Support means and construction method for timbering
The shoring support means stabilizes new steel shoring on existing supports, improving efficiency and safety by avoiding dangerous areas and reducing complex machinery operations during tunnel construction.
Patent Information
- Application Number
- JP2023051500
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-10
AI Technical Summary
The instability of the tunnel bottom immediately after excavation poses a safety hazard during steel shoring erection, requiring time-consuming concrete hardening and complex machinery operations, which are dangerous and inefficient.
A shoring support means that includes pedestals, support jigs, girders, and receiving plates to stabilize and position new steel shoring on existing supports, allowing erection without entering the dangerous area and reducing the need for heavy machinery.
Enhances work efficiency and safety by stabilizing the steel shoring without entering the danger zone, reducing costs and simplifying the erection process.
Smart Images

Figure 2024140383000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a shoring support means and a shoring construction method used when erecting steel shoring for a tunnel. [Background technology]
[0002] In tunnel construction using NATM, the ground surface exposed by tunnel excavation is sealed off early with shoring. Tunnel shoring is generally composed of shotcrete sprayed onto the ground surface, steel shoring assembled along the ground surface, and rock bolts poured into the ground in the normal direction from inside the tunnel. The shoring is installed by spraying the primary shotcrete onto the ground exposed by excavation, assembling the steel shoring, and then spraying the secondary shotcrete.
[0003] When assembling steel supports, it is common to use heavy machinery such as an erector to erect the steel supports that have been brought in lying on their side near the tunnel face at a specified distance from the existing steel supports. For example, Patent Document 1 discloses a tunnel construction method in which the steel supports are erected using heavy machinery equipped with an erector device that has a gripping hand. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 6374051 Summary of the Invention [Problem to be solved by the invention]
[0005] The bottom of the tunnel immediately after excavation is not leveled, so it may become unstable when steel supports are erected. To ensure stability, workers must avoid entering the dangerous area near the tunnel face where the surface may fall, and the area must be hardened with concrete spraying and held with an erector until it develops its strength, which is time-consuming. In addition, positioning the steel supports when erecting them requires surveying at a location away from the tunnel face and operating heavy machinery at the same time, which makes the work time-consuming.
[0006] The present invention aims to propose a shoring support means and a shoring installation method that improves workability by preventing workers from entering the risk of skin falling areas near the face during shoring construction, and also reduces costs. [Means for solving the problem]
[0007] The shoring support means of the present invention, which solves such problems, supports the legs of a new steel shoring to be erected on the face side of an existing steel shoring, and comprises a number of pedestals respectively provided below a number of existing steel shorings arranged at the front and back, a support jig interposed between the pedestals and the existing steel shoring, a support girder suspended horizontally on the legs of the multiple existing steel shorings, and a support plate on which the legs of the new steel support, fixed to the face side end of the support girder, can be placed.
[0008] The shoring installation method of the present invention, which utilizes the shoring support means, includes the steps of sliding the support girder to position the support plate at the installation position of the newly constructed steel shoring, and erecting the newly constructed steel shoring with the legs of the newly constructed steel shoring placed on the support plate.
[0009] According to this shoring support means and shoring erection method, the new steel shoring is erected by placing it on the support girder (support plate) maintained by the existing steel shoring, so the stability of the steel shoring can be ensured even if the foundation ground is uneven. Also, since the positioning of the new steel shoring is completed by placing the joint plate (base plate) of the new steel shoring on the support plate, the steel shoring can be erected easily without carrying out complex work such as surveying and operating heavy machinery in parallel.
[0010] It is preferable that the support girder is placed on the corner between the flange and the joint plate (including the base plate) of the existing steel support and fixed to the flange via a fixing jig. In this way, the support girder is supported by the existing steel support placed on the base, ensuring the stability of the support girder.
[0011] In addition, it is preferable that the receiving plate has a through hole formed at a position corresponding to the bolt hole of the joint plate (including the base plate) of the new steel support. In this case, the through hole should have a shape that allows the guide pin fixed to the bolt hole to be inserted. In this way, the positioning of the new steel support is completed by inserting the guide pin into the through hole. Effect of the Invention
[0012] According to the shoring support means and shoring construction method of the present invention, it is possible to improve workability during shoring construction by preventing workers from entering the risk of skin falling areas near the face, and also to reduce costs. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a cross-sectional view showing an overview of a tunnel. [Diagram 2] FIG. 2 is a diagram showing a steel support and a support support means. [Diagram 3] FIG. 2 is a diagram showing a shoring support means, where (a) is a plan view and (b) is a side view. [Figure 4]3A and 3B are diagrams showing the support means and the legs of the steel support, in which (a) is a view taken along the line B in FIG. 3B, and (b) is a view taken along the line A in FIG. 3B. [Diagram 5] This is a side view showing the sliding state of the support girder in the support construction method. [Figure 6] This is a side view showing the construction status of the newly constructed steel support structure. [Figure 7] This is a front view showing the construction status of the newly constructed steel support structure. [Figure 8] FIG. 7 is a side view showing the erection of the newly constructed steel support structure, following FIG. 6. [Figure 9] This is a side view showing the newly constructed steel support structure after it has been erected. [Figure 10] This is a side view showing the construction status of the lower half of the support structure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] In this embodiment, a case where a tunnel is constructed by NATM will be described. As shown in Fig. 1, a tunnel T is stabilized by blocking the exposed natural ground surface Gs by excavating the natural ground G with supports 1 made of sprayed concrete 2, steel supports 3, etc. During tunnel construction, auxiliary construction methods such as forepoling (short-length pre-supporting work), head bolt work, and leg reinforcement work may be used in combination as necessary.
[0015] In this embodiment, construction of the upper half T1 above the spring line SL (upper half excavation and formation of the support 1) is carried out first, and then construction of the lower half T2 (lower half excavation or re-bench excavation and formation of the support 1) is carried out at a predetermined interval. Note that construction of the lower half T2 is carried out at a position away from the construction site of the upper half T1 so as to ensure time until the ground of the upper half T1 is stabilized.
[0016] The construction of the upper half T1 involves first excavating the natural ground G to form a borehole (tunnel T) (excavation process). The excavation method for the tunnel T is not limited, and may be, for example, blasting excavation or mechanical excavation. The excavation length of the tunnel T per cycle is determined according to the natural ground conditions (natural ground grade, earth covering, etc.), but is set to 1.0 to 1.2 m in this embodiment.
[0017] After the tunnel T has been excavated to a predetermined length (1.0 to 1.2 m in this embodiment), the ground G is excavated and the support 1 is formed along the ground surface Gs exposed. The support 1 in this embodiment includes shotcrete 2 and steel support 3. The construction of the support 1 includes shoring assembly work and spraying work. The construction of the shotcrete 2 (spraying work) may be performed in two steps, a primary spray and a secondary spray, or the shotcrete 2 of a predetermined thickness may be formed in one step.
[0018] As shown in Fig. 2, the new steel support 31 is erected on the face K side of the existing steel support 30 (support assembly work). At this time, the legs (lower end) of the new steel support 31 are supported by the support support means 4. As shown in Figs. 3(a) and (b), the support support means 4 includes a base 41, a support jig 42, a support girder 43, and a support plate 44.
[0019] The pedestal 41 is provided below the existing steel support 30. The pedestal 41 in this embodiment is made of a columnar concrete block. The material constituting the pedestal 41 is not limited, and may be made of, for example, steel material. The shape and dimensions of the pedestal 41 are not limited as long as it has the strength to support the steel support 3 (the upper half of the support 1) and allows the steel support 3 to be arranged at a predetermined position (height position), and may be appropriately determined. The ground on which the pedestal 41 is to be installed is leveled by laying a concrete slab or pouring leveling concrete as necessary. When a concrete slab is used, the ground is leveled by leveling concrete, crushed stone, or the like as necessary.
[0020] As shown in FIG. 3(b), the support jig 42 is interposed between the base 41 and the existing steel support 30. The support jig 42 is composed of a bolt 45 inserted through a bolt hole 33 of a joint plate 32 (base plate) of the existing steel support 30, and a nut 46 screwed onto the bolt 45. The support jig 42 supports the joint plate 32 by inserting the bolt 45 into the bolt hole 33 from above the joint plate 32 and abutting the lower end of the bolt 45 on the upper surface of the base 41 while the nut 46 is abutting on the lower surface of the joint plate 32. When the nut 46 is rotated, the joint plate 32 of the steel support 3 of the existing steel support 30, which is fixed to the ground by sprayed concrete and a lock bolt, acts as a reaction force to press the base 41 against the ground, stabilizing it. In addition, the load of the steel support 3 is applied to the base 41 via the support jig 42 to prevent the base 41 from shifting.
[0021] The support girder 43 is made of steel such as an L-shaped steel (angle bar), and is horizontally supported on the legs of a plurality of (two in this embodiment) existing steel supports 30 close to the face K, as shown in Figs. 3(a) and (b). The tip (the end on the face side) of the support girder 43 protrudes toward the new steel support 31 (face K). As shown in Fig. 4(a), the support girder 43 is placed on the corner between the flange 34 and the joint plate 32 of the existing steel support 30, and is fixed to the flange 34 via a fixing jig 47. In this embodiment, a vice is used as the fixing jig 47, but the configuration of the fixing jig 47 is not limited as long as the support girder 43 can be fixed. In addition, the support girder 43 does not necessarily need to be fixed to the flange 34 of the steel support 3, and may be fixed to the joint plate 32, for example. In addition, the material constituting the support girder 43 is not limited to L-shaped steel, but may be, for example, H-shaped steel, channel steel, etc. Furthermore, the installation range (length) of the support girder 43 is not limited, so long as it has a length that allows it to be hung horizontally on the legs of two or more existing steel supports 30.
[0022] The support plate 44 is made of a steel plate, and is fixed to the face side end of the support girder 43 as shown in Figs. 3(a) and (b). As shown in Fig. 4(b), the leg (joint plate 32) of the new steel support 31 can be placed on the support plate 44. At this time, the height position of the leg of the new steel support 31 is made higher by an amount of deflection (deformation) assuming the weight of the new steel support 31. The support plate 44 has a through hole 48 formed at a position corresponding to the bolt hole 33 of the joint plate 32 of the new steel support 31. The through hole 48 has a shape that allows the guide pin 5 fixed to the joint plate 32 (bolt hole 33) to be inserted (engaged).
[0023] The guide pin 5 is composed of a bolt portion 51 inserted from above into the bolt hole 33 of the joint plate 32, and a main body portion 52 fixed to the bolt portion 51 from below the joint plate 32. The main body portion 52 is a cone-shaped member whose diameter decreases downward. The shape of the main body portion 52 is not limited and may be determined appropriately.
[0024] A method of erecting shoring using the shoring support means 4 will be described below. After the ground G has been excavated to a specified length, as shown in Fig. 5, the support girder 43 is slid toward the face K, and the support plate 44 is placed in the erection position of the new steel support 31. At this time, the support girder 43 is supported (hung horizontally) by at least two sets of existing steel supports 30, 30. Next, the support jig 42 is installed on the legs of the existing steel support 30 that was installed last and to which concrete spraying and rock bolts were applied. At this time, since the work location is below the existing steel support 30 and close to the tunnel side wall, workers can work without entering the face area or the risk area of skin falling from the mirror surface (45° gradient range from the mirror end).
[0025] Next, as shown in Fig. 6, the new steel support 31 with the guide pin 5 fixed in the bolt hole 33 of the joint plate 32 is held by heavy machinery such as an erector M and placed near the face K (the face side of the existing steel support 30). At this time, as shown in Fig. 7, the left and right new steel supports 31, 31 are connected at their tops to form an arch shape. Although the method of connecting the new steel supports 31 at their tops is not limited, in this embodiment, they are connected by a one-touch joint part (not shown). Also, in this embodiment, a plurality of one-touch connecting members 6, 6... are attached in advance to the side surface of the new steel support 31 at the wellhead (the flange 34 on the wellhead side).
[0026] 8, the legs of the new steel support 31 are placed on the support plate 44. Once the new steel support 31 is placed on the support plate 44, the guide pins 5 are inserted into the through holes 48 of the support plate 44. At this time, the new steel support 31 is inclined with its head closer to the face K than the legs because the one-touch ties 6 interfere with the existing steel support 30.
[0027] 9, the head of the new steel support 31 is raised (pulled toward the tunnel mouth) and erected on the receiving plate 44. At this time, the new steel support 31 is connected to the existing steel support 30 via the one-touch connecting material 6. Once the new steel support 31 has been erected, the upper half of the support 1 is formed by spraying concrete 2 onto the side walls of the upper half, avoiding the area below the fixing jig 47.
[0028] The construction of the lower half T2 is carried out at a specified interval after the formation of the support 1 of the upper half T1, as shown in Figure 10. The construction of the lower half T2 involves excavating the ground Gb at the bottom of the tunnel (below the spring line SL), including the area below the legs of the support 1 (steel support 3) of the upper half T1, by mechanical excavation, and then forming the support 1 for the lower half along the ground surface on the exposed side of the tunnel.
[0029] The lower half support 1 is constructed by erecting a lower half steel support 35 below the joint plate 32 of an arch-shaped steel support 3 (existing steel support 30) with its lower end exposed, and connecting the upper and lower joint plates 32 (the joint plate 32 at the lower end of the existing steel support 30 and the joint plate 32 at the upper end of the lower half steel support 35). At this time, the steel support joint plate 32 with its lower end exposed is not sprayed with the shotcrete 2, so it can be easily bolted to the joint plate 32 of the lower half steel support 35. In addition, although not shown, by extending or separately installing support girders 43 on the existing steel support before and after the installation of the lower half steel support 35, there is no need to worry about the steel support 3 dropping downward even if the support jig 42 of the steel support 3 is removed and exposed. Once the lower steel support 35 has been installed, shotcrete 2 (see Figure 1) is sprayed onto the exposed side of the tunnel.
[0030] As described above, according to the shoring support means 4 and shoring installation method of this embodiment, it is possible to improve workability during shoring construction by preventing workers from entering areas near the face that are at risk of skin falling. In addition, the new steel support 31 is erected by placing it on the support girder 43 (support plate 44) supported by the existing steel support 30, so that the stability of the steel support 3 can be ensured even if the foundation ground is uneven. In addition, the positioning of the newly constructed steel support 31 is completed by placing the joint plate 32 (bale plate) of the newly constructed steel support 31 on the receiving plate 44, so that the steel support 3 can be easily erected without having to carry out complex work such as surveying and operating heavy machinery in parallel.
[0031] In addition, the support girder 43 is placed on the corner between the flange 34 of the existing steel support 30 and the joint plate 32 (including the base plate) and is fixed to the flange 34 via a fixing jig 47, so that the stability of the support girder is ensured via the existing steel support 30 placed on the base 41. In addition, by using the guide pin 5, the positioning of the newly constructed steel support 31 can be easily determined.
[0032] In addition, the location of the new steel support 31 can be determined by managing the protruding length of the support girder 43 from the existing steel support 30, making it easy to position the new steel support 31.
[0033] The embodiment of the present invention has been described above. However, the present invention is not limited to the above embodiment, and each of the above components can be appropriately modified without departing from the spirit of the present invention.
[0034] For example, in the above embodiment, a case has been described in which the steel support 3 is divided into an upper half T1 and a lower half T2, but the upper half T1 and the lower half T2 of the steel support 3 may be formed integrally, and the configuration of the steel support 3 may be appropriately determined depending on the cross-sectional shape of the tunnel T. The connecting material 6 may be installed after erecting the new steel support 31. The connecting material 6 may be fixed by spraying concrete using an anchor system.
[0035] The installation location of the support girder 43 is not limited to the corner between the flange 34 and the joint plate 32 of the existing steel support 30, but may be fixed to the flange 34 via a bolt, for example, or may be placed on the base 41.
[0036] The receiving plate 44 does not necessarily need to have the through hole 48. The method of placing (attaching) the joint plate 32 on the receiving plate 44 may be determined appropriately, and the configuration of the receiving plate 44 may be determined appropriately depending on the placing (attaching) direction. [Explanation of symbols]
[0037] 1 Shoring 2. Shotcrete 3 Steel shoring 30 Existing steel support structure 31 New steel shoring 32 Joint plate 33 Bolt hole 34 Flange 35 Lower steel support structure 4 Shoring support means 41 Pedestal 42 Support jig 43 Receiving beam 44 Receiving plate 45 Volts 46 Nut 47 Fixture 48 Through Hole 5 Guide pin 6. Connectors K Face M Erector SL Spring Line T-Tunnel T1 upper half T2 lower half
Claims
1. A support support means for supporting a leg of a new steel support to be erected on the face side of an existing steel support, A plurality of pedestals respectively provided below the plurality of existing steel supports arranged at the front and rear; A support jig interposed between the base and the existing steel support; A support girder horizontally installed on the legs of a plurality of the existing steel supports; A support plate fixed to the face side end of the support girder, A support support means, characterized in that the support plate is capable of supporting the legs of the newly constructed steel support.
2. The support support means described in claim 1, characterized in that the support girder is placed on the corner between the flange and the joint plate of the existing steel support and is fixed to the flange via a fixing jig.
3. The receiving plate has a through hole formed at a position corresponding to the bolt hole of the joint plate of the newly installed steel support, The shoring support means according to claim 1, characterized in that the through hole has a shape that allows a guide pin fixed to the bolt hole to be inserted therein.
4. A shoring erection method using the shoring support means according to any one of claims 1 to 3, Sliding the support girder to position the support plate at a position where the new steel support is installed; A method for erecting shoring, comprising the step of erecting the newly constructed steel shoring with the legs of the newly constructed steel shoring placed on the receiving plate.
Citation Information
Patent Citations
Lamination of photopolymerizing film
JP1988074051A