Mass concrete poured into hollow piers can cause damage due to temperature expansion, leading to potential cracking and increased construction costs or time when multiple batches are used.
A method involving the creation of a non-placing area within the hollow portion for concrete to allow thermal expansion, followed by filling this area with concrete, thereby releasing expansion forces away from the pier structure.
Reduces the risk of damage to the pier by allowing thermal expansion to occur in a controlled non-concrete area, minimizing construction costs and time without the need for special concrete mixes or reduced lift sizes.
Smart Images

Figure 2024136818000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for pouring concrete. [Background technology]
[0002] Some viaduct piers have hollow spaces, and some hollow piers require reinforcement work to ensure earthquake resistance. Patent Document 1 describes a method of reinforcing hollow piers by pouring concrete into the hollow spaces inside existing steel piers. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 08-296208 Summary of the Invention [Problem to be solved by the invention]
[0004] The concrete poured into the hollow space inside the pier becomes a large-volume mass concrete, and the thermal expansion caused by the heat of hydration can cause damage to the pier. For example, if the pier is made of reinforced concrete, there is a concern that the concrete may crack.
[0005] In order to prevent such damage to the pier, it is possible to change the mix of concrete poured into the hollow space or pour the concrete into the hollow space in multiple installments. However, the former would increase costs, and the latter would take longer to complete because the concrete pouring lift per installment would be smaller.
[0006] The present invention has been made in consideration of the above problems, and aims to provide a concrete pouring method and the like that can suppress damage caused by thermal expansion of concrete. [Means for solving the problem]
[0007] In order to solve the above-mentioned problems, the present invention is a concrete pouring method for pouring concrete into a hollow portion of a columnar member having a hollow portion, characterized in that concrete is poured into the hollow portion while a non-pouring area of concrete is provided on the plane of the hollow portion, the concrete is thermally expanded toward the non-pouring area, and then concrete is poured into the non-pouring area.
[0008] According to the present invention, the temperature expansion after pouring concrete (preceding concrete) into the hollow portion of the columnar member can be released to the non-pouring area of the concrete. Therefore, damage to the columnar member due to the temperature expansion of the concrete can be suppressed. After that, by pouring concrete (following concrete) into the non-pouring area, the entire plane of the hollow portion can be filled with concrete.
[0009] The columnar member is, for example, an existing bridge pier. This makes it possible to reinforce existing piers by filling the hollow spaces with concrete.
[0010] The non-casting area is desirably a slit-shaped area located between the formwork. This makes it easy to form a small non-casting area within the hollow portion, and also eliminates the problem of temperature expansion of the concrete poured in the non-casting area.
[0011] It is also preferred that a fluid-expandable bag is disposed in the non-pouring area, and that the bag is removed before pouring concrete in the non-pouring area. This makes it easy to form the non-pouring areas and also makes it easy to remove the bag before pouring concrete into the non-pouring areas.
[0012] When providing the non-pouring area, it is desirable to form an opening in the wall surface of the columnar member to be used as a passageway for workers or a way for materials to be brought in and out. This makes it easier to provide a non-casting area in the hollow portion. Effect of the Invention
[0013] The present invention can provide a method for pouring concrete that can suppress damage caused by thermal expansion of concrete. [Brief description of the drawings]
[0014] [Figure 1] A diagram showing pier 1. [Diagram 2] A diagram showing how concrete is poured. [Diagram 3] A diagram showing how concrete is poured. [Figure 4] A diagram showing pier 1. [Diagram 5] A diagram showing the stress generated in a pier 1 due to the temperature expansion of concrete Con. [Figure 6] A diagram showing the stress generated in a pier 1 due to the temperature expansion of concrete Con. [Figure 7] A diagram showing a non-pouring area of concrete Con1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.
[0016] FIG. 1 is a diagram showing an existing bridge pier 1 to which a concrete pouring method according to an embodiment of the present invention is applied. The bridge pier 1 is a columnar member made of reinforced concrete (RC) that supports bridge girders (not shown) of an elevated bridge or the like, and has a hollow section. The upper view of FIG. 1 shows a vertical cross section of the bridge pier 1 taken along a direction perpendicular to the bridge axis, and the lower view shows a horizontal cross section of the bridge pier 1. This is the same for each of FIG. 2 to FIG. 4, which will be described later. The direction perpendicular to the bridge axis is a direction perpendicular to the bridge axis direction on a plane, and corresponds to the left-right direction in the upper and lower views of FIG. 1. The bridge axis direction corresponds to the normal direction to the paper surface of the upper view, and the up-down direction in the lower view.
[0017] In this embodiment, the horizontal cross section of the pier 1 and its hollow portion is rectangular, and two hollow portions are provided side by side in a direction perpendicular to the bridge axis within the horizontal cross section of the pier 1. However, the shape of the pier 1 and its hollow portion, and the number and arrangement of the hollow portions are not particularly limited.
[0018] In this embodiment, as part of the reinforcement work (reinforcement method) of the pier 1, concrete is filled into the hollow part of the pier 1 at the base of the pier 1 to improve the earthquake resistance of the pier 1. At this time, as shown in FIG. 2(a), first, formwork 11 is placed on both sides of the non-casting area 10 so that a slit-shaped non-casting area 10 is formed in the hollow part of the pier 1 in plan view. The non-casting area 10 is provided in a cross shape within the hollow part. The formwork 11 can be supported from the inner surface of the pier 1 by a support material 12 such as a separator. When installing the formwork 11 and the support material 12, an opening 13 is formed in the wall surface of the pier 1, and the opening 13 is used as a passage for workers and a route for carrying materials in and out.
[0019] Thereafter, as shown in FIG. 2(b), concrete (preliminary concrete) Con1 is poured in the area surrounded by the formwork 11 and the inner surface of the pier 1. The concrete Con1 can be poured through a pouring pipe (not shown) passed through the opening 13 of the pier 1. The concrete Con1 in the above-mentioned area (pouring area) expands due to the temperature rise after pouring caused by the heat of hydration, but since the pier 1 is stronger than the formwork 11, the expansive force of the concrete Con1 escapes to the non-pouring area 10 side, and the concrete Con1 expands toward the non-pouring area 10 side. Therefore, no cracks or the like are generated in the pier 1. The formwork 11 deforms or moves as the concrete Con1 expands.
[0020] The temperature rise of the concrete Con1 continues for about two days after pouring, and thereafter, the formwork 11 is removed as shown in Fig. 3(a), and concrete (subsequent concrete) Con2 is poured into the non-pouring area 10 as shown in Fig. 3(b). Since the non-pouring area 10 has a small area and the volume of the concrete Con2 is small, temperature expansion does not become a problem.
[0021] After the concrete Con2 hardens, a formwork 11 is installed above it in the same manner as in Fig. 2(a). By repeating the steps of Fig. 2(a) to Fig. 3(b), concrete Con1 and Con2 are filled up to the required height in the hollow part of the pier 1 as shown in Fig. 4. This height corresponds to the plasticity region during an earthquake, for example. In the example of Fig. 4, the opening 13 is closed by a closing material 14, and the outer periphery of the pier 1 is further wrapped with wrapping concrete 2 as seismic reinforcement for the pier 1.
[0022] 5 and 6 show the stress (N / mm2) generated in the pier 1 due to the temperature expansion of the concrete Con when the concrete Con is poured with a slit-shaped non-pouring area 10 provided as in the present invention ("slit pouring") and when the concrete Con is poured without providing the non-pouring area 10 ("general pouring"). 2 ) are the results of a simulation. Figure 5 shows the stress generated on side A of pier 1 along the bridge axis, with the horizontal axis representing the number of days that have passed since the concrete Con was poured, and Figure 6 shows the stress generated on side B of pier 1 along the perpendicular direction to the bridge axis, with the horizontal axis representing the number of days that have passed.
[0023] As shown in Figures 5 and 6, by providing non-pouring areas 10 on either side A, B of the pier 1, the maximum value of stress generated by the temperature expansion of the concrete Con is reduced, and it can be seen that providing non-pouring areas 10 is effective in preventing cracks, etc. in the pier 1.
[0024] As described above, according to this embodiment, the temperature expansion after pouring concrete Con1 into the hollow portion of the pier 1 can be released to the non-pouring region 10 of the concrete Con1. Therefore, damage to the pier 1 due to the temperature expansion of the concrete Con1 can be suppressed. Then, by pouring concrete Con2 into the non-pouring region 10, the entire plane of the hollow portion can be filled with the concretes Con1 and Con2. In this embodiment, there is no need to use concrete with a special mix, and there is also no need to reduce the pouring lift in consideration of temperature expansion, so the cost and time required for construction can be reduced.
[0025] In this embodiment, the existing pier can be reinforced by filling the hollow parts with concrete Con1 and Con2. However, the objects and purposes of filling the concrete Con1 and Con2 are not limited to those described above, and it is sufficient that the concrete Con1 and Con2 are filled in the hollow parts of the columnar members.
[0026] In this embodiment, the non-pouring area 10 is a slit-shaped area located between the forms 11, and the non-pouring area 10 having a small area can be easily formed in the hollow portion. In addition, the temperature expansion of the concrete Con2 poured in the non-pouring area 10 does not become a problem.
[0027] In this embodiment, an opening 13 is formed in the wall surface of the pier 1 and used as a passageway for workers and a way to carry in and out materials, making it easier to create a non-pouring area 10 in the hollow portion.
[0028] However, the present invention is not limited to the above embodiment. For example, in this embodiment, after removing the formwork 11, the concrete Con2 is poured in the non-pouring area 10, but it is also possible to install a buried concrete formwork instead of the formwork 11 and pour the concrete Con2 while leaving the buried formwork in place.
[0029] In this embodiment, the formwork 11 is installed on both sides of the slit-shaped non-casting area 10, but as shown in FIG. 7(a), bags 15, such as air tubes, which expand with a fluid such as air or water, may be arranged in a cross shape to form the non-casting area of the concrete Con1. In this case, the bags 15 also contract in response to the temperature expansion of the concrete Con1, allowing the temperature expansion of the concrete Con1 to escape to the non-casting area of the concrete Con1, making it easy to form the non-casting area. The bags 15 can be easily removed before casting the concrete Con2 by draining the fluid inside and contracting them. The bags 15 may be placed in the non-casting area 10 between the formwork 11 shown in FIG. 2(a), in which case the support material 12 can be omitted, making construction easier.
[0030] Furthermore, the shape of the non-pouring area of the concrete Con1 is not limited to a cross slit shape, and for example, as shown in Fig. 7(b), a ring-shaped area along the inner surface of the pier 1 may be used as the non-pouring area 10 of the concrete Con1, and the concrete Con1 may be poured in an area surrounded by a formwork 11 on the inside. In this case as well, the temperature expansion of the concrete Con1 can be released to the non-pouring area 10 side of the concrete Con1.
[0031] On the other hand, as shown in Fig. 7(c), it is also possible to make the non-casting area 10 of the concrete Con1 an I-shaped slit along the bridge axis direction. In this case, however, there is a concern that the temperature expansion of the concrete Con1 in the bridge axis direction indicated by the arrow a will not escape to the non-casting area 10 side, causing cracks on the side of the pier 1 perpendicular to the bridge axis. When the horizontal cross section of the pier 1 and its hollow part is rectangular as in this embodiment, it is desirable, if possible, to set the non-casting area 10 of the concrete Con1 so as to cross the hollow part of the pier 1 in the direction of each side of the rectangle, as in the examples of Fig. 2(b) and Fig. 7(a) and (b). Alternatively, as shown in Fig. 7(d), the slit-shaped non-casting area 10 may be provided so as to cross the diagonal of the hollow part.
[0032] Although the preferred embodiment of the present invention has been described above with reference to the accompanying drawings, the present invention is not limited to the above examples. It is clear that a person skilled in the art can come up with various modified or altered examples within the scope of the technical ideas disclosed in this application, and it is understood that these also naturally belong to the technical scope of the present invention. [Explanation of symbols]
[0033] 1: Bridge pier 10: Non-casting area 11: Formwork 12: Support material 13:Aperture 15: Bag body
Claims
1. A method for pouring concrete into a hollow portion of a columnar member having a hollow portion, comprising: A non-pouring area of concrete is provided on the plane of the hollow portion, concrete is poured into the hollow portion, and the concrete is thermally expanded toward the non-pouring area, A concrete pouring method comprising pouring concrete into the non-pouring area.
2. 2. A method for pouring concrete according to claim 1, wherein the columnar member is an existing bridge pier.
3. 2. The method for pouring concrete according to claim 1, wherein the non-pouring area is a slit-shaped area located between the forms.
4. A bag that expands with a fluid is disposed in the non-casting region, 2. The method of claim 1, further comprising removing the bag before pouring concrete into the non-pouring area.
5. A concrete pouring method according to claim 1, characterized in that, when providing the non-pouring area, an opening is formed in the wall surface of the columnar member to be used as a passageway for workers or a way for materials to be brought in and out.
Citation Information
Patent Citations
Reinforcing structure and reinforcing method of corner part of existing steel pier
JP2006183320A
Method of filling concrete inside steel pipe shaft for small cross section caisson bridge pier
JP2019007302A
Concrete filling and reinforcing method for stud and reinforced stud
JP1996296208A