Construction method for invert structure in mountain tunnel
The method uses PCa concrete blocks supported by H-shaped steels to construct an invert section in mountain tunnels, allowing simultaneous traffic maintenance and efficient formation of a stable lining without full closure.
Patent Information
- Application Number
- JP2023058346
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-03-31
AI Technical Summary
Existing methods for constructing an invert section in mountain tunnels using precast concrete blocks are time-consuming and require complete traffic closure, making it difficult to maintain a stable passageway and ground below during construction.
A method involving the use of PCa concrete blocks supported by H-shaped steels with flange portions, allowing construction on one side while maintaining traffic on the other, and integrating the blocks with a filling solidifying material to form a stable invert section lining.
Enables the construction of an invert section structure in mountain tunnels without complete traffic closure, maintaining a stable passageway and ground below, and reducing construction time.
Smart Images

Figure 2024145827000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for constructing an invert structure in a mountain tunnel. [Background technology]
[0002] A mountain tunnel is a tunnel formed by excavating a self-supporting and relatively stable ground such as a rock mass, and the excavated inner wall surface is covered with a primary lining and a secondary lining made of concrete or mortar. That is, the inner wall surface of a mountain tunnel is excavated, for example, while performing blasting, etc., and then a protective layer is formed by spraying mortar or concrete to form a primary lining, and then, for example, a known tunnel lining formwork is installed inside the protective layer formed by the primary lining, and a lining body made of concrete of a predetermined thickness is formed as a secondary lining from the side wall part to the upper arch-shaped part of the tunnel. Furthermore, in the lining body formed previously from the both side walls of the tunnel to the upper arch-shaped part, a lining body of the bottom invert part is integrally formed with concrete to a predetermined thickness in the transverse direction of the tunnel between the receiving parts at the lower ends of the pair of side walls, so that the entire circumference of the inner wall surface of the mountain tunnel is continuously covered with the secondary lining.
[0003] In addition, since mountain tunnels are formed by excavating relatively stable ground, some tunnels constructed several decades ago, for example, omit the invert lining and form a secondary lining only in the area from the side wall of the tunnel to the upper arch-shaped part. For such mountain tunnels that omit the invert lining, it is being considered to form a new invert lining to prevent future effects such as swelling of the base.
[0004] As a method for forming the invert lining at the bottom of the tunnel, continuing from the lining installed earlier from the side wall to the upper arch-shaped part of the tunnel, cast-in-place concrete has been used in the past (see, for example, Patent Document 1), but finishing the upper surface of the invert lining to give it a curved shape requires a high level of skill. Furthermore, when cast-in-place concrete is used, it takes a considerable amount of time for the poured concrete to harden and undergo a prescribed curing period, and therefore, particularly when a new invert lining is formed on the lining from the side wall to the upper arch-shaped part, where the invert lining is omitted, traffic through the tunnel will be blocked for a long period of time, so it is desirable to be able to complete the construction as quickly as possible.
[0005] For this reason, it has been considered to shorten the construction period by forming the lining of the invert section using concrete members made of precast concrete that have been manufactured in advance in a factory or the like (see, for example, Patent Document 2 and Patent Document 3).In addition, when forming a new lining of the invert section using concrete members (blocks) made of precast concrete for an existing mountain tunnel that was constructed several decades ago, for example, it is desirable to be able to carry out construction work while ensuring passage on the passageway without completely blocking traffic through the tunnel, and therefore a technology has been developed that allows the lining of the invert section of a mountain tunnel to be constructed for each side area in the transverse direction of the tunnel (see, for example, Patent Document 4). [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2020-159060 A [Patent Document 2] JP 2013-28898 A [Patent Document 3] JP 2018-123528 A [Patent Document 4] JP 2000-145390 A Summary of the Invention [Problem to be solved by the invention]
[0007] In the method of forming an invert in a mountain tunnel described in Patent Document 1, while ensuring passage on the passage in the other side area in the transverse direction of the tunnel, the passage in one side area and the ground below it are excavated to form an excavation trench, and then multiple blocks that constitute the invert are lined up at the bottom of the excavation trench that has been formed. Also, the side of the ground below the passage in the other side area where passage is ensured is retained by the rising parts of the blocks that are placed adjacent to the other side area. However, the work of precisely lining up multiple blocks at the bottom of the excavation trench formed in one side area requires a lot of time and effort, and the side of the ground below the passage is left open and not retained until the blocks with rising parts are placed adjacent to the ground in the other side area where passage on the passage is ensured, so it is considered difficult to maintain the passage and the ground below it in a stable state.
[0008] The present invention aims to provide a construction method for invert structures in mountain tunnels, which can be formed in one side region of an existing mountain tunnel, while maintaining the passageway and the ground below it in a stable state in the other side region, using PCa concrete blocks to form the lining of the invert section, in one side region in the transverse direction of the tunnel, using a simple structure. [Means for solving the problem]
[0009] The present invention is a construction method for an invert structure in a mountain tunnel, in which an invert structure using PCa concrete blocks is provided in the entire transverse direction of the invert section of a mountain tunnel to constitute an invert lining, and is constructed in two separate one-side regions on either side of the center in the transverse direction, so that one side can be formed in each one-side region while ensuring passage in the other one-side region. In the center of the transverse direction of the tunnel in the invert section, a plurality of H-shaped steel beams are installed upright at a predetermined interval in the axial direction of the tunnel by being driven into the ground of the invert section with flange portions aligned in the axial direction of the tunnel, and the flange portions of the H-shaped steel beams supporting the earth retaining plate members are supported by the flange portions on one side region side or the flange portions on the other side region side, so that the other can be formed. The above-mentioned object has been achieved by providing a construction method for invert structures in mountain tunnels, which includes the steps of: forming one-side invert structure in one side area using PCa concrete blocks up to a portion exceeding the flange portion of one side area, while ensuring passage in the other side area by retaining the ground of the passage in one side area; and restoring the passage in one side area by supporting an earth retaining plate member on the H-shaped steel and retaining the ground created by backfilling the upper portion of the invert structure formed in one side area, and while ensuring passage in the restored passage, forming the remaining invert structure in the other side area using PCa concrete blocks.
[0010] In the construction method of the invert structure in a mountain tunnel of the present invention, in the process of forming one-side invert structure in one side region using PCa concrete blocks up to the part that exceeds the flange portion on one side region, it is preferable that a sparser member is interposed between the inner surface of the flange portion on one side region of the H-shaped steel, and the retaining plate member is supported by the flange portion on one side region in a state shifted to the other side region.
[0011] Furthermore, in the construction method of the invert structure in a mountain tunnel of the present invention, it is preferable that the invert structure formed in one side region and the other side region is formed by arranging a plurality of PC concrete blocks in a row in the transverse direction of the tunnel, while maintaining a gap between the blocks and the support base portions of the lower ends of the adjacent side wall lining bodies and between the blocks and adjacent PC concrete blocks, and installing the blocks in a row in the invert section, while maintaining a gap between the blocks and adjacent PC concrete blocks in the axial direction of the tunnel, and then filling the gaps between the blocks and adjacent support base portions and between the blocks and adjacent PC concrete blocks with a filling solidification material and allowing it to harden, thereby forming a group of blocks that are integrated together via the hardened filling solidification material. Effect of the Invention
[0012] According to the construction method of the present invention for invert structures in mountain tunnels, when invert structures using PCa concrete blocks that constitute the lining of the invert section in an existing mountain tunnel are constructed in each side region in the transverse direction of the tunnel, the passageway and the ground below this in the other side region can be formed in one side region while maintaining the passageway and the ground below this in a stable state using a simple configuration. [Brief description of the drawings]
[0013] [Figure 1] This is a simplified cross-sectional view illustrating a mountain tunnel in which invert structures are formed on both sides of the invert in the transverse direction of the tunnel using a construction method for invert structures according to a preferred embodiment of the present invention. [Diagram 2] This is a schematic top view seen from the AA direction in Figure 1, illustrating the state in which the invert section structure is formed on both sides over the entire area of the invert section in the transverse direction of the tunnel. [Diagram 3] 1 is a schematic cross-sectional view of a mountain tunnel illustrating a construction method for an invert structure according to a preferred embodiment of the present invention. FIG. [Figure 4] 4(a) to 4(f) are schematic top views of the main part of part B in FIG. 3, illustrating a method of constructing an invert structure according to a preferred embodiment of the present invention. [Diagram 5] This is a schematic top view of an invert section structure provided in one side region of the invert section in the transverse direction of the tunnel. [Figure 6] 4 is a schematic cross-sectional view taken along the line CC in FIG. 3 before the filling solidification material is filled. FIG. [Figure 7] This is an oblique view of the PCa concrete block that constitutes the invert structure. [Figure 8] (a) is a top view of the PCa concrete block that constitutes the invert structure, (b) is a transverse side view of (a) seen from the right side, and (c) is an axial side view of (a) seen from the front. [Figure 9] 2 is a schematic cross-sectional view illustrating a PCa concrete block along a portion in which a bolt insertion hole is formed, illustrating the bolt insertion hole. FIG. [Figure 10] FIG. 13 is a perspective view illustrating a ground adjuster attached to a lower end of a height adjustment bolt. [Figure 11] This is a simplified cross-sectional view illustrating the state in which filling solidification material has been filled into the gaps between the receiving base, the gaps between adjacent PCa concrete blocks, and the gaps below the bottom surface of the hexahedral shape. [Figure 12] 2 is a schematic cross-sectional view in the transverse direction of a PCa concrete block along a portion where a filler injection hole is formed, illustrating a filler injection hole and an opening and closing valve. FIG. [Figure 13] 1 is a schematic top view of an invert structure illustrating the injection status of filling solidification material. FIG. [Figure 14] FIG. 2 is an explanatory diagram of the unevenness formed on the surface of the central portion of a PCa concrete block. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] A construction method for an invert structure in a mountain tunnel according to a preferred embodiment of the present invention is adopted as a construction method for forming the invert structure 32 on both left and right sides, which are components of the invert structure 32, on each side of the transverse center line C of the tunnel, when newly forming the invert structure 32 on the bottom portion 30a of the mountain tunnel 30 in continuity with the lining 31 in the area extending from both side wall portions 31a to the upper arch-shaped portion 31b, which has been formed in advance to cover the inner wall surface of the tunnel in the existing mountain tunnel 30 shown in Figure 1.
[0015] In this embodiment, the mountain tunnel 30 is a tunnel that was constructed, for example, several decades ago, and the ground to be excavated was stable, so at the time of construction, the lining 31 covering the inner wall surface of the tunnel was formed only from the side wall portions 31a on both sides to the upper arch-shaped portion 31b. However, as time passed, concerns arose about the effects of ground swelling of the base portion 30a, so a new invert lining 32 was formed using invert structures 10 on both the left and right sides, as shown in Figure 2.
[0016] In addition, when a new invert lining 32 is formed in an existing mountain tunnel 30, it is desirable to be able to carry out the work while ensuring passage on the passageway without completely blocking traffic through the tunnel. Therefore, in this embodiment, as shown in Fig. 3, each step of forming the invert structure 10 is carried out in one side region while ensuring passage on the passageway 60 in the other side region in the cross direction of the tunnel. The construction method of the invert structure in a mountain tunnel in this embodiment is such that, when constructing the invert structure 10 for each side region in the cross direction of the tunnel, the invert structure 10 can be efficiently formed in one side region while the passageway 60 in the other side region and the ground 61 below it are held in a stable state by a simple configuration.
[0017] The construction method of the invert structure of this embodiment is a construction method for a mountain tunnel in which the invert structure 10 using PCa concrete blocks 20, which is installed throughout the entire transverse area of the invert section 33 of a mountain tunnel 30 to constitute the invert lining body 32, is constructed in two separate side areas on either side of the transverse center, so that one side can be formed in each side area while ensuring passage in the other side area (see Figure 3).In the transverse center of the tunnel in the invert section 33, multiple H-shaped steels 35 for supporting the earth retaining plate members are installed upright at a predetermined interval in the axial direction of the tunnel by being driven into the ground of the invert section 33 with the flange portions 35a aligned along the axial direction of the tunnel (see Figures 2 and 5). As shown in Figs. 4(a) to (f), by supporting the flange portion 35a on one side region 55A of the H-shaped steel 35 or the flange portion 35a on the other side region 55B, the ground 61 of the passageway 60 in the other side region 55B is retained, thereby ensuring passage in the other side region 55B (see Fig. 3). In one side region 55A, a step of forming the invert structure 10 on one side using PCa concrete blocks 20 up to a portion exceeding the flange portion 35a on the one side region 55A (see Figs. 4(a) and (b)); By supporting the retaining plate member 57 on the retaining plate member 35, the upper part of the invert structure 10 on one side formed in one side region 55A is backfilled to form ground 61' (see Figures 4(d) and (e)), which is then retained to restore a passage 60' (see Figures 4(d) and (e)) in the one side region 55A, and with passage on the restored passage 60' secured, the remaining invert structure 10 on the other side region 55B is formed using PCa concrete blocks 20 (see Figures 4(d) to (f)).
[0018] Furthermore, according to this embodiment, in the process of forming one-side invert structure 10 in one side region 55A using PCa concrete blocks 20 up to the portion exceeding the flange portion 35a on one side region 55A, preferably a sparser member 56 is interposed between the inner surface of the flange portion 35a on one side region 55A of the H-shaped steel 35, so that the retaining plate member 57 is supported by the flange portion 35a on one side region 55A in a state shifted toward the other side region 55B (see Figures 4(a) and (b)).
[0019] In this embodiment, the invert structure 10 formed in one side region 55A and the other side region 55B is preferably formed by arranging a plurality of PCa concrete blocks 20 in series in the transverse direction of the tunnel and installing them in the invert section 33 while maintaining gaps 21a, 21b between the receiving base 31c at the lower end of the adjacent side wall covering body 31a and between the adjacent PCa concrete blocks 20, as shown in Figs. 1 and 2, and by arranging a plurality of PCa concrete blocks 20 in series in the transverse direction of the tunnel and installing them in the invert section 33 while maintaining gaps 21b between the adjacent PCa concrete blocks 20 in the axial direction of the tunnel, and by filling the gaps 21a between the adjacent receiving bases 31c and the gaps 21b between the adjacent PCa concrete blocks 20 with a filling solidification material 22 and hardening it (see Fig. 11), thereby integrating the block groups 20X, 10Y through the hardened filling solidification material 22.
[0020] That is, in this embodiment, the invert structure 10 is provided in at least one side region in the cross-sectional direction of the invert 33 of the mountain tunnel 30 as shown in Fig. 5 and Fig. 6, and is a structure of the invert 33 using PCa concrete blocks 20 constituting the invert lining body 32. As shown in Fig. 7 and Fig. 8 (a) to (c), the PCa concrete blocks 20 are formed as hexahedral blocks having curved upper surface portions 20a and lower surface portions 20b so as to have a curved shape along the cross-sectional shape of the invert lining body 32. These multiple PCa concrete blocks 20 are arranged in series in the cross-sectional direction of the tunnel and installed in the invert 33 with gaps 21a, 21b between the receiving base portion 31c at the lower end of the adjacent side wall lining body 31a and between the adjacent PCa concrete blocks 20, and are also arranged in series in the axial direction of the tunnel and installed in the invert 33 with gaps 21b between the adjacent PCa concrete blocks. As shown in Figures 1, 2, and 11, the multiple PCa concrete blocks 20 arranged in a vertical and horizontal manner are integrated together through filling solidification material 22 that has been filled and hardened in the gaps 21a between adjacent receiving base portions 31c, the gaps 21b between adjacent PCa concrete blocks 20, and the gaps 21c below the hexahedral underside portion connecting to these gaps 21a, 21b, and forms one side portion of the invert covering body 32 as at least a part of the invert covering body 32.
[0021] In this embodiment, the PCa concrete blocks 20 are preferably formed to have a similar hexahedral shape with the same width x in the transverse direction of the tunnel, the same vertical width y in the axial direction of the tunnel, and the same height z (see FIG. 7 and FIG. 8(a)-(c)). The PCa concrete blocks 20 arranged in a row are arranged in a row and horizontally, and the gaps 21b extending in the axial direction between the PCa concrete blocks 20 adjacent to each other in the transverse direction of the tunnel, filled with the filling solidification material 22, and the gaps 21b extending in the transverse direction between the PCa concrete blocks adjacent to each other in the axial direction of the tunnel, are preferably arranged in a potato shape that is linearly continuous, and are installed in the invert part 33 (see FIG. 2 and FIG. 5). The gaps 21a between the adjacent receiving base parts 31c filled with the filling solidification material 22 and the gaps 21b between the adjacent PC concrete blocks are preferably gaps with an interval width of about 15 to 30 mm.
[0022] In this embodiment, the PCa concrete blocks 20 constituting the invert structure 10 are arranged in series in the transverse direction of the tunnel with the gaps 21a, 21b between the receiving base 31c at the lower end of the adjacent side wall lining body 31a and between the adjacent PCa concrete blocks 20, and are arranged in series in the axial direction of the tunnel with the gaps 21b between the adjacent PC concrete blocks and the filling solidification material 22, and are arranged vertically and horizontally in the invert section 33. As shown in Figs. 7 and 8(a) to (c), the PCa concrete block 20 has a curved upper surface 20a and a lower surface 20b that are curved along the cross-sectional shape of the invert lining body 32, and is formed as a hexahedral block having a pair of flat axially opposing surfaces 20c in the front and rear and a pair of flat transversely opposing surfaces 20d in the left and right.
[0023] Furthermore, in each of these PCa concrete blocks 20, a bolt box 23 or a female screw anchor 24 is embedded and fixed to the four sides of the upper surface portion of the hexahedron shape to connect adjacent PCa concrete blocks 20 using a bolt member (not shown). The bolt box 23 opens on the upper surface portion 20a of the PCa concrete block 20, and the female screw anchor 24 opens on the upper end of the axially facing surface 20c or the transversely facing surface 20d of the side portion. As shown in FIG. 7, the PCa concrete block 20 has three bolt insertion screw holes 25 that penetrate the hexahedron shape in the vertical direction and are arranged at each corner of the isosceles triangle (see FIG. 8(a)). A female screw member 25a to which a height adjustment bolt 26 is screwed is fixed to each bolt insertion screw hole 25 at a portion lower than the vertical middle portion. A large trumpet-shaped recess 25b is formed from the portion where the female screw member 25a of each bolt insertion screw hole 25 is fixed, expanding in diameter upward and opening on the upper surface 20a of the PCa concrete block 20, and a small trumpet-shaped recess 25c is formed from the portion where the female screw member 25a is fixed, expanding in diameter downward and opening on the lower surface 20b of the PCa concrete block 20. A height adjustment bolt 26 is inserted into each of these bolt insertion screw holes 25 and screwed into the female screw member 25a, so that the height adjustment bolt 26 is attached with its lower end 26a protruding movably from the lower surface 20b of the PCa concrete block 20. In addition, since the large trumpet-shaped recess 25b and the small trumpet-shaped recess 25c have a trumpet shape that tapers toward the upper and lower openings, the box punching members attached to the box-shaped formwork for pouring concrete to form these trumpet-shaped recesses 25b, 25c can be smoothly removed after the concrete has hardened.
[0024] As shown in Figure 8(a), the three bolt insertion screw holes 25 are formed on the upper surface 20a of the PCa concrete block 20, preferably arranged at each corner of an isosceles triangle (see dotted line) with the base positioned parallel to one axial opposing surface 20c and the apex positioned on the other axial opposing surface 20c.
[0025] Furthermore, as shown in Figs. 11 and 12, a filler injection hole 27 is formed in some of the PCa concrete blocks 20' (see Fig. 5) that penetrates the hexahedron in the vertical direction. A female screw member 27a is fixed to the middle part of each filler injection hole 27 in the vertical direction, to which a male screw portion of an opening / closing valve 28 is screwed. An upper trumpet-shaped recess 27b is formed from the part where the female screw member 27a of each filler injection hole 27 is fixed, expanding in diameter upward and opening on the upper surface 20a of the PCa concrete block 20', and a lower trumpet-shaped recess 27c is formed from the part where the female screw member 27a is fixed, expanding in diameter downward and opening on the lower surface 20b of the PCa concrete block 20'. In these filler injection holes 27, the male screw part of the opening / closing valve 28 is screwed into the female screw member 27a, and the handle part 28a is disposed above the upper surface part 20a of the PCa concrete block 20', so that the opening / closing valve 28 is detachably attached to the PCa concrete block 20' in a state in which the handle part 28a can be opened and closed by working on the upper surface part 20a of the PCa concrete block 20'. In addition, the upper side trumpet-shaped recess 27b and the lower side trumpet-shaped recess 27c have a trumpet shape that tapers toward the upper and lower openings, so that the box punching member attached to the box-shaped formwork for concrete pouring to form these trumpet-shaped recesses 27b, 27c can be smoothly removed after the concrete hardens.
[0026] In this embodiment, the filler injection hole 27 that penetrates the hexahedral PCa concrete block 20' in the vertical direction can be preferably formed and disposed in the central part of the upper surface 20a of the PCa concrete block 20' (see Figure 8(a)).
[0027] In this embodiment, the PCa concrete blocks 20 (20') are preferably provided with a pair of flat axially opposed faces 20c in the front and rear direction and a pair of flat transversely opposed faces 20d in the left and right direction, each of which can be fitted with spacer jigs 29a, 29b for maintaining a predetermined gap width 21b between the other opposed faces 20c, 20d (see Figs. 5, 6(b), and (c)). A plurality of lifting jigs 29c used for lifting each PCa concrete block 20 are embedded and fixed in the upper face 20a, preferably of a hexahedral shape (see Fig. 8(a)).
[0028] In this embodiment, the PCa concrete blocks 20 are formed to have a hexahedral shape with a curved upper surface 20a and lower surface 20b, preferably with a width x of about 1385 to 1435 mm, a vertical width y of about 730 mm, and a height z of about 500 mm, by pouring and hardening concrete into the box-shaped formwork assembled in a shape according to the above-mentioned predetermined hexahedral shape at a manufacturing factory, for example, and then demolded after a predetermined curing period. The PCa concrete blocks 20 are formed to have a width x of about 1385 to 1435 mm, a vertical width y of about 730 mm, and a height z of about 500 mm, and have a weight of about 1300 kg. For example, a preparation reinforcement is arranged inside the box-shaped formwork, and the above-mentioned bolt box 23, female thread anchor 24, and box punching members for the bolt insertion screw hole 25 and filler injection hole 27 are attached to the preparation reinforcement. These can be embedded and fixed in the PCa concrete block 20 or temporarily fixed. In this embodiment, the size, shape, weight, etc. of the PCa concrete block 20 used as the invert block can be appropriately designed according to the capacity of a lifting machine or the like that can be used in the work yard 71 of one side area 55A without affecting the traffic of vehicles in the other side area 55B. For example, the weight of the PCa concrete block 20 can be preferably set to 1000 to 1500 kg.
[0029] In addition, in this embodiment, the multiple PCa concrete blocks 20 are formed to have the same hexahedral shape, so it is possible to efficiently manufacture them by limiting the type of box-shaped formwork used, and since the blocks are of similar weight, the workability during lifting and transportation is improved, and they can be handled in the same way when lifting and installing, so it is easy to accurately install each PCa concrete block 20 in a predetermined position, for example, so that they are arranged in a potato-like shape. It is also possible to reduce manufacturing costs.
[0030] In this embodiment, the invert structure 10 is constructed in each of the one-side regions 55A, 55B, with the two regions sandwiching the center in the transverse direction of the tunnel as a pair of one-side regions, as described above (see Figs. 1 and 2). In the center of the transverse direction of the tunnel in the invert 33, as described above, a plurality of H-shaped steels 35 supporting retaining plate members 57 for preventing the other one-side region from being affected when constructing the invert structure 10 in each one-side region 55A, 55B can be erected at a predetermined interval in the axial direction of the tunnel by driving the H-shaped steels 35 into the ground of the invert 33 with the flange portions 35a aligned in the axial direction of the tunnel. For this reason, at the position where these H-shaped steels 35 are erected, at the center side ends of a pair of PCa concrete blocks (center side blocks) 20B adjacent in the axial direction of the tunnel at the center side in the cross direction of the tunnel, cutout recesses 20e having a rectangular cross section can be formed in the corners on both sides sandwiching the gap 21b between them (see FIG. 5). By using the cutout recesses 20e in the corners on both sides, a flange arrangement recess 10a for arranging one flange of the H-shaped steel 35 can be provided in the end face portion (center side end face portion) 10B on the center side in the cross direction of the tunnel of each invert section structure 10, in the portion where the H-shaped steel 35 is erected.
[0031] That is, in the block group 20X, 20Y (see FIG. 1) consisting of a plurality of PCa concrete blocks 20 constituting the invert structure 10 of each one side region 55A, 55B, the PCa concrete block 20 (central side block 20B) arranged in the portion where the H-shaped steel 35 is erected has a curved upper surface portion 20a and a lower surface portion 20b having a curved shape that follows the cross-sectional shape of the invert covering body 32, and is formed as a hexahedral block having a pair of flat axial opposing surfaces 20c at the front and rear and a pair of flat transverse opposing surfaces 20d at the left and right (see FIGS. 8(a) to (c)). At the corner portion between any one of the axial opposing surfaces 20c and the transverse opposing surfaces 20d, as shown in FIG. 5, for example, a notched recess 20e having a rectangular cross-sectional shape is cut out so as to have a side portion having a width of 1 / 2 or more of the width of the flange portion 35a of the H-shaped steel 35, and is continuously provided from the upper surface portion 20a to the lower surface portion 20b. As a result, at the central ends of a pair of central side blocks 20B that are adjacent in the axial direction of the tunnel at the portion where the H-shaped steel 35 is erected, these notched recesses 20e form flange arrangement recesses 10a that can accommodate the flange portions of the H-shaped steel 35.
[0032] In this embodiment, as shown in Figures 5 and 6, the multiple PCa concrete blocks 20 constituting the invert section structure 10 have multiple transverse block rows 20D including a receiving section side block 20A arranged adjacent to the receiving section 31c at the lower end of the side wall covering body 31a, a central section side block 20B arranged on the transverse central side of the invert section, and one or more intermediate blocks 20C (in this embodiment, one intermediate block 20C) arranged between them, and these PCa concrete blocks 20A, 20B, 20C are arranged in a row in the transverse direction of the tunnel with gaps 21a, 21b maintained between the adjacent receiving sections 31c and between the adjacent PCa concrete blocks 20A, 20B, 20C, and are also arranged in a row in the axial direction of the tunnel with gaps 21b maintained between the adjacent PCa concrete blocks 20A, 20B, 20C (transverse block rows 20D), and are arranged vertically and horizontally in the invert section 33. The multiple PCa concrete blocks 20A, 20B, 20C used when constructing the invert structure 10 can be constructed by the following method of installing PCa blocks in the invert.
[0033] That is, in this embodiment, the multiple PCa concrete blocks 20A, 20B, 20C of each transverse block row 20D arranged in the transverse direction of the tunnel are installed in the invert section 33 by installing the receiving base side block 20A adjacent to the receiving base portion 31c and temporarily fixing it by temporary fixing means 36, as shown in Figure 6, and then installing the intermediate block 20C and the central side block 20B adjacent to the temporarily fixed receiving base side block 20A in sequence.
[0034] Also, for example, the receiving base side block 20A is installed adjacent to the receiving base portion 31c and temporarily fixed by the temporary fixing means 36, and then the intermediate block 20C is installed adjacent to the temporarily fixed receiving base side block 20A, and at the adjacent location between the installed intermediate block 20C and the receiving base side block 20A, they are temporarily fixed by bolt members (not shown) via a bolt box 23 arranged on the upper surface 20a of at least one of the PCa concrete blocks 20A, 20C that is adjacent to the transverse opposing surface 20d, and the height and position of each PCa concrete block 20A, 20C are adjusted, and the bolt members are then finally tightened. Next, a central side block 20B is installed adjacent to the intermediate block 20C, and at the adjacent location between the installed central side block 20B and the intermediate block 20C, they are temporarily fixed with bolt members via a bolt box 23 arranged on the upper surface 20a of at least one of the PCa concrete blocks 20C, 20B that is adjacent to the transverse opposing surface 20d.After that, the height and position of the central side block 20B is adjusted, and the bolt members are finally tightened, thereby installing the multiple PCa concrete blocks 20A, 20B, 20C of each transverse block row 20D that are connected in the transverse direction of the tunnel in the invert portion 33.
[0035] Here, in this embodiment, the temporary fixing means 36 for temporarily fixing the receiving pedestal side block 20A adjacent to the receiving pedestal 31c can be preferably a wire, chain or other such rope 36b whose both ends are locked to a locking member attached to a hole-in anchor 36a buried in the receiving pedestal 31c and a locking member attached to a bolt box 23 or a hanging jig 29c provided on the receiving pedestal side block 20A. The wire, chain or other such rope 36b can be provided with an expansion and contraction adjustment means 36c, for example a turnbuckle, capable of adjusting the length between the both locked ends. This makes it possible to adjust the width of the gap 21a maintained between the receiving pedestal 31c and the adjacent receiving pedestal side block 20A.
[0036] In this embodiment, the height of each of the PCa concrete blocks 20A, 20B, and 20C can be adjusted by using three height adjustment bolts 26 screwed into the bolt insertion screw holes 25 formed in the above-mentioned three locations, as shown in Figures 8(a) and 9. That is, each of the PCa concrete blocks 20A, 20B, and 20C has three bolt insertion screw holes 25 formed in the vertical direction, and the height adjustment bolts 26 are attached to each of the bolt insertion screw holes 25 in a state in which the lower end portions 26a can be protruded downward from the lower surface portions 20b of the PCa concrete blocks 20A, 20B, and 20C. Prior to the process of filling the gaps 21a between adjacent receiving portions 31c of a plurality of PCa concrete blocks 20A, 20B, 20C arranged vertically and horizontally with the filling solidification material 22, the gaps 21b between adjacent PCa concrete blocks 20A, 20B, 20C, and the gaps 21c below the hexahedral lower surface portions 20b that communicate with these gaps 21a, 21b (see FIG. 11), a process of adjusting the height and inclination of each of the PCa concrete blocks 20A, 20B, 20C is performed by rotating the PCa concrete blocks 20A, 20B, 20C from above to change the protruding lengths of the three height adjustment bolts 26 in each of the PCa concrete blocks 20A, 20B, 20C from the lower surface portions 20b of the PCa concrete blocks 20A, 20B, 20C.
[0037] As described above, in this embodiment, a nut member is preferably fixed as a female screw member 25a to the lower part of each bolt insertion screw hole 25 from the vertical middle part, and the height adjustment bolt 26 is screwed to this nut member 25a, so that the height adjustment bolt 26 is attached in a state in which the lower end 26a can be protruded downward from the lower surface part 20b of the PCa concrete block 20A, 20B, 20C. In addition, a tiltable ground adjuster 26b can be attached to the lower end 26a of the height adjustment bolt 26. This allows the lower end 26a of the height adjustment bolt 26 to be grounded in a stable state on, for example, the ground surface that becomes the filling bottom surface part 26c below the lower surface part 20b. The grounding adjuster 26b can also be shaped so that when the height adjustment bolt 26 is retracted upward, the opening peripheral portion of the bolt insertion hole 25 can be tapered so that it can be accommodated in the above-mentioned small trumpet-shaped recess 25c, which expands downward and is formed in the underside 20b of the PCa concrete blocks 20A, 20B, 20C.
[0038] In this embodiment, the upper end 26d of the height adjustment bolt 26 is preferably formed to have a square cross section, and by engaging an insert extension bar as a rotation operation tool with the upper end 26d and rotating the height adjustment bolt 26, the protruding length of the lower end 26a of the height adjustment bolt 26 from the lower surface 20b of the PCa concrete block 20A, 20B, 20C can be easily changed by working above the upper surface 20a of the PCa concrete block 20A, 20B, 20C. As described above, the bolt insertion screw hole 25 has a large trumpet-shaped recess 25b that expands upward from the portion where the nut member 25a, which is a female screw member, is fixed and opens to the upper surface 20a of the PCa concrete block 20A, 20B, 20C. If the upper end 26d of the height adjustment bolt 26 after the lower end 26a is adjusted to be in contact with the filling bottom surface 26c protrudes from or is close to the upper surface 20a of the PCa concrete block 20A, 20B, 20C, and a sufficient covering thickness cannot be secured above the upper end 26d when the large trumpet-shaped recess 25b is filled with a finishing filler, the upper end 26d of the height adjustment bolt 26 can be appropriately cut to a required length in the large trumpet-shaped recess 25b. This makes it possible to secure a desired covering thickness by the finishing filler such as mortar filled in the bolt insertion screw hole 25, and to prevent the height adjustment bolt 26 from corroding. The work of cutting the upper end 26d of the height adjustment bolt 26 can be performed smoothly because a sufficient working space can be secured in the large trumpet-shaped recess 25b whose diameter expands upward.
[0039] Furthermore, in this embodiment, in the invert structure 10 using the above-mentioned PCa concrete blocks 20A, 20B, 20C, a connecting structure 37 of the PCa blocks in the invert structure can be adopted as the connecting structure for connecting and arranging the multiple PCa concrete blocks 20A, 20B, 20C vertically and horizontally while maintaining gaps 21b of a predetermined spacing width between adjacent PCa concrete blocks 20A, 20B, 20C and installing them as a single unit in the invert structure 33.
[0040] That is, in this embodiment, as shown in Figures 5, 6, and 8(a) to (c), the PCa block connection structure 37 has transverse spacer jigs 29a (see Figure 8(b)) fixed to one of the opposing surfaces between each pair of transverse opposing surfaces 20d of the PCa concrete blocks 20A, 20B, 20C adjacent to each other in the transverse direction of the tunnel, preferably arranged in at least three locations, and each pair of PCa concrete blocks 20A, 20B, 20C adjacent to each other in the transverse direction of the tunnel is connected to each other in a state in which a gap 21b of a predetermined interval width is maintained between the transverse opposing surfaces 20d by the fastening force of bolt members (not shown) fastened by bolt boxes 23 arranged on the upper surface 20a of at least one of the PCa concrete blocks 20A, 20B, 20C adjacent to the transverse opposing surfaces 20d. In addition, between each pair of axially opposing surfaces 20c of the PCa concrete blocks 20A, 20B, 20C adjacent in the axial direction of the tunnel, axial spacer jigs 29b (see FIG. 8(c)) fixed to one of the axially opposing surfaces 20c are arranged at preferably at least three locations, and each pair of PCa concrete blocks 20A, 20B, 20C adjacent in the axial direction of the tunnel is connected in a state in which a gap 21b of a predetermined interval width is maintained between the axially opposing surfaces 20c by the fastening force of a bolt member (not shown) fastened by a bolt box 23 arranged on the upper surface 20a of at least one of the PCa concrete blocks 20A, 20B, 20C adjacent to the axially opposing surfaces 20c. The transverse spacer jigs 29a and the axial spacer jigs 29b can also be attached to the transversely opposing surfaces 20d and the axially opposing surfaces 20c at the position where the bolt box 23 is provided.
[0041] In this embodiment, the transverse spacer jig 29a and / or the axial spacer jig 29b may be made of mortar blocks, preferably attached and fixed to one of the opposing surfaces 20c, 20d. The mortar block spacer jigs 29a, 29b may be removably attached to the opposing surfaces 20c, 20d, and may be removed after the PCa concrete blocks 20A, 20B, 20C are fully tightened and connected. The transverse spacer jig 29a and / or the axial spacer jig 29b may be made of male thread members, preferably screwed into female thread inserts embedded in one of the opposing surfaces 10c, 10d, so that the protruding length can be adjusted.
[0042] The transverse spacer jigs 29a and the axial spacer jigs 29b, which are preferably arranged at at least three places and fixed to either one of the transverse facing surfaces 20d or the axial facing surfaces 20c, are preferably fixed to at least two places in the region below the center of gravity of the PCa concrete blocks 20A, 20B, and 20C. This makes it possible to form the gaps 21a and 21b of a predetermined interval in a stable and accurate manner in the region below the center of gravity, where it is difficult to confirm that the gaps 21a and 21b have been formed accurately, without using any special device, when installing the PCa concrete blocks 20A, 20B, and 20C.
[0043] The bolt member fastened in the bolt box 23 arranged on the upper surface 20a of at least one of the PCa concrete blocks 20A, 20B, 20C adjacent to the transverse opposing surface 20d, or the bolt member fastened in the bolt box 23 arranged on the upper surface 20a of at least one of the PCa concrete blocks 20A, 20B, 20C adjacent to the axial opposing surface 20c, may preferably be fastened across the bolt box 23 arranged on the upper surface 20a adjacent to the axial opposing surface 20c or the transverse opposing surface 20d of one of the PCa concrete blocks 20A, 20B, 20C and the female thread anchor 24 embedded in the axial opposing surface 20c or the transverse opposing surface 20d of the other PCa concrete block 20A, 20B, 20C. Preferably, the bolt box 23 may be fastened across and between the bolt box 23 arranged on the upper surface 20a adjacent to the axial opposing surface 20c or the transverse opposing surface 20d of one PCa concrete block 20A, 20B, 20C and the bolt box 23 arranged on the upper surface 20a adjacent to the axial opposing surface 20c or the transverse opposing surface 20d of the other PCa concrete block 20A, 20B, 20C.
[0044] In this embodiment, the PCa concrete blocks 20A, 20B, and 20C arranged in a row and columns are integrated through the filling solidification material 22 filled and hardened in the gaps 21a between the adjacent receiving bases 31c, the gaps 21b between the adjacent PCa concrete blocks 20A, 20B, and 20C, and the gaps 21c below the hexagonal bottom surface portion communicating with these gaps, as shown in Fig. 11, to form at least a part of the invert section covering body 32. In this embodiment, the filling solidification material 22 is filled in the gaps 21a between the adjacent receiving bases 31c, the gaps 21b between the adjacent PCa concrete blocks 20A, 20B, and 20C, and the gaps 21c below the hexagonal bottom surface portion communicating with these gaps, by the following construction method.
[0045] That is, in this embodiment, in order to fill the filling solidification material 22 into the gaps 21a between adjacent receiving portions 31c of multiple PCa concrete blocks 20A, 20B, 20C arranged in a row and column, the gaps 21b between adjacent PCa concrete blocks 20A, 20B, 20C, and the gaps 21c below the hexahedral lower surface portion that communicates with these gaps 21a, 21b, the opening portions of the gaps 21a, 21b opening in the upper surface portion 20a, the end side end surface portion 10A (see Figures 5 and 11), and the center side end surface portion 10B (see Figures 5 and 11) of the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row and column are closed. Thereafter, as shown in Figures 11 to 13, the filling solidification material 22 is sequentially injected into these gaps 21a, 21b from the filling material injection hole 27d on the center side, which is provided vertically penetrating one or more of the multiple central side blocks 20B arranged in series in the axial direction of the tunnel, and from the filling material injection hole 27e on the receiving side, which is provided vertically penetrating one or more of the multiple receiving base side blocks 20A arranged in series in the axial direction of the tunnel. Preferably, as shown in Figure 13, the injection of the filling solidification material 22 is started from the filling material injection hole 27d on the center side, and then the filling material injection hole 27e on the receiving base 31c side is switched to inject the filling solidification material 22 further, and then the filling of the filling solidification material 22 is completed when it is confirmed that the filling solidification material 22 flows out from the opening of the gap 21a between the receiving base 31c held on the upper surface 20a of the receiving base side block 20A. It is also possible to inject the filling solidification material 22 using only the filler injection hole 27d of the center side block 20B without using the filler injection hole 27e of the receiving base side block 20A, and to finish filling the filling solidification material 22 when it is confirmed that the filling solidification material 22 flows out from the opening of the gap 21a between the receiving base 31c held on the upper surface 20a of the receiving base side block 20A.
[0046] In this embodiment, the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row are preferably adjacent to the axial direction of the tunnel of the existing invert structure 40 (see Figs. 5 and 13) formed in advance. In a state where the opening portion of the gap 21d between the upper surface 20a of the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row and the existing invert structure 40, which opens at the center end surface 10B, and the upper surface 20a of the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row, and the existing invert structure 40, is blocked, the filling solidification material 22 is injected while switching from the filling material injection hole 27d on the center side located on the existing invert structure 40 side to the filling material injection hole 27d on the center side located on the gable side, as shown in Fig. 13, and the filling solidification material 22 is injected while switching from the filling material injection hole 27e on the receiving base side located on the existing invert structure 50 side to the filling material injection hole 27e on the receiving base side located on the gable side. It is also possible to switch from the filler injection hole 27d of the central side block 20B on the existing invert section structure 50 side to the filler injection hole 27d of the central side block 20B on the gable side and halfway inject the filling solidification material 22, and then switch again from the filler injection hole 27e of the receiving base side block 20A on the existing invert section structure 50 side to the filler injection hole 27e of the receiving base side block 20A on the gable side to inject the filling solidification material 22.
[0047] Furthermore, in this embodiment, the strip-shaped formwork 41a is attached to the upper surface 20a of the PCa concrete blocks 20A, 20B, 20C arranged vertically and horizontally, preferably so as to cover the openings of the gaps 21b in the upper surface 20a, thereby blocking the openings of the upper surface 20a (see FIG. 11). The strip-shaped formwork is attached to the end surface 10A, preferably so as to cover the openings of the gaps 21a, 21b, and 21c, thereby blocking the openings of the end surface 10A (not shown). The strip-shaped formwork 41b is attached to the end surface 10B, preferably so as to cover the openings of the gaps 21b, 21c, and 21d, thereby blocking the openings of the end surface 10B (see FIG. 11).
[0048] Moreover, it is preferable that these strip-shaped forms are formed using transparent plate-shaped members, so that the filling status of the filling solidification material 22 in each of the gaps 21a, 21b, 21c, and 21d can be visually observed through these transparent strip-shaped forms.
[0049] Furthermore, it is preferable to attach an air vent hose 42 (see FIG. 11) extending from an appropriate position to the band plate-shaped formwork 41a attached so as to cover the openings of the gaps 21a, 21b, 21d in the upper surface 20a of the multiple PCa concrete blocks 20A, 20B, 20C arranged vertically and horizontally. This makes it possible to effectively vent air from the gaps 21a, 21b, 21d via the air vent hose 42 when the filling solidification material 22 is filled, and it is also possible to confirm that the filling solidification material 22 has been filled by the flow of the filling solidification material 22 from the air vent hose 42.
[0050] In this embodiment, in order to fill the gaps 21a between the adjacent receiving base portions 31c of the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row vertically and horizontally, the gaps 21b between the adjacent PCa concrete blocks 20A, 20B, 20C, and the gaps 21c below the hexahedral bottom surface portions communicating with these gaps 21a and 21b, as described above, the upper surface portions 20a of the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row vertically and horizontally, With the openings of the gaps 21a, 21b, 21c at the end face 10A and the center face 10B closed, the filling solidification material 22 is sequentially injected from the center-side filler injection hole 27d provided vertically penetrating one or more of the center-side blocks 20B arranged in series in the axial direction of the tunnel, and from the pedestal-side filler injection hole 27e provided vertically penetrating one or more of the base-side blocks 20A arranged in series in the axial direction of the tunnel. An open / close valve 28 is attached to the center-side filler injection hole 27d and the base-side filler injection hole 27e, respectively. When filling the filling solidification material 22 by sequentially connecting the injection hose to the opening and closing valves 28 of the selected filling material injection holes 27d on the center side or the filling material injection holes 27e on the pedestal side, the opening and closing valves 28 of the filling material injection holes 27d on the center side or the filling material injection holes 27e on the pedestal side are closed after filling is completed. The opening and closing valves 28 of the unused filling material injection holes 27d on the center side or the filling material injection holes 27e on the pedestal side are left open and can be used as air vent members. As described above, in the process of filling the filling solidification material 22, the filling solidification material 22 can be injected using only the filling material injection holes 27d of the center side block 20B without using the filling material injection holes 27e of the pedestal side block 20A, and the filling of the filling solidification material 22 can be completed by confirming that the filling solidification material 22 flows out from the openings of the gaps 21a between the pedestal 31c held on the upper surface 20a of the pedestal side block 20A.By filling the filling solidification material 22 through the filling material injection hole 27d on the central side, air can be smoothly removed from the gap 21a between the receiving base 31c held on the upper surface 20a of the receiving base side block 20A, making it possible to effectively prevent air from collecting in the filled filling solidification material 22.
[0051] In addition, in this embodiment, the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row and columns are preferably arranged adjacent to each other in the axial direction of the tunnel of the existing invert structure 40 formed previously, as described above. With the opening portion of the gap 21d between the upper surface 20a and the central end surface 10B of the multiple PCa concrete blocks 20A, 20B, 20C arranged in a row and columns blocked, the filling solidification material 22 is injected while switching from the opening / closing valve 28 of the filler injection hole 27d on the central side located on the existing invert structure 40 side to the opening / closing valve 28 of the filler injection hole 27d on the central side located on the gable side, and the filling solidification material 22 is injected while switching from the opening / closing valve 28 of the filler injection hole 27e on the receiving base side located on the existing invert structure 40 side to the opening / closing valve 28 of the filler injection hole 27e on the receiving base side located on the gable side. As described above, it is also possible to switch from the filler injection hole 27d of the central side block 20B on the existing invert section structure 50 side to the filler injection hole 27d of the central side block 20B on the gable side to halfway inject the filling solidification material 22, and then switch further from the filler injection hole 27e of the receiving base side block 20A on the existing invert section structure 50 side to the filler injection hole 27e of the receiving base side block 20A on the gable side to inject the filling solidification material 22.
[0052] In each of the central filler injection holes 27d and the pedestal filler injection holes 27e, the open / close valves 28 can be attached in a state of protruding upward from the upper surface of the multiple PCa concrete blocks 20A, 20B arranged vertically and horizontally by screwing the male screw part 28b into the female screw member 27a fixed to the middle part in the penetration direction of the central filler injection hole 27d or the pedestal filler injection hole 27e, as described above. This makes it possible to easily perform the operation of detachably connecting the injection hose by working on the upper surface 20a of the PCa concrete blocks 20A, 20B, 20C.
[0053] The construction method of the invert structure in a mountain tunnel in this embodiment makes it possible, when constructing the above-mentioned invert lining body 10 in each of the transverse side regions 55A, 55B of the tunnel, to carry out each process of forming the invert structure 10 in one side region 55A while ensuring passage on the passageway 60 in the other side region 55B, as shown in Figures 3 and 4(a) to (f).
[0054] That is, in this embodiment, as described above, in the center of the transverse direction of the tunnel in the invert section 33, multiple H-shaped steel beams 35 for supporting the retaining plate members 57 are installed upright at a predetermined interval in the axial direction of the tunnel by being driven into the ground of the invert section 33 with the flange portions 35a aligned in the axial direction of the tunnel (see Figures 2 and 5). As shown in Figs. 4(a) to (f), the construction method of the invert structure of this embodiment preferably involves interposing a sparser member 56 between the inner surface of the flange portion 35a on one side region 55A of the H-shaped steel 35, and supporting the retaining plate member 57 on the flange portion 35a on one side region 55A in a state in which the retaining plate member 57 is shifted toward the other side region 55B. By retaining the ground 61 of the passageway 60 in the other side region 55B, the invert structure 10 on one side is supported on a portion exceeding the flange portion 35a on the one side region 55A while ensuring passage in the other side region 55B (see Fig. 3) in one side region 55A. The method includes a process of forming up to one half of the invert structure 10 formed in one side region 55A (see Figures 4(a) and (b)), and a process of restoring a passage 60' (see Figures 4(d) and (e)) in the one side region 55A by, for example, supporting a retaining plate member 57 on the flange portion 35a on one side region 55A of the H-shaped steel 35, and then forming the remaining invert structure 10 in the other side region 55B (see Figures 4(d) to (f)).
[0055] In this embodiment, in the process of forming one-side invert structure 10 on one side of one side region 55A, first, while retaining the ground 61 below the passage 60 in the other side region 55B, the passage 60 and the ground 61 below it on one side region 55A are excavated down to the bottom portion 30a of the mountain tunnel 30. Here, as shown in Figure 4(a), the ground 61 below the walkway 60 in the other side area 55B can be retained simply and stably by attaching both ends of a known earth retaining plate member 57, which has a length spanning the flange portions 35a of each pair of adjacent H-shaped steel beams 35 at a predetermined distance, to the inner surface of the flange portion 35a on one side area 55A of the H-shaped steel beam 35 with a spacer member 56 interposed between the inner surface and the earth retaining plate member 57 shifted to the other side area 55B, and having the flange portion 35a on one side area 55A support the earth pressure from the other side area 55B.
[0056] As a result, as shown in Fig. 4(a), it is possible to form the invert structure 10 on one side region 55A side in a state in which the flange portion 35a of the H-shaped steel 35 on one side region 55A side is arranged in the flange arrangement recess 10a by the notched recess 20e of a pair of PCa concrete blocks (center side blocks) 20B adjacent in the axial direction of the tunnel, which are formed on the center side of the invert structure 10 on one side region 55A side in the transverse direction of the tunnel. This also makes it possible to form the invert structure 10 on one side region 55A side in a state in which the end face excluding the notched recess 20e by the transverse direction opposing surface 20d of the center side block 20B protrudes to a portion beyond the flange portion 35a on one side region 55A while ensuring passage on the passageway 60 in the other side region 55B (see Fig. 3).
[0057] In this way, since the invert structure 10 in one side region 55A is formed to a portion that exceeds the flange portion 35a on one side region 55A of the H-shaped steel 35, in the process of forming the invert structure 10 on the other side region 55B described below, it becomes possible to easily fill and harden the filling solidification material 22 in the gap portion 51 (see Figures 1 and 2) between the one side block group 20X and the other side block group 20Y.
[0058] After the invert structure 10 on one side region 55A is formed, in this embodiment, as shown in Fig. 4(c), the lower end portion of the earth retaining plate member 57 is removed from the H-shaped steel 35 together with the sparser member 56, and the portion between the earth retaining plate member 57 and the ground 61 on the other side region 55B is backfilled up to the height position of the upper surface of the formed invert structure 10 (see dotted portion). Thereafter, as shown in Fig. 4(d), the earth retaining plate member 57 above the invert structure 10 on one side region 55A is removed from the H-shaped steel 35 together with the sparser member 56, and the removed earth retaining plate member 57 is replaced, and both ends of the earth retaining plate member 57 are abutted against the inner surface of the flange portion 35a on the other side region 55B of the H-shaped steel 35 by interposing the sparser member 56 between the inner surface of the flange portion 35a on the other side region 55B of the H-shaped steel 35, and the earth retaining plate member 57 is reattached in a state of being biased toward the one side region 55A. In addition, the gap created by this between the retaining plate member 57 and the ground 61 below the walkway 60 in the other side area 55A is backfilled, and the retaining plate member 57 is engaged with the inner surface of the flange portion 35a on one side area 55A of the H-shaped steel 35.
[0059] 4(e), in one side region 55A, the upper part of the formed invert structure 10 is backfilled up to the height position of the passageway 60 in the other side region 55B to create a ground 61' for paving, and the upper surface of the created ground 61' is paved to restore the passageway 60' in one side region 55A. After the passageway 60' is restored in one side region 55A, the passageway 60 and the ground 61 below it are excavated in the other side region 55B as the new side region in which the invert structure 10 is formed, in the same manner as described above, with the passageway 60 secured in the restored passageway 60'. In addition, by engaging both ends of the retaining plate member 57 with the inner surface of the flange portion 35a on the other side region 55A of the H-shaped steel 35 via a sparser member 56, the earth pressure from one side region 55A can be supported by the retaining plate member 57, making it possible to form an invert structure 10 in the other side region 55B as well, while retaining the earth in a simple and stable manner.
[0060] That is, in the process of forming the remaining invert structure 10 in the other side region 55B, as shown in Figures 4(d) to (f), preferably a retaining plate member 57 is supported on the flange portion 35a of the other side region 55B of the H-shaped steel 35 via a sparser member 56, so that the upper portion of the invert structure 10 formed in one side region 55A is backfilled to form a ground 61', which is retained in the one side region 55A, thereby restoring the passage 60' in the one side region 55A, and the remaining invert structure 10 is formed in the other side region 55B with passage on the restored passage 60' being secured.
[0061] In addition, in the process of forming the remaining inverter structure 10 in the other side region 55B, as described below, the gap portion 51 between the one-side block group 20X formed in one side region 55A and the other-side block group 20Y formed in the other side region 55B can also be filled with filling solidification material 22 and solidified.
[0062] In this embodiment, after forming the remaining invert structure 10 in the other side region 55B, the retaining plate member 57 and the sparser member 56 are removed, and the upper part of the invert structure 10 in the other side region 55B is moved to the passage 61 in the one side region 55A. ’ By filling in the area up to this height, the ground for paving can be reconstructed, and by paving the top surface of the constructed ground, a path (not shown) can be restored in the other side area 55B as well.
[0063] In this embodiment, the inverter structures 10 formed in one side region 55A and the other side region 55B are configured to form an inverter structure 50 extending across the entire transverse area, which together constitute the inverter covering body 32, as shown in Figures 1 and 2.
[0064] That is, the invert section structure 50 covering the entire transverse area is a structure using PCa concrete blocks 20A, 20B, 20C that are provided throughout the entire transverse area of the tunnel in the invert section 33 of the mountain tunnel and constitute the invert section lining body 32, and each of the PCa concrete blocks 20A, 20B, 20C is formed as a hexahedral block having curved upper surface portion 20a and lower surface portion 20b so as to have a curved shape that follows the cross-sectional shape of the invert section lining body 32, as described above. As shown in Figures 1 and 2, in each of one side region 55A and the other side region 55B in the transverse direction of the tunnel, a plurality of PCa concrete blocks 20A, 20B, 20C are arranged in series in the transverse direction of the tunnel and installed in the invert section 33 with gaps 21a, 21b between the receiving base 31c at the lower end of the adjacent side wall lining body 31a and between the adjacent PCa concrete blocks, and are also arranged in series in the axial direction of the tunnel with gaps 21b between the adjacent PCa concrete blocks 20A, 20B, 20C, thereby forming a one-side block group 20X and an other-side block group 20Y. In addition, a space portion 51 is maintained between the one-side block group 20X and the other-side block group 20Y in the central portion of the transverse direction of the tunnel. The multiple PCa concrete blocks 20A, 20B, 20C arranged vertically and horizontally in the one side block group 20X and the other side block group 20Y are integrated together via the filling solidification material 22 that has been filled and hardened in the gaps 21a between each adjacent receiving portion 31c, the gaps 21b between adjacent PCa concrete blocks 20A, 20B, 20C, the spacing portion 51 between the one side block group 20X and the other side block group 20Y, and the gaps 21c below the hexahedral underside portion that communicates with these gaps 21a, 21b and the spacing portion 51, to form the invert portion covering body 32.
[0065] In addition, in this embodiment, the gaps 21a between adjacent receiving base portions 31c filled with filling solidification material 22, and the gaps 21b between adjacent PCa concrete blocks 20A, 20B, 20C, preferably have a spacing width of 15 to 30 mm, and the spacing portion 51 between one side block group 20X and the other side block group 20Y preferably has a spacing width of 100 to 130 mm.
[0066] Furthermore, in this embodiment, the multiple PCa concrete blocks 20A, 20B, 20C arranged vertically and horizontally in the one side block group 20X and the other side block group 20Y, respectively, are installed in the invert section 33, with the gaps 21b extending in the axial direction between adjacent PCa concrete blocks in the transverse direction of the tunnel, filled with filling solidification material 22, and the gaps extending in the transverse direction between adjacent PCa concrete blocks in the axial direction of the tunnel being preferably all arranged in a potato shape that is continuous in a straight line.
[0067] Furthermore, in this embodiment, it is preferable that the central side surface of the PCa concrete block (central side block) 20B located most centrally of the one side block group 20X, which faces the gap portion 51, and the central side surface of the PCa concrete block (central side block) 20B located most centrally of the other side block group, are provided with irregularities 52 for improving adhesion with the filling solidification material 22, as shown in Figure 14, for example.
[0068] The unevenness 52 for improving the adhesion with the filling solidification material 22 can also be formed on the transverse facing surfaces 20d facing each other across the held gaps 21a, 21b of each PCa concrete block 20 arranged in series in the transverse direction of the tunnel and installed in the invert section 33, preferably with the gaps 21a, 21b held between the receiving base 31c at the lower end of the adjacent side wall lining body 31a and between the adjacent PCa concrete blocks 20. The unevenness 52 for improving the adhesion with the filling solidification material 22 can also be formed on the axial facing surfaces 20c facing each other across the held gaps 21b of each PCa concrete block 20 arranged in series in the axial direction of the tunnel and installed in the invert section 33, preferably with the gaps 21b held between the adjacent PCa concrete blocks 20.
[0069] In this embodiment, the PCa concrete block (center-side block) 20B located at the most central side of the one-side block group 20X and the PCa concrete block (center-side block) 20B located at the most central side of the other-side block group 20Y are preferably connected via long bolt members (not shown). This makes it possible to ensure the installation accuracy of the one-side block group 20X and the other-side block group 20Y, and also to ensure the shear strength of the portion between these block groups 20X and 20Y.
[0070] In this embodiment, the invert structure 50 for the entire area in the cross direction of the tunnel is formed as follows. That is, the invert structure 50 for the entire area in the cross direction of the tunnel is installed in the invert section 33 by arranging a plurality of PCa concrete blocks 20A, 20B, 20C in series in the cross direction of the tunnel in one side region 55A of the tunnel, with gaps 21a, 21b being maintained between the receiving base 31c at the lower end of the adjacent side wall lining body 31a and between the adjacent PCa concrete blocks 20A, 20B, 20C, and by arranging the plurality of PCa concrete blocks 20A, 20B, 20C in the cross direction of the tunnel. Also, the process includes a step of forming a one-side block group 20X by arranging adjacent PCa concrete blocks 20A, 20B, 20C in a state in which gaps 21b are maintained between the adjacent PCa concrete blocks 20A, 20B, 20C and installing them on an invert portion 33, and a step of forming a one-side block group 20X by arranging the adjacent PCa concrete blocks 20A, 20B, 20C in a state in which gaps 21b are maintained between the adjacent receiving portions 31c of the plurality of PCa concrete blocks 20A, 20B, 20C in the one-side block group 20X arranged in a row and column, and by forming gaps 21a between the adjacent receiving portions 31c of the plurality of PCa concrete blocks 20A, 20B, 20C in a row and column, and by forming gaps 21b between the adjacent PCa concrete blocks 20A, 20B, 20C ...a between the adjacent receiving portions 31c of the plurality of PCa concrete blocks 20A, 20B, 20C in a row and column. and a process of filling and hardening a filling solidification material 22 into a gap 21c below a lower surface portion of the hexahedron shaped structure communicating with the blocks 20A, 20B, 20C, and setting the blocks 20A, 20B, 20C in the invert portion 33 by arranging the blocks 20A, 20B, 20C in series in the transverse direction of the tunnel in a state in which gaps 21a, 21b are maintained between the blocks 20A, 20B, 20C and the receiving base portion 31c at the lower end of the adjacent side wall lining body 31a and between the blocks 20A, 20B, 20C in the other side region 55B in the transverse direction of the tunnel. and a step of forming the other side block group 20Y by arranging the PCa concrete blocks 20A, 20B, 20C in a row and installing them in the invert section 33 while maintaining gaps 21b between the adjacent PCa concrete blocks 20A, 20B, 20C in the axial direction of the tunnel as well, and forming the other side block group 20Y by maintaining gaps 21a between the adjacent receiving base sections 31c of the plurality of PCa concrete blocks 20A, 20B, 20C of the other side block group 20Y arranged in a row and arranged horizontally and vertically.The process includes filling and hardening the filling solidification material 22 in the gap 51 between the block group 20X on one side and the block group 20Y on the other side, in addition to the gap 21b between the block group 20X on one side and the gap 21c below the bottom surface of the hexahedron that communicates with these, and thereby makes it possible to easily form the invert structure 50 that is provided across the entire transverse area of the tunnel and that constitutes the invert covering body 32.
[0071] Furthermore, according to the construction method of the present invention for an invert structure in a mountain tunnel having the above-mentioned configuration, when constructing the invert structure 10 that constitutes the invert lining 32 in an existing mountain tunnel 30 in each of the side regions 55A, 55B in the transverse direction of the tunnel, it becomes possible to form the passage 60 in the other side region 55B and the ground 61 below it in one side region 55A while maintaining it in a stable state with a simple configuration.
[0072] The present invention is not limited to the above embodiment and can be modified in various ways. For example, the invert structure of the present invention is not limited to construction work for extending a lining to an invert in a mountain tunnel in which the lining covering the inner wall surface of the tunnel is formed only in the region from the side walls on both sides to the upper arch-shaped portion and is not formed in the invert, but can also be used in construction work for repairing the lining of the invert already installed in the mountain tunnel and re-installing a new lining of the invert.
[0073] Furthermore, in the process of forming the remaining invert structure on one side, by supporting the retaining plate member 57 on the flange portion of the other side area of the H-shaped steel via a sparser member, it is not necessarily necessary to retain the ground created in one side area. For example, by engaging both ends of the retaining plate member with the surface of the flange portion of one side area of the H-shaped steel, the H-shaped steel can be supported by the retaining plate member, thereby retaining the ground created by backfilling in one side area.
[0074] Furthermore, in the process of forming the invert structure on one side using PCa concrete blocks up to the portion exceeding the flange on one side, for example, the H-shaped steel can be supported by engaging both ends of the earth retaining plate member with the surface of the flange on the other side of the H-shaped steel. The PCa concrete blocks are not limited to those in the above embodiment, and various shapes and weights can be used. [Explanation of symbols]
[0075] 10 Inverter structure 10a Flange mounting recess 10A End face on the side 10B Center side end section 20,20' PCa concrete block 20a Top part 20b Bottom part 20c Axial opposing surface 20d Transverse facing surface 20e Notch recess 20f, 20g Axial connection part 20A Receiving block 20B Center side block 20C Middle block 20D Transverse Block Row 20E External PCa concrete block 20F Inner PCa concrete block 20X One-sided block group 20Y Other side block group 21a Gap between the support and the base 21b Gaps between adjacent PCa concrete blocks 21c Lower gap of the bottom surface 21d Gap between existing invert structure 22 Filling and solidification materials 23 Bolt Box 24 Female thread anchor 25 Bolt insertion hole 25a Female screw member (nut member) 25b Large trumpet-shaped recess 25c Small trumpet-shaped recess 26 Height adjustment bolt 26a Lower end 26b Grounding adjuster 26c Filled bottom part 26d Upper end 27 Filler injection hole 27a Female thread member 27b Upper trumpet-shaped recess 27c Lower trumpet-shaped recess 27d Filler injection hole on the center side 27e Filler injection hole on the support side 28 Opening and closing valve 28a Handle 29a Transverse spacer fixture 29b Axial spacer jig 29c Hanging jig 30 Mountain Tunnel 30a Bottom panel part 31 Lining body 31a Side wall (side wall lining) 31b Arch-shaped part 31c pedestal part 32 Invert section lining 33 Inverter 35 H type steel 35a Flange part 36 Temporary fixing means 36a Hole in Anchor 36b striae 36c Telescopic adjustment means 37 PCa block joint structure 40 Existing invert structure 41a Upper surface band plate formwork 41b Gable section strip formwork 41c Central side strip plate formwork 42 Air bleed hose 50 Invert structure of the entire cross section of the tunnel 51 Interval between one side block group and the other side block group 55A One side area 55B Other side area 56 Sparser member 57 Earth retaining plate material 60,60' Passageway 61,61' Ground below the road b Gap below the bottom surface
Claims
1. A method for constructing an invert structure in a mountain tunnel, the method comprising: constructing an invert structure using PCa concrete blocks in the entire transverse direction of the invert of a mountain tunnel to constitute an invert lining body, in two one-side regions on either side of the center of the transverse direction, so that each one side can be formed in one of the one-side regions while ensuring passage in the other one-side region; In the center of the tunnel in the transverse direction of the invert section, a plurality of H-shaped steels for supporting the earth retaining plate members are installed at predetermined intervals in the axial direction of the tunnel by driving the H-shaped steels into the ground of the invert section with the flange portions aligned in the axial direction of the tunnel, a step of forming an invert structure on one side of the one side region using PCa concrete blocks up to a portion beyond the flange portion on one side of the one side region while ensuring passage in the other side region by supporting the flange portion on one side region of the H-shaped steel or the flange portion on the other side region to retain the ground of the passage in the other side region; A construction method for invert structures in mountain tunnels comprising the steps of: supporting an earth retaining plate member on the H-shaped steel, thereby restoring a passage in one of the areas by retaining the ground created by backfilling the upper part of the invert structure on one side, and, while ensuring passage through the restored passage, forming the remaining invert structure on the other side using PCa concrete blocks.
2. 2. A method for constructing an invert structure in a mountain tunnel as described in claim 1, wherein in the process of forming one-side invert structure in one side region using PCa concrete blocks up to a portion exceeding the flange portion on one side region, a sparser member is interposed between the inner surface of the flange portion on one side region of the H-shaped steel, and the retaining plate member is supported on the flange portion on one side region in a state shifted toward the other side region.
3. 3. The invert structure formed in one side region and the other side region is formed by arranging a plurality of PC concrete blocks in a row in the transverse direction of the tunnel, while maintaining gaps between the blocks and the support base portions of the lower ends of adjacent side wall lining bodies and between adjacent PC concrete blocks, and by installing the blocks in a row in the invert section, while maintaining gaps between the blocks and the support base portions of the lower ends of adjacent side wall lining bodies and between adjacent PC concrete blocks, and also by installing the blocks in a row in the axial direction of the tunnel, while maintaining gaps between the blocks and adjacent PC concrete blocks, and by filling the gaps between the blocks and the support base portions and between adjacent PC concrete blocks with a filling solidification material and allowing it to harden, thereby integrating the blocks together via the hardened filling solidification material.
Citation Information
Patent Citations
Execution method of tunnel invert and precast plate for tunnel invert
JP1998220186A
Invert-forming method and block in existing mountain tunnel
JP2000145390A
Underground structure construction method, underground structure, and precast concrete side wall or intermediate wall / pole for use in the same
JP2006132219A
Soldier piles horizontal lagging method and earth retaining unit fixture
JP2012158926A
Construction method of invert, invert and precast member
JP2013028898A