Towing type underpass construction method

The towed underpass construction method stabilizes support and reaction forces by reinforcing the supporting wall with hollow pipe members and connecting beams, allowing efficient towing of heavy box structures across embankments, thereby reducing costs and labor.

JP2024143680APending Publication Date: 2024-10-11OKUMURA CORP +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023056468
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing underpass construction methods face challenges in obtaining stable support and reaction forces when towing heavy box structures across existing structures like embankments, leading to inefficiencies and increased costs due to the need for additional structures and labor.

Method used

A towed underpass construction method that reinforces the supporting wall at the starting base by arranging hollow pipe members in a row and connecting them to a supporting wall, using a traction steel wire to transfer the reaction force through connecting beams to both the supporting wall and embankment ground, allowing for stable towing of heavy box structures.

Benefits of technology

Enables stable and efficient towing of heavy box structures by distributing the support reaction force across the supporting wall and embankment ground, reducing the need for additional structures and labor, thus enhancing construction efficiency and reducing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143680000001_ABST
    Figure 2024143680000001_ABST
Patent Text Reader

Abstract

To provide a towing type underpass construction method capable of obtaining a stable support reaction force when towing even if a box structure is heavy.SOLUTION: The present invention includes a box-shaped roof forming step of forming a box-shaped roof 22 on the ground immediately below an expressway 50, and a towing step of towing a box structure 20 to an arrival base 52 side while replacing it with the box-shaped roof 22, and installing it on the ground below the expressway 50. In the towing step, at the arrival base 52, a tie beam 13 is erected between an opposing surface portion 11b of a support wall 11 in the towing direction X and a face wall portion 53a of an embankment ground below the expressway 50, and by using the erected tie beam 13, the support reaction force when the box structure 20 is towed by a towing steel wire 12 is borne not only by the support wall 11 but also by the face wall portion 53a of the embankment ground.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a tow-type underpass construction method, and in particular to a tow-type underpass construction method for forming an underground space by using a box structure with a rectangular cross-sectional shape that is towed across the ground below an existing structure. [Background technology]

[0002] The underpass method is a method for forming an underground space that crosses the ground below an existing structure such as a railroad track or a road without interfering with the operation of railroads or vehicles, and examples of such methods include the SFT method (registered trademark) and the R&C method (registered trademark), which replace a box-shaped roof with a box-shaped roof, and the Frontejacking method (registered trademark). The SFT method and the R&C method form a box-shaped roof, preferably made of hollow pipe members having a rectangular cross-sectional shape, including a pipe roof (a row of pipes on the top surface) of the upper floor that supports an existing structure such as a railroad track or a road from below, on the ground in the planned installation area of ​​the box structure, which is the planned location for forming an underground space, and replace the box-shaped roof including the pipe roof of the upper floor, for example, made of concrete and having a rectangular cross-sectional shape, by driving or towing the box structure into the ground in the planned installation area to form an underground space by the box structure (see, for example, Patent Document 1 and Patent Document 2).

[0003] In addition, the Frontejacking method involves leaving a row of pipes, including a pipe roof on the upper floor, formed on the ground in the planned installation area of ​​the box structure, in the ground, and towing the box structure of the departure base toward the arrival base while aligning the top surface of the left behind pipe row, particularly the pipe roof on the upper floor, to form an underground space inside the left behind pipe row (see, for example, Patent Documents 3 and 4).

[0004] Here, when towing a box structure from a departure base to a destination base, a reaction force resistor must be provided at the destination base to obtain a supporting reaction force when the box structure is towed by the towing steel wire. For example, Figures 14(a) to (d) of Patent Document 4 show various proposals for such reaction force resistors. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2007-177553 A [Patent Document 2] JP 2012-144942 A [Patent Document 2] Japanese Patent Application Publication No. 6-41996 [Patent Document 3] JP 2004-257025 A Summary of the Invention [Problem to be solved by the invention]

[0006] On the other hand, for example, in a construction site where the ground below the existing structure is a banked ground and the site for establishing the starting base and the arrival base can be secured without forming a shaft on both sides of the existing structure, it is necessary to erect a support wall as a reaction force resister at the arrival base to obtain a support reaction force. In addition, when a large site can be secured as the starting base, it is preferable to use the large site of the starting base to construct the concrete box structure as a large structure, preferably with a sufficient extension to cross the ground below the existing structure at once and advance it, rather than constructing the concrete box structure by dividing it into multiple parts and building the next part each time after advancing the preceding part, in that it allows for more efficient construction, but if the weight of the box structure becomes considerably heavy, it is assumed that it will be difficult to obtain a support reaction force in a stable state when towing the box structure with only the support wall formed at the arrival base.

[0007] In such cases, it may be possible to construct a larger supporting wall or to form additional auxiliary walls or structures to reinforce the supporting wall, but constructing these would require extra work and costs, and removing them would also require extra work and costs. Therefore, there is a need for the development of technology that can more simply and effectively obtain a stable support reaction force when towing an existing structure.

[0008] The present invention aims to provide a tow-type underpass construction method that can simply and effectively reinforce the support wall installed at the starting base, thereby enabling a stable support reaction force to be obtained when towing a box structure even when the weight of the box structure to be towed is considerably heavy. [Means for solving the problem]

[0009] The present invention relates to a tow-type underpass construction method for forming an underground space by using a box structure having a rectangular cross-sectional shape towed across the ground below an existing structure, the tow-type underpass construction method including a box roof forming process in which a plurality of hollow pipe members are arranged in a line in a circumferential direction of the planned installation area of ​​the box structure from a starting base provided on one side of the planned installation area of ​​the ground below the existing structure, to a destination base provided on the other side, and each of the hollow pipe members is pushed into the ground directly below the existing structure to form a box roof including at least a top surface pipe row that crosses the ground directly below the existing structure; and a box roof forming process in which one end of the box structure is connected and supported to a back portion in a towing direction of a support wall provided upright at the destination base, and is extended so as to cross the planned installation area, The method includes a towing process in which the box structure is towed toward the destination base by a towing steel wire engaged with the rear end in the towing direction of the box structure provided at the starting base, while replacing the top surface with the top surface pipe row or aligning the top surface with the top surface pipe row, thereby moving the box structure to the ground below the existing structure. In the towing process, a tie beam is erected at the destination base between the opposing surface in the towing direction of the support wall body and a mirror wall body formed on the ground below the existing structure, and the above-mentioned objective is achieved by providing a towing-type underpass construction method in which the support reaction force when towing the box structure with the towing steel wire is borne not only by the support wall body but also by the mirror wall body via the erected tie beam.

[0010] In the tow-type underpass construction method of the present invention, the support wall body, which is erected at the arrival base, is formed by filling and solidifying concrete in the gap between a pair of retaining wall members installed at a distance in the towing direction, and it is preferable that one end of the towing steel wire is arranged to penetrate the support wall body in the towing direction and is fixed and supported to the back side of the support wall body in the towing direction.

[0011] In addition, it is preferable that the towed underpass construction method of the present invention is implemented using the R&C construction method (registered trademark), in which the box structure is towed while excavation work is carried out at the face portion of the front portion in the towing direction of the box structure and the top surface portion is replaced with the top surface pipe row.

[0012] Furthermore, it is preferable that the tow-type underpass construction method of the present invention is implemented using a fronte-jacking construction method in which excavation work is carried out at the face portion of the front portion in the towing direction of the box structure, while the top surface is aligned with the underside of the top surface pipe row, and the box structure is towed while leaving the top surface pipe row in the ground.

[0013] Furthermore, in the tow-type underpass construction method of the present invention, it is preferable that the box structure has a configuration in which a plurality of unit boxes arranged in series in the towing direction are towed as a unit.

[0014] In addition, in the tow-type underpass construction method of the present invention, it is preferable that the ground below the existing structure is a banked ground. Effect of the Invention

[0015] According to the tow-type underpass construction method of the present invention, the support wall installed at the starting base can be easily and effectively reinforced, and a stable support reaction force can be obtained when towing the box structure to be towed, even if the weight of the box structure to be towed is considerably heavy. [Brief description of the drawings]

[0016] [Figure 1] FIG. 1 is a schematic vertical cross-sectional view illustrating a tow-type underpass construction method according to a preferred embodiment of the present invention. [Diagram 2] FIG. 2 is an enlarged view of part A in FIG. 1, illustrating a tow-type underpass construction method according to a preferred embodiment of the present invention. [Diagram 3]1(a) to 1(c) are schematic vertical cross-sectional views illustrating each step of a tow-type underpass construction method according to a preferred embodiment of the present invention. [Figure 4] 1(a) to 1(d) are schematic vertical cross-sectional views illustrating each step of a tow-type underpass construction method according to a preferred embodiment of the present invention. [Diagram 5] 1(a) to 1(c) are schematic vertical cross-sectional views illustrating each step of a tow-type underpass construction method according to a preferred embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] The tow-type underpass construction method according to a preferred embodiment of the present invention is adopted as a construction method for forming an underground space in which another road is laid by propelling a hollow box structure 20 having a rectangular cross section into the ground directly below the expressway 50 when a new road is constructed to cross the ground below a multi-lane expressway as an existing structure 50 and cross over it, as shown in FIG. 1. In this embodiment, the tow-type underpass construction method is preferably a well-known tow-type R&C construction method (registered trademark), and the box structure 20 is propelled and installed into the ground below the expressway 50 so as to replace the box roof 22 made of hollow pipe members 23 preferably having a rectangular cross section, including a top pipe row 22a, which was previously formed on the ground directly below the expressway 50, thereby forming an underground space.

[0018] In this embodiment, the ground beneath the expressway 50, an existing structure, along which the box structure 20 is advanced is an embankment, and a vast starting base 51 and a destination base 52 can be secured on both sides of the expressway 50. For this reason, in this embodiment, in order to enable efficient construction, the concrete box structure 20 is constructed as a large and considerably heavy structure at the vast starting base 51, preferably by connecting a plurality of unit box bodies 21 in the towing direction X, with a sufficient length to cross the ground beneath the expressway 50 at one time. This creates a need to ensure that the support reaction force can be obtained in a stable state when the heavy box structure 20 is towed toward the destination base 52. In the tow-type underpass construction method of this embodiment, the support wall 11, which is erected and constructed at the destination base 52 to obtain the support reaction force during towing, is simply and effectively reinforced, making it possible to obtain a more stable support reaction force when the box structure 20 is towed.

[0019] The tow-type underpass method of this embodiment is a tow-type R&C method (registered trademark) for forming an underground space by using a box structure 20 having a rectangular cross-sectional shape that is towed across the ground below an expressway 50, which is an existing structure. As shown in Figures 3 to 5, a plurality of hollow pipe members 23 are arranged in a line in the circumferential direction of the planned installation area 24 (see Figure 3(a)) of the box structure 20 in the ground below the expressway 50, from a starting base 51 provided on one side of the planned installation area 24 (see Figure 3(a)) of the box structure 20 in the ground below the expressway 50, toward a destination base 52 provided on the other side, and are then pushed into the ground directly below the expressway 50, thereby forming an underground space directly below the expressway 50. The process includes a box-shaped roof forming process (see FIG. 3(b)) for forming a box-shaped roof 22 including at least a top surface pipe row 22a that crosses the ground in the lower portion, and a towing process (see FIG. 4(a) to (d)) for moving the box-shaped structure 20 to the ground below the expressway 50 by towing the box-shaped structure 20 toward the arrival base 52 with a towing steel wire 12 (see FIG. 3(c)) that is connected and supported at one end to a back portion 11a in the towing direction X of a supporting wall 11 that is erected at the arrival base 52 and extended so as to cross the planned installation area 24 and engaged with a rear end portion in the towing direction X of the box-shaped structure 20 that is installed at the starting base 51, while replacing the top surface 20a with the top surface pipe row 22a. In the towing process, as shown in FIG. 2, at the arrival base 52, a tie beam 13 is erected between the opposing surface 11b of the supporting wall 11 in the towing direction X and the mirror wall surface 53a formed on the embankment ground below the expressway 50. By using the erected tie beam 13, the support reaction force when towing the box structure 20 with the towing steel wire 12 is borne not only by the supporting wall 11 but also by the mirror wall surface 53a of the embankment ground.

[0020] Moreover, in this embodiment, the box structure 20 has a configuration in which a plurality of unit boxes 21 (five in this embodiment) preferably arranged in series in the towing direction X are towed as a unit (see Figs. 4(a) to (d)). In this embodiment, these arranged unit boxes 21 are arranged with inner push jacks 25 interposed between each adjacent unit box 21, which makes it possible to implement the well-known ESA construction method in which, for example, one unit box 21 is used as a driving box and the remaining unit boxes 21 are used as reaction boxes, and the frictional resistance force of the reaction box that is not being driven is used as a reaction force, and the driving boxes are driven in one direction while being replaced without relying on external reaction force resistance.

[0021] To carry out the tow-type underpass construction method of this embodiment, as preparatory work, for example, removal and restoration of obstacles at the construction site, and chemical injection work 56a prior to excavation of the guide pit 56 are carried out, and then, as shown in FIG. 3(a), steel sheet piles for retaining soil are driven into both sides of the embankment ground below the expressway 50 to form mirror wall surfaces 53a, 53b on both sides of the expressway 50, and a roof propulsion reaction body 55 is formed at the starting base 51, and a support wall body 11 is formed at the arrival base 52. Since the roof propulsion reaction body 55 needs to be removed before propelling the box structure 20 after the box-shaped roof 22 is formed, it is preferable to form it by backfilling soil and sand in an interior surrounded by a rectangular shape of steel sheet piles, for example. The support wall body 11 is preferably formed by pouring concrete in an interior surrounded by a rectangular shape of steel sheet piles, for example, so that it can fully bear the reaction force during towing. A through hole for inserting the traction wire 12 is formed at a predetermined position in the supporting wall 11, penetrating between the opposing surface portion 11b and the back surface portion 11a in the traction direction X. Also, a guide pit 56 for inserting the traction wire 12 is formed in the area where the chemical grouting work 56a is performed in the bottom corner portion of the planned installation area 24 of the box structure 20.

[0022] Furthermore, in this embodiment, in the towing process of the box structure 20 described later, a tie beam 13 is installed between the opposing surface 11b of the supporting wall 11 in the towing direction X and the mirror wall 53a on the side of the arrival base 52 of the embankment land so that the support reaction force when towing the box structure 20 is also borne by the wall 53a. The tie beam 13 is made of a retaining beam member made of, for example, H-shaped steel, and can be installed in an erected state between them by joining both ends to a wale member made of, for example, H-shaped steel installed on the opposing surface 11b and the mirror wall 53a. In this embodiment, the tie beam 13 is installed in a position appropriately selected so as not to interfere with the frame steel constituting the temporary hollow pipe removal equipment 27 (see FIG. 3(b)) installed within the range surrounded by the box-shaped roof 22 at the arrival base 52, and is installed in two stages, for example, one above the other.

[0023] In this embodiment, after these preparatory works, a box-shaped roof forming process is carried out to form a box-shaped roof 22 including at least a top surface pipe row 22a, as shown in Fig. 3(b). In the box-shaped roof forming process, a propulsion stand 54 and propulsion equipment similar to those in the conventional R&C construction method are provided between the formed roof propulsion reaction body 55 and the mirror wall surface portion 53b on the starting base 51 side at the starting base 51, and multiple hollow pipe members 23, preferably multiple unit pipe members 23a, are sequentially added from the starting base 51 to the arrival base 52, so that they are lined up in a circumferential direction of the planned installation area 24 and pushed into the ground directly below the expressway 50, respectively, in the same manner as in the conventional R&C construction method. This allows a box-shaped roof 22 having a U-shaped cross-sectional shape, preferably consisting of at least a top surface pipe row 22a and a pair of side surface pipe rows 22b on both sides, to be formed so as to span the mirror wall portion 53a on the departure base 51 side and the mirror wall portion 53b on the arrival base 52 side.

[0024] In this embodiment, in parallel with the above-mentioned box-shaped roof forming process, for example, five unit boxes 21 constituting the box structure 20 are formed in a working area on the rear side of the roof propulsion reaction body 55 in the towing direction X at the starting base 51. That is, in the working area on the vast site of the starting base 51, for example, a formwork is assembled on a steel plate, reinforcing bars are installed, and then concrete is poured and hardened / cured, so that each of the five unit boxes 21 can be formed in a state in which they are connected at a predetermined interval in the towing direction X. Also, a known center push jack 25 is attached to each of the intervals between the five unit boxes 21 connected in the towing direction X, and a cutting edge member 26 used when excavating the ground inside the box-shaped roof 22 is attached to the tip of the unit box 21 at the tip end in the towing direction X.

[0025] Meanwhile, at the arrival base 52, in parallel with the above-mentioned box-shaped roof forming process, a temporary hollow pipe removal equipment 27 is installed in the area between the mirror wall surface portion 53a on the arrival base 52 side and the opposing surface portion 11b of the support wall body 11, between the previously installed tie beams 13. The temporary hollow pipe removal equipment 27 is used when removing the hollow pipe members 23 constituting the box-shaped roof 22, which have been pushed out by the box structure 20 in the towing process described below, one by one for each unit pipe member 23a (see Figs. 4(a) to (d)). The temporary hollow pipe removal equipment 27 is formed by assembling the structural steel members constituting the equipment into a three-dimensional shape while avoiding interference with the above-mentioned tie beams 13 that have been previously installed within the area surrounded by the box-shaped roof 22.

[0026] In this embodiment, in the above-mentioned box-shaped roof forming process, a plurality of hollow pipe members 23 are each pushed into the ground in the planned installation area 24 to form a box-shaped roof 22 including a top pipe row 22a that crosses the ground directly below the expressway 50.Then, as shown in Figure 3(c), at the starting base 51, the roof propulsion reaction body 55 and the propulsion stand 54 are removed and the towing steel wire 12 is attached, making it possible to carry out the towing process of the box structure 20.

[0027] That is, in the starting base 51, preferably in the portion from which the roof propulsion reaction body 55 and the propulsion base 54 have been removed, a steel sheet, for example, is laid so that the box structure 20 consisting of the five unit box bodies 21 can be smoothly slid in the towing direction X when towing the box structure 20 in the towing direction X. Also, a known traction steel wire 12 made of, for example, a steel strand is inserted into a through hole formed in the supporting wall body 11, and is inserted into a guide pit 56 in a bottom corner portion so as to cross the planned installation area 24 of the box structure 20, and further into an insertion hole provided in a bottom corner portion of the unit box body 21, and is arranged so as to extend from a back portion 11a of the supporting wall body 11 in the towing direction X to a rear end portion of the box structure 20 in the towing direction X. Furthermore, one end of the arranged traction steel wire 12 is fixed to the back part 11a in the towing direction X of the supporting wall 11 via a known fastener 28a for connection and support, and the other end of the arranged traction steel wire 12 is fixed to the rear end of the box structure 20 in the towing direction X of the multiple unit box bodies 21 connected together via a known front jack as an expansion jack 28b, for example, for connection and support. This makes it possible to carry out the towing process of the box structure 20, which will be described later, while obtaining a support reaction force from the supporting wall 11 during towing, while expanding and contracting the expansion jack 28b.

[0028] In the towing process of the box structure 20, the telescopic jack 28b is extended and retracted from the state shown in Fig. 3(c), and the box structure 20 made up of the five unit box bodies 21 is towed as a whole in the towing direction X while receiving a support reaction force from the support wall body 11 during towing, as shown in Fig. 1, and pulled toward the destination base 52. When the box structure 20 is pulled toward the destination base 52 and the tip of the box structure 20 made up of the unit box body 21 at the tip part abuts against the rear end of the box roof 22 previously installed on the ground of the planned installation area 24, the box structure 20 is further pulled toward the destination base 52 while excavating the ground inside the box roof 22. This makes it possible to push the box structure 20 as a whole into the ground of the planned installation area 24 directly below the expressway 50 while replacing it with the box roof 22, as shown in Fig. 4(a). Furthermore, each hollow pipe member 23 constituting the box-shaped roof 22 which has been pushed out to the arrival base 52 will be removed at the arrival base 52, one unit pipe member 23a at its tip, using temporary hollow pipe removal equipment 27.

[0029] In this embodiment, in the towing process in which the five unit box bodies 21 of the box structure 20 are towed as a whole, as shown in an enlarged view in Figure 2, a tie beam 13 is erected between the mirror wall portion 53a of the embankment land below the expressway 50, and by using the erected tie beam 13, the support reaction force when towing the box structure 20 with the towing steel wire 12 can be borne not only by the supporting wall body 11 but also by the mirror wall portion 53 of the embankment land. As a result, because the five unit box bodies 21 are integrated, the box structure 20 is constructed as a large structure with sufficient length to cross the ground below the existing structure, the expressway 50, in one go, and even if its weight is considerable, the support reaction force when towing the box structure 20 with the towing steel wire 12 is also borne by the mirror wall portion 53 of the embankment land, making it possible to tow the box structure 20 in a stable state by pulling it toward the arrival base 52.

[0030] Therefore, according to the tow-type underpass construction method of this embodiment, the support wall 11 provided at the arrival base 52 can be easily and effectively reinforced by the tie beams 13 erected between it and the mirror wall portion 53 of the embankment land, so that even if the weight of the box structure 50 to be towed is considerably heavy, the support reaction force when towing it can be obtained effectively in a stable state.

[0031] In this embodiment, in the towing process described above, the box structure 20 is pushed into the ground of the planned installation area 24 directly below the expressway 50 while replacing the box roof 22, and when the box structure 20 reaches a predetermined position, one end of the towing steel wire 12 fixed to the back part 11a of the supporting wall 11 in the towing direction X is replaced and fixed to the tip of the box structure 20 by the unit box 21 at the tip part by the fixing device 28a, as shown in Fig. 4(b). Also, by attaching the ESA steel wire 29c to the upper part of the box structure 20 via the fixing device 29a and the ESA jack 29b, the box structure 20 is changed over to a state in which it can be advanced by a known ESA construction method.

[0032] 4(c), the box structure 20 is further pushed into the ground of the planned installation area 24 directly below the expressway 50 by the ESA method, in which one of the five unit boxes 21, for example, is used as a driving box and the remaining unit boxes 21 are used as reaction boxes, and the frictional resistance of the reaction boxes that are not being driven is used as a reaction force, so that the box structure 20 is further pushed into the ground of the planned installation area 24 directly below the expressway 50, replacing the box roof 22. Also, each of the hollow pipe members 23 constituting the box roof 22 pushed out to the arrival base 52 by the pushing of the box structure 20 is removed at the arrival base 52 by the unit pipe members 23a at the tip thereof, by the temporary hollow pipe removal equipment 27, in the same manner as described above.

[0033] When the tip of the box structure 20 made of the unit pipe members 23a at the tip reaches the arrival base 52 by the ESA method, the tie beams 13 and the temporary hollow pipe removal equipment 27 installed between the support wall 11 and the mirror wall surface portion 53a of the embankment land below the expressway 50 are removed as shown in Fig. 4(d). Also, as shown in Fig. 5(a), while the center push jacks 25 between adjacent unit boxes 21 are sequentially removed, the unit box 21 at the rear end is pulled toward the arrival base 52 by the ESA method, whereby the box structure 20 having a rectangular cross section formed by five unit boxes 21 as one body is installed across the ground directly below the expressway 50 by the underpass method of this embodiment (see Fig. 5(b)).

[0034] Furthermore, once the box structure 20 has been installed across the ground directly below the expressway 50, as shown in Figures 5(b) and (c), the towing steel wires 12 and the ESA steel wires 29c, etc. will be removed, the cutting edge member 26 will be removed from the tip of the box structure 20, and the supporting wall 11 installed at the arrival base 52 will be removed. After that, the necessary waterproofing work, backfill grout injection work, road ancillary work, etc. will be carried out, and an underground space in which other roads will be laid will be formed by the box structure 20, with a multi-level intersection in the ground directly below the expressway 50.

[0035] The present invention is not limited to the above embodiment and can be modified in various ways. For example, the present invention does not necessarily have to be implemented in the R&C method in which the box structure is towed while replacing it with a box roof while performing excavation work at the face of the front part of the box structure, but can also be implemented in the Fronte Jacking method in which the box structure is towed while leaving the top surface pipe row in the ground while performing excavation work at the face of the front part in the towing direction of the box structure and aligning the top surface part with the underside of the top surface pipe row of the box roof. Also, when the setup is changed to a state where the box structure can be advanced by the ESA method, the stress on the supporting wall is significantly reduced, so the tie beams may be removed at this point. However, in the above-described embodiment, anchors are installed within the planned installation area 24 of the embankment land to prevent the box structure 20 from collapsing due to being pushed in. However, since the anchors are cut when the tip of the box structure 20 reaches the arrival base 52, as a substitute for these anchors, tie beams 13 may be left installed until just before the tip of the box structure 20 reaches the arrival base 52. [Explanation of symbols]

[0036] 11 Support wall 11a Rear part in towing direction 11b Facing surface in the towing direction 12 Towing wire 13 Tie beam 20 Box structure 20a Top section 21 Unit Box 22 Box roof 22a Top pipe row 22b Side pipe row 23 Hollow pipe components 23a Unit pipe member 24 Planned installation area 25 Center Jack 26 Blade mouth parts 27 Hollow pipe removal equipment 28a Fixture 28b Telescopic jack (fronte jack) 29a Fixtures 29b ESA jack 29c ESA steel wire 50 Expressway (Existing Structures) 51 Launch Base 52 Base reached 53a,53b Mirror wall section 54 Propulsion mount 55 Roof propulsion reaction body 56 Guide Tunnel 56a Chemical grouting work X Towing direction

Claims

1. A tow-type underpass construction method for forming an underground space by a box structure having a rectangular cross-sectional shape towed across the ground below an existing structure, a box-shaped roof forming process in which a plurality of hollow pipe members are arranged in a line in a circumferential direction of a planned installation area of ​​the box structure in the ground below the existing structure, from a starting base provided on one side of the planned installation area of ​​the box structure in the ground below the existing structure, toward a destination base provided on the other side, and each of the hollow pipe members is pushed into the ground directly below the existing structure, thereby forming a box-shaped roof including at least a top surface pipe row that crosses the ground directly below the existing structure; a towing process in which the box structure is towed toward the arrival base by a towing steel wire that is connected and supported at one end thereof to the rear end in the towing direction of the support wall that is erected at the arrival base and that is extended across the planned installation area and engaged with the rear end in the towing direction of the box structure that is installed at the departure base, while replacing the top surface portion with the top surface pipe row or aligning the top surface portion with the top surface pipe row, thereby moving the box structure to the ground below the existing structure, In the towing process, a tie beam is erected at the arrival base between the opposing surface portion of the support wall in the towing direction and a mirror wall portion formed on the ground below the existing structure, and by using the erected tie beam, the support reaction force when towing the box structure with the towing steel wire is borne not only by the support wall but also by the mirror wall portion, thereby forming a towing underpass construction method.

2. The support wall body erected at the arrival base is formed by filling and solidifying concrete in the gap between a pair of retaining wall members installed at a distance in the towing direction, and one end of the towing steel wire is arranged to penetrate the support wall body in the towing direction and is fixed to and supported by the back side of the support wall body in the towing direction.

3. A towed underpass construction method as described in claim 1 or 2, implemented in the R&C construction method (registered trademark), in which the box structure is towed while replacing the top surface with the top surface pipe row while performing excavation work at the face portion of the front portion in the towing direction of the box structure.

4. A tow-type underpass construction method as described in claim 1 or 2, which is implemented in a front jacking construction method, in which excavation work is carried out at the face of the front part in the towing direction of the box structure, while the top surface is aligned with the underside of the top surface pipe row, and the box structure is towed while the top surface pipe row is left in the ground.

5. 3. A tow-type underpass construction method according to claim 1 or 2, wherein the box structure has a configuration in which a plurality of unit boxes arranged in series in the towing direction are towed as a unit.

6. 3. A tow-type underpass construction method according to claim 1 or 2, wherein the ground below the existing structure is a fill ground.

Citation Information

Patent Citations

  • Building method for underground structure of large section

    JP1994041996A

  • Caisson body traction method and caisson body used therefor

    JP2004257025A

  • Construction method for underground passage

    JP2007177553A

  • Construction method of underpass

    JP2012144942A