The roadmap creation system efficiently calculates and presents optimal equipment introduction plans by transitioning equipment configurations and KPIs over time, addressing the challenge of lengthy calculation times in existing technologies.

JP2024151789AInactive Publication Date: 2024-10-25HITACHI LTD

Patent Information

Application Number
JP2023065499
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-13
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies struggle to calculate and present all equipment introduction plans with realistic response times, missing promising plans if calculation time exceeds a certain threshold.

Method used

A roadmap creation system and method that efficiently calculates and presents an optimal equipment introduction plan by transitioning equipment configurations and associated KPIs over time, using a control unit to set target points, an extraction unit to select suitable configurations, a KPI calculation unit to evaluate KPIs, and an update unit to link KPIs across time points.

Benefits of technology

Enables the presentation of an optimal equipment introduction plan in a realistic calculation time, facilitating informed decision-making with reduced computational burden.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024151789000001_ABST
    Figure 2024151789000001_ABST
Patent Text Reader

Abstract

To present an optimum facility introduction plan (road map) in a real calculation time.SOLUTION: The present invention relates to a road map creation method that creates a road map representing a facility constitution ID and transition of KPI of the facility constitution from an initial point of time to an end point of time, and the method comprises: a setting step of generating road map group information at the initial point of time and setting, as an object point of time, a point of time of each one unit time from a start point of time which is one unit time after the initial point of time to the end point of time; an extraction step of extracting, as facility constitution at the object point of time, one or more facility constitution candidates meeting a predetermined condition among a plurality of facility constitution candidates; a KPI calculation step of calculating a KPI of facility constitution at the object point of time; a road map update step of adding the KPI of the facility constitution at the object point of time to road map group information so that when a last point of time is set as one unit time before the object point of time, it is linked to the KPI of facility constitution at the last point of time; and a display step of displaying the road map based upon the road map group information.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a roadmap creation system and a roadmap creation method that present the trends of multiple KPIs associated with facility introduction plans for power generation facilities and the like. [Background technology]

[0002] In recent years, KPIs (Key Performance Indicators) other than productivity, such as CO2 emissions, are being required for corporate activities, and management decision-making to optimize policies and plans is becoming increasingly important. For example, it is necessary to determine equipment installation plans that indicate when to install what equipment to achieve energy conservation, and equipment consolidation and abolition plans.

[0003] For example, Patent Document 1 determines equipment that can be decommissioned in a power system and system measures associated with the decommissioning of the equipment, together with KPIs such as risk and cost. Specifically, in the same document, paragraph 0041 states that "the reliability is set for values ​​related to electricity, such as voltage, frequency, and power amount, for the configuration and equipment of the power system 200, and any index determined, such as KPI (Key Performance Indicator), can be used," and paragraph 0045 states that "the decommissioning target equipment selection unit 21 performs a power flow calculation to determine the state in which power flows (including the voltage and power of each equipment), the reliability, and the utilization rate of the equipment." Also, paragraph 0046 states that "if the reliability is not satisfied, the system measure selection unit 22 calculates and determines system measures, such as new installation of equipment, expansion of existing equipment, and change of operation, for the system configuration in the case where the equipment that is a candidate for decommissioning is decommissioned, and outputs the determined system measures to the risk calculation unit 23 and the cost calculation unit 24 as system measure candidates." [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2022-87501 Summary of the Invention [Problem to be solved by the invention]

[0005] For facility consolidation plans, since the scope of the study is limited to existing facilities, KPIs can be calculated and presented using technology such as that described in Patent Document 1.

[0006] On the other hand, for equipment installation plans that show when to install what equipment, there are a huge number of candidate patterns, and calculating and presenting KPIs for all patterns poses the problem of calculation time.Specifically, it is not possible to calculate KPIs for all plans within a realistic response time, and if the time limit is reached, it may not be possible to present a promising plan.

[0007] Therefore, in order to solve the above problems, an object of the present invention is to provide a roadmap creation system and method that presents an optimal facility introduction plan (roadmap) within a realistic calculation time. [Means for solving the problem]

[0008] Specifically, the roadmap creation system of the present invention is a roadmap creation system that creates a roadmap that shows, for example, trends in equipment configuration ID and KPIs of equipment configuration from an initial point to an end point, and includes a control unit that creates roadmap group information at the initial point and sets each unit time from a start point, which is one unit time from the initial point, to the end point as a target point, an equipment configuration extraction unit that extracts one or more equipment configuration candidates that satisfy predetermined conditions from among multiple equipment configuration candidates as the equipment configuration at the target point, a KPI calculation unit that calculates the KPI of the equipment configuration at the target point, a roadmap update unit that adds the KPI of the equipment configuration at the target point to the roadmap group information so as to be linked to the KPI of the equipment configuration at the previous point when the previous point is set to one unit time before the target point, and an information display unit that displays a roadmap based on the roadmap group information. In addition, the roadmap creation method of the present invention is a roadmap creation method for creating a roadmap that represents, for example, trends in equipment configuration IDs and KPIs of equipment configurations from an initial point to an end point, and includes a setting step for creating roadmap group information at the initial point and setting each unit time point from a start point, which is one unit time from the initial point, to the end point as a target point, an extraction step for extracting one or more equipment configuration candidates that satisfy a predetermined condition from among multiple equipment configuration candidates as an equipment configuration at the target point, a KPI calculation step for calculating a KPI of the equipment configuration at the target point, a roadmap update step for adding the KPI of the equipment configuration at the target point to the roadmap group information so as to be linked to the KPI of the equipment configuration at the previous point when the previous point is set to one unit time before the target point, and a display step for displaying a roadmap based on the roadmap group information. Effect of the Invention

[0009] The present invention can provide a roadmap creation system and method that presents an optimal facility introduction plan (roadmap) in a realistic calculation time. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a system configuration diagram. [Diagram 2] FIG. 11 is a diagram illustrating an example of an equipment configuration candidate list. [Diagram 3] FIG. 11 is a diagram illustrating an example of a simulation parameter. [Figure 4] FIG. 11 is a diagram illustrating an example of KPI calculation information. [Diagram 5] FIG. 13 is a diagram showing an example of analysis parameters in the first embodiment. [Figure 6] FIG. 2 is a diagram showing an example of a roadmap group. [Figure 7] FIG. 13 is a diagram showing another example of a roadmap group. [Figure 8] FIG. 13 is a diagram showing an example of roadmap group information at an initial point in time. [Figure 9]FIG. 11 is a diagram illustrating an example of an equipment configuration list. [Figure 10] FIG. 13 is a diagram illustrating an example of roadmap group information. [Figure 11] FIG. 2 is a process flow diagram of an analysis unit in the first embodiment. [Figure 12] FIG. 13 is a diagram showing an example of roadmap group information at a previous time point t−1. [Figure 13] FIG. 12 is a diagram showing an example of an equipment configuration list created in step S6 of FIG. [Figure 14] FIG. 13 is a diagram showing an example of roadmap group information at a target time point t. [Figure 15] FIG. 13 is a diagram for explaining an update of a roadmap ID. [Figure 16] FIG. 11 is a process flow diagram of an analysis unit in the second embodiment. [Figure 17] FIG. 11 is a diagram showing an example of analysis parameters in the second embodiment. [Figure 18] FIG. 11 is a diagram showing another example of the analysis parameters in the second embodiment. [Figure 19] FIG. 11 is a diagram showing another example of the analysis parameters in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS EXAMPLES

[0011] 1 is a system configuration diagram of this embodiment. The roadmap creation system E0 is composed of a computer E1, an information input unit E2, and an information display unit E3. The computer E1, the information input unit E2, and the information display unit E3 are connected to each other. The computer E1 has a storage unit E11 and an analysis unit E12. Note that, although this embodiment shows a case where the computer E1 is composed of one computer, the computers having the storage unit E11 and the analysis unit E12 may be separate computers that communicate with each other.

[0012] The roadmap creation system E0 creates a roadmap by an analysis unit E12 using the analysis data D stored in a storage unit E11, and displays the created roadmap on an information display unit E3. The configuration of the computer E1 will be described in detail below.

[0013] <Storage section E11> The storage unit E11 stores analysis data D. The analysis data D includes an equipment configuration candidate list D1, simulation parameters D2, KPI calculation information D3, and analysis parameters D4.

[0014] <<Facility configuration candidate list D1>> FIG. 2 is a diagram showing an example of the equipment configuration candidate list D1. The equipment configuration candidate list D1 shown in FIG. 2 represents a list of equipment configurations that are candidates at each time point. The equipment configuration candidate list D1 lists all the equipment configuration candidates that an analyst is considering introducing in advance and stores them in the storage unit E11 of the computer E1. For example, in FIG. 2, four equipment configuration candidates with equipment configuration IDs 1 to 4 are illustrated among the multiple equipment configuration candidates. Each equipment configuration is described in a list of equipment elements. The equipment elements are described in a dictionary format including information such as name and capacity, for example, a set of the equipment name and the performance parameter of the equipment. Here, the capacity is illustrated as the performance parameter. In the case of FIG. 2, the equipment configuration with the equipment configuration ID of 1 means that no equipment is introduced. The equipment configuration with the equipment configuration ID of 2 represents a configuration of only a photovoltaic power generation device with a capacity of 1× the reference unit. The equipment configuration with the equipment configuration ID of 3 represents a configuration of only a photovoltaic power generation device with a capacity of 2× the reference unit. An equipment configuration with an equipment configuration ID of 4 represents a configuration of a photovoltaic power generation device whose capacity is 1× the reference unit and a wind power generation device whose capacity is 1× the reference unit. The reference unit is defined using a power generation amount such as 5 kW, for example. The reference unit of capacity of the photovoltaic power generation device and the reference unit of capacity of the wind power generation device may be the same or different.

[0015] <<Simulation parameter D2>> FIG. 3 is a diagram showing an example of the simulation parameter D2. The simulation parameter D2 shown in FIG. 3 is a parameter that affects KPIs other than the facility configuration. The simulation parameter D2 is set in advance by the analyst and stored in the storage unit E11 of the computer E1. For example, it is the electricity charge, power demand, etc., and is set by predicting the future from past data. Even with the same facility configuration, if the simulation parameters are different, the KPIs generally have different values.

[0016] <<Information D3 for KPI calculation>> FIG. 4 is a diagram showing an example of the information D3 for KPI calculation. The information D3 for KPI calculation shown in FIG. 4 stores the values for calculating the KPI values for each facility configuration and each year. The number of KPIs can be any number as long as there is one or more. In this embodiment, the total value of the facility investment amount up to 10 years later and the CO2 emission amount in one year in the 10th year are used. For example, when operating with the facility configuration ID1 for one year in the first year, it represents that the CO2 emission amount in that year is 100 and the facility investment amount is 0. The information for KPI calculation is the value for each year, and the final KPI is calculated by aggregating this. For example, when calculating the total value of the facility investment amount up to 10 years later, the sum of the facility investment amounts for each year may be calculated. The information D3 for KPI calculation is calculated in advance by the analyst and stored in the storage unit E11 of the computer E1. For example, a program for simulating the CO2 emission amount and facility investment amount for each year from the facility configuration candidate list D1 and the simulation parameter D2 is prepared separately, and the calculation results are stored.

[0017] <<Analysis parameter D4>> FIG. 5 is a diagram showing an example of the analysis parameter D4. The analysis parameter D4 shown in FIG. 5 is a parameter used in the analysis unit E12. The analysis parameter D4 is set in advance by the analyst through the information display unit E3 and stored in the storage unit E11 of the computer E1.

[0018] <Information input unit E2> Information input unit E2 accepts input of information when an analyst sets and stores analysis data D. Examples of information input unit E2 include a keyboard connected to computer E1 and a mobile terminal that communicates with computer E1.

[0019] <Information display section E3> The information display unit E3 is used when an analyst sets and stores the analysis data D and when confirming the analysis results by the analysis unit E12. Specifically, in the former case, a screen for setting the analysis data D or a screen for storing data as shown in Figs. 2 to 5 is displayed. In the latter case, a group of roadmaps created by the analysis unit E12 is displayed as the analysis result. A roadmap is a visualization of the change in the equipment configuration ID over time and the associated change in the KPI. A group of roadmaps is a collection of roadmaps. The information display unit E3 may be realized by a device other than the computer E1, such as a display or a mobile terminal. In addition, when the mobile terminal is a touch panel that accepts touch operations, one mobile terminal may function as both the information input unit E2 and the information display unit E3.

[0020] <Roadmaps> FIG. 6 is a diagram showing an example of a roadmap group. The roadmap group in FIG. 6 shows the changes in two KPIs in a line graph, and is a roadmap group consisting of three roadmaps, which will be described later. In FIG. 6, each of the two KPIs constitutes an axis, the horizontal axis is the total amount of capital investment, and the vertical axis is the amount of CO2 emissions per year. In FIG. 6, the starting point and intermediate points are represented by black circles, and the end point at the end of 10 years is represented by a white circle. In FIG. 6, the changes in the equipment configuration ID corresponding to each roadmap are also displayed at the same time. For example, in FIG. 6, the numbers attached to each vertex represent the equipment configuration ID, which shows the changes in the equipment configuration. Specifically, in the first roadmap, the equipment configuration ID changes in the order of 1, 3, 6, and 8. In the second roadmap, the equipment configuration ID changes in the order of 1, 4, 5, and 12. In the third roadmap, the equipment configuration ID changes in the order of 1, 4, 5, and 7. The starting point of the roadmap is the current KPI, which is represented by position P0. Position P0 is a fixed value that depends only on the current existing equipment configuration and does not depend on the future equipment configuration, so the starting points of all roadmaps are at position P0. In this embodiment, a group of roadmaps displayed as a collection of line graphs with the same starting point is called a broom-shaped roadmap group. Note that, for ease of understanding, FIG. 6 shows an example of the progress of equipment configuration IDs and KPIs over a four-year period, i.e., only four points are plotted on one roadmap.

[0021] FIG. 7 is a diagram showing another example of a roadmap group. The roadmap group in FIG. 7 shows the changes in two KPIs in a line graph, and is a roadmap group consisting of three roadmaps, which will be described later. In FIG. 7, as in FIG. 6, each of the two KPIs constitutes an axis, the horizontal axis is the total amount of capital investment, and the vertical axis is the amount of CO2 emissions per year. In FIG. 7, the starting point and intermediate points are represented by black circles, and the end point at the end of 10 years is represented by a white circle. In FIG. 7, the changes in the equipment configuration corresponding to each roadmap are displayed by the equipment configuration ID. Specifically, in the first roadmap, the equipment configuration ID changes in the order of 1, 3, 6, and 7. In the second roadmap, the equipment configuration ID changes in the order of 1, 4, 12, and 7. In the third roadmap, the equipment configuration ID changes in the order of 1, 4, 5, and 7. The starting points of the roadmaps are the same as in FIG. 6, and all of the starting points of each roadmap are at position P0. Furthermore, in FIG. 7, the end point of each roadmap is on the area A representing the target state determined in advance. In this embodiment, a roadmap group displayed as a set of line graphs with the same starting point and a specified end point on a specific area A is called a sweet potato-shaped roadmap group. The area A is set, for example, from the analysis parameter D4 with a set of points as coordinates. If the entire space is set as the area A, the end point becomes an arbitrary point, so the sweet potato-shaped roadmap coincides with the broom-shaped roadmap. Note that, in FIG. 7, an example in which the end points of each roadmap are the same is shown as a sweet potato-shaped roadmap group, but this is not limited thereto, and they may be different points as long as they are on the area A. Also, in FIG. 7, in order to facilitate understanding, the transition of the equipment configuration ID and KPI over four years, that is, an example in which only four points are plotted on one roadmap, is shown. As in FIG. 6 and FIG. 7, a plurality of display methods for the roadmap group are provided, and by using them according to the purpose of creating the roadmap, only the information required by the analyst, etc. can be displayed as the roadmap group. For example, if a target KPI for 10 years from now has been decided, by using the sweet potato-shaped roadmap group display, only the roadmap groups that are capable of achieving the target KPI for 10 years from now will be displayed.

[0022] Furthermore, the information display unit E3 may display a list showing the correspondence between the equipment configuration ID and the equipment configuration as shown in Fig. 2, together with the roadmaps shown in Fig. 6 and Fig. 7. This makes it possible to easily grasp changes in the equipment configuration that accompany changes in the equipment configuration ID when checking the roadmap.

[0023] <Analysis Department E12> As shown in FIG. 1, the analysis unit E12 has a control unit E121, an equipment configuration extraction unit E122, a KPI calculation unit E123, and a roadmap update unit E124.

[0024] In this embodiment, the initial point in time is set to year 0. One unit of time is set to "1 year," and one unit of time after the initial point in time 0, i.e., one year later, is set to year 1 as the starting point. In addition, hereinafter, the point in time one unit of time before the target point in time is referred to as the "previous point in time." Note that, in this embodiment, the target is the equipment configuration ID on a yearly basis and the transition of the KPI of the equipment configuration, but this is not limited thereto, and the target may be, for example, the equipment configuration ID on a monthly basis and the transition of the KPI of the equipment configuration.

[0025] <<Control unit E121>> When the analysis unit E12 is started, the control unit E121 creates roadmap group information at the initial point in time, year 0. Fig. 8 is a diagram showing an example of roadmap group information at the initial point in time, year 0. As the roadmap group information at the initial point in time, year 0, a one-row, three-column table is created in which the roadmap ID is entered in the first column, the equipment configuration ID at the initial point in time, year 0, is entered in the second column, and the KPI of the equipment configuration at the initial point in time, year 0, is entered in the third column. Note that the equipment configuration ID of the equipment configuration at the initial point in time, year 0, and the KPI of the equipment configuration at the initial point in time, year 0, are set via the analysis parameter D4.

[0026] After creating the roadmap group information at the initial time point of year 0, the control unit E121 sequentially sets the time points from the start time point of year 1 to the end time point of year T as the target time point t. Regarding the end time point of year T, it follows the analysis period T included in the analysis parameter D4. Therefore, the analyst can change the end time point by changing the analysis period T of the analysis parameter D4. In this embodiment, based on the analysis parameter D4 shown in FIG. 5, the analysis period T is set to 10 years. Therefore, the control unit E121 sequentially sets the time points from the start time point of year 1 to the end time point of year 10 as the target time point t.

[0027] <<Facility Configuration Extraction Unit E122>> The facility configuration extraction unit E122 takes as input the roadmap group information at the previous time point t - 1, the facility configuration candidate list D1, and the analysis parameter D4, and extracts, as the facility configuration at the target time point, the facility configuration candidates that meet a predetermined condition among the plurality of facility configuration candidates. The facility configuration extraction unit E122 outputs, for example, the facility configuration at the target time point extracted from the facility configuration candidate list D1 as a facility configuration list. An example of the facility configuration list is shown in FIG. 9. The facility configuration list is obtained by extracting only some rows from the facility configuration candidate list D1. An example is shown where two types are extracted, one with a facility configuration ID of 2 and the other with a facility configuration ID of 3, from among many facility configuration lists. The specific processing of the facility configuration extraction unit E122 will be described later.

[0028] <<KPI Calculation Unit E123>> The KPI calculation unit E123 takes as input the roadmap group information at the previous time point t - 1, the facility configuration list, and the KPI calculation information D3, and calculates the KPI of the facility configuration at the target time point. The specific processing of the KPI calculation unit E123 will be described later.

[0029] <<Roadmap Update Unit E124>> Finally, the roadmap update unit E124 receives the roadmap group information of the previous time point and the equipment configuration list, and adds the KPI of the equipment configuration at the target time point t to the roadmap group information of the previous time point t-1. An example of the roadmap group information is shown in FIG. 10. The roadmap group information is a table showing the equipment configuration and the KPI value at each time point. The first column of the roadmap group information is a roadmap ID that is an identifier of the roadmap. The second and third columns of the roadmap group information store the equipment configuration ID and KPI of the equipment configuration in the initial state. The fourth and fifth columns of the roadmap group information store the equipment configuration ID and KPI of the equipment configuration one year from the start time point. In the same manner, the equipment configuration ID and KPI of the equipment configuration up to the end time point 10 years are stored while increasing the columns of the roadmap group information. The specific processing of the roadmap update unit E124 will be described later.

[0030] In the roadmap group information, each line corresponds to one roadmap. That is, the roadmap group information includes roadmaps for the number of lines from the second line onwards.

[0031] <Processing flow of analysis unit E12> Fig. 11 is a process flow diagram of the analysis unit E12 in the embodiment 1. Specific processes by the analysis unit E12 will be described with reference to Fig. 11. Note that steps S2 to S8 are performed for each year from the start point 1 to the end point 10.

[0032] <<Step S1>> In step S1, the control unit E121 creates roadmap group information with one row and three columns, as described above with reference to Fig. 8. Then, each year from the start point 1 year to the end point 10 years is set as the target time t. The target time t is set after the roadmap group information with one row and three columns is created, and from the end of step S8 to the start of step S2, which will be described later.

[0033] <<Step S2>> Steps S2 to S6 are performed for each row of the roadmap group information at the previous time point t-1. For example, if the roadmap group information at the previous time point is as shown in Fig. 10, steps S2 to S6 are performed for the rows with roadmap IDs 1 and 2. In the following description, an arbitrary row of the roadmap group information at the previous time point is designated as row R, and steps S2 to S6 are performed for row R.

[0034] In step S2, the equipment configuration extraction unit E122 acquires the value i_old of the latest equipment configuration ID in row R. That is, the value i_old of the equipment configuration ID in row R at the previous time point t-1 is acquired.

[0035] <<Step S3>> In step S3, the equipment configuration extraction unit E122 acquires an equipment configuration S_old corresponding to the equipment configuration ID value i_old of the equipment configuration at the previous time point t-1 from the equipment configuration candidate list D1. Also, the equipment configuration S_new corresponding to the equipment configuration ID value i_new of the equipment configuration candidate at the target time point t is acquired from the equipment configuration candidate list D1. That is, the equipment configuration extraction unit E122 acquires the equipment configurations corresponding to the equipment configuration ID values ​​i_old and i_new from the equipment configuration column of the equipment configuration candidate list D1. For example, if the equipment configuration ID at the previous time point t-1 is i_old = 3 and the equipment configuration ID at the target time point is i_new = 4, the equipment configurations S_old and S_new obtained by the equipment configuration extraction unit E122 from the equipment configuration candidate list D1 shown in Figure 2 are S_old = [{“Name”:”Photovoltaic power generation equipment”, “Capacity”:”2”}], S_new = [{“Name”:”Photovoltaic power generation equipment”, “Capacity”:”1”}, {“Name”:”Wind power generation equipment”, “Capacity”:”1”}].

[0036] 2, when multiple equipment configuration candidates are included in the equipment configuration candidate list D1, in step S3, the value of one equipment configuration ID from the equipment configuration candidate list is selected as i_new, and steps S5 to S6 are performed, and then the process returns from step S5 to step S3, and the value of the equipment configuration ID of another configuration candidate is set as i_new, and steps S3 to S5 are similarly performed. In this way, steps S3 to S5 are looped and performed a number of times equal to the number of equipment configuration candidates included in the equipment configuration candidate list D1.

[0037] <<Step S4>> In step S4, the equipment configuration extraction unit E122 acquires a degradation judgment condition of the analysis parameter D4. For example, the equipment configuration extraction unit E122 acquires either the number N_D of performance parameters that are allowed to deteriorate (hereinafter abbreviated as the "number of deterioration-allowed performance parameters N_D") or the allowable deterioration amount x_D for each performance parameter from the analysis parameter D4 shown in FIG. 5. The number N_D of deterioration-allowed performance parameters is an integer, and the allowable deterioration amount x_D is a real number. Note that in order to perform step S4, at least one of the number N_D of deterioration-allowed performance parameters and the allowable deterioration amount x_D needs to be set in advance in the analysis parameter D4. Also, degradation refers to a decrease in the performance of the equipment.

[0038] <<Step S5>> In step S5, the equipment configuration extraction unit E122 determines whether or not a transition from the equipment configuration S_old at the previous time point t-1 to the equipment configuration S_new at the target time point t is permissible, based on the degradation determination condition acquired in step S4.

[0039] In step S4, when the number N_D of degradation-tolerable performance parameters is acquired as a degradation judgment condition, the equipment configuration extraction unit E122 performs the following process in step S5. The equipment configuration extraction unit E122 calculates the number C of equipment that has degraded from the equipment configuration S_old to the equipment configuration S_new, and if the number C of equipment is greater than the number N_D of performance parameters, it does not allow the transition from the equipment configuration S_old to the equipment configuration S_new, and if the number C of equipment is equal to or less than the number N_D of performance parameters, it allows the transition from the equipment configuration S_old to the equipment configuration S_new.

[0040] For example, when the equipment configuration ID is i_old=3, i_new=4, the equipment configurations S_old and S_new are S_old=[{“name”:”photovoltaic power generation equipment”, “capacity”:”2”}], S_new=[{“name”:”photovoltaic power generation equipment”, “capacity”:”1”}, {“name”:”wind power generation equipment”, “capacity”:”1”}] as described above. In this case, the capacity of the photovoltaic power generation equipment has degraded from 2 to 1, while the capacity of the wind power generation equipment has changed from 0 to 1 and has not degraded, so the number C of degraded equipment is 1. In the analysis parameter D4 shown in FIG. 5, the number N_D of degradation-tolerable performance parameters is 0, so in this case C>N_D, and the equipment configuration extraction unit E122 does not allow a transition from S_old to S_new.

[0041] Here, an example of evaluating the magnitude relationship of the performance parameters of all the facilities in S_old and S_new has been described, but the magnitude relationship of only some of the facilities in S_old and S_new may be evaluated. In this case, the performance parameters to be excluded from the evaluation may be specified through the analysis parameter D4. In this embodiment, the capacity of the photovoltaic power generation equipment and the capacity of the wind power generation equipment used as the performance parameters of S_old and S_new are determined to be degraded when the value becomes smaller, since the larger the value, the better the performance. However, when using a performance parameter such as power consumption, where the smaller the value, the better the performance, it is determined to be degraded when the value becomes larger.

[0042] When the allowable deterioration amount x_D is acquired in step S4, the equipment configuration extraction unit E122 performs the following process in step S5. The equipment configuration extraction unit E122 acquires performance parameters v_old and v_new corresponding to the allowable deterioration amount x_D for each of the equipment configurations S_old and S_new, and allows a transition from S_old to S_new if the difference v_old-v_new is equal to or less than the allowable deterioration amount x_D. If the difference v_old-v_new is greater than the allowable deterioration amount x_D, the transition from S_old to S_new is not allowed.

[0043] For example, the allowable deterioration amount x_D shown in Fig. 5 indicates that a decrease in the capacity of the photovoltaic power generation equipment up to 1 is acceptable. When i_old = 3 and i_new = 4, as described above, the equipment configurations S_old and S_new are S_old = [{"Name":"Photovoltaic Power Generation Equipment", "Capacity":"2"}], S_new = [{"Name":"Photovoltaic Power Generation Equipment", "Capacity":"1"}, {"Name":"Wind Power Generation Equipment", "Capacity":"1"}]. In this case, the capacity of the photovoltaic power generation equipment has degraded from 2 to 1, but this is within the allowable range, so the transition from S_old to S_new is allowed.

[0044] <<Step S6>> In step S6, the equipment configuration extraction unit E122 outputs an equipment configuration list for row R, which lists the equipment configuration S_new for which the transition from S_old has been permitted, and the equipment configuration ID i_new corresponding to the equipment configuration S_new. Specifically, the equipment configuration list is a list obtained by extracting a portion of the equipment configuration candidate list, or the same list as the equipment configuration candidate list, as shown in Fig. 9 described above. Note that the case where the equipment configuration list is the same list as the equipment configuration candidate list corresponds to the case where the equipment configuration extraction unit E122 permits the transition from S_old to S_new for all equipment configurations in the equipment configuration candidate list.

[0045] As described above, performing steps S2 to S6 once creates an equipment configuration list for row R. Then, as described above, steps S2 to S6 are repeated, and steps S2 to S6 are performed for each row of the roadmap group information at the previous point in time t-1. Therefore, an equipment configuration list is created for each row of the roadmap group information at the previous point in time t-1. Hereinafter, the equipment configuration list created for row R of the roadmap group information at the previous point in time t-1 is referred to as S_R.

[0046] <<Step S7>> In step S7, the KPI calculation unit E123 calculates the KPI for all equipment configurations at the target time t. Specifically, for each equipment configuration list S_R, the KPI for the corresponding equipment configuration is calculated for all equipment configuration ID values ​​i_new included in the equipment configuration list S_R. As described above, R represents a row of old provisional roadmap group information, and i_new represents the equipment configuration ID value of the equipment configuration included in the equipment configuration list S_R. The KPI value at the target time t for an equipment configuration included in the equipment configuration list S_R and having an equipment configuration ID value i_new is represented as K_t(R, i_new).

[0047] The roadmap group information at the previous time point t-1 includes the equipment configuration ID and KPI of the equipment configuration at the previous time point t-1. In step S7 at the target time point t, the KPI calculation unit E123 calculates the KPI value K_t(R, i_new) based on the roadmap group information at the previous time point t-1, the equipment configuration list S_R, and the KPI calculation information D3. The specific calculation method is programmed in advance in the KPI calculation unit E123. Two examples of specific calculation methods are shown below.

[0048] The first method is to simply obtain the KPI value K_t(R, i_new) at the target time t from the KPI calculation information D3. For example, when calculating the KPI value K_2(R, 4) of an equipment configuration that is included in the equipment configuration list S_R and has an equipment configuration ID value of i_new=4 in processing at the target time t=2, the value of the second year row and equipment configuration ID 4 column is obtained in the KPI calculation information D3 in Figure 4. In other words, CO2 emissions of 62 and capital investment amount of 2000 are set as K_2(R, 4). This is an example of a simple case where the KPI is determined only by the current equipment configuration, without depending on past KPI values.

[0049] The second method is a method of calculation from the KPI of the equipment configuration at the previous time t-1 and the KPI of the equipment configuration at the target time t. For example, consider the case of calculating the KPI value K_2(R,4) of the equipment configuration included in the equipment configuration list S_R and having the equipment configuration ID value i_new=4 in the process at the target time t=2. In this case, the KPI calculation unit E123 obtains the value of the second year row and the column of equipment configuration ID4 from the KPI calculation information D3 in FIG. 4, and adds it to the KPI of the first year in R. For example, if the KPI of the first year in R is CO2 emission 50 and capital investment 3000, CO2 emission 50+62=112 and capital investment 3000+2000=5000 are set as the KPI value K_2(R,4).

[0050] As such, there are multiple specific calculation methods, and they may differ depending on the KPI. For example, CO2 emissions are calculated using the first method, and capital investment amounts are calculated using the second method.

[0051] In this manner, the KPI value K_t(R, i_new) at the target time point t is calculated.

[0052] <<Step S8>> Finally, in step S8, the roadmap update unit E124 updates the roadmap group information at the previous time point t-1 based on the information calculated up to S7.

[0053] Fig. 12 is a diagram showing an example of roadmap group information at a previous time point t-1. Fig. 13 is a diagram showing an example of an equipment configuration list S_R created in step S6. Fig. 13 is assumed to be an equipment configuration list S_1 created for row R=1 of the roadmap group information at a previous time point t-1 shown in Fig. 12. Fig. 14 is a diagram showing an example of roadmap group information at a target time point t.

[0054] The roadmap update unit E124 duplicates row R for each row R in the roadmap group information at the previous time point t-1 so that the row R has the same number as the number of equipment configurations in the equipment configuration list S_R. Here, an example is described in which a KPI of the equipment configuration at the target time point t is added to row R=1 shown in FIG. 12, that is, a row with a roadmap ID of 1. In this case, since the number of equipment configurations in the equipment configuration list in FIG. 13 is 2, the same row with a roadmap ID of 1 is added below row R=1 shown in FIG. 12, that is, a row with a roadmap ID of 1. Then, since only up to the 2(t-1)+3 column exists in the roadmap group information at the previous time point t-1 shown in FIG. 12, the 2t+2 column and the 2t+3 column are added. The 2t+2 column becomes the "equipment configuration ID at the target time point t", and the 2t+3 column becomes the "KPI at the target time point t". Then, the equipment configuration ID values ​​i_new = 3, 4 in the equipment configuration list S_R are added to the 2t+2 column of the row with the roadmap ID of 1, and the KPI values ​​K_t(1,3) = {CO2 emissions: 60, capital investment: 1800}, K_t(1,4) = {CO2 emissions: 62, capital investment: 2000} calculated in step S7 are added to the 2t+3 column, thereby adding the KPI for the equipment configuration at the target time point t for row R = 1. A similar process is performed for each row R of the roadmap group information for the previous time point t-1.

[0055] At the previous time point t-1, the roadmap group information is filled up to the 2(t-1)+3 columns, and two columns are added in step S8 at the target time point t, so that at the end of step S8 at the target time point t, the roadmap group information becomes a table with 2t+3 columns. In this embodiment, one unit time is one year, and analysis is performed for each year from the start point 1 year to the end point 10 years, so the final number of columns in the roadmap group information is 23. The first column represents the roadmap ID, the second and third columns represent the equipment configuration and KPIs in the initial state, the fourth and fifth columns represent the equipment configuration and KPIs at the end of the first year, and the 22nd and 23rd columns represent the equipment configuration and KPIs at the end of the 10th year.

[0056] Fig. 15 is a diagram for explaining the update of the roadmap ID. After the equipment configuration ID and KPI at the target time point t are added to all rows, the roadmap update unit E124 reassigns the roadmap IDs so that the roadmap IDs become consecutive numbers, as shown in Fig. 15.

[0057] As described above, according to the present invention, it is possible to provide a roadmap creation system and method that presents an optimal facility introduction plan (roadmap) in a realistic calculation time. EXAMPLES

[0058] This embodiment is similar to the first embodiment, but differs only in the contents of the analysis parameters D4 and the processing of the equipment configuration extraction unit E122. That is, the equipment configuration extraction unit E122 ranks the roadmap based on a predetermined standard determined through the analysis parameters D4, and extracts only those with good KPIs in the intermediate stages as equipment configurations. The specific processing of the equipment configuration extraction unit E122 will be described below.

[0059] A process flow diagram of the analysis unit E12 in this embodiment is shown in Fig. 16. The difference from Fig. 11 in the first embodiment is that steps S11 and S12, which are processes for filtering, are inserted before step S2. That is, in the roadmap group information at the previous time point t-1, a row in which the KPI value of the equipment configuration in the previous time point t-1 year does not satisfy a predetermined standard is not analyzed from the target time point t year onwards, and is deleted from the roadmap group information.

[0060] <<Step S11>> In step S11, KPI information K_old representing a set of KPIs of the facility configuration at the previous time point t-1 is acquired from each row of the roadmap group information at the previous time point t-1. For example, when the target time point t=2 and the roadmap group information at the previous time point 1 is as shown in FIG. 10, the facility configuration extraction unit E122 acquires K_old=[{CO2 emission: 80, capital investment: 1000}, {CO2 emission: 63, capital investment: 2000}...] as KPI information representing a set of KPIs of the facility configuration at the previous time point 1. The number of elements of K_old is the number of roadmaps in the roadmap group information at the previous time point t-1, that is, the number of rows from the second row onwards in the roadmap group information at the previous time point t-1.

[0061] <<Step S12>> In step S12, rows with good KPIs are searched for in K_old, and rows other than those with good KPIs are deleted from the roadmap group information for the previous year t-1. The criteria for good KPIs are specified through the analysis parameter D4. Three examples of such roadmap filtering processing are shown below.

[0062] The first method is to specify one of the most important KPIs. FIG. 17 is a diagram showing an example of analysis parameters D4 in the second embodiment. As shown in FIG. 17, in the filtering method in analysis parameters D4, for example, CO2 emissions, which is one of the KPIs, are specified. In this case, the rows in K_old are determined to be good in order from the smallest CO2 emissions. Furthermore, the number of rows or the ratio of rows to be left as good rows is specified through analysis parameters D4. For example, as shown in FIG. 17, when the number of rows to be left in analysis parameters D4 is set to 1, only the row with the smallest CO2 emissions is determined to be good, and all the remaining rows are deleted from the roadmap group information.

[0063] The second method is to specify the weight of each KPI and minimize the linear sum. FIG. 18 is a diagram showing another example of the analysis parameter D4 in the second embodiment. As shown in FIG. 18, in the filtering method in the analysis parameter D4, for example, a linear sum of {CO2 emission: 10, capital investment: 1} is specified. In this case, in step S12, the best K_old is determined in order from the smallest linear sum of CO2 emission x 10 + capital investment x 1. As shown in FIG. 18, when the number of rows to be left in the analysis parameter D4 is set to 1, only the row with the smallest linear sum is determined to be good, and all the remaining rows are deleted from the roadmap group information. Note that the KPIs handled in this embodiment are CO2 emission and capital investment, both of which are KPIs that are to be minimized, but when handling a KPI that is to be maximized, the specified real number should be a negative number instead of a positive number such as 10 or 1.

[0064] The third is a method of selecting Pareto-optimal ones. FIG. 19 is a diagram showing another example of the analysis parameter D4 in Example 2. As shown in FIG. 19, in the filtering method for the analysis parameter D4, for example, Pareto-optimality is specified. Here, Pareto-optimality means that when multiple indicators that are in a trade-off relationship with each other are used as KPIs, if one or more KPIs are to be improved, one of the other KPIs will necessarily deteriorate. For example, when there are two indicators of the KPI to be minimized, and the element i of K_old is represented as (xi, yi), the Pareto-optimal (xi, yi) means that for any other element (xj, yj) of K_old, xi > xj and yi < yj, or xi < xj and yi > yj are satisfied. When K_old = {(80, 1000), (63, 2000), (70, 2000)}, (70, 2000) is not Pareto-optimal. This is because when (xi, yi) = (70, 2000) and compared with (xj, yj) = (63, 2000), xi < xj and yi = yj, which does not satisfy the above Pareto-optimal condition. On the other hand, (80, 1000) and (63, 2000) are Pareto-optimal because for any other element (xj, yj) of K_old, xi > xj and yi < yj, or xi < xj and yi > yj are satisfied.

[0065] Furthermore, not only the Pareto-optimal ones but also the vicinity of the Pareto-optimal ones, that is, the second and subsequent layers of the Pareto-optimal ones may be left. For example, through the analysis parameter D4 shown in FIG. 19, it is possible to specify up to which layer of the Pareto-optimal ones to leave. In the analysis parameter D4 shown in FIG. 19, the number of Pareto-optimal layers is 2, which means leaving up to the second layer of the Pareto-optimal ones. Here, the layers of the Pareto-optimal ones will be described. For example, if there are 10 elements in K_old and 3 of them are Pareto-optimal, these 3 are the first layer of the Pareto-optimal ones. And the elements that are Pareto-optimal among the remaining 7 elements after removing the 3 elements of the first layer of the Pareto-optimal ones from K_old are the second layer of the Pareto-optimal ones.

[0066] As the third method of filtering the roadmap, the Pareto optimum has been explained, but as another example, the distance from the origin of the KPI, that is, the sum of squares of each indicator of the KPI, may be calculated, and the indicator with the smallest sum of squares may be selected in ascending order of the best. However, this is limited to the case where it is better for all the indicators of the KPI to be closer to 0.

[0067] As in this embodiment, by performing a filtering process on the roadmap before performing an analysis at the target time point t, it is possible to present an optimal facility introduction plan (roadmap) in a shorter time. [Explanation of symbols]

[0068] D: Analysis data D1: Facility configuration candidate list D2: Simulation parameters D3: KPI calculation information D4: Analysis parameters E0: Roadmap creation system E1: Computer E11: Storage section E2: Information input section E3: Information display section E12:Analysis Department E121: Control unit E122: Equipment configuration extraction section E123:KPI calculation department E124: Roadmap Update Section P0: Position of the starting point A:Area

Claims

1. A roadmap creation system that creates a roadmap showing a transition of an equipment configuration ID and a KPI of the equipment configuration from an initial point to an end point, a control unit that creates roadmap group information at the initial time point, and sets a time point for each unit time from a start time point, which is one unit time from the initial time point, to the end time point as a target time point; an equipment configuration extraction unit that extracts one or more equipment configuration candidates that satisfy a predetermined condition from among a plurality of equipment configuration candidates as the equipment configuration at the target time; A KPI calculation unit that calculates a KPI of the equipment configuration at the target time point; a roadmap update unit that adds a KPI of an equipment configuration at the target time to the roadmap group information so as to be linked to a KPI of the equipment configuration at the previous time when a time one unit time before the target time is defined as a previous time; and an information display unit that displays a roadmap based on the roadmap group information. A roadmap creation system comprising:

2. 2. The roadmapping system according to claim 1, The equipment configuration includes one or more pairs of a name of the equipment and a performance parameter of the equipment; The equipment configuration extraction unit extracts, from the equipment configuration candidates, an equipment configuration candidate in which the number of pieces of equipment whose performance parameters have deteriorated from the equipment configuration at the previous time point is equal to or less than a predetermined number, as an equipment configuration at the target time point. A roadmap creation system comprising:

3. 2. The roadmapping system according to claim 1, The equipment configuration includes one or more pairs of a name of the equipment and a performance parameter of the equipment; The equipment configuration extraction unit extracts, from the equipment configuration candidates, an equipment configuration candidate in which a deterioration amount of the performance parameter from the equipment configuration at the previous time point is within a predetermined range as an equipment configuration at the target time point. A roadmap creation system comprising:

4. 2. The roadmapping system according to claim 1, The information display unit displays only roadmaps whose starting points match, or roadmaps whose starting points match and whose ending points are included in a predetermined area. A roadmap creation system comprising:

5. 2. The roadmapping system according to claim 1, The equipment configuration extraction unit ranks the roadmaps included in the roadmap group information of the previous time point based on the KPI of the equipment configuration of the previous time point, and extracts the equipment configuration of the target time point after deleting a predetermined number of roadmaps with lower rankings from the roadmap group information of the previous time point. A roadmap creation system comprising:

6. 6. The roadmapping system according to claim 5, The equipment configuration extraction unit ranks the roadmap based on a value of a predetermined index included in a KPI of the equipment configuration at the previous time point. A roadmap creation system comprising:

7. 6. The roadmapping system according to claim 5, When the KPI of the equipment configuration at the previous time point includes a plurality of indicators, the equipment configuration extraction unit ranks the roadmap based on a weighted linear sum of the plurality of indicators. A roadmap creation system comprising:

8. 6. The roadmapping system according to claim 5, The equipment configuration extraction unit ranks the roadmap based on the Pareto optimality of the KPI of the equipment configuration at the previous time point when the KPI of the equipment configuration includes multiple indicators having a trade-off relationship. A roadmap creation system comprising:

9. A roadmap creation method for creating a roadmap showing a transition of an equipment configuration ID and a KPI of the equipment configuration from an initial point to an end point, comprising: a setting step of creating roadmap group information at the initial time point, and setting a time point for each unit time from a start time point, which is one unit time from the initial time point, to the end time point as a target time point; an extraction step of extracting one or more equipment configuration candidates that satisfy a predetermined condition from among a plurality of equipment configuration candidates as the equipment configuration at the target time; A KPI calculation step of calculating a KPI of the equipment configuration at the target time; a roadmap updating step of adding a KPI of the equipment configuration at the target time to the roadmap group information so as to be linked to the KPI of the equipment configuration at the previous time when the previous time is one unit time before the target time; A display step of displaying a roadmap based on the roadmap group information. A method for creating a roadmap.

Citation Information

Patent Citations

  • Support system for creating facility abolishment / consolidation plan

    JP2022087501A

Cited By

  • Evaluation model construction method for road slope disaster prevention and reduction

    CN121982456A

  • A Method for Constructing an Assessment Model for Disaster Prevention and Mitigation of Highway Slopes

    CN121982456B