional view showing the pouring state of lining concrete. [Diagram 2] FIG. 2 is a side view showing the foam unit in an assembled state. [Diagram 3] FIG. 4 is a front cross-sectional view showing the formwork device in a state where the lower legs are not connected. [Figure 4] FIG. [Diagram 5] FIG. 1 is a perspective view showing the arch-shaped foam placed on the ground. [Figure 6] 1 is a perspective view showing the state in which the top form is assembled onto the support device from above the ground. [Figure 7] In the first embodiment, (a) is a perspective view showing the top form in an unfolded state and loaded on a truck bed, and (b) is a partial perspective view showing the support structure of the top form with respect to the end stand. [Figure 8] FIG. 1A is an oblique view showing the unfolded top form placed on the ground, and FIG. 1B is a partial oblique view showing the support structure of the top form relative to the central stand. [Figure 9] FIG. 11 is a perspective view of the hinge portion when the top form is in the unfolded state. [Figure 10] FIG. 13 is a perspective view of the hinge portion when the top form is in an arch shape. [Figure 11] FIG. [Figure 12] FIG. [Figure 13] FIG. [Figure 14] FIG. [Figure 15]FIG. 1(a) is a side view showing the top form in an unfolded state on the ground, and FIG. 1(b) is a side view showing the top form in an arched state on the ground. [Figure 16] In the second embodiment, (a) is a perspective view showing a state in which the top form is unfolded and loaded on a truck bed, and (b) is a partial perspective view showing a receiving metal fitting portion. [Figure 17] (a) is an oblique view showing the top form in an unfolded state placed on the ground, and (b) is a cross-sectional view showing the top form in a lifted state. [Figure 18] (a) is a side view showing the top form on the ground before the end foam members are assembled, (b) is a side view showing the top form with the end foam members assembled, and (c) is a side view showing the top form in an arched state on the ground. [Figure 19] In the third embodiment, (a) is a simplified cross-sectional view showing half of the top form in an unfolded state, and (b) is a simplified cross-sectional view showing half of the top form in an arch-shaped state. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. <Configuration and Construction Method of Concrete Formwork Device> First, the configuration and construction method of the concrete formwork device will be described mainly with reference to Figs. 1 to 4.

[0013] 1 and 2, the formwork device 11 includes a gantry-shaped support device 12 installed on the ground surface T1 of the tunnel T, and a plurality of curved arch-shaped form units 13 supported on the support device 12. A plurality of form units 13 are arranged side by side along the extension direction of the tunnel T. The lining concrete C is formed on the inner peripheral surface of the tunnel T by the form units 13 arranged side by side.

[0014] As shown in Figures 1 and 2, the form unit 13 has a shallow arch-shaped top form 21 located on the top of the formwork device 11. The form unit 13 has arc-shaped side forms 22 located on both sides of the top form 21, and an arc-shaped invert form 23 located on the lower side of the side forms 22. As shown in Figures 2 and 4, each of the forms 21, 22, 23 has a face plate 24 (see Figures 9 and 10) on its outer periphery. The face plate 24 has an opening 25 for inspection, etc., and a cover plate 26 is fitted into the opening 25 to close the opening 25.

[0015] As shown in Fig. 1, when constructing the formwork device 11, a support device 12 is assembled on the ground T1 of the tunnel T. Then, a form unit 13 is supported on the support device 12. The support device 12 has legs 14 on both the left and right sides. Wheels 17 at the lower ends of lower leg bodies 16 connected to the undersides of the legs 14 are supported on rails 18 on the ground T1 of the tunnel T. As shown in Fig. 3, before the lower leg bodies 16 are connected to the legs 14, auxiliary legs 19 are attached to both the left and right sides of the legs 14.

[0016] As shown in Fig. 3, a beam member 15 is installed between the upper ends of the legs 14. Then, a top form 21, a side form 22, and an invert form 23 are attached to the beam member 15 in this order, via various intermediate members 20 (not shown in Figs. 1 and 3) as shown in Fig. 6. The top form 21 is attached to the beam member 15 of the support device 12 before the lower leg body 16 is connected. Thereafter, the auxiliary legs 19 are removed, and the lower leg body 16 is attached in a state in which the support device 12 is raised by a jack (not shown). Then, the side forms 22 are attached to both ends of the top form 21, and then the invert form 23 is attached to the lower end of the side form 22.

[0017] <Heaven Form Composition> As shown in Figures 3 and 4, the top foam 21 is composed of a central foam member 211 and end foam members 212. The end foam members 212 are connected to both ends of the central foam member 211. Both foam members 211, 212 have side plates 27 on both sides of the back surface of the base plate 24. The central foam member 211 has end plates 28 on both ends of the back surface of the base plate 24. The end foam member 212 has end plates 29, 30 on both ends of the base plate 24, and one end plate 29 is connected to the end plates 28 on both ends of the central foam member 211 by bolts and nuts (hereinafter, this combination will be simply called bolts) 31. A hinge plate 32 is fixed to the other end plate 30 of the end foam member 212 for connecting to the side foam members 22 by hinges 33 (see Figures 1 and 14).

[0018] How to handle the top form Next, a method of handling the top form of the first embodiment will be described. As shown in Figures 4 to 6, when constructing the formwork device 11, the top form 21 is erected on the ground surface T1 of the tunnel T with both ends facing down. In this state, the rope S of the crane R is passed through the central opening 25 of the top form 21. A hanging fitting K located on the underside of the top form 21 is detachably attached to the lower end of the rope S.

[0019] 5 and 6, the crane R raises the hoisting fitting K via the rope S, and the top form 21 is lifted through the engagement between the hoisting fitting K and the inner edge of the opening 25. In this state, the top form 21 is moved to the support device 12 as the crane R rotates, and is assembled onto the support device 12. Normally, the opening 25 is closed by a cover plate 26, but when the top form 21 is suspended by the hoisting fitting K, the cover plate 26 of the opening 25 in the center of the top form 21 is removed. When the suspension is completed, the opening 25 is closed by the cover plate 26.

[0020] When the top form 21 is to be removed in conjunction with the dismantling of the formwork device 11, the above-described operations are carried out in reverse order. That is, the top form 21 is lifted up from above the support device 12 by the lifting fixture K of the crane R and lowered onto the ground T1 of the tunnel T.

[0021] <Method of transporting top form and members used for transport> Next, a method for transporting the top form 21 from the factory or the like to the tunnel construction site will be described.

[0022] As shown in FIG. 7 and subsequent drawings, when the top form 21 is transported, members such as hinges 41, spacers 42, and casters 43, each of which is detachable, are attached to the top form 21.

[0023] As shown in Fig. 7(a) and Fig. 8(a), the hinge 41 is interposed between the central foam member 211 and the end foam member 212 on both sides of the top form 21. The central foam member 211 and the end foam member 212 are rotatably connected to each other via this hinge 41. As shown in Fig. 9 to Fig. 11, the hinge 41 is composed of a first member 44 attached to the side plate 27 of the central foam member 211 by a bolt 31, and a second member 45 attached to the side plate 27 of the end foam member 212 by a bolt 31. The first member 44 has an axial hole 40 and a pin hole 47 at one location. The second member 45 has an axial hole 40 at one location and pin holes 47 at two locations. A pressing plate 46 is fixed to the first member 44 as a holding part.

[0024] The first member 44 and the second member 45 are fixed to the central foam member 211 and the end foam member 212, respectively, by bolts 31. The first member 44 and the second member 45 are also connected by a hinge shaft 51 passing through the shaft holes 40 thereof.

[0025] 12 and 13, the spacer 42 has a pair of mounting pieces 49 fixed to the end plates 28, 29 of the central foam member 211 and the end foam member 212 by bolts 31 (not shown). A connecting piece 50 is connected between the two mounting pieces 49 by the bolts 31.

[0026] 14, the casters 43 have wheels 55. The casters 43 are attached to the hinge plates 32 of the end plates 30 of both end form members 212 at both ends of the top form 21 by shafts 56. The casters 43 are held in a fixed position by a plurality of stoppers 52 that come into contact with the end plates 30, etc.

[0027] As shown in FIG. 7(a), when the top form 21 is transported by truck, casters 43 are attached to both ends of the top form 21, and the central foam member 211 and the end foam member 212 are connected by the hinge 41. Then, the central foam member 211 and the end foam member 212 are unfolded around the hinge shaft 51. A spacer 42 is interposed between the central foam member 211 and the end foam member 212 to maintain the top form 21 in an unfolded state. At this time, as shown in FIG. 9, one pin 53 is inserted through the pin hole 47 of the first member 44 and the pin hole 47 of the second member 45. Therefore, the hinge 41 is fixed so that it cannot be opened or closed, and the top form 21 is maintained in a flat unfolded state.

[0028] In this state, the central stands 61 are attached to both sides of the central foam member 211 of the top form 21. As shown in Fig. 8(b), the central stands 61 are fixed to the side plates 27 of the central foam member 211 with bolts 31. The central stands 61 are connected to other central stands 61 in the vertical direction at connecting protrusions 62 at their ends. This set of the top forms 21 and central stands 61, connected in three stages, is loaded onto the truck bed TR.

[0029] On the other hand, as shown in Figures 7(a) and 7(b), a pair of end stands 63 are erected on both sides of the front and rear positions of the truck bed TR. The side plates 27 of both end form members 212 of the stacked top forms 21 are fixed to the end stands 63 by bolts 31. In this manner, three flat top forms 21 are loaded in a stacked state. In this state, the top forms 21 are raised above the floor surface of the truck bed TR without contacting the floor surface, and a gap is formed between the top forms 21 without contacting each other.

[0030] <How to assemble the top form> As shown in Fig. 7(a), in this state, the top form 21 is transported by truck and carried into the construction site of the tunnel T for the construction of the formwork device 11. Then, at the construction site, the bolts 31 between the end stands 63 and the side plates 27 are removed, and the set of the upper top form 21 and the central stand 61 is lifted up by the crane R. At this time, the upper end central stand 61 is separated from the lower central stand 61.

[0031] Then, as shown in Figures 8 and 15(a), the set of the top form 21 and the central stand 61 is lowered to the ground T1 of the tunnel T. At this time, the set has the central stand 61 and the casters 43 in contact with the ground T1, but the top form 21 is in a state of being raised above the ground T1.

[0032] Next, by maintaining the application of the lifting force of the rope S of the crane R, the spacer 42 between the central foam member 211 and the end foam members 212 is removed while the top form 21 is lifted. Also, the central stand 61 is removed from the top form 21.

[0033] Also, the pin 53 of the hinge 41 is removed from the pin holes 47 of the first member 44 and the second member 45. Then, the rope S of the crane R is pulled up. In this way, as shown in Figures 15(a) and 15(b), the wheels 55 of the casters 43 roll on the ground T1, while the end foam members 212 rotate around the hinge shafts 51 and rise up. Therefore, the top form 21 approaches an arch shape. Then, the edges of the side plates 27 of the central foam member 211 and the end foam members 212 and the edges of the face plates 24 of both foam members 211 and 212 are joined together in a butt-jointed state. In this state, the top form 21 as a whole has an arch shape, and the face plates 24 are continuous on the same curved surface. Also, the pressing plate 46 of the hinge 41 presses down the joined face plates 24.

[0034] Then, the pin 53 is inserted into the pin hole 47 of the first member 44 and another pin hole 47 of the second member 45. In this way, the first member 44 and the second member 45 of the hinge 41 are prevented from rotating while the top form 21 is in an arch shape. Therefore, the central foam member 211 and the end foam member 212 are fixed while the top form 21 is held down by the holding plate 46. At this time, the top form 21 is maintained in a suspended state by the rope S. In this state, the adjacent end plates 29, 30 of the central foam member 211 and the end foam member 212 are fixed by the bolt 31 as a fixing member, as shown in FIG. 4. Therefore, the top form 21 is fixed in an arch shape.

[0035] Thereafter, when assembling the top form 21 to the support device 12 of the formwork device 11, the hinges 41 are removed and the casters 43 are removed from the end form members 212, and then the top form 21 is lifted and moved to the top of the support device 12 as shown in Figure 6.

[0036] When dismantling the formwork device 11, the top form 21 is handled in the reverse order to that of assembly. That is, the arch-shaped top form 21 is removed from the support device 12 by the crane R and lowered to near the ground T1. Then, at the lowered position where the top form 21 is lifted by the rope S, the casters 43 are attached to the end form members 212. Next, the hinges 41 are attached to the top form 21. At this time, the hinges 41 are connected by the hinge shafts 51 and the pins 53. In this way, the face plates 24 of the central form member 211 and the end form members 212 are held down by the holding plates 46 of the hinges 41. Then, the bolts 31 between the central form member 211 and the end form members 212 are removed, and then the pins 53 of the hinges 41 are removed.

[0037] Next, the top foam 21 rotates about the hinge axis 51 as the rope S descends, and is put into an expanded state in which it spreads out. In this state, a pin 53 is inserted into the pin hole 47 of the first member 44 of the hinge 41 and into a pin hole 47 of the second member 45 other than the one in the arched state. Next, a spacer 42 is interposed between the central foam member 211 and the end foam members 212. Note that the pin 53 may be inserted into the pin hole 47 of the hinge 41 after the spacer 42 is interposed. Then, central stands 61 are attached to both sides of the central foam member 211.

[0038] Next, the top form 21 in the unfolded state is lifted up and loaded onto the truck bed TR in three tiers. Finally, the side panels 27 of the end form members 212 are fixed to the end stands 63. In this way, the top form 21 is removed from the form device 11 when the form device 11 is dismantled, and then is transported out of the tunnel construction site.

[0039] In this manner, a series of handling operations of the top form 21 is carried out, such as transporting it to the tunnel construction site, constructing and dismantling the formwork device 11, transporting it from the tunnel construction site, and processes using the crane R during the construction and dismantling work.

[0040] (Effects of the first embodiment) This embodiment has the following advantages. (1) When constructing and dismantling the formwork device 11, the central foam member 211 and the end foam members 212 constituting the top form 21 are handled as an integrated unit connected by the hinges 41. Therefore, since there is no need to handle the central foam member 211 and the end foam members 212 separately when loading and unloading onto the truck bed TR, handling of them can be completed in a short time. In addition, there is no need to assemble or disassemble the top form 21 at the construction site of the tunnel T. In this way, the number of tasks involved in constructing and dismantling the formwork device 11 can be reduced, thereby shortening the construction period for tunnel construction.

[0041] (2) The top form 21, which is assembled to form an arch shape on the support device 12, is unfolded via the hinge 41 outside the support device 12. In other words, the top form 21 becomes flat when unfolded, so that it is not bulky and truck transportation can be performed stably.

[0042] (3) When constructing the formwork device 11, the top form 21 in the unfolded state after the hinges 41 are attached can be pulled up above the ground to form the top form 21 into an arch shape. Then, the arch shape can be fixed by the bolts 31. Therefore, when the hinges 41 are subsequently removed, the top form 21 can be stabilized, and the removal work can be carried out efficiently.

[0043] (4) The spacer 42 is interposed between the foam members 211, 212 of the top form 21 in the unfolded state, so that the top form 21 is maintained in the unfolded state. Therefore, the top form 21 in the unfolded state can be handled as a structure that is nearly rigid, which makes it easy to handle when loading and unloading the top form 21 onto and from the truck bed TR.

[0044] (5) The top form 21 in the unfolded state can be loaded and transported on the truck bed TR via the center stand 61 and the end stands 63 so that the longitudinal direction of the top form 21 is aligned with the front-to-rear direction of the truck bed TR. Therefore, the top form 21 can be loaded comfortably in the truck bed TR and transported stably by truck.

[0045] Second embodiment Next, a second embodiment of the present invention will be described with reference to Figs. 16 to 18, focusing on the differences from the first embodiment.

[0046] This embodiment is used for a large-sized formwork device 11, and is therefore suitable for use when handling a large-sized top form 21 or when the length of the truck bed TR is short. As shown in Figs. 16(a), (b) and 17(a), (b), when the top form 21 is transported by truck, the top form 21 is composed of a central foam member 211 and one end foam member 212. At this time, as in the first embodiment, the central foam member 211 is supported by the central stand 61, and the end foam member 212 is supported by the end stand 63. The other end foam member 212 is transported by another truck (not shown). At this time, the central foam member 211 and one end foam member 212 are connected by a hinge 41 via a hinge shaft 51 and a pin 53, as in the first embodiment. Furthermore, a spacer 42 is interposed between the central foam member 211 and one end foam member 212, and a caster 43 is attached to one end foam member 212.

[0047] 16(a), (b) and 17(a), a receiving bracket 81 is attached by a bolt 31 to the top form 21 to which the other end form member 212 is not connected. The receiving bracket 81 is attached to both sides of the central form member 211 at positions corresponding to the center of gravity of the top form 21. The receiving bracket 81 is provided with a plurality of hanging holes 82.

[0048] Then, at the construction site of tunnel T, as shown in Fig. 17(b), a pair of hooks RF at the ends of ropes S of crane R are hung on hanging holes 82 of receiving fittings 81. The hooks RF are supported by supports SP detachably provided at the ends of the ropes S.

[0049] 18(a) to 18(c), the top foam 21 is lowered in an unfolded state onto the ground T1 together with the central stand 61 and the end stand 63, and the hook RF is released. In this state, the other end foam member 212 is attached to the central foam member 211 using a hinge 41 having a hinge shaft 51 and a pin 53. In this case, the spacer 42 is not interposed between the central foam member 211 and the other end foam member 212.

[0050] Then, the spacer 42 between the central foam member 211 and one of the end foam members 212 is removed, and the pin 53 of the hinge 41 is pulled out. After that, the top form 21 is lifted up at the central opening 25 by the rope S in the same manner as in the first embodiment. By this lifting, the top form 21 is made into an arch shape, as shown in FIG. 18(b). The central stand 61 and the end stand 63 are removed before the top form 21 is lifted up. In addition, the receiving metal fitting 81 is removed at a timing between after the hook RF is released and before the top form 21 is lifted up. Then, the top form 21 is assembled to the formwork device 11 in the same manner as in the first embodiment. In this manner, the top form 21 is handled and the formwork device 11 is constructed.

[0051] When dismantling the formwork apparatus 11, the top form 21 is removed from the formwork apparatus 11 and transported in the reverse order to that during construction of the formwork apparatus 11. As described above, in this embodiment, the unit of the central foam member 211 and one end foam member 212 can be handled in the same manner as in the first embodiment. Therefore, even if the top form 21 is large or the truck bed TR is small, this can contribute to shortening the construction period of the tunnel construction.

[0052] Third embodiment Next, a third embodiment of the present invention will be described with reference to FIGS. 19(a) and 19(b), focusing on the differences from the first embodiment.

[0053] In this embodiment, mounting pieces 71 are fixed to the end plates 28, 29 of the central foam member 211 and the end foam members 212, and hinge pieces 72 are supported on the mounting pieces 71 via shafts 73. The hinge pieces 72 are connected to each other by shafts 74. The mounting pieces 71, hinge pieces 72, etc. form hinges 70 between the central foam member 211 and the end foam members 212.

[0054] When the top form 21 is deployed during construction or dismantling of the formwork device 11, a spacer 42 (not shown in this embodiment) is used in the same manner as in the first embodiment. At this time, the end plates 28, 29 are spaced apart, and the distance is determined by the hinge pieces 72 becoming linear. Therefore, the central foam member 211 and the end foam members 212 become flat and are prevented from rotating any further. As a result, the top form 21 is maintained in the deployed state in cooperation with the spacer 42 (not shown in FIG. 19).

[0055] When the top foam 21 is to be formed into an arch shape, the spacer 42 is removed and the arch state is maintained using metal fittings (not shown). Then, as shown in Figure 4, the central foam member 211 and the end foam members 212 are fixed together by bolts 31. The rest of the process is the same as in the previous embodiment.

[0056] (Example of change) The present invention is not limited to the above-described embodiment, and may be embodied in the following aspects. The embodiment and the following modified examples may be combined with each other to the extent that they are not technically inconsistent.

[0057] In the above embodiment, the present invention is implemented in both the construction and dismantling of the formwork apparatus 11, but the present invention may be implemented in either the construction or dismantling of the formwork apparatus 11. In other words, the present invention may be implemented in the construction of the formwork apparatus 11, but the foam members may not be connected by hinges when dismantling. Alternatively, the present invention may be implemented in the dismantling of the formwork apparatus 11, but the foam members may not be connected by hinges when constructing.

[0058] The present invention is applied when the side form 22 or the invert form 23 is composed of multiple foam members. [Explanation of symbols]

[0059] 11...Formwork device 12...Support device 21...Heaven Form 41…hinge 42…Spacer 211…Central foam member 212...End foam member C…Lining concrete T…Tunnel T1…ground TR…Truck bed

Claims

1. At least one of the construction and dismantling of a concrete formwork device for forming a tunnel lining concrete by a form on a support device installed on the ground of the tunnel, A method for handling a form in a concrete formwork apparatus, in which a plurality of form members constituting the form are handled while being connected by hinges.

2. 2. The method for handling forms in a concrete formwork apparatus according to claim 1, wherein the form is a top form assembled to form an arch shape on the support device and deployed outside the support device via the hinge.

3. 3. A method for handling forms in a concrete formwork apparatus as described in claim 2, wherein the top form comprises a central form member and end form members connected to its end sides via the hinges, and when constructing the concrete formwork apparatus, the central form member of the top form in an expanded state is pulled up to cause the top form to assume the arch shape via the rotation of the hinges.

4. 4. A method for handling forms in a concrete formwork apparatus according to claim 3, further comprising the steps of: after the top form is fixed in the arch shape, removing the hinge and assembling the top form to the support device.

5. 3. A method for handling forms in a concrete formwork apparatus according to claim 2, wherein the top form is maintained in an expanded state by interposing spacers between the form members constituting the top form.

6. 3. The method for handling forms in a concrete formwork apparatus according to claim 2, wherein the hinge has a holding portion for holding the top form in the arch shape.

7. A method for handling forms in a concrete formwork apparatus as described in claim 5, wherein the top form in the unfolded state is loaded onto the truck bed via a stand so that its longitudinal direction is aligned with the fore-and-aft direction of the truck bed, and transported by truck in that state.

Citation Information

Patent Citations

  • Protection structure of tunnel and its construction method

    JP2004285594A

  • Form for tunnel work

    JP2004353230A

  • Lining concrete placing method

    JP2020128696A

  • Method for assembling and disassembling form in arch center, and jig for fixing form member in arch center

    JP2023033867A

  • Display device

    KR1020220149892A

Cited By

  • Form position adjustment mechanism, concrete formwork device, and form position adjustment method

    JP2026118394A

  • Form Position Adjusting Mechanism, Concrete Formwork Device, and Form Position Adjusting Method

    JP7687760B1