Warning information generation device and warning information generation method

The caution information generation device addresses the challenge of identifying cautionary points in revised train schedules by comparing past performance with new plans, facilitating proactive operational adjustments.

JP2024149233APending Publication Date: 2024-10-18HITACHI LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023062980
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-07
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing train schedule rescheduling systems fail to account for past maintenance and driving results, making it difficult to identify specific cautionary points in revised timetables, which can lead to operational violations.

Method used

A caution information generation device that compares past train running status information with changed operation plans to generate and display caution information, including points of caution based on past performance, thereby determining the level of caution required.

Benefits of technology

Enables administrators to take preventive measures by estimating permissible ranges and risk levels, ensuring compliance with operational policies and safety conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024149233000001_ABST
    Figure 2024149233000001_ABST
Patent Text Reader

Abstract

To provide a technique for determining a warning level for prompting attention to an operation plan based on a past operation achievement and generating warning information for an operation.SOLUTION: This information generating device comprises: a warning information generation unit that compares past train traveling state information before a change time point of a train operation plan with an operation plan after the change to generate warning information including a warning place regarding a train operation generated along with the change of the operation plan; and a warning information output unit that causes the generated warning information to be displayed.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an attention information generating device and an attention information generating method for generating attention information for calling the attention of an operation manager or the like when creating a train operation plan. [Background technology]

[0002] When train schedules are disrupted due to disasters or breakdowns, operations plans are revised in a process known as rescheduling, in order to minimize the impact and return trains to normal operation. Patent document 1 discloses a technology for a traffic replanning support system that includes a traffic replanning plan memory unit that acquires and stores traffic replanning proposals, and a judgment condition memory unit that stores specified conditions for determining whether the traffic replanning proposal can be realized.The system compares the acquired traffic replanning proposal with the specified conditions corresponding to the traffic replanning proposal to determine whether the traffic replanning proposal satisfies the specified conditions.The user can use the judgment result to quickly determine whether the traffic replanning proposal can be realized, thereby improving usability. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-70044 A Summary of the Invention [Problem to be solved by the invention]

[0004] In Patent Document 1, since judgment can only be made based on the conditions stored in the judgment condition storage unit, it is difficult to identify points requiring caution for proposed timetable rescheduling while taking into account past maintenance records and driving records, because the threshold value for identifying points requiring caution varies depending on past records.

[0005] In this way, if it is possible to identify and present points of caution for the operation plan being created, in particular points of caution that are approaching conditions that must be observed or conditions related to safety, then operation command staff and others performing operation command duties will be able to take measures to prevent violations, etc. from occurring in advance, based on the identified points of caution.

[0006] Therefore, an object of the present invention is to provide a technology for determining a level of caution for calling attention to an operation plan based on past operational performance, and generating caution information for operation. [Means for solving the problem]

[0007] In order to solve the above problems, one representative warning information generating device of the present invention includes a warning information generating unit that compares past train running state information up until the time when the train operation plan was changed with the changed operation plan, and generates warning information including warning points regarding train operation that arise as a result of the change in the operation plan, and a warning information output unit for displaying the generated warning information. Effect of the Invention

[0008] According to the present invention, when generating warning information related to operations, the acceptable range for extracting warning points is estimated from past operating performance, and the level of warning (risk) is also determined, thereby encouraging operation managers and others to issue warnings in line with operational policies. Problems, configurations and effects other than those described above will become apparent from the description of the following embodiments. [Brief description of the drawings]

[0009] [Figure 1] 1 is a diagram showing an example of the configuration of a train control device including an attention information generating device according to the present invention. [Diagram 2] 1 is a diagram showing an example of a configuration of an alert information generating device according to the present invention; [Diagram 3] 11 is a diagram showing an example of a processing flow in which the warning information generating device generates and displays warning information. FIG. [Figure 4] FIG. 11 is a diagram illustrating an example of a processing flow of an attention information generating process. [Diagram 5] FIG. 11 is a diagram illustrating an example of a processing flow of a process for generating attention information related to a train operation plan. [Figure 6] FIG. 11 is a diagram illustrating an example of a processing flow of a process for generating caution information regarding vehicle operation. [Figure 7] FIG. 11 is a diagram illustrating an example of a processing flow of a process for generating caution information regarding crew operations. [Figure 8] FIG. 11 is a diagram illustrating an example of a processing flow of attention level determination processing. [Figure 9] FIG. 13 is a diagram showing an example of a train operation plan change condition input screen. [Figure 10] FIG. 13 is a diagram showing an example of an alert information generating condition input screen. [Figure 11] FIG. 13 is a diagram showing an example of displaying warning information classified into cases according to warning levels; [Figure 12] FIG. 13 is a diagram showing an example of displaying warning information including a deviation degree of a warning level. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, examples of the present invention will be described with reference to the drawings. Note that the present invention is not limited to these examples. In addition, in the description of the drawings, the same parts are denoted by the same reference numerals. EXAMPLES

[0011] FIG. 1 is a diagram showing an example of the configuration of a train control device including an alert information generating device according to the present invention. The attention information generating device 101, the traffic management device 103, the route control device 105, and the ground device 107 are connected via a network 102, a network 104, and a network 106, respectively, as shown in Fig. 1. However, the relationship between the above four devices and the network is not limited to the configuration shown in Fig. 1. The warning information generating device 101 will be described later.

[0012] The operation management device 103 is a device related to known technology, but this device includes an operation plan generation unit (not shown), and the operation plan generated by this operation plan generation unit is closely related to the warning information generation device 101 according to the present invention. The warning information generation device 101 functions for the operation plan that is generated and changed daily, and generates warning information including identification of warning points.

[0013] The route control device 105 is also a device according to known technology, but this device includes a train control unit (not shown), which controls trains according to a generated or changed operation plan. If the operation plan includes warning information generated by the warning information generating device 101, train control will be performed according to the operation plan.

[0014] The ground equipment 107 is connected to, for example, a track circuit 108, a signal 109, and a switch 110 that are installed on or beside the track on which the train 111 runs. Train position information is acquired from the track circuit 108, signal information is acquired from the signal 109, and switch information is acquired from the switch 110 as the train 111 runs.

[0015] FIG. 2 is a diagram showing an example of the configuration of the alert information generating device 101 according to the present invention. The alert information generating device 101 is configured with a CPU 201, a memory 202, a storage unit 203, and a communication unit 204, similar to a general processing device. The memory unit 203 has a number of programs (P01 to P06) for executing the processing required to generate and display warning information, and a number of storage units (D01 to D05) for storing conditions and information used in that processing, and also stores basic data B01 that is the basis for train operation (e.g., the length of the station line platform, whether the line is electrified or not, etc.).

[0016] 3 is a diagram showing an example of a processing flow in which the alert information generating device 101 generates and displays alert information. When executing this processing flow, the CPU 201 retrieves predetermined programs and information from the storage unit 203 into the memory 202 and executes them.

[0017] When the processing starts, in step S301, as a train running state information collection process, the train running state information collection program P01 acquires the current time and collects the train's running history (e.g., arrival / departure times at each station, train position information by time, etc.) as past train running state information from the past train running state information storage unit D04.

[0018] In step S302, as a train operation plan change condition input reception process, the train operation plan change condition input reception program P03 receives input of train operation plan change conditions and stores the received input data in the train operation plan change condition storage unit D01.

[0019] Here, the information related to the train operation plan change conditions includes information related to at least one of facilities related to train operation, operation status, and surrounding environment, such as train information, organization information, crew information, weather, and passenger data. A representative input mode for accepting the input of these change conditions is, for example, accepting the input using an input screen. An example of the train operation plan change condition input screen is shown in Fig. 9, which will be described later.

[0020] In step S303, as an alert information generating condition input reception process, the alert information generating condition input reception program P04 receives an input of the alert information generating condition, and stores the received input data in the alert information generating condition storage unit D02.

[0021] Here, the information related to the caution information generation conditions includes conditions for searching for trains (train search conditions) and items to be checked (check items), and a representative input mode for accepting input of the generation conditions is, for example, accepting the input using an input screen. An example of the caution information generation condition input screen is shown in Fig. 10, which will be described later.

[0022] In step S304, as a train operation plan generation process, the train operation plan generation program P02 generates a changed train operation plan based on the operation plan before the change and the train operation plan change conditions accepted in step S302. However, the operation plan is not generated from scratch, but rather there is an original operation plan, and changes to the operation plan are generated from that. Note that this train operation plan generation can be handled using publicly known technology, so details will not be described.

[0023] In step S305, as an attention information generation process, the attention information generation program P03 generates attention information related to train operation based on the degree of deviation between the changed operation plan generated in step S304 and the train running records collected in step S301. That is, the deviation is obtained by comparing a value obtained from the changed operation plan with a statistical amount obtained from the past train running records. This attention information generation process is a key process of the present invention, and will be described in detail later.

[0024] In step S306, as a warning information display process, the warning information display program P06 displays and outputs the warning information generated in step S305 using a screen or the like. Various display modes can be used for the screen display. Examples of warning information display modes are shown in Figs. 11 and 12, which will be described later. The output screen for the warning information is displayed on a display unit of a terminal or the like provided in a relevant department involved in train operation. Furthermore, the output is not limited to display output, and may be a warning output using an audible alarm or the like, or a display and an audible alarm may be used together. When step S306 is completed, the process flow ends.

[0025] <Caution information generation process> Next, a processing flow of the warning information generating process according to the present invention will be described. FIG. 4 is a diagram showing an example of a processing flow of the warning information generating process (step S305 in FIG. 3). The attention information generation process is composed of a process flow consisting of three generation process steps: train operation schedule attention information generation process (step S401, details of which are shown in FIG. 5), vehicle operation attention information generation process (step S402, details of which are shown in FIG. 6), and crew operation attention information generation process (step S403, details of which are shown in FIG. 7). However, the three generation process steps can be performed in any order.

[0026] The three generation processing steps will be described below in order. The alert information generating program P05 is the main entity that executes the processing in all three generation processing steps, but in the following description, the description of the main entity will be omitted.

[0027] <Processing for generating warning information related to train operation schedule> FIG. 5 is a diagram showing an example of a process flow of the train operation plan-related attention information generation process in step S401. In step S501, a repetitive process is performed on the search conditions input in the train search conditions field on the alert information generation condition input screen shown in FIG.

[0028] In step S502, a group of trains (hereinafter, the group of trains will be referred to as "G") that meets the search conditions input in step S501 is extracted from the past train running state information (train running records) stored in the past train running state information storage unit D04.

[0029] In step S503, the process is repeated for the items (hereinafter referred to as "operation plan items A") listed in the "operation plan" check item on the alert information generation condition input screen shown in FIG. In step S504, a warning level determination process is executed, which will be described later.

[0030] <Processing for generating caution information regarding vehicle operation> FIG. 6 is a diagram showing an example of a process flow of the process of generating caution information related to vehicle operation in step S402. In step S601, a repetitive process is performed on the search conditions input in the train search conditions on the alert information generation condition input screen shown in FIG.

[0031] In step S602, a train group (hereinafter, the train group will be referred to as "H") that meets the search conditions input in step S601 is extracted from the past train running state information (train running record) stored in the past train running state information storage unit D04. In step S603, the past train operation plan change conditions stored in the past train operation plan change condition storage unit D05 are compared with the train group H extracted in step S602, and a corresponding train group (hereinafter, this train group will be referred to as "G") is extracted.

[0032] In step S604, the process is repeated for the items listed in the "vehicle operation (formation)" check item on the alert information generation condition input screen shown in FIG. 10 (hereinafter referred to as "vehicle operation (formation) item A"). In step S605, a warning level determination process is executed, which will be described later.

[0033] <Processing for generating caution information regarding crew operations> FIG. 7 is a diagram showing an example of a process flow of the crew operation-related attention information generation process in step S403. In step S701, a repetitive process is performed on the search conditions input in the train search conditions on the alert information generation condition input screen shown in FIG.

[0034] In step S702, a train group (hereinafter, the train group will be referred to as "H") that meets the search conditions input in step S701 is extracted from the past train running state information stored in the past train running state information storage unit D04. In step S703, the past train schedule change conditions stored in the past train schedule change condition storage unit D05 are compared with the train group H extracted in step S702 to extract a corresponding crew group (hereinafter, the train formation group is referred to as "G").

[0035] In step S704, the process is repeated for the items (hereinafter referred to as "crew operation items A") listed in the "crew operation" check item on the alert information generation condition input screen shown in FIG. In step S705, a warning level determination process is executed, which will be described later.

[0036] <Attention level judgment process> FIG. 8 is a diagram illustrating an example of a processing flow of the attention level determination processing. The processing flow of the warning level determination processing shown in Figure 8 is common to each of the warning level determination processing steps of step S504 in the processing flow for generating warning information regarding train operation plans (Figure 5), step S605 in the processing flow for generating warning information regarding vehicle operations (Figure 6), and step S705 in the processing flow for generating warning information regarding crew operations (Figure 7).

[0037] In the following, the processing flow of the attention level determination process will be described using the attention information generation process related to the train operation plan as an example. In step S801, operation plan item A for train group G (running stations and track numbers, running track, operating time, stopping time, number of passengers, and train intervals) is compared with basic data B01 stored in memory unit 203 to confirm whether the conditions are right for running.

[0038] If it is determined that driving is not permitted (NO), then in step S802, the warning level is determined to be "violation" and the determination process ends. If it is determined that the train can run (YES), then in step S803, a histogram is generated for operation plan item A for the train group G. For example, if operation plan item A is "train interval," a histogram is generated with the time interval between the preceding and following trains as the "train interval." This time interval may be an average of multiple preceding and following trains from a preset number. Histograms for other operation plan items A will be described later.

[0039] In step S804, it is determined whether the item is rare with a standard deviation of σ of 3σ or more. If it is 3σ or more (YES), in step S805, the attention level is determined to be "Caution required", and the determination process is terminated. If it is less than 3σ (NO), in step S806, it is determined whether or not the item is 2σ or more. If it is 2σ or more (less than 3σ) (YES), in step S807, the warning level is determined to be "warning", and the judgment process is terminated.

[0040] If it is less than 2σ (NO), in step S808, it is determined whether or not the item is equal to or greater than σ. If it is equal to or greater than σ (less than 2σ) (YES), in step S809, the warning level is determined to be "reference", and the determination process ends. If it is less than σ (NO), it is not determined as being at the caution level and the determination process ends.

[0041] The above has been an example of the process of generating warning information regarding train operation plans. In steps S801 and S803, the target group G and confirmation item A are, in the case of the process of generating warning information regarding vehicle operations, the formation group G and the vehicle operation (formation) item A, and in the case of the process of generating warning information regarding crew operations, the crew group G and the crew operation item A.

[0042] <Train operation plan change condition input processing> Next, an input mode and the like in the train operation plan change condition input process shown in step S302 of FIG. 3 will be described. Fig. 9 is a diagram showing an example of a train operation plan change condition input screen. Required input items are displayed for each of the train information, organization information, crew information, weather, and passenger data shown in Fig. 9, and input of change conditions is accepted. In this case, it is possible to accept multiple inputs, and a GUI or the like can be used to input each item.

[0043] Each piece of information is explained below. A. Train information Input items relating to train information include, for example, train number, stopping stations, required station arrival time, and required station departure time. For example, in the example shown in FIG. 9, the train number is "t001", the station is "Station", the required arrival time is "23:00", and the required departure time is "none".

[0044] B. Organization information The input items include, for example, the name of the train, the number of cars in the train, the assigned train, the time period during which the train can run, the place of stay, the distance that the train can run, and the date of the last inspection. For example, in the example shown in Figure 9, the train formation name is "v101", the number of cars in the formation is "y cars", the assigned trains are "t101, t102, t103", the available running time is "6:00-25:00", the stopover is "S Station", the available running distance is "1000km", and the last inspection date is "2022 / 4 / 1".

[0045] C. Crew information Input items related to train formation information include, for example, the crew member's name, the train to be boarded, the train formation that can be operated, the end station of operations, and the available time for working. For example, in the example shown in FIG. 9, the crew member name is "Keikaku Taro", the trains to be boarded are "t202, t203, t204", the available formations to operate are "any", the end station of operations is "W Station", and the available working hours are "8:00-20:00".

[0046] D. Weather Weather-related input items include, for example, time period and weather. For example, in the example shown in FIG. 9, the time period is "11:00-13:00" and the weather is "rainy."

[0047] E. Passenger Data Input items related to passenger data include, for example, the line section traveled, the distance between stations, and the number of passengers. For example, in the example shown in FIG. 9, the boarding line section is "L001", the station interval is "X Station - Y Station", and the number of passengers is "50 people".

[0048] <Warning information generation condition input process> Next, the input mode and the like in the alert information generation condition input process shown in step S303 of FIG. 3 will be described in more detail. Fig. 10 is a diagram showing an example of an input screen for caution information generation conditions. For each of the train search conditions and confirmation items shown in Fig. 10, the necessary input items are divided into categories and displayed using, for example, check boxes, and input of generation conditions is accepted. In this case, it is also possible to accept multiple inputs.

[0049] (1)Train search conditions The train search conditions include, for example, a date and time range, weather, and a target train. Date and time range As the date and time range from the present, for example, the number of days within the present period (in FIG. 10, "D" days) is specified.

[0050] K Weather As the type of weather, for example, any, rainy weather, or fine weather is selected. Q Target trains As the target trains, for example, all trains, the same train number, or the same train type is selected.

[0051] (2) Check items Items to be checked include, for example, operation plans, vehicle operations (formations), and crew operations. Operation plan Items related to the operation plan, such as the station and track number, the track, the operation time, the stop time, the number of passengers, and the train interval, are selected. These items are operation plan items A of the warning level determination process (step S504, FIG. 8) which is repeatedly executed in the warning information generation process related to the train operation plan (FIG. 5).

[0052] -Station and track number When using stations and track numbers that are infrequently used or that are not used in normal operations, there is a higher risk of equipment malfunctions and a need to recheck equipment compatibility. Therefore, for the extracted train group, the number of times the stations and track numbers are used is counted and a histogram is created.

[0053] -Train track Even when using tracks that are infrequently used or not used in normal operations, there is an increased risk of equipment malfunctions and a need to recheck equipment compatibility. Therefore, the number of times the track is used is counted for the extracted train group, and a histogram is created.

[0054] Driving time If there are locations where operating times are shorter compared to the same day in past weather conditions, the possibility of delays increases, for example, when it rains, as operating times may be extended. Therefore, a histogram of operating times is created from the actual operating times between adjacent stations for the extracted group of trains.

[0055] ·Stopping time Even if there are locations where train stop times are shorter compared to the same day in past weather conditions, the possibility of delays increases, for example, when it rains, as stop times are extended. Therefore, a histogram of stop times is created from the actual stop times at each station of the extracted group of trains.

[0056] Number of passengers When there are trains with a heavier load (more passengers) than usual, the possibility of wear and tear or breakdowns in the vehicles increases, so a histogram of passenger numbers is created from the expected number of passengers between adjacent stations for the extracted train group.

[0057] ·Train interval If there are locations where train intervals are shorter than past actual values, the possibility of delays increases. Therefore, a histogram of train intervals is created from the time intervals between the preceding and following trains at adjacent stations in the extracted group of trains.

[0058] Vehicle operation (formation) Items related to vehicle operation (formation), such as stopping place, available traveling kilometers, and available traveling time, are selected. These items are vehicle operation (formation) items A of the caution level determination process (step S605, FIG. 8) that is repeatedly executed in the caution information generation process related to vehicle operation (FIG. 6).

[0059] ·Place of stay When a group of trains is to stay at a different stopover point from usual, the number of times the group of trains has used the stopover point is counted and a histogram is created for the extracted group of trains.

[0060] - Mileage When the running distance of the group of trains is longer than the past actual values, a histogram of remaining running distance is created for the extracted group of trains from the running distance from the most recent inspection to the next inspection.

[0061] Driving time Cases where the period until the inspection of a group of trains becomes longer compared with past actual values ​​are pointed out, and for an extracted group of trains, the number of actual days from the most recent inspection to the next inspection of the extracted group of trains is counted to create a histogram of the running time of the extracted group of trains.

[0062] Crew operation Items related to crew operation, such as the anchorage and boarding time, are selected. These items are crew operation items A of the caution level determination process (step S705, FIG. 8) that is repeatedly executed in the caution information generation process related to crew operation (FIG. 7).

[0063] ·Place of stay If crew members are staying at different anchorages than usual, a histogram is created for the extracted group of crew members from the anchorage usage counts.

[0064] -Riding time When the driving time of the crew members is longer than usual, a histogram is created for the extracted crew members from the time from the start to the end of their driving duties.

[0065] <Caution information display screen> Next, a description will be given of the display mode in the warning information display process shown in step S306 in Fig. 3. As the display mode, for example, a display mode in which cases are classified according to warning levels and a mode in which the deviation degree is displayed numerically are shown.

[0066] Fig. 11 is a diagram showing an example of displaying caution information classified by caution level. The caution levels are classified into "Violation", "Caution", "Caution" and "Reference" as shown in Fig. 8, and the corresponding contents are displayed as information on items that require caution, such as category, train number and details. The categories are classified into operation plans, vehicle operations (formation) and crew operations, the train numbers identify the target train, and the details present the items and contents that should be checked.

[0067] FIG. 12 is a diagram showing an example of displaying caution information including the deviation degree of the caution level. In FIG. 12, the four items shown in FIG. 11 are displayed separately as category, train number, details, and deviation degree, and the deviation degree is displayed as a deviation value. However, in the case of a violation of a condition, "NAN" (Not a Number) is displayed as the deviation degree, as in the case of "Not possible to run" in the "Operation plan" in the first row. The deviation degree for the remaining three items is displayed as the calculated standard deviation σ value. Here, instead of the standard deviation σ, the z score related to the standard deviation may be defined and displayed as the deviation degree.

[0068] Furthermore, the above embodiment encompasses at least the following technical aspects. <Technical aspect 1> A warning information generating device comprising: a warning information generating unit that compares past train running state information up until the time when a train operation plan was changed with the operation plan after the change, and generates warning information including points of caution regarding train operation that arise as a result of the change to the operation plan; and a warning information output unit that displays the generated warning information.

[0069] <Technical aspect 2> In the warning information generating device described in technical aspect 1 above, operating conditions based on information regarding at least one of facilities related to train operation, operating status, and the surrounding environment are input, and the warning information generating unit selects train running state information that matches the operating conditions from past train running state information, compares the selected past train running state information with the changed operation plan, and generates warning information.

[0070] <Technical aspect 3> In the alert information generating device according to the first or second technical aspect, the operation plan includes at least information on trains, train configurations, and train crew members.

[0071] <Technical aspect 4> In the warning information generating device described in any one of technical aspects 1 to 3 above, the warning information generating unit calculates the degree of attention for the warning points based on the degree of deviation between the changed operation plan and past train running state information at the time of comparison, and makes the calculated degree of attention the information to be included in the warning information.

[0072] <Technical aspect 5> A traffic control device comprising: an alert information generating device according to any one of Technical Aspects 1 to 4 above; an operation plan generating unit that generates an operation plan; and a train control unit that controls train running in accordance with the operation plan.

[0073] <Technical Aspect 6> A warning information generating method comprising: a generating step of comparing past train running condition information up until the time when the train operation plan was changed with the changed operation plan, and generating warning information including points of caution regarding train operation that arise as a result of the change in the operation plan; and a display step of displaying the generated warning information.

[0074] <Technical Aspect 7> The warning information generating method described in technical aspect 6 above includes an input step of inputting operation conditions based on information regarding at least one of facilities related to train operation, operation status, and surrounding environment, and a selection step of selecting train running state information that matches the operation conditions from past train running state information, and the generation step compares the past train running state information selected in the selection step with the changed operation plan to generate warning information.

[0075] <Technical Aspect 8> In the alert information generating method according to the sixth or seventh technical aspect, the operation plan includes at least information on trains, train configurations, and train crew members.

[0076] <Technical Aspect 9> A warning information generating method described in any one of technical aspects 6 to 8 above, in which the generation step calculates the degree of attention for the warning points based on the degree of deviation between the changed operation plan and past train running state information at the time of comparison, and includes the calculated degree of attention in the warning information.

[0077] Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and various modifications are possible without departing from the spirit of the present invention. [Explanation of symbols]

[0078] 101...attention information generating device, 102, 104, 106...network, 103... operation control device, 105... route control device, 107... ground device, 108... track circuit, 109...signal, 110...switch, 111...train, 201...CPU, 202...memory, 203: memory unit, 204: communication unit

Claims

1. an attention information generating unit that compares past train running state information up until a time point when a train operation plan is changed with the changed operation plan, and generates attention information including attention points related to train operation that arise due to the change in the operation plan; a warning information display processing unit that displays and outputs the generated warning information; An alert information generating device comprising:

2. 2. The warning information generating device according to claim 1, inputting operation conditions based on at least one of information regarding facilities, operation status, and surrounding environment related to the train operation; The warning information generating unit selects train running state information that matches the operation conditions from the past train running state information, compares the selected past train running state information with the changed operation plan, and generates the warning information.

13. An alert information generating device comprising:

3. 2. The warning information generating device according to claim 1, The operation plan includes at least information regarding trains, train configurations, and train crews.

13. An alert information generating device comprising:

4. 2. The warning information generating device according to claim 1, The warning information generating unit calculates a degree of warning regarding the warning location based on a degree of deviation between the changed operation plan and the past train running state information at the time of the comparison, and sets the calculated degree of warning as information included in the warning information.

13. An alert information generating device comprising:

5. 3. The warning information generating device according to claim 2, The warning information generating unit calculates a degree of warning regarding the warning location based on a degree of deviation between the changed operation plan and the past train running state information at the time of the comparison, and sets the calculated degree of warning as information included in the warning information.

13. An alert information generating device comprising:

6. 6. A traffic control device comprising: the alert information generating device according to claim 1; an operation plan generating unit that generates the operation plan; and a train control unit that controls train running in accordance with the operation plan.

7. a generating step of comparing past train running state information up until a time point when a train operation plan is changed with the changed operation plan to generate warning information including warning points related to train operation that arise due to the change in the operation plan; a display step of displaying the generated warning information; The method for generating attention information includes the steps of:

8. The method for generating warning information according to claim 7, an input step of inputting operation conditions based on information on at least one of facilities, operation status, and surrounding environment related to the train operation; a selection step of selecting train running state information that matches the operation conditions from the past train running state information, The generating step compares the past train running state information selected in the selecting step with the changed operation plan to generate the warning information.

23. A method for generating warning information comprising the steps of:

9. The method for generating warning information according to claim 7, The operation plan includes at least information regarding trains, train configurations, and train crews.

23. A method for generating warning information comprising the steps of:

10. The method for generating warning information according to any one of claims 7 to 9, The generating step calculates a degree of attention for the attention point based on a degree of deviation between the changed operation plan and the past train running state information at the time of the comparison, and includes the degree of attention in the attention information.

23. A method for generating warning information comprising the steps of: