Ground improvement method utilizing removed utility pole

The method enhances ground improvement by selecting and press-fitting utility pole piles with tailored soil types and techniques, addressing limitations of conventional methods to expand applicability to diverse soil conditions.

JP2024141480APending Publication Date: 2024-10-10TOKYO ELECTRIC POWER CO HOLDINGS INC +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023053163
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Conventional methods for using removed utility poles in ground improvement are limited in scope and difficult to apply outside specific soil conditions, particularly in sandy and gravelly ground with N values beyond 4 or less.

Method used

A method involving the selection and press-fitting of utility pole piles, including first and second utility pole piles and split piles, tailored to different soil types based on soil bearing capacity, with optional through holes for enhanced consolidation, and combinations of static and oscillating press-fitting techniques.

Benefits of technology

Expands the applicability of ground improvement using removed utility poles to various soil types, including clay and sandy grounds with N values up to 10, by increasing soil density and circumferential support force.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

To expand a scope of a ground improvement method utilizing removed utility poles.SOLUTION: A ground improvement method utilizing removed utility pole piles (1) includes: a step of obtaining a bearing capacity of a target ground (2); a step of selecting at least one type of removed utility pole pile to be embedded to achieve the desired bearing capacity, based on the obtained bearing capacity of the target ground; and a step of pressing the selected removed utility pole pile into the target ground.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a ground improvement method using removed utility poles. [Background technology]

[0002] In recent years, for example, in conjunction with urban redevelopment and road widening construction, many utility poles have been removed and disposed of as industrial waste, while various methods have been developed to enable the effective use of removed utility poles as recycled products.For example, a method of constructing foundation piles using recycled utility poles is known in which recycled utility poles are pressed into foundation ground, including ground with an N value of 3 or less, by using a heavy press-in machine without drilling and forming guide holes in advance (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2007-231552 A Summary of the Invention [Problem to be solved by the invention]

[0004] In conventional technology, removed utility poles are pressed into the poles either in their original state or after being cut to a specified length, which limits the range of application and makes it difficult to apply the technology outside of specific conditions. In particular, the application of Patent Document 1 was limited mainly to very soft clay ground with an N-value of 3 or less, making it difficult to apply to clay ground with an N-value of approximately 3 to 4 or gravel ground with an N-value of approximately 10 or less.

[0005] Therefore, the present invention has been made in consideration of the above-mentioned problems, and aims to provide a technology that can expand the scope of ground improvement methods that utilize removed utility poles. [Means for solving the problem]

[0006] One aspect of the present invention is a ground improvement method using removed utility pole piles, characterized by comprising the steps of: determining the bearing capacity of a target ground; selecting at least one type of removed utility pole pile to be buried from the determined bearing capacity of the target ground to achieve a desired bearing capacity; and pressing the selected removed utility pole pile into the target ground.

[0007] It is also preferable that the removed utility pole piles include a first utility pole pile, a second utility pole pile having a different diameter than the first utility pole pile, a first split pile obtained by cutting the first utility pole pile into 1 / 2 along its extension direction, a second split pile obtained by cutting the first utility pole pile into 1 / 4 along its extension direction, a third split pile obtained by cutting the second utility pole pile into 1 / 2 along its extension direction, and a fourth split pile obtained by cutting the second utility pole pile into 1 / 4 along its extension direction.

[0008] Moreover, in the step of selecting utility pole piles to be removed, when the determined target ground is a clay ground having an N value of 0 to 2, it is preferable to select the first utility pole pile and the second utility pole pile.

[0009] In addition, in the step of selecting the utility pole piles to be removed, when the determined target ground is a clay ground having an N-value of 2 to 4, it is preferable to select the second utility pole pile and the second sectional pile.

[0010] In addition, in the step of selecting the utility pole piles to be removed, when the determined target ground is a sandy ground with an N value of 0 to 4, it is preferable to select the second utility pole pile and the second secant pile.

[0011] In addition, in the step of selecting the utility pole pile to be removed, when the determined target ground is a sandy ground having an N value of 4 to 10, it is preferable to select the second sectional pile.

[0012] In addition, it is preferable that the step of pressing the removed utility pole pile into the target ground includes at least one of a step of statically pressing the removed utility pole pile into the target ground and a step of swingingly pressing the removed utility pole pile into the target ground.

[0013] In addition, it is preferable that the step of pressing the removed utility pole pile into the target ground includes a step of connecting a plurality of the removed utility pole piles.

[0014] In addition, it is preferable that the removed utility pole pile has a through hole that penetrates from the outer peripheral surface to the inner peripheral surface.

[0015] In addition, it is preferable that the through hole is formed by drilling a scaffolding mounting hole in the removed utility pole pile.

[0016] It is also preferred that the first utility pole pile is manufactured from a utility pole having a length of more than 10 m.

[0017] It is also preferable that the second utility pole pile is manufactured from a utility pole having a length of 10 m or less.

[0018] It is also preferable that the second secant pile is manufactured by cutting the first secant pile in half along the extension direction, and the fourth secant pile is manufactured by cutting the third secant pile in half along the extension direction. Effect of the Invention

[0019] According to one aspect of the present invention, the scope of application of a ground improvement method using removed utility poles can be expanded. [Brief description of the drawings]

[0020] [Figure 1] FIG. 1 is a schematic diagram showing the state in which a removed utility pole pile is pressed into the ground. [Diagram 2] FIG. 1 shows six types of removed utility pole piles. [Diagram 3] FIG. 11 is a cross-sectional view of the construction position after the first utility pole pile and the second utility pole pile are pressed into place. [Figure 4] FIG. 11 is a cross-sectional view of the construction position after the second utility pole pile and the second cotter pile are pressed into place. [Diagram 5] FIG. 11 is a cross-sectional view of the construction position after the second utility pole pile and the second cotter pile are pressed into place. [Figure 6]FIG. 11 is a cross-sectional view of the construction position after the second secant pile is pressed in. [Figure 7] FIG. 13 is a diagram showing the effect of the through hole of the removed utility pole pile. [Figure 8] 1 is a flowchart showing a method for pressing in a removed utility pole pile. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will now be described with reference to the accompanying drawings. Note that the embodiments described below are merely examples, and various embodiments are possible within the scope of the present invention.

[0022] As shown in Fig. 1, the ground improvement method using a removed utility pole according to the present invention involves carrying out ground improvement of a target ground by using piles (hereinafter referred to as "removed utility pole piles") manufactured by processing utility poles (including power poles, telegraph poles, and shared poles) that have been removed by electric utilities, telecommunications carriers, etc. due to changes in road alignments, etc. Specifically, the removed utility pole piles 1 are adopted when effectively utilizing them as foundation piles for a building by pressing them into the target ground 2 using a pile driver 3 equipped with a pressing mechanism, which is known as heavy machinery for driving steel pipe piles or PC concrete piles.

[0023] As shown in FIG. 2, six types of removed utility pole piles 1 are used, for example, a first utility pole pile 1a, a second utility pole pile 1b, a first sectional pile 1c, a second sectional pile 1d, a third sectional pile 1e, and a fourth sectional pile 1f. The first utility pole pile 1a is manufactured by cutting a utility pole having a length of more than about 10 m in a direction intersecting with the extending direction so as to have a length suitable for transportation, removing the scaffolding protrusions and the insulator supporting cross beam, and further drilling the scaffolding mounting hole from which the scaffolding protrusions have been removed using a tool such as a drill to form a through hole h that penetrates from the outer peripheral surface to the inner peripheral surface. In this embodiment, for example, the utility pole (main pole) erected for attaching electric wires is cut into two equal parts (a length suitable for transportation), and then the head is cut off, and the scaffolding protrusions and the insulator supporting cross beam are removed, and the scaffolding mounting hole from which the scaffolding protrusions have been removed is further drilled using a tool such as a drill to form the through hole h. The second utility pole pile 1b is a utility pole having a different diameter from the first utility pole pile 1a. The second utility pole pile 1b is manufactured by removing the scaffolding protrusions and the insulator supporting cross beams from a utility pole having a length of about 10 m or less and a diameter smaller than that of the first utility pole pile 1a, and further drilling the scaffolding mounting hole from which the scaffolding protrusions have been removed using a tool such as a drill to form a through hole h that penetrates from the outer peripheral surface to the inner peripheral surface. In addition, if necessary, the pole may be cut in a direction intersecting the extension direction in order to adjust the length in the extension direction. In this embodiment, the utility pole (small pole) erected mainly for passing electric wires through narrow places is manufactured by removing the scaffolding protrusions and the insulator supporting cross beams from the utility pole, and further drilling the scaffolding mounting hole from which the scaffolding protrusions have been removed using a tool such as a drill to form a through hole h, without cutting the pole in a direction intersecting the extension direction. The first split pile 1c is manufactured by cutting the first utility pole pile 1a in half along the extension direction so as to pass through the axis. The second secant pile 1d is manufactured by cutting the first utility pole pile 1a into 1 / 4 along the extension direction so as to pass through the axis. Specifically, the second secant pile 1d is manufactured by further cutting the first secant pile 1c into 1 / 2 along the extension direction. The first secant pile 1c and the second secant pile 1d are manufactured by dividing the first utility pole pile 1a in consideration of strength, but in addition to these secant piles 1c and 1d, a third secant pile 1e obtained by cutting the second utility pole pile 1b in half along the extension direction so as to pass through the axis, or a fourth secant pile 1f obtained by cutting the second utility pole pile 1b in a quarter along the extension direction so as to pass through the axis may also be used. Here, the fourth secant pile 1f is manufactured by further cutting the third secant pile 1e in half along the extension direction. Regarding the combination and number of each utility pole pile 1a, 1b and each sectional pile 1c to 1f, it is preferable to measure the bearing capacity of the ground to be improved and then realize the bearing capacity that needs to be increased to achieve the desired bearing capacity with as few numbers as possible.

[0024] As shown in Figures 3 to 6, the removed utility pole piles 1 are pressed into the ground to a depth of approximately 1 m added to their own length. When multiple types of removed utility pole piles 1 are selected to be pressed into the ground, it is preferable to press in different types of removed utility pole piles 1 alternately in the horizontal direction as shown in Figures 3 to 5. The number of removed utility pole piles 1 pressed into the ground is preferably approximately 30 to 40 removed utility pole piles 1 per 166 m2, similar to ground improvement using general piles.

[0025] When selecting the utility pole piles to be pressed into the target ground (foundation ground) 2, for example, if the measured N-value of the target ground 2 is a clay ground of 0 to 2, the first utility pole pile 1a and the second utility pole pile 1b are pressed into the target ground 2 so that they are arranged alternately in the horizontal direction, as shown in Figure 3. If the measured N-value of the target ground 2 is a clay ground of 2 to 4, the second utility pole piles 1b and the second cotter piles 1d are pressed into the target ground 2 so that they are alternately arranged in the horizontal direction, as shown in FIG. When the measured target ground 2 is a sandy ground with an N-value of 0 to 4, the second utility pole piles 1b and the second cotter piles 1d are pressed into the target ground 2 so as to be alternately arranged in the horizontal direction, as shown in FIG. When the measured target ground 2 is a sandy ground with an N-value of 4 to 10, the second secant piles 1d are pressed into the target ground 2 so as to be aligned horizontally, as shown in FIG.

[0026] As shown in FIG. 7, when the removed utility pole pile 1 (in this embodiment, the first utility pole pile 1a) is pressed into the ground, an increase in pore water pressure occurs in the ground surrounding the removed utility pole pile 1. The increase in pore water pressure causes the permeation of pore water in the soil components, and water equivalent to the excess pore water pressure is discharged from the gaps between the soil particles. If the removed utility pole pile 1 does not have a through hole h, the water discharged from the gaps between the soil particles moves outward in the normal direction from the center point of the removed utility pole pile 1. However, by providing the removed utility pole pile 1 with a through hole h, as shown in FIG. 7(a), the water discharged from the gaps between the soil particles penetrates into the removed utility pole pile 1 through the through hole h of the removed utility pole pile 1, thereby decreasing the void ratio (water content) of the ground surrounding the removed utility pole pile 1. As a result, the density of the soil components in the ground surrounding the removed utility pole pile 1 increases. The increase in density of the soil components promotes consolidation of the ground surrounding the removed utility pole pile 1. As shown in Figure 7(b), the water that has infiltrated into the inside of the removed utility pole pile 1 is discharged from the inside surface of the removed utility pole pile 1 through the opening at the bottom, to the outside of the removed utility pole pile 1. In addition, for the soil that has infiltrated into the inside surface of the removed utility pole pile 1 due to pressing in, the increase in pore water pressure causes the permeation of pore water in the soil components, and the water equivalent to the excess pore water pressure discharged from the gaps between the soil particles is discharged from the inside surface of the removed utility pole pile 1 through the opening at the bottom of the removed utility pole pile 1 to the outside of the removed utility pole pile 1. As a result, the increase in density of the soil components also promotes consolidation on the inside surface of the removed utility pole pile 1. As a result of the promoted consolidation, the peripheral bearing capacity (frictional force) of the removed utility pole pile 1 is increased, thereby providing a bearing capacity that cannot be obtained with a general pile of the same diameter and length.

[0027] Figure 8 shows a flowchart for the process of pressing in the removed utility pole piles 1. This flowchart shows the preferable judgment process in the process of pressing in the removed utility pole piles 1, from selecting the removed utility pole pile 1 to be pressed in first based on the results of a soil bearing capacity survey, and starting to press the removed utility pole piles 1 into the construction position, to completing pressing in all the required removed utility pole piles 1.

[0028] In the ground improvement method according to the present embodiment, first, a bearing capacity survey is carried out in advance on the target ground 2 to be improved. As the bearing capacity survey, for example, a standard penetration test or a screw weight penetration test may be carried out. The bearing capacity survey allows the N value of the target ground to be ascertained.

[0029] Next, based on the N-value determined by the soil bearing capacity survey, the type of removed utility pole pile that is most suitable for ground improvement of the target ground is selected.

[0030] In the case of a very soft clay ground with an N value of about 0 to 2, the first utility pole pile 1a and the second utility pole pile 1b are selected as the type of the removed utility pole pile 1 most suitable for ground improvement. In this case, in the step of performing the press-in, it is preferable to perform static press-in for both the first utility pole pile 1a and the second utility pole pile 1b. This is because a very soft clay ground with an N value of about 0 to 2 has a large void ratio and a saturation degree close to 1, so that the total stress increase in the soil caused by the press-in of the removed utility pole pile 1 induces an increase in pore water pressure with small shear resistance. On the other hand, since it is difficult to induce an increase in effective stress with large shear resistance, the increase in the press-in resistance of the ground due to press-in is suppressed, and press-in is easier than other grounds. Therefore, by adopting the first utility pole pile 1a and the second utility pole pile 1b, which are removed utility pole piles 1 with a large pressed-in volume, the aim is to consolidate the surrounding ground with a larger load and obtain a greater peripheral bearing capacity.

[0031] In the case of soft clay ground with an N value of about 2 to 4, the second utility pole pile 1b and the second cotter pile 1d are selected as the type of removed utility pole pile 1 most suitable for ground improvement. In this case, in the step of performing press-in, it is preferable to perform static press-in for the second utility pole pile 1b, and to switch to rocking press-in when the static press-in for the second cotter pile 1d stops. This is because soft clay ground with an N value of about 2 to 4 has a degree of saturation close to 1, but has a smaller void ratio than very soft clay ground with an N value of about 0 to 2, and when the N value increases due to the press-in of the removed utility pole pile 1, the effective stress of the soil with high shear resistance increases, so the press-in resistance of the ground increases with press-in. And, since it becomes difficult to press in the removed utility pole pile 1, which has a large press-in volume, as the pressing-in proceeds, the second sectional pile 1d, which is a removed utility pole pile 1 with a small press-in volume, is used in combination with the second sectional pile 1d, with the aim of enabling the pressing-in of the removed utility pole pile 1 to be performed reliably even in ground in which it is difficult to press in the first utility pole pile 1a and the second utility pole pile 1b. On the other hand, unlike in the case of very soft clay ground with an N value of about 0 to 2, the increase in the press-in resistance of the ground caused by pressing-in increases the circumferential bearing capacity at the same time, so that even if the pressed-in volume (circumferential area) of the removed utility pole pile 1 to be pressed in is small, the circumferential bearing capacity can be sufficiently secured, and therefore the required ground improvement effect can be sufficiently obtained even when the second sectional pile 1d is used.

[0032] In the case of a very loose sandy ground with an N value of about 0 to 4, the second utility pole pile 1b and the second cotter pile 1d are selected as the type of removed utility pole pile 1 most suitable for ground improvement. In this case, in the step of performing the press-in, it is preferable to perform static press-in for the second utility pole pile 1b and to switch to rocking press-in when the static press-in for the second cotter pile 1d stops. This is because the very loose sandy ground with an N value of about 0 to 4 has a larger void ratio than the soft clay ground with an N value of about 2 to 4, and the degree of saturation is also close to 1. Therefore, in the initial stage of press-in, the total stress increase in the soil caused by the press-in of the removed utility pole pile 1 induces an increase in pore water pressure with small shear resistance. On the other hand, since it is difficult to induce an increase in effective stress with large shear resistance, the increase in the resistance of the ground due to injection is suppressed and injection becomes easy, but since the permeability coefficient is large, the pore water pressure increases during the injection stage and then dissipates quickly, so the increase in the total stress of the soil induces an increase in the effective stress. This increases the resistance to injection and makes it difficult to inject the removed utility pole pile 1, which has a large injected volume, so the aim is to use the second split pile 1d, which is a removed utility pole pile 1 with a small injected volume, in combination so that the first utility pole pile 1a and the second utility pole pile 1b can be pressed in reliably even in ground conditions where it is difficult to press in the piles. On the other hand, due to the increase in the pressing resistance of the ground that accompanies pressing, the circumferential bearing capacity also increases at the same time, unlike in the case of very soft clay ground with an N-value of approximately 0 to 2. Therefore, even if the pressing volume (circumferential area) of the removed utility pole pile 1 to be pressed in is small, sufficient circumferential bearing capacity can be secured, and the required ground improvement effect can be fully obtained even when the second sectional pile 1d is used.

[0033] In the case of loose sandy ground with an N value of about 4 to 10, the second cotter pile 1d is selected as the type of removed utility pole pile 1 most suitable for ground improvement. In this case, in the step of performing press-in, it is preferable to perform static press-in of the second cotter pile 1d, and switch to rocking press-in when the press-in stops. This is because loose sandy ground with an N value of about 4 to 10 has a small void ratio, a saturation degree close to 1, and a large coefficient of permeability, so that the pore water pressure with small shear resistance increases due to the increase in the total stress of the soil caused by the press-in of the removed utility pole pile 1, and then dissipates instantly, inducing an increase in the effective stress with large shear resistance. Therefore, the press-in resistance increases instantly after the start of press-in, making it difficult to press-in the removed utility pole pile 1 with a large press-in volume, and press-in is difficult only with the second cotter pile 1d, which is a removed utility pole pile 1 with a small press-in volume. On the other hand, since the increase in the pressing resistance of the ground due to pressing-in causes the circumferential bearing capacity to increase instantaneously, even if the pressing volume (circumferential area) of the removed utility pole pile 1 to be pressed in is small, sufficient circumferential bearing capacity can be secured, and the required ground improvement effect can be fully obtained even when the second cotter pile 1d is used.

[0034] Next, a process of pressing in the removed utility pole pile 1 is started. Note that, prior to the process of pressing in, it is advisable to level the target ground 2 as necessary. First, it is confirmed whether there is an area of ​​the target ground 2 into which the utility pole pile 1 to be removed can be pressed in (YES in step S101). Next, from among the removed utility pole piles 1 selected in the process of selecting the type of removed utility pole pile 1 most suitable for ground improvement based on the results of the soil bearing capacity survey, the first utility pole pile 1a, the second utility pole pile 1b, and the second sectional pile 1d are selected in this order as the removed utility pole piles 1 to be driven in first (steps S102 to S104). This is because it is advantageous in terms of cost to use the first utility pole pile 1a, which is the removed utility pole pile 1 with a larger cross-sectional area, first, first, and second sectional piles 1d first, first, and second sectional piles 1d first, first, and second sectional piles 1d first, first, and second sectional piles 1d first, first, and second sectional piles 1d first, first, and second sectional piles 1d first, first, and second sectional piles 1d, second, and second sectional piles 1d ... second, and second sectional piles 1d, first, and second sectional piles 1d, second, and sectional piles 1d, respectively, first, first, and second sectional piles 1d, second, and sectional piles 1d, respectively, first, first, and second sectional piles 1d, second, and sectional piles 1d, respectively, first, first, and second sectional piles 1d, second, and sectional piles 1d, respectively, first, first, and second sectional piles 1d, second, and sectional piles 1d, respectively, first, Next, a pile driver 3 equipped with a pressing mechanism is used to perform static pressing-in of the removed utility pole pile 1 selected in steps S102 to S104 (steps S105 to S107). The static pressing-in continues until the removed utility pole pile 1 cannot be pressed in any deeper due to pressing-in resistance (YES in step S108) and until the length of the removed utility pole pile 1 being pressed in is insufficient to continue pressing in (YES in step S111). Next, when the removed utility pole pile 1 cannot be driven deeper due to the drive-in resistance (NO in step S108), only when the second secant pile 1d is being statically driven in (YES in step S109), the drive-in is changed to rocking drive-in (step S110) and the drive-in is continued. In cases other than when the second secant pile 1d is being statically driven in (NO in S109), the drive-in of the removed utility pole pile 1 being driven in is stopped (step S116). Next, if the pressing-in of the removed utility pole pile 1 progresses and there is no longer a sufficient length to continue pressing in (NO in step S111), or if the pressing-in depth does not exceed 20 m (NO in step S112), pressing in of the removed utility pole pile 1 is temporarily stopped (step S113), and a metal fitting is used to connect a removed utility pole pile 1 of the same type to the removed utility pole pile 1 being pressed in (step S114). After connecting the removed utility pole piles 1, pressing in of the removed utility pole pile 1 being pressed in continues (step S115). If the pressing-in depth exceeds 20 m (YES in step S112), pressing in of the removed utility pole pile 1 being pressed in is stopped (step S116). Next, after stopping the pressing-in of the removed utility pole pile 1 being pressed in (step S116), another removed utility pole pile 1 is prepared and pressing-in of the removed utility pole pile 1 is continued until there is no more area available to press in the pile (NO in step S101).

[0035] According to the above-described ground improvement method, by combining multiple types of removed utility pole piles of different diameters with multiple types of split piles obtained by dividing these utility pole piles along their extension direction (axial direction), and selecting and pressing them in according to the bearing capacity (N value) of the target ground 2, the removed utility pole piles 1 can be used for ground improvement of any ground. This makes it possible to apply the ground improvement method using removed utility poles not only to very soft clay ground with an N value of 3 or less, which is the range of application of the conventional ground improvement method using removed utility poles, but also to clay ground with an N value of approximately 3 to 4 and sand ground with an N value of approximately 10 or less. In the above embodiment, the first secant pile 1c, the third secant pile 1e, and the fourth secant pile 1f were not used, but the same effect as the second secant pile 1d can be achieved. Of course, it is also possible to further divide the second secant pile 1d in half to produce a 1 / 8 split pile of the first utility pole pile 1a. Furthermore, the utility pole piles used as the removed utility pole piles 1 are not limited to two types of utility poles with different diameters, and any type of utility pole can be used as the utility pole pile. Also, by dividing any utility pole pile along its extension direction (axial direction), multiple types of split piles can be used. The split piles are not limited to those divided into 1 / 2 or 1 / 4 as described above, but may be any number of parts of the utility pole pile divided into 1 / 3, 1 / 5, 1 / 6, 1 / 10, etc. Furthermore, when the removed utility pole pile 1 is pressed into the target ground 2, at least one of static pressing and rocking pressing may be performed.

[0036] Although the preferred embodiment of the present invention has been described, the present invention is not limited to the above embodiment, and includes all aspects included in the concept of the present invention and the scope of the claims. In addition, each configuration may be appropriately and selectively combined so as to achieve at least a part of the above-mentioned problems and effects. For example, the shape, material, arrangement, size, etc. of each component in the above embodiment may be appropriately changed depending on the specific use of the present invention. [Explanation of symbols]

[0037] 1. Removed utility pole piles 1a First utility pole 1b Second utility pole 1c First split pile 1d Second split pile 1e Third Split Pile 1F 4th split pile 2. Target ground 3 Pile driver h through-hole

Claims

1. A ground improvement method using removed utility pole piles, A process of determining the bearing capacity of the target ground; A step of selecting at least one type of removed utility pole pile to be buried to achieve a desired bearing capacity from the obtained bearing capacity of the target ground; Pressing the selected removed utility pole pile into the target ground; A ground improvement method using removed utility pole piles, comprising:

2. A ground improvement method using the removed utility pole pile according to claim 1, The removed utility pole pile is A first utility pole; A second utility pole pile having a diameter different from that of the first utility pole pile; A first split pile obtained by cutting the first utility pole pile in half along the extension direction; A second split pile obtained by cutting the first utility pole pile into 1 / 4 along the extension direction; A third split pile obtained by cutting the second utility pole pile in half along the extension direction; A fourth split pile obtained by cutting the second utility pole pile into 1 / 4 along the extension direction; A ground improvement method using removed utility pole piles, comprising:

3. A ground improvement method using the removed utility pole pile according to claim 2, The step of selecting the removed utility pole pile includes: If the N value of the target ground is 0 to 2, which is clay ground, The first utility pole pile; The second utility pole pile; A ground improvement method using removed utility pole piles, characterized by selecting

4. A ground improvement method using the removed utility pole pile according to claim 2, The step of selecting the removed utility pole pile includes: If the N value of the target ground is 2 to 4, which is clay ground, The second utility pole pile; The second split pile; A ground improvement method using removed utility pole piles, characterized by selecting

5. A ground improvement method using the removed utility pole pile according to claim 2, The step of selecting the removed utility pole pile includes: If the N value of the target ground is 0 to 4, which is sand ground, The second utility pole pile; The second split pile; A ground improvement method using removed utility pole piles, characterized by selecting

6. A ground improvement method using the removed utility pole pile according to claim 2, The step of selecting the removed utility pole pile includes: If the N value of the target ground is 4 to 10, which is sandy ground, The second split pile A ground improvement method using removed utility pole piles, characterized by selecting

7. A ground improvement method using the removed utility pole pile according to claim 1 or 2, The step of pressing the removed utility pole pile into the target ground includes: A step of statically pressing in the removed utility pole pile; In the step of performing the rocking and pressing of the removed utility pole pile, A ground improvement method using removed utility pole piles, characterized by having at least one of the following:

8. A ground improvement method using the removed utility pole pile according to claim 1 or 2, The step of pressing the removed utility pole pile into the target ground includes: A step of connecting a plurality of the removed utility pole piles A ground improvement method using removed utility pole piles, comprising:

9. A ground improvement method using the removed utility pole pile according to claim 1 or 2, The removed utility pole pile is Having a through hole that penetrates from the outer peripheral surface to the inner peripheral surface This is a ground improvement method using removed utility pole piles.

10. A ground improvement method using the removed utility pole pile according to claim 9, The through hole is formed by drilling a scaffolding mounting hole of the removed utility pole pile. This is a ground improvement method using removed utility pole piles.

11. A ground improvement method using the removed utility pole pile according to claim 2, The first utility pole pile comprises: Manufactured from utility poles that are over 10m long This is a ground improvement method using removed utility pole piles.

12. A ground improvement method using the removed utility pole pile according to claim 2, The second utility pole pile includes: Manufactured from utility poles with a length of 10m or less This is a ground improvement method using removed utility pole piles.

13. A ground improvement method using the removed utility pole pile according to claim 2, The second split pile is manufactured by cutting the first split pile in half along the extension direction, The fourth split pile is manufactured by cutting the third split pile in half along the extension direction. This is a ground improvement method using removed utility pole piles.

Citation Information

Patent Citations

  • Construction method of foundation pile using recycled electric pole

    JP2007231552A