Penetration assisting jig and steel pipe penetration method
The penetration auxiliary jig addresses the challenge of penetrating core materials into underground soil cement columns by applying rotational force and vibration, ensuring efficient and stable penetration of steel pipes into soil cement columns.
Patent Information
- Application Number
- JP2023051051
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-10
AI Technical Summary
Existing methods face challenges in efficiently penetrating core materials, such as steel pipes, into underground soil cement columns due to the lack of means to apply external force when the core material gets stuck, requiring significant effort and time.
A penetration auxiliary jig is used, comprising a rod connector with a notch to lock a protruding member on the core material, and a guide block with adjustable gaps, allowing for the application of rotational force and vibration to assist the penetration of the core material into the underground hole filled with filler.
The jig enables efficient penetration of core materials by applying external forces, ensuring they reach the desired depth without causing eccentricity, improving work efficiency and reducing the need for additional devices.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a penetration assisting tool for penetrating a core material into an underground hole filled with a filling material, and a method for penetrating a steel pipe. [Background technology]
[0002] Conventionally, a method of constructing a soil cement pillar underground and using it to build an underground structure such as a support pile has been widely known. For example, Patent Document 1 discloses a method of constructing a soil cement pillar using a small drilling mixer. Specifically, a vibrating means for transmitting a vibrating force is connected to a rod equipped with a drilling bit near the lower end.
[0003] Using this drilling mixer, the rod is rotated while being subjected to a vertical vibration force to drill a hole in the ground, while cement milk is discharged from the tip of the rod. The excavated soil and cement milk are then mixed and mixed to create a soil cement pillar in the ground. Before this soil cement pillar hardens, a core material is inserted to the desired depth and erected to construct a support pile in the ground. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent Application No. 2011-252349 Summary of the Invention [Problem to be solved by the invention]
[0005] According to the method of Patent Document 1, even under various ground conditions, soil cement pillars can be constructed in the ground by efficiently excavating and mixing the soil, and support piles can be constructed using these.
[0006] However, when inserting the core material, the drilling mixer is first removed, and then a lifter is brought in, and the core material is suspended by a wire or the like. In this way, the core material penetrates into the soil cement column under its own weight. However, if the core material cannot penetrate under its own weight alone and becomes stuck high inside the soil cement column, there is no way to apply an external force to help the core material penetrate, and the construction requires a great deal of effort.
[0007] The present invention has been made in consideration of the above-mentioned problems, and a main object of the present invention is to efficiently penetrate a core material into an earth hole filled with a filling material. [Means for solving the problem]
[0008] In order to achieve this objective, the penetration assistance jig of the present invention is a penetration assistance jig for penetrating a core material into an underground hole filled with a filling material, and is characterized in that it is equipped with a rod connector connected to a rod that can selectively apply a rotational force about an axis, or a vibration, or both a rotational force and a vibration, and the rod connector is provided with a notch portion for engaging a protruding member attached to the core material.
[0009] The penetration assisting jig of the present invention is characterized in that the rod is provided on a drilling and stirring device used when drilling the underground hole.
[0010] The penetration assisting jig of the present invention is characterized in that the core material is a steel pipe, the protruding member is provided on the inner surface of the steel pipe, and the rod connecting device is disposed within the steel pipe.
[0011] The penetration assisting jig of the present invention is characterized in that it comprises a guide block provided on the rod connecting device, and the guide block comprises a gap adjustment piece interposed in the gap between the rod connecting device and the steel pipe.
[0012] The penetration assisting jig of the present invention is characterized in that the guide block has an attachment piece fixed to the rod connecting device, and two types of gap adjustment pieces of different widths are provided on the upper and lower surfaces of the attachment piece, respectively.
[0013] The steel pipe penetration method of the present invention is a method for penetrating a steel pipe into an underground hole filled with a filling material using the penetration auxiliary tool of the present invention, and is characterized by the steps of connecting the rod connecting tool equipped with the guide block to the rod and inserting it into the steel pipe, engaging the protruding member of the steel pipe with the notch portion of the rod connecting tool, and applying a rotational force around the axis, or vibration, or both a rotational force and vibration to the rod.
[0014] The method of inserting a steel pipe of the present invention is characterized in that a plurality of guide blocks with different widths of the gap adjustment piece are prepared, and each time the inner diameter of the steel pipe changes, a guide block having a gap adjustment piece with a width corresponding to the gap between the steel pipe and the rod connector is replaced and attached to the rod connector.
[0015] The steel pipe penetration method of the present invention is characterized in that the filler is soil cement.
[0016] According to the penetration assisting jig and steel pipe penetration method of the present invention, the penetration assisting jig is connected to a rod that can selectively apply a rotational force around the axis, or vibration, or both. Therefore, when the core material is stuck at a high level in the filling, a suitable force can be selected from the rotational force, vibration, or both depending on the state, and applied to the core material. This can assist the penetration of the stuck core material and allow the core material to reach a predetermined depth efficiently.
[0017] In addition, by attaching a penetration assistance jig to the rod attached to the drilling and mixing device used to drill the underground hole, it is possible to avoid the trouble of having to introduce a separate device to press in the core material that has become stuck at a high level.
[0018] Furthermore, when the core material is a steel pipe, the penetration assist jig is composed of a rod connector and a guide block, and the gap between the rod connector and the steel pipe can be minimized by the gap adjustment piece of the guide block. This allows the steel pipe, which has been subjected to a rotational force, vibration, or both, to be penetrated into the filler in a stable state without eccentricity.
[0019] Furthermore, by preparing multiple guide blocks with gap adjustment pieces of different widths, when handling multiple types of steel pipes with different inner diameters at the construction site, it is possible to handle them simply by replacing the guide blocks, greatly improving workability. Effect of the Invention
[0020] According to the present invention, rotational force, vibration, or a suitable combination of both can be transmitted from the rod to the core material via the penetration assistance jig, making it possible to efficiently penetrate a core material that has been stuck high up in an underground hole filled with filler and is unable to penetrate under its own weight, until it reaches the desired depth. [Brief description of the drawings]
[0021] [Figure 1] 11A to 11C are diagrams showing a method of inserting a core material in the present embodiment. [Diagram 2] 1A and 1B are diagrams showing a rod connector according to the present embodiment. [Diagram 3] FIG. 2 is a diagram showing a guide block according to the present embodiment. [Figure 4] 1 is a diagram showing a state in which a penetration assisting jig in the present embodiment is attached to a rod. FIG. [Diagram 5] 10A to 10C are diagrams showing a procedure for engaging a penetration assisting jig attached to a rod in the present embodiment with a steel pipe. [Figure 6] 11 is a diagram showing another example of the guide block according to the present embodiment (part 1). FIG. [Figure 7] 13 is a diagram showing another example of the guide block according to the present embodiment (part 2). FIG. [Figure 8]13A and 13B are diagrams showing an example in which the penetration assisting jig in this embodiment is attached to a swivel joint provided on a rod. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0022] The present invention relates to a tool and method for efficiently penetrating a core material into an underground hole filled with a filling material. In this embodiment, an example is given of a case in which a round steel pipe is inserted into a soil cement column built in the ground to construct a soil cement pile, and the details are described below with reference to Figs. 1 to 7.
[0023] ≪≪How to construct soil cement bearing piles≫≫ A soil cement support pile 50 as shown in Fig. 1(c) is constructed, for example, in the following procedure. First, as shown in Fig. 1(a), a soil cement pillar 51 is constructed while drilling a hole in the ground using a drilling and mixing device 10. Cement milk is injected into the tip of the soil cement pillar 51 to provide a base reinforcement portion 52.
[0024] ≪Drilling stirring device≫ The drilling and mixing device 10 used to construct the soil cement pillar 51 comprises a moving mechanism 11 consisting of a caterpillar, a base portion 12 provided on the upper part of the moving mechanism 11, and a leader 13 supported by the base portion 12.
[0025] A vibration exciter 14 is installed on the leader 13 so as to be movable up and down, and the head of a rod 15 is in contact with the vibration exciter 14. The rod 15 has an excavation / agitation part 16 attached to its tip, and is rotated via a rotation device 18.
[0026] The vibration excitation device 14 is a device that generates a vibration force by rotating an eccentric weight, and applies vibration to the rod 15. Any device may be used as long as it can transmit vibration including at least one of components in the vertical direction and the horizontal direction to the rod 15.
[0027] The rotation device 18 is a device that grips the circumferential surface of the rod 15 with a rod gripping portion provided inside and applies a rotational force in the forward or reverse direction around the axis of the rod 15. It is located below the vibration exciter 14 and is installed so as to be movable up and down along the leader 13 together with the vibration exciter 14.
[0028] The rod 15 is made of a hollow single tube, and is provided with a swivel joint 19 in the middle. A supply pipe 17 for supplying cement milk is connected to the swivel joint 19. As a result, the cement milk is supplied to the hollow part of the rod 15 which rotates by the rotational force applied to the rotation device 18.
[0029] The drilling and mixing unit 16 has a shaft 161 connected to the rod 15 and a tip bit 162 attached to the tip of the shaft 161, and the tip bit 162 is provided with a discharge port for cement milk. In addition, the shaft 161 is also provided with a mixing blade and the like.
[0030] <<How to insert steel pipes>> After constructing the soil cement pillar 51 using the above-mentioned drilling and mixing device 10, the steel pipe 53 is inserted under its own weight while being added before the soil cement pillar 51 and the base fixing portion 52 harden.
[0031] If the steel pipe 53 at the lowest end becomes stuck before reaching the base fixing portion 52, the drilling and stirring device 10 is used to apply an external force such as rotational force or vibration to the steel pipe 53, and the steel pipe 53 penetrates until its tip reaches the base fixing portion 52. The procedure for applying an external force to the steel pipe 53 is as follows.
[0032] First, as shown in Fig. 1(b), the drilling and stirring part 16 attached to the rod 15 of the drilling and stirring device 10 is removed, and an attachment-type penetration assist jig 20 is connected. On the other hand, a protruding member 54 protruding from the inner peripheral surface of the steel pipe 53 toward the axis is provided.
[0033] This protruding member 54 is engaged with the penetration assist jig 20, and the rotation device 18 or the vibration device 14 of the drilling and mixing device 10 is operated, or both the rotation device 18 and the vibration device 14 are operated. In this way, a rotational force or vibration, or both a rotational force and a vibration, are applied to the steel pipe 53 via the penetration assist jig 20 connected to the rod 15, and the attachment between the steel pipe 53 and the soil cement column 51 is broken.
[0034] As a result, the steel pipe 53, which was unable to penetrate under its own weight and remained high, sinks by itself while rotating or vibrating within the soil cement pillar 51, as shown in Figure 1 (c). In this way, by using the penetration assistance jig 20, the drilling and mixing device 10 used for constructing the soil cement pillar 51 can also be used for the penetration work of the steel pipe 53.
[0035] Therefore, when the steel pipe 53 is stuck at a high level, there is no need to prepare a separate device for penetrating it to a desired depth. Also, since the work of replacing the construction machine can be omitted in a narrow construction site, the workability can be significantly improved.
[0036] In addition, since the drilling and stirring device 10 is equipped with not only the rotating device 18 but also the vibration generating device 14, both the rotational force and the vibration can be transmitted to the steel pipe 53 via the penetration assisting jig 20. This makes it possible to deal with cases where the steel pipe 53 cannot be penetrated to a depth sufficient to reach the base protection portion 52 by only applying the rotational force, and to more reliably assist the penetration of the steel pipe 53.
[0037] <<Penetration Support Jig>> The penetration assisting jig 20 includes a rod connector 30 and a guide block 40, as shown in FIG.
[0038] <Rod connector> The rod connector 30 connects the rod 15 and the steel pipe 53, and functions as a transmission member for transmitting external forces such as rotational force and vibration acting on the rod 15 to the steel pipe 53. Its structure is composed of a connector body 31 and a male fitting 32, as shown in Figures 2(a) and (b).
[0039] The male fitting 32 is formed in a shape corresponding to the female fitting (not shown) provided on the rod 15 of the drilling and mixing device 10. In Fig. 2(a), a case where a hexagonal joint is used is shown as an example. The male fitting 32 having such a shape is provided on the connector body 31 facing upward.
[0040] The connector body 31 comprises a substantially rectangular base plate 311 and a pair of wall portions 312 rising from each of the short sides of the base plate 311. The male fitting 32 described above is attached to the center of the base plate 311.
[0041] The pair of walls 312 have their outer circumferential surfaces formed as arcs that follow the inner circumferential surface of the steel pipe, and on their lower sides, as shown in Fig. 2(b), a substantially T-shaped notch 313 is formed. This notch 313 is formed in a size and shape that allows the protruding member 54 provided on the steel pipe 53 to be inserted from below toward above and then moved relatively laterally to engage with it.
[0042] Further, a generally hook-shaped recess 314 is formed on the pair of walls 312, extending from the upper surface at the generally central portion to the outer circumferential surface. A guide block 40 as shown in FIG. 3(a) is placed in this recess 314.
[0043] <Guide block> The guide block 40 functions as a guide when the penetration assisting jig 20 is inserted into the steel pipe 53. It also has a gap adjustment function that minimizes the gap that occurs between the rod connector 30 and the inner surface of the steel pipe 53.
[0044] 3(a), its shape is generally hook-shaped and is composed of a mounting piece 41 and a gap adjustment piece 42. The mounting piece 41 is formed in a generally rectangular shape in a plan view and is provided with a bolt hole 411. The gap adjustment piece 42 hangs down from the underside of the mounting piece 41, and the protruding corner on the outer surface side of the lower end is chamfered.
[0045] The guide block 40 having such a shape fits into the recess 314 of the connector main body 31, as shown in Figures 3(b) and 4(a). That is, the mounting piece 41 of the guide block 40 fits into the upper surface side of the recess 314, and the gap adjustment piece 42 fits into the side surface side of the recess 314. Furthermore, a through hole 3141 corresponding to the bolt hole 411 of the mounting piece 41 is provided on the upper surface side of the recess 314, as shown in Figure 2(a).
[0046] These are utilized to bolt the guide block 40 and the connector body 31 in which the recess 314 is formed. Since the recess 314 is provided in each of the pair of walls 312 constituting the connector body 31, a guide block 40 is attached to each of them. In this manner, the penetration assist jig 20 is assembled by the rod connector 30 and the pair of guide blocks 40, as shown in Fig. 4(a).
[0047] ≪≪How to use the Penetration Assistance Tool 20≫≫ Next, the procedure for attaching the above-mentioned penetration assisting jig 20 to the rod 15 of the drilling and stirring device 10 as shown in FIG. 1(b) and for engaging it with the steel pipe 53 as shown in FIG. 1(c) will be described below.
[0048] ≪≪Installation of the rod and the penetration support jig≫ First, as shown in FIG. 4( a ), the penetration assist jig 20 is attached to the rod 15 of the drilling and stirring device 10 .
[0049] A female fitting (not shown) is provided on the lower end side of the rod 15 to mate with a male fitting 32 provided on the rod connector 30. The male fitting 32 is inserted into this female fitting, and a flange 151 provided on the lower end of the rod 15 and a flange 321 provided below the male fitting 32 are brought into contact with each other.
[0050] 4(b), the retaining band 33 is attached so as to enclose the flange 151 and the flange 321. The upper surface of the flange 151 and the lower surface of the flange 321 are each tapered.
[0051] The restraining band 33 is formed in a shape that utilizes this taper to enhance the adhesion between the flange 151 and the flange 321. This allows the vibration generated by operating the vibration generating device 14 to be efficiently transmitted from the rod 15 of the drilling and stirring device 10 to the penetration assist jig 20.
[0052] In addition, as mentioned above, the rotational force generated by operating the rotation device 18 can be efficiently transmitted from the rod 15 of the drilling and mixing device 10 to the penetration assistance jig 20 by using hexagonal joints for the female and male fittings 32 provided on the lower end of the rod 15.
[0053] In this way, as long as the mechanism can efficiently transmit rotational force and vibration, any structure, including the shape of the joint, may be adopted for connecting the rod 15 and the penetration assist jig 20.
[0054] <<Attachment of the penetration support jig and the steel pipe>> Next, the penetration assisting jig 20 is inserted toward the inner space of the steel pipe 53 , and the protruding member 54 of the steel pipe 53 is engaged with the penetration assisting jig 20 .
[0055] First, the orientation of the penetration assist jig 20 is adjusted, and as shown in Fig. 5(a), the notch 313 provided in the rod connector 30 is positioned directly above the protruding member 54 provided in the steel pipe 53. Next, as shown in Fig. 5(b), the penetration assist jig 20 is lowered to insert the protruding member 54 into the notch 313 of the rod connector 30. Thereafter, the penetration assist jig 20 is rotated horizontally via the rod 15, and as shown in Fig. 5(c), the protruding member 54 is engaged with the notch 313.
[0056] 1(c), when the rotation device 18 of the drilling mixer 10 is operated to rotate the rod 15 about its axis, the steel pipe 53 can be rotated in the soil cement column 51 via the penetration assist jig 20 and the protruding member 54. If the steel pipe 53 cannot be lowered sufficiently by the rotation force alone, the vibration device 14 of the drilling mixer 10 is operated. Then, vibrations can be imparted to the steel pipe 53 via the rod 15 and the penetration assist jig 20.
[0057] <<Other examples of guide blocks>> Incidentally, the guide block 40 constituting the penetration assisting jig 20 is shaped to have only one gap adjustment piece 42, as shown in Fig. 3(a). However, this is not limited to this, and a guide block 60 as shown in Figs. 6(a) and (b) can also be used.
[0058] The guide block 60 includes an attachment piece 61, and a first gap adjustment piece 62 and a second gap adjustment piece 63 provided above and below the attachment piece 61. The second gap adjustment piece 63 is formed to have a narrower width than the first gap adjustment piece 62.
[0059] 7(a), the guide block 60 is attached to the rod connector 30 with the second gap adjustment piece 63 facing downward to form the penetration assist jig 20. Then, by providing a female joint at the upper end, even if a reduced diameter portion is formed inside the steel pipe 53, the penetration assist jig 20 can be formed in a shape that can be placed at this reduced diameter portion.
[0060] 7(b), the guide block 60 is attached to the rod connector 30 with the first gap adjustment piece 62 facing downward to form the penetration assist jig 20. Then, the penetration assist jig 20 can be formed into a shape suitable for a steel pipe 53 having a different shape from that exemplified in the above-mentioned FIG.
[0061] Therefore, if both guide blocks 40, 60 are prepared, it is possible to assemble the penetration assisting jigs 20 corresponding to each of the three types of steel pipes 53 and apply rotational force and vibration to each of the steel pipes 53.
[0062] The core material penetration method and penetration assisting tool of the present invention are not limited to the above-described embodiment, and it goes without saying that various modifications are possible without departing from the spirit of the present invention.
[0063] For example, in this embodiment, the penetration assist jig 20 is connected using a female joint provided at the lower end of the rod 15, but this is not limited to this. As shown in Fig. 8, the penetration assist jig 20 may be connected to a swivel joint 19 provided at the middle part of the rod 15.
[0064] In addition, in this embodiment, two types of guide blocks 40, 60 are prepared, but two or more types may be prepared and used interchangeably depending on the type of steel pipe used at the construction site.
[0065] Furthermore, in this embodiment, the steel pipe 53 is used as the core material, but a square steel pipe or the like can also be used as the core material if a protruding member 54 that can be engaged with the notch 313 provided in the rod connector 30 can be provided. The filling material to fill the underground hole is not limited to soil cement, and any material such as a muddy water solidification material can be used. [Explanation of symbols]
[0066] 10 Drilling stirring device 11 Moving mechanism 12 Pedestal 13. Leader 14 Excitation device 15 Rod 151 Flange 16 Excavation and stirring section 17 Supply pipe 18 Rotating device 19 Swivel joint 20 Penetration aid jig 30 Rod connector 31 Connector body 311 Base plate 312 Wall 313 Notch 314 Recess 3141 Through hole 32 Male fitting 321 Flange 33 Retaining Band 40 Guide block 41 Mounting piece 411 Bolt hole 42 Gap adjustment piece 50 Support pile 51 Soil-cement pillar 52 Root protection section 53 Steel pipe 54 Protruding member 60 Guide block 61 Mounting piece 62 First gap adjustment piece 63 Second gap adjustment piece S Sludge pipe
Claims
1. A penetration assisting tool for penetrating a core material into an underground hole filled with a filling material, A rod connector is provided for connecting to a rod capable of selectively applying a rotational force about an axis, a vibration, or both a rotational force and a vibration, The penetration assisting jig is characterized in that the rod connecting device is provided with a notch for engaging a protruding member attached to the core material.
2. In the penetration assisting tool according to claim 1, A penetration assisting jig, characterized in that the rod is provided on a drilling stirring device used when drilling the underground hole.
3. In the penetration assisting tool according to claim 1, The core material is a steel pipe, and the protruding member is provided on an inner peripheral surface of the steel pipe, The rod connector is disposed within the steel pipe.
4. In the penetration assisting tool according to claim 3, A guide block is provided on the rod connector, The guide block is characterized in that it is provided with a gap adjustment piece that is interposed in the gap between the rod connector and the steel pipe.
5. The penetration assisting tool according to claim 4, the guide block includes an attachment piece secured to the rod connector; The penetration assisting jig is characterized in that two types of gap adjustment pieces having different widths are provided on the upper and lower surfaces of the mounting piece.
6. A method for inserting a steel pipe into an underground hole filled with a filling material using the insertion assisting jig according to claim 4, a step of connecting the rod connector with the guide block attached to the rod and inserting the rod connector into the steel pipe; a step of engaging the protruding member of the steel pipe with the notch of the rod connector; A method for penetrating a steel pipe, comprising applying a rotational force about an axis, or a vibration, or both a rotational force and a vibration to the rod.
7. The steel pipe penetration method according to claim 6, A plurality of the guide blocks having gap adjustment pieces each having a different width are prepared, A method for inserting a steel pipe, characterized in that each time the inner diameter of the steel pipe changes, the guide block having the gap adjustment piece of a width corresponding to the gap between the steel pipe and the rod connector is replaced and attached to the rod connector.
8. The steel pipe penetration method according to claim 6, A method for inserting a steel pipe, characterized in that the filling material is soil cement.