Method for suspending and installing temporary material and method for preventing deformation of resin concrete panel

The panel lining method using resin concrete panels with additional tightening and female/male thread installation secures temporary materials and prevents deformation, enhancing efficiency and stability during construction.

JP2024146867AActive Publication Date: 2024-10-15LIGHT PLANNING & DESIGN OFFICE CO LTD +2
View PDF 16 Cites 0 Cited by

Patent Information

Application Number
JP2024051868
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2024-03-27
Publication Date
2024-10-15
Estimated Expiration
2044-03-27

AI Technical Summary

Technical Problem

Existing methods for installing temporary materials during the reinforcement of concrete structures using resin concrete panels are inefficient, impairing workability and causing panel deformation due to the application of load from backfill grouting material.

Method used

A panel lining method using resin concrete panels that involves installing a steel support along the tunnel lining, fixing resin concrete panels with a panel fixing tool, injecting backfill grout, and using female and male threads to secure temporary materials and prevent panel deformation by additional tightening with a second fixing member.

Benefits of technology

Enables efficient installation of temporary materials without impairing workability and prevents resin concrete panel deformation by distributing load and reducing material leakage and deformation risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024146867000001_ABST
    Figure 2024146867000001_ABST
Patent Text Reader

Abstract

To provide means that efficiently executes an involute repair reinforcement of an existing concrete-structured channel using a resin concrete panel, while installing an accompanying temporary material without compromising workability, and a method for preventing deformation of a resin concrete panel.SOLUTION: A method for suspending and installing a temporary material in a panel lining method comprises a process of installing a steel support structure, etc. along an existing tunnel lining surface, a process of installing a panel fastening steel material to the steel support structure, a process of installing resin concrete panels using a panel fastening tool (a first fastening member 20) on the panel fastening steel material, a process of injecting backfill grout into a void between a back surface of the resin concrete panel and the existing tunnel lining surface and a process of additionally fastening the panel fastening tool (a second fastening member 30) into a head screw hole of the panel fastening tool (the first fastening member 20).SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for suspending and installing the necessary temporary materials on the side wall of a waterway when repairing and reinforcing a concrete waterway structure using a panel lining method, and a method for preventing deformation when injecting grout into the back surface (of a resin concrete panel) used in repairing and reinforcing a concrete waterway structure. [Background technology]

[0002] When reinforcing existing concrete structures with resin concrete panels, temporary materials are required. In the case of tunnels, temporary materials include lighting equipment to ensure illumination inside the tunnel, power cable wiring equipment to enable the use of electric tools, drainage equipment to drain spring water and other running water from the construction site inside the existing tunnel, and piping equipment to pump backfill grout material, which is injected into the gap between the concrete panel and the existing concrete surface, into the tunnel from a grout manufacturing plant installed outside the tunnel.

[0003] If the above temporary materials were installed on the invert surface inside a tunnel, not only would it be an obstacle to securing work space when constructing the resin concrete panels, but it would also cause electrical wiring, etc. to be placed in contact with a wet surface, which could lead to short circuits. For this reason, countersunk bolts (which secure the resin concrete panels) that have already been fastened (on the tunnel side walls) and are at a suitable height were loosened by about 10 mm along the direction that runs through the tunnel, with the bolt heads pulled out to the inside of the tunnel, and the numbered wire and coated numbered wire were then laid there before the temporary materials were fastened and hung.

[0004] When treating temporary materials using such countersunk bolts for fixing panels, it is necessary to apply a release agent to the bolts to be loosened in advance to make them easier to remove. Then, before injecting the backfill grout material into the resin concrete panel, it is necessary to rub a backfill grout leakage prevention material into the gap between the bolt hole in the resin concrete panel and the fixing countersunk bolt to seal and block it. Furthermore, once the countersunk bolts are loosened, they harden after the backfill grout material is injected, which makes it difficult to refasten them, and so they must be removed and replaced with bolts of a new length.

[0005] On the other hand, when injecting the backfilling grout material, by injecting the backfilling grout material in several stages from the bottom of the panel (along the side of the tunnel), the load due to the weight of the backfilling grout material that is lifted up and filled is applied to the back of the resin concrete panel, and a stress that pushes the resin concrete panel toward the inside of the tunnel acts, causing the resin concrete panel to deform. In light of this situation, the applicants have made extensive development efforts and have arrived at the present invention.

[0006] Patent Document 1 discloses a cable hanger for suspending a low-voltage cable, the cable hanger comprising a tubular member with a slit in the axial direction, a spring-loaded clip, and a magnet, the slit extending from the surface of the tubular member to its interior, the cable passing through the slit and stored in the tubular member, the magnet being provided in the grip portion of the clip (Patent Document 1: Claim 1)." [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2016-663582 A Summary of the Invention [Problem to be solved by the invention]

[0008] The cable sling according to Patent Document 1 (Patent Document 1: Title of the invention) can easily attach and detach low-voltage cables to underground piping when extending, switching, or routing low-voltage cables by utilizing the properties of magnets. However, when installing (multiple slings with complex configurations such as those described in Patent Document 1) along a long tunnel, it can be said that there are problems in terms of cost, and is therefore not desirable.

[0009] The object of the present invention is to provide a means for efficiently repairing and reinforcing the inner surface of a concrete structure waterway using a resin concrete panel without impairing workability, a means for installing associated temporary materials, and a method for preventing deformation of the resin concrete panel. [Means for solving the problem]

[0010] In order to solve the above problem, the invention described in claim 1 is a method for hanging and installing temporary materials in a panel lining method using a resin concrete panel, comprising the steps of: installing a steel support along the surface of an existing tunnel lining; installing a panel fixing steel material on the steel support; installing a resin concrete panel on the panel fixing steel material using a panel fixing device (first fixing member); injecting backfilling grout material into the gap between the back surface of the resin concrete panel and the surface of the existing tunnel lining; and cutting a female screw into the head countersunk screw hole of the panel fixing device (first fixing member) to make it a female-male screw, and additionally tightening the panel fixing device (second fixing member).

[0011] The invention described in claim 2 is a method for hanging and installing temporary materials in a panel lining method using a resin concrete panel, comprising the steps of: installing a concrete anchor for fixing a panel along the surface of an existing tunnel lining; installing a resin concrete panel on the concrete anchor for fixing a panel using a panel fixing device (first fixing member); injecting backfilling grout material into the gap between the back surface of the resin concrete panel and the surface of the existing tunnel lining; and cutting a female screw into the head countersunk screw hole portion of the panel fixing device (first fixing member) to make it a female-male screw, and additionally tightening the panel fixing device (second fixing member).

[0012] The invention described in claim 3 is characterized in that, in the invention described in claim 1 or claim 2, the panel fixing device is a male-female threaded flat head bolt consisting of a first fixing member and a second fixing member, which is a method for hanging and installing temporary materials in a panel lining construction method.

[0013] The invention described in claim 4 is a method for preventing deformation of a resin concrete panel in a panel lining method using a resin concrete panel, comprising the steps of: installing a steel support along the surface of an existing tunnel lining; installing a panel fixing steel material on the steel support; installing a resin concrete panel on the panel fixing steel material using a panel fixing device (first fixing member); injecting backfilling grout material into the gap between the back surface of the resin concrete panel and the surface of the existing tunnel lining; temporarily installing the position of the panel fixing device (first fixing member) of the resin concrete panel (installed on the panel fixing steel material) and the position of the panel fixing device (first fixing member) of the vertically adjacent resin concrete panel in accordance with the position of an alignment hole drilled in a panel deformation prevention member; and cutting a female screw into the head countersunk screw hole portion of the panel fixing device (first fixing member) to make it a female-male screw, and additionally tightening the panel fixing device (second fixing member).

[0014] The invention described in claim 5 is a method for preventing deformation of a resin concrete panel in a panel lining method using a resin concrete panel, comprising the steps of: installing a concrete anchor for fixing a panel along the surface of an existing tunnel lining; installing a resin concrete panel using a panel fixing device (first fixing member) on the concrete anchor for fixing a panel; injecting backfill grout material into the gap between the back surface of the resin concrete panel and the surface of the existing tunnel lining; temporarily installing the position of the panel fixing device (first fixing member) of the resin concrete panel and the position of the panel fixing device (first fixing member) of the vertically adjacent resin concrete panel in accordance with the position of an alignment hole drilled in a panel deformation prevention member; and cutting a female screw into the head countersunk screw hole portion of the panel fixing device (first fixing member) to make it a female-male screw, and additionally tightening the panel fixing device (second fixing member).

[0015] The invention described in claim 6 is characterized in that, in the invention described in claim 4 or claim 5, the panel fixing device is a female-male countersunk bolt consisting of a first fixing member and a second fixing member, which is a method for preventing deformation of a resin concrete panel in a panel lining method.

[0016] The invention described in claim 7 is a panel lining method using a resin concrete panel, comprising the steps of: installing a steel support along an existing tunnel lining surface; installing a panel fixing steel material on the steel support; installing a resin concrete panel on the panel fixing steel material using a panel fixing tool (first fixing member); injecting a backfilling grout material into a gap between the back surface of the resin concrete panel and the existing tunnel lining surface; and determining the position of the panel fixing tool (first fixing member) of the resin concrete panel (installed on the panel fixing steel material) and the water pressure. This method is characterized in that it is a method for preventing deformation of a resin concrete panel in a panel lining construction method, which includes the steps of: tightening a connecting screw member at the position of a panel fixing device (first fixing member) of the resin concrete panel adjacent in the horizontal direction; temporarily tightening a pressure adjustment member to the tightened connecting screw member with a formwork metal member attached, placing a lateral panel deformation prevention member above the pressure adjustment member in a position in contact with the resin concrete panel, and additionally tightening the pressure adjustment member together with the formwork metal member.

[0017] The invention described in claim 8 is characterized in that it is a method for preventing deformation of a resin concrete panel in a panel lining method using a resin concrete panel, comprising the steps of: installing a concrete anchor for fixing a panel along the surface of an existing tunnel lining; installing a resin concrete panel using a panel fixing device (first fixing member) on the concrete anchor for fixing a panel; injecting backfill grout material into a gap between the back surface of the resin concrete panel and the surface of the existing tunnel; tightening a connecting screw member to the position of the panel fixing device (first fixing member) of the resin concrete panel (installed on the panel fixing steel material) and the position of the panel fixing device (first fixing member) of the horizontally adjacent resin concrete panel; provisionally tightening a pressure adjustment member with a formwork metal member attached to the tightened connecting screw member, placing a lateral panel deformation prevention member above the pressure adjustment member and in a position in contact with the resin concrete panel, and additionally tightening the pressure adjustment member together with the formwork metal member. Effect of the Invention

[0018] The present invention further includes a process of tightening a panel fastener (second fastening member) into the female screw hole at the head of the panel fastener (first fastening member). Therefore, when installing a temporary material such as a power cable (as in the past), a convex portion is formed on the resin concrete panel surface by tightening the second fastening member into the head of the first fastening member without loosening the bolt that has been tightened once, and it is now possible to install the temporary material (by using the convex portion as it is or by hooking a special hook or the like onto the convex portion). In other words, it is now possible to install a special hook that can support the temporary material (even if it is somewhat heavy) at the point where the panel fastener (second fastening member) is tightened.

[0019] Furthermore, before injecting backfilling grout material into the gaps at the back of the resin concrete panel, it was necessary to rub a backfilling grout material leakage prevention material into the bolt holes in the resin concrete panel and the gaps between the bolts to seal them off. However, by adding a process of additionally tightening a panel fastener (second fixing member) into the female screw hole in the head of the panel fastener (first fixing member), it is no longer necessary to rub an injection material leakage prevention material into the gaps to seal them off.

[0020] Furthermore, the present invention includes a step of temporarily setting the position of the panel fixing device (first fixing member) of the resin concrete panel (installed on the panel fixing steel material) and the position of the panel fixing device (first fixing member) of the resin concrete panel adjacent in the vertical direction (and horizontal direction) to the position of the alignment hole drilled in the panel deformation prevention member (and the lateral panel deformation prevention member), and a step of cutting a female screw into the head screw hole of the panel fixing device (first fixing member) to make a female and male screw, and additionally tightening the panel fixing device (second fixing member). Therefore, by injecting the backfilling grout material, the load due to the weight of the injection material is applied to the back surface of the resin concrete panel, and a stress that pushes the resin concrete panel toward the inside of the tunnel works, but (to counter this stress), by installing a panel deformation prevention member that counteracts the stress that deforms the resin concrete panel so as to straddle the position of the first fixing member (of the resin concrete panel) adjacent in the vertical direction, and by installing a lateral panel deformation prevention member on a plurality of resin concrete panels adjacent in the horizontal direction and continuously in the extension direction of the tunnel, it has become possible to prevent the deformation of the resin concrete panel. [Brief description of the drawings]

[0021] [Figure 1] This is a diagram to explain the state in which resin concrete panels, panel deformation prevention members, special hooks, etc. have been installed on the surface of an existing tunnel lining. [Diagram 2] Overall view of the panel fixing device (first fixing member and second fixing member) [Diagram 3] FIG. 2 is a diagram for explaining a method for suspending and installing a temporary material according to the present invention. [Figure 4] 13 is a diagram for explaining a method for preventing deformation of a resin concrete panel. FIG. [Diagram 5] 1 is a diagram to explain a method of preventing deformation of a resin concrete panel using a lateral panel deformation prevention member. [Figure 6] 13A and 13B are diagrams for explaining a method of fixing a lateral panel deformation prevention member. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0022] Before describing the method for suspending and installing temporary materials in the panel lining method according to the present invention and the method for preventing deformation of a resin concrete panel, the panel lining method will be briefly described.

[0023] <Outline of Panel Lining Method> The panel lining method is used to reinforce or repair existing concrete waterways by using a lining plate. Panel lamination using recast concrete panels (e.g. resin concrete panels) This is a construction method using resin concrete panels to cover the inside of an existing tunnel. Backfill grout material is filled between the panel and the inner surface of the existing tunnel, and the resin concrete panel is The inner surface of the tunnel is reinforced with an inward lining.

[0024] <Summary of the method for hanging temporary materials and preventing deformation of resin concrete panels> Figure 1 is a diagram for explaining the state in which resin concrete panels, panel deformation prevention members, dedicated hooks, etc. are installed on the surface of an existing tunnel lining. As shown in Figure 1, an (H-shaped) steel support 1 (which is formed with a component member (flange) parallel to the existing tunnel lining surface and a component member (web) perpendicular to the existing tunnel lining surface) is installed along the surface of the existing tunnel lining that is the target of repair and reinforcement, and a panel fixing steel material 2 is installed on the steel support 1 by bolting or the like. The panel fixing steel material 2 is made of angle iron, and is formed from a rectangular steel plate with a panel fixing hole on one side of the angle iron and fixing bolt holes on both ends.

[0025] Then, the resin concrete panel 3 is installed using bolts or the like on the panel fixing steel material, and a backfilling grout material is injected into the gap formed between the back surface of the installed resin concrete panel 3 and the existing tunnel lining surface, thereby reinforcing and repairing the existing concrete structure waterway, etc. It is a construction method. Note that after a panel fixing concrete anchor (not shown) is installed along the existing tunnel lining surface, the resin concrete panel 3 can also be installed using a bolt or the like (in this invention, a panel fixing device (first fixing member 20)) on the panel fixing concrete anchor (not shown). After the resin concrete panel 3 is installed, a backfilling grout material is injected into the gap formed between the back surface of the installed resin concrete panel 3 and the existing tunnel lining surface, thereby reinforcing and repairing the existing concrete structure waterway, etc.

[0026] In a simple manner, the temporary material suspension installation method is to fasten the panel fixing tool (second fixing tool 30) to the head screw hole 40 of the panel fixing tool (first fixing tool 20) and form a convex part (by the panel fixing tool (second fixing tool 30)), so that a dedicated hook 50 can be hung (by the dedicated hook 50) and a temporary material such as a steel pipe can be held (see Figs. 1 and 3). Furthermore, in a simple manner, the resin concrete panel deformation prevention method is to fasten the panel fixing tool (second fixing tool 30) to the head screw hole 40 of the panel fixing tool (first fixing tool 20) of the resin concrete panel and the panel fixing tool (first fixing tool 20) of the resin concrete panel adjacent in the vertical direction (and horizontal direction) with the panel deformation prevention member 60 (and the lateral panel deformation prevention member 80) interposed therebetween (see Figs. 1, 4, and 5). The details of the temporary material suspension installation method and the resin concrete panel deformation prevention method will be explained later.

[0027] The resin concrete panel 3 (size of one panel: approximately 1000mm x 1000mm x 10mm, 9 bolt holes) is made by mixing thermosetting resin such as unsaturated polyester resin or epoxy resin as a binder with fine aggregate such as silica sand, calcium carbonate, and glass fiber as aggregate, and press molding it under high pressure while heating. It has excellent strength, and even a thickness of about 10mm is sufficient for use as a precast panel for lining, and is preferable as an internal reinforcement material for existing concrete waterways.

[0028] As a backfill grout material, high-strength micro-particle grout mortar, which is made by adding micro-particle admixtures to cement, is preferably used. Micro-particle grout mortar has excellent long-distance pumpability, and due to its special additives, it has little bleeding (the phenomenon in which water rises to the surface of concrete after it is poured) and is also excellent in long-term durability, so it is preferably used.

[0029] <Male and female threaded flat head bolts as panel fasteners> 2 is an overall view of the panel fixing devices (first fixing member 20 and second fixing member 30). The temporary material hanging installation method (in the panel lining construction method) and the resin concrete panel deformation prevention method according to the present invention are characterized in that they use male and female screw flat head bolts (the diameter of the first fixing member 20 is formed to be larger than the diameter of the second fixing member 30, and the second fixing member 30 can be additionally tightened to the first fixing member 20) as the panel fixing devices (first fixing member 20 and second fixing member 30).

[0030] As shown in FIG. 2, the panel fixing device is composed of a first fixing member 20 and a second fixing member 30. A head screw hole 40 is formed on the head side of the first fixing member 20, and the first fixing member 20 is designed to have a diameter dimension that allows the second fixing member 30 to be fastened by (additionally) screwing it into the head screw hole 40. In the temporary material hanging installation method, the technical feature is that the second fixing member 30 is installed so that it protrudes from the tunnel side wall surface by about 10 mm to 20 mm. In the resin concrete panel deformation prevention method, the technical feature is that the second fixing member 30 is installed by screwing in the panel deformation prevention member 6 (see FIG. 4) and the horizontal panel deformation prevention member 80 (see FIG. 5) by aligning the holes of the panel deformation prevention member 6 (see FIG. 4) and the horizontal panel deformation prevention member 80 (see FIG. 5) with the position where the resin concrete panel is fastened by the first fixing member 20.

[0031] <How to hang temporary materials> Hereinafter, an embodiment of a method for suspending and installing a temporary material and a method for preventing deformation of a resin concrete panel according to the present invention will be described in detail with reference to Figs. 3 and 4.

[0032] The method of hanging and installing temporary materials according to the present invention is characterized in that a panel fixing device (a male-female threaded flat head bolt consisting of a first fixing member 20 and a second fixing member 30) is used, and when the second fixing member 30 is tightened into the head screw hole portion 40 of the first fixing member 20, the height is adjusted to form a protrusion (convex portion) on the resin concrete panel surface, making it possible to install a dedicated hook 50 for preparing the temporary material so that it can be hung and installed.

[0033] Steel supports are installed along the surface of the existing tunnel lining, panel fixing steel is installed on the steel supports, a resin concrete panel is installed on the panel fixing steel using a panel fixing device (first fixing member 20), backfilling grout material is injected into the gap between the back of the resin concrete panel and the surface of the existing tunnel lining, and then the second fixing member 30 is tightened and installed so that it protrudes approximately 10 mm to 20 mm from the resin concrete panel surface.

[0034] As shown in Fig. 3, the second fixing member 30 (convex portion) is installed so as to protrude from the resin concrete panel surface by about 10mm to 20mm, and by hooking a special hook 50 on it, a support for installing other temporary materials can be formed. That is, by installing the special hook 50 on the additional fastening point of the panel fastener (second fixing member 30) as it is or by installing the special hook 50, it becomes possible to support temporary materials such as power cables, injection material pressure pipes, drainage pipes, etc. (even if they are relatively heavy) (see Fig. 3).

[0035] <Method to prevent deformation of resin concrete panels> 4 is a diagram for explaining a method for preventing deformation of a resin concrete panel. As in the temporary material hanging installation method, a steel support is installed along the existing tunnel lining surface, a panel fixing steel material is installed on the steel support, and a resin concrete panel is installed using a panel fixing tool (first fixing member 20) on the panel fixing steel material (or a panel fixing concrete anchor is installed along the existing tunnel lining surface, and a resin concrete panel is installed using a panel fixing tool (first fixing member) on the panel fixing concrete anchor), and then a backfilling grout material is injected into the gap between the back surface of the resin concrete panel and the existing tunnel lining surface, and the position of the panel fixing tool (first fixing member 20) of the resin concrete panel (installed on the panel fixing steel material) and the position of the panel fixing tool (first fixing member 20) of the resin concrete panel adjacent in the vertical direction are temporarily installed in accordance with the position of the positioning hole 70 drilled in the panel deformation prevention member 60. Then, the panel fixing device (second fixing member 30: see Figure 2) is additionally tightened into the head screw hole portion 40 (see Figure 2) of the panel fixing device (first fixing member 20) to install the panel deformation prevention member 60 (see Figure 4).

[0036] The panel deformation prevention member 60 is made of processed wood or the like having a length of 500 mm to 600 mm and a thickness of 20 mm to 50 mm. The panel deformation prevention member 60 has alignment holes 70 (two holes so that they will come to the position of the first fixing member 20 for installing the resin concrete panel when installed). The alignment holes 70 are located in two places near both ends, and the shape of the alignment holes 70 may be a so-called elongated hole (a normal round hole extended long) so that the dimensions can be adjusted. The panel deformation prevention member 60 is installed evenly in the circumferential and axial directions of the existing tunnel (see FIG. 4). It is preferable that the material of the panel deformation prevention member 60 is lightweight wood, but it may be made of metal other than wood or plastic. Furthermore, as shown in FIG. 4, the fixing strength (degree of prevention of panel deformation) can be strengthened by using angle iron (angle).

[0037] 5 is a diagram for explaining a method for preventing deformation of a resin concrete panel by a horizontal panel deformation prevention member 110. The construction method for preventing deformation of a resin concrete panel by a horizontal panel deformation prevention member 110 is carried out by installing a steel support along the surface of the existing tunnel lining, installing a panel fixing steel material on the steel support, installing a resin concrete panel using a panel fixing tool (first fixing member 20) on the panel fixing steel material, (or installing a concrete anchor for fixing a panel along the surface of the existing tunnel lining, installing a resin concrete panel using a panel fixing tool (first fixing member 20) on the concrete anchor for fixing a panel,) and injecting a backfilling grout material into the gap between the back surface of the resin concrete panel and the surface of the existing tunnel lining.

[0038] After injecting backfill grout material into the gap between the back of the resin concrete panel and the existing tunnel lining surface, the horizontal panel deformation prevention member 110 is installed along the extension direction of the tunnel (to prevent the resin concrete panel from deforming due to the stress generated by the weight of the backfill grout material) as shown in Figure 5 (the horizontal panel deformation prevention member 110 is supported by the formwork metal member 90 and the pressure adjustment member 100). As shown in Figure 5, the horizontal panel deformation prevention member 110 can be installed for adjacent resin concrete panels (in the extension direction of the tunnel). In other words, the length of the horizontal panel deformation prevention member 110 can be freely set according to the construction site.

[0039] Figure 6 is a diagram for explaining a method of fixing the lateral panel deformation prevention member 110. Figure 6(a) is a diagram seen from the side, and Figure 6(b) is a partially enlarged view (part marked α). The method for preventing deformation of a resin concrete panel using a lateral panel deformation prevention member 110 includes the steps of tightening (the left half of) a connecting screw member 80 at the position of the panel fixing device (first fixing member 20) of the resin concrete panel (installed on the panel fixing steel member 2) and at the position of the panel fixing device (first fixing member 20) of the resin concrete panel horizontally adjacent (to this resin concrete panel), and provisionally tightening (the right half of) the connecting screw member 80 thus tightened with a formwork hardware member 90 attached, placing (the lateral panel deformation prevention member 110) above the pressure adjustment member 100 in a position in contact with the resin concrete panel, and then tightening (the left half of) the pressure adjustment member 100 together with the formwork hardware member 90.

[0040] In short, the lateral panel deformation prevention member 110 is installed so as to be in contact with the resin concrete panel to prevent deformation of the resin concrete panel, and by tightening the pressure adjustment member 100, the formwork hardware member 90 is also tightened (as stress acts on the lateral panel deformation member 110 in a direction that prevents deformation of the resin concrete panel), a force is generated that presses against the resin concrete panel via the lateral panel deformation prevention member 110, thereby preventing deformation (of the resin concrete panel).

[0041] The connecting screw member 80 is a screw having a structure in which the right and left sides have different screw pitches and diameters (see FIG. 6). The right half of the connecting screw member 80 is screwed (tightened) into the panel fixing device (first fixing member 20) and the left half is screwed (tightened) into the pressure adjustment member 100, thereby connecting the panel fixing device (first fixing member 20) and the pressure adjustment member 100. The formwork metal member 90 is composed of two members, a main body 91 and an angle bar 92 (which transmits the tightening force when the pressure adjustment member 100 is screwed in to the main body) (see FIG. 6). When it is necessary to increase the stress of the lateral panel deformation prevention member 110 pressing down on the resin concrete panel, the angle bar 92 of the formwork metal member 90 is moved downward by applying pressure (including hitting from above), thereby generating stress that presses down on the lateral panel deformation prevention member 110 via the main body 91 of the formwork metal member 90 (in the direction of the resin concrete panel). As the lateral panel deformation prevention member 110, a square pipe (60 mm x 60 mm x t2.3 mm: the length can be freely selected according to the construction site) can be used.

[0042] <Effects of the method for hanging temporary materials and the method for preventing deformation of concrete panels> According to the present invention, when installing temporary materials such as power cables (as in the conventional method), the bolts that have been tightened once are not loosened, but rather the second fixing member 30 is additionally tightened onto the head of the first fixing member 20, thereby forming a convex portion on the surface of the resin concrete panel, making it possible to install temporary materials such as power cables, injection material pressure pipes, drainage pipes, etc. (by using the convex portion as it is, or by hooking a special hook 50 or the like onto the convex portion).

[0043] In conventional construction methods, the fixing device (such as a flat head bolt) that fixed the resin concrete panel had to be loosened to form a convex portion on the surface of the resin concrete panel. In the temporary material hanging installation method (according to the present invention), a panel fixing device (a double flat head bolt consisting of a first fixing member 20 and a second fixing member 30) is used, and a construction method is adopted in which the second fixing member 30 is added to the head screw hole portion 40 provided in the head of the first fixing member 20 and then tightened, eliminating the need to loosen the already-tightened flat head bolt that fixed the resin concrete panel.

[0044] That is, it has become possible to install power cables directly on the convex parts of the resin concrete panel surface without having to take the trouble of loosening the already-tightened countersunk bolts that secure the resin concrete panel, and it has also become possible to install (on the convex parts of the resin concrete panel surface) dedicated hooks 50 capable of receiving and supporting injection material pressure pipes, drainage pipes, etc. In conventional construction methods, injection material pressure pipes, drainage pipes, etc. were installed on the invert surface, so the temporary material hanging method of the present invention has made it possible to effectively utilize the space at the construction site.

[0045] In the conventional construction method, it was necessary to take the trouble of loosening the fixing device (countersunk bolt) that fixed the resin concrete panel, and therefore it was necessary to apply a release agent to the fixing device (countersunk bolt), but this work is no longer necessary, and it is also no longer necessary to fill the joints of the backfill grout material leakage prevention material on the back of the resin concrete panel. If the fixing device (countersunk bolt) that fixed the resin concrete panel was once loosened, the bolt unfixed position would harden after the backfill grout material on the back was injected, so the loosened countersunk bolt could not be retightened, and it was necessary to reinstall a new countersunk bolt, but with the present invention, this is no longer necessary, which also leads to a reduction in the industrial waste disposal of the original fixing device (countersunk bolt) and the joint filling material.

[0046] By installing the temporary material using the convex part formed by the second fixing member 30, the leakage of grout material from around the fixing member (countersunk bolt) that is pulled out when injecting backfill grout material into the back of the resin concrete panel is eliminated, and the resin concrete panel can be easily installed without soiling the surface of the panel, reducing the time required for cleaning. In addition, the amount of polluted water caused by the outflow of grout material is reduced, reducing the amount of sludge water to be treated, which is also an environmental measure.

[0047] In a general process, the time spent for curing (protecting until it has a strength that can withstand external forces) after injecting the backfilling grout material (cement mortar, etc.) is about 24 hours, and the injection work had to be suspended until the backfilling grout material solidified (cured). That is, in the case of the backfilling grout material being cured, when (further) backfilling grout material is injected upward along the tunnel circumferential direction (of the backfilling grout material being cured), the pressure due to the self-weight load from the (further) backfilling grout material is applied to the back of the resin concrete panel, and a stress that pushes (the resin concrete panel) toward the inside of the tunnel acts. According to the resin concrete panel deformation prevention method of the present invention, (to counter this stress) a panel deformation prevention member 60 (processed wood, etc.) that counteracts the stress that deforms the resin concrete panel, and a lateral panel deformation prevention member 110 are installed on a plurality of adjacent resin concrete panels in the horizontal direction in the extension direction of the tunnel, thereby making it possible to prevent the resin concrete panel from deforming.

[0048] By installing the panel deformation prevention material 60 (processed wood, etc.) and the lateral panel deformation prevention member 80 in the vertical (and horizontal) directions, it has become possible to prevent the resin concrete panel from deforming (which may lead to cracking and destruction). In other words, even during curing, even if the load is increased by placing void-filling grout material upward along the circumferential direction of the tunnel, it has become possible to inject and fill further backfilling grout material, which contributes to shortening the construction period.

[0049] <Examples of changes to methods for hanging and fixing temporary materials and preventing deformation of concrete panels> The method for suspending and fixing temporary materials and the method for preventing deformation of concrete panels according to the present invention are not limited to the aspects of the above-mentioned embodiments, and each step can be appropriately modified as necessary without departing from the spirit of the present invention. [Industrial Applicability]

[0050] The method for hanging and installing temporary materials and the method for preventing deformation of resin concrete panels according to the present invention have excellent effects as described above, and therefore can be suitably used as a method for hanging and installing temporary materials in a panel lining method, and as a method for preventing deformation of resin concrete panels. [Explanation of symbols]

[0051] 1...Steel shoring 2. Panel fixing steel 3. Resin concrete panel 20 Panel fixing device (first fixing member) 30 Panel fixing device (second fixing member) 40··Head screw hole 50··Special hook 60 Panel deformation prevention member 70··Alignment hole 80··Connecting screw member 90··Formwork hardware components 91··Formwork hardware (main body) 92··Formwork hardware (angle bars) 100 Pressure adjustment member 110... Lateral panel deformation prevention member

Claims

1. In the panel lining method using resin concrete panels, The process involves installing steel supports along the surface of the existing tunnel lining; A step of installing a panel fixing steel material on the steel support; A step of installing a resin concrete panel using a panel fixing tool (first fixing member) on the panel fixing steel material; A step of injecting a backfill grout material into a gap between the back surface of the resin concrete panel and the existing tunnel lining surface; A method for suspending and installing temporary materials in a panel lining construction method, comprising the steps of cutting a female screw into a head countersunk screw hole of the panel fixing device (first fixing member) to form a female-male screw, and additionally tightening the panel fixing device (second fixing member).

2. In the panel lining method using resin concrete panels, A process of installing a concrete anchor for fixing the panel along the surface of the existing tunnel lining; A step of installing a resin concrete panel using a panel fixing tool (first fixing member) on the panel fixing concrete anchor; A step of injecting a backfill grout material into a gap between the back surface of the resin concrete panel and the existing tunnel lining surface; A method for suspending and installing temporary materials in a panel lining construction method, comprising the steps of cutting a female screw into a head countersunk screw hole of the panel fixing device (first fixing member) to form a female-male screw, and additionally tightening the panel fixing device (second fixing member).

3. 3. The method for suspending and installing temporary materials in a panel lining construction method according to claim 1 or 2, characterized in that the panel fixing device is a male-female screw flat head bolt consisting of a first fixing member and a second fixing member.

4. In the panel lining method using resin concrete panels, The process involves installing steel supports along the surface of the existing tunnel lining; A step of installing a panel fixing steel material on the steel support; A step of installing a resin concrete panel using a panel fixing tool (first fixing member) on the panel fixing steel material; A step of injecting a backfill grout material into a gap between the back surface of the resin concrete panel and the existing tunnel lining surface; A process of temporarily setting the position of the panel fixing device (first fixing member) of the resin concrete panel (installed on the panel fixing steel material) and the position of the panel fixing device (first fixing member) of the resin concrete panel adjacent in the vertical direction to the position of the alignment hole drilled in the panel deformation prevention member; A method for preventing deformation of a resin concrete panel in a panel lining construction method, characterized in that it includes a step of cutting a female thread into the head countersunk screw hole portion of the panel fixing device (first fixing member) to make it a female-male thread, and then tightening an additional panel fixing device (second fixing member).

5. In the panel lining method using resin concrete panels, A process of installing a concrete anchor for fixing the panel along the surface of the existing tunnel lining; A step of installing a resin concrete panel using a panel fixing tool (first fixing member) on the panel fixing concrete anchor; A step of injecting a backfill grout material into a gap between the back surface of the resin concrete panel and the existing tunnel lining surface; A step of temporarily installing the panel fixing device (first fixing member) of the resin concrete panel and the panel fixing device (first fixing member) of the resin concrete panel adjacent in the vertical direction in accordance with the position of the alignment hole drilled in the panel deformation prevention member; A method for preventing deformation of a resin concrete panel in a panel lining construction method, characterized in that it includes a step of cutting a female thread into the head countersunk screw hole portion of the panel fixing device (first fixing member) to make it a female-male thread, and then tightening an additional panel fixing device (second fixing member).

6. 6. A method for preventing deformation of a resin concrete panel in a panel lining method according to claim 4 or claim 5, characterized in that the panel fixing device is a male-female threaded flat head bolt consisting of a first fixing member and a second fixing member.

7. In the panel lining method using resin concrete panels, The process involves installing steel supports along the surface of the existing tunnel lining; A step of installing a panel fixing steel material on the steel support; A step of installing a resin concrete panel using a panel fixing tool (first fixing member) on the panel fixing steel material; A step of injecting a backfill grout material into a gap between the back surface of the resin concrete panel and the existing tunnel lining surface; A process of tightening a connecting screw member at the position of the panel fixing device (first fixing member) of the resin concrete panel (installed on the panel fixing steel material) and at the position of the panel fixing device (first fixing member) of the horizontally adjacent resin concrete panel; A method for preventing deformation of a resin concrete panel in a panel lining construction method, characterized in that it further comprises the steps of provisionally tightening a pressure adjustment member with a formwork hardware member attached to the tightened connecting screw member, placing a lateral panel deformation prevention member above the pressure adjustment member in a position in contact with the resin concrete panel, and further tightening the pressure adjustment member together with the formwork hardware member.

8. In the panel lining method using resin concrete panels, A process of installing a concrete anchor for fixing the panel along the surface of the existing tunnel lining; A step of installing a resin concrete panel using a panel fixing tool (first fixing member) on the panel fixing concrete anchor; A step of injecting a backfill grout material into a gap between the back surface of the resin concrete panel and the existing tunnel lining surface; A process of tightening a connecting screw member at the position of the panel fixing device (first fixing member) of the resin concrete panel (installed on the panel fixing steel material) and at the position of the panel fixing device (first fixing member) of the horizontally adjacent resin concrete panel; A method for preventing deformation of a resin concrete panel in a panel lining construction method, characterized in that it further comprises the steps of provisionally tightening a pressure adjustment member with a formwork hardware member attached to the tightened connecting screw member, placing a lateral panel deformation prevention member above the pressure adjustment member in a position in contact with the resin concrete panel, and further tightening the pressure adjustment member together with the formwork hardware member.

Citation Information

Patent Citations

  • JP1988149138U

  • JP1989075509U

  • Insert

    JP2003247276A

  • Repair structure of existing pipeline

    JP2006274535A

  • Connector

    JP2009264463A