Casing and casing head
The cylindrical casing head with a flexible hydraulic hose and chuck system simplifies the replacement process, enabling efficient extraction of broken piles by adjusting hydraulic pressure, reducing effort and cost.
Patent Information
- Application Number
- JP2023066757
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-14
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2043-04-14
AI Technical Summary
Buried piles often bend or break due to underground loads and deterioration, making it difficult to pull them out using conventional casings, and replacing the casing head is time-consuming.
A cylindrical casing head with a chuck, hydraulic cylinder, and flexible hydraulic hose that adjusts hydraulic pressure to open and close the chuck, eliminating the need for a rigid hydraulic rod connection.
Reduces the effort and cost of replacing the casing head, allows flexible operation, and enables efficient extraction of buried piles even when broken, with real-time monitoring of chuck operation.
Smart Images

Figure 2024152518000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a casing and a casing head. [Background technology]
[0002] When rebuilding a building, it is sometimes necessary to dismantle and remove the existing building and to pull out piles buried in the ground. For example, a buried pile can be pulled out by enclosing it in a tool called a casing, fixing the casing with wires or claws (chucks), and pulling it out. The casing has a mechanism for opening and closing the claws with, for example, a hydraulic rod.
[0003] The following Patent Documents 1 to 4 provide techniques relating to the extraction of buried piles. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 3823113 [Patent Document 2] Patent No. 4249254 [Patent Document 3] Patent No. 5203539 [Patent Document 4] JP 2018-119260 A Summary of the Invention [Problem to be solved by the invention]
[0005] Buried piles may bend or break due to loads placed underground or deterioration over time. When pulling out such a buried pile with its casing, the broken part of the buried pile cannot be pulled up properly. In this case, it is necessary to replace the head of the casing (hereinafter sometimes called the casing head), fix the buried pile, and pull it up.
[0006] However, when replacing the casing head, for example in the case of the above-mentioned system in which the claws are opened and closed by a hydraulic rod, the work of connecting the hydraulic rod is required, which is time-consuming.
[0007] Therefore, one disclosure provides a casing head and a casing that reduce the effort required for replacing the casing head. [Means for solving the problem]
[0008] A cylindrical casing head is used to extract buried piles and is connected to the bottom of a casing surrounding the buried pile, the casing head having a chuck, a hydraulic cylinder, and a hydraulic hose, the chuck is connected to the hydraulic cylinder, the hydraulic cylinder is connected to the hydraulic hose, the chuck opens and closes depending on the applied hydraulic pressure, the hydraulic hose is made of a flexible material, and the hydraulic pressure applied to the hydraulic cylinder can be adjusted. Effect of the Invention
[0009] One aspect of the present invention is to reduce the effort required for replacing a casing head. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a diagram showing an example of a drawing process. [Diagram 2] FIG. 2 is a diagram showing an example of the configuration of the casing 30. As shown in FIG. [Diagram 3] FIG. 3 is a diagram showing an example of the configuration of the casing head 33. As shown in FIG. [Figure 4] FIG. 4 is a diagram showing an example of a cross-sectional view of the hose portion 101. As shown in FIG. [Diagram 5] FIG. 5 is a diagram showing an example of a cross-sectional view of the cross section in FIG. [Figure 6] FIG. 6 is a diagram showing an example of the casing head 33 when in use. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, embodiments of the present invention will be described with reference to the drawings. However, the technical scope of the present invention is not limited to these embodiments, but extends to the matters described in the claims and their equivalents.
[0012] [First embodiment] A first embodiment will be described.
[0013] <Removal of buried piles> Fig. 1 is a diagram showing an example of extracting a buried pile. The extracting of a buried pile includes an excavation process and an extraction process.
[0014] Fig. 1(A) is a diagram showing an example of a hole-drilling process. The hole-drilling process is carried out, for example, by rotating a casing 30 with heavy equipment (such as a drilling machine) 10 as shown in Fig. 1. The casing 30 is rotated, for example, by operating a motor operated in the heavy equipment 10. In the hole-drilling process, water is sprayed from the tip of the casing 30, and a hole is drilled up to the tip of the buried pile 20 while rotating the casing 30.
[0015] 1(B) is a diagram showing an example of the extraction process. For example, after the hole drilling is completed, a wire is hung on the buried pile 20 and the pile is extracted. Note that the extraction may be performed by a crane (not shown) different from the heavy equipment 10, for example.
[0016] However, for example, the buried pile 20 may be broken or severed midway due to deterioration or load. In this case, when the buried pile 20 is pulled up using a casing 30 as shown in FIG. 1, the tip of the severed buried pile 20 may not be pulled up. In such a case, the construction worker may, for example, replace the head part of the casing 30 (hereinafter, sometimes referred to as the casing head) with one with a chuck, reinsert it into the buried hole, fix the buried pile 20 with the chuck, and perform the pulling out process. When using a casing 30 with a replaced chucking head, for example, the buried pile is pulled up using a heavy machine 10. At this time, the wire is connected (tied) to the upper end of the casing 30 with sufficient strength so that the connection does not come off when lifted.
[0017] <Example of casing 30 configuration> Figure 2 is a diagram showing an example of the configuration of the casing 30. Figure 2(A) is a diagram showing an example of the casing 30 in an excavation process. Figure 2(B) is a diagram showing an example of the casing 30 in an extraction process when a pile is left behind.
[0018] The casing 30 is a cylindrical member having a hollow cylindrical shape. The casing 30 used has an inner diameter larger than the outer diameter of the buried pile to be extracted. The casing 30 is made of a high-strength material such as steel so as to be able to withstand the weight of the buried pile. The casing 30 is connected to heavy machinery, for example, by a wire or the like, and is lifted up together with the buried pile by the heavy machinery 10 and extracted from the buried hole.
[0019] 2(A) in the drilling process is composed of casing bodies 31-1 to 3 (hereinafter sometimes referred to as casing body 31) and a casing head 32. The casing bodies 31-1 to 3 and the casing head 32 are connected to each other via connecting parts.
[0020] The casing body 31-1 is a part located at the top of the casing 30. The casing body 31-1 may be called, for example, a casing top. The casing body 31-1 has a connection part at its lower part for connecting to another casing body.
[0021] The casing bodies 31-2 and 31-3 have connection parts at the top and bottom. There are two casing bodies 31-2 and 31-3 in the example of Fig. 2, but the number of casing bodies to be installed depends on the length of the buried pile to be extracted.
[0022] The casing head 32 is a part located at the bottom of the casing 30. The casing head 32 has a connection part at its upper part for connecting to the casing body 31. The casing head 32 has excavation equipment such as a cutter at its front (lower part) for digging into the ground in the excavation process.
[0023] The casing 30 in the extraction process in Fig. 2(B) is composed of casing bodies 31-1 to 3 and a casing head 33. As described above, if extraction cannot be performed with the casing 30 in the drilling process, the casing head 32 is replaced with a casing head 33 with a chuck, and the extraction process is performed. The casing body 31 in the drilling process can continue to be used as it is for the casing 30 in the extraction process.
[0024] <Configuration example of casing head 33> 3 is a diagram showing an example of the configuration of the casing head 33. The casing head 33 is made up of a hose portion 101, a chuck portion 102, a cover portion 103, and a housing portion 104.
[0025] The housing 104 is a cylindrical member having a hollow cylindrical shape. The housing 104 is made of a high-strength material such as steel. The inner diameter and material of the housing 104 are the same as those of the casing body 31 connected to the upper part, for example.
[0026] Cover portion 103 is a cover that protects hose portion 101, and is placed on the outside of housing portion 104. Cover portion 103 is preferably made of a material such as metal or synthetic resin that has a predetermined strength or more in order to protect hose portion 101.
[0027] The chuck unit 102 is composed of a claw-shaped chuck and a hydraulic cylinder. The chuck unit 102 is installed under the casing head 33. The chuck unit 102 is installed so that at least the tips of the claws are located lower than the bottommost part of the housing unit 104. The chuck unit 102 fixes the buried pile 20 in the housing unit 104 to the inside of the housing unit 104 by closing the chuck. The chuck is opened and closed by the hydraulic cylinder that receives hydraulic pressure from a hydraulic hose.
[0028] The hose portion 101 is a hose that is installed on the outside of the housing portion 104. The hose portion 101 is made of a flexible material such as rubber or cloth, and can withstand bending and stretching to a certain degree. The hose portion 101 branches into two and is connected to chuck portions 102 installed on the left and right. The hose portion 101 is longer than the casing 30, for example. Furthermore, when the hose portion 101 is shorter than the casing 30, the hose portion 101 has a mechanism that allows an extension connection.
[0029] 4 is a diagram showing an example of a cross-sectional view of the hose portion 101. The hose portion 101 is composed of a protective portion 1011, a hydraulic hose 1012, and an electric signal line 1013, for example.
[0030] As described above, the protective portion 1011 is made of a flexible material, and protects the hydraulic hose 1012 and the electric signal line 1013 therein.
[0031] The hydraulic hose 1012 is a hose that adjusts the hydraulic pressure applied to the chuck portion 102. In the chuck portion 102, the hydraulic cylinder opens and closes the chuck by increasing or decreasing the applied hydraulic pressure.
[0032] The electric signal line 1013 is a signal line that notifies information regarding the opening and closing of the chuck in the chuck unit 102, such as the degree of opening and closing of the chuck in the chuck unit 102. The worker can obtain the electric signal via the electric signal line 1013 and recognize the open / closed state of the chuck unit 102.
[0033] The electric signal line may also notify, for example, that a force equal to or greater than a predetermined value has been applied to the chuck unit 102 (or that the chuck unit 102 has applied a force equal to or greater than a predetermined value to the object). The construction worker can obtain the electric signal via the electric signal line 1013 and recognize that the chuck unit 102 has grasped and fixed the object (in this case, the buried pile).
[0034] Fig. 5(A) is a diagram showing an example of a cross-sectional view of cross section 1 in Fig. 3. The casing head 33 has a cover part 103 on the outside of a housing part 104, and has a hose part 101 inside the cover part 103.
[0035] 3, the casing head 33 has a cover part 105 on the outside of the housing part 104, and a water pipe 106 inside the cover part 105. The water pipe 106 is necessary, for example, when the casing head 33 is used in the excavation process. For example, a construction worker performs the excavation process while letting water out from the water pipe 106. Note that, when the casing head 33 is not used in the excavation process, the cover part 105 and the water pipe 106 are not necessary.
[0036] FIG. 5(B) is a diagram showing an example of a cross-sectional view of cross section 2 in FIG. 3. The casing head 33 has a hose portion 101 on the outside of the housing portion 104. The hose portion 101 branches to the left and right along the housing portion 104, and reaches the chuck portion 102 installed on the left and right. The chuck portion 102 opens and closes the chuck by a hydraulic cylinder to which hydraulic pressure is applied by a hydraulic hose 1012. As shown in FIG. 5(B), the chuck portion 102 can fix the buried pile 20 so that it does not fall from the housing portion 104 by positioning a part of the chuck inside the housing portion 104. The cover portion 105 and the water pipe 106 are the same as those in FIG. 5(A).
[0037] A casing has a hydraulic cylinder at the top (the top of the casing body). A hydraulic rod connects the hydraulic cylinder at the top of the casing to the chuck of the casing head. The hydraulic rod is made of a material having hardness, such as metal.
[0038] In the case of such a casing, a hydraulic rod is installed for each casing body, and a hydraulic rod is required to connect the casing bodies to each other or to the casing head. As described above, the hydraulic rod has a certain rigidity and does not have elasticity or bending, so the connected casing also does not have elasticity or bending. For example, the buried pile 20 moves left and right inside the casing.
[0039] However, the casing 30 having the casing head 33 does not require a hydraulic rod because the hydraulic pressure can be adjusted by the hose portion 101 of the casing head 33. Therefore, the connection between the casing bodies or between the casing body and the casing head does not need to be strongly fixed, and a certain degree of flexibility can be provided. For example, even if the buried pile 20 moves left and right inside the casing 30 and a force is applied to the casing 30, the force can be released by having a certain degree of flexibility. In other words, even if a force is applied by the buried pile 20 to a certain casing, the casing 30 using the casing head 33 may be able to be pulled out while releasing the force.
[0040] In addition, as described above, in some casings, the hydraulic rod needs to be connected without any gaps, so connecting the casing body is time-consuming. On the other hand, in the casing 30 using the casing head 33, the hydraulic rod is not connected, so the time and effort required for connecting the casing body can be reduced. Furthermore, since the casing body can be constructed without a hydraulic rod, the entire casing can be constructed inexpensively.
[0041] Furthermore, hydraulic hoses are lighter and less expensive than hydraulic rods, making it possible to reduce the cost of the casing as a whole.
[0042] Furthermore, since the casing head 33 has an electric signal line, it can recognize the degree to which the chuck is opened or closed in real time (with the casing remaining buried in the ground).
[0043] <Example of using Casing Head 33> Fig. 6 is a diagram showing an example of the casing head 33 in use. Fig. 6 is a diagram showing an example of the casing 30 in the drawing process.
[0044] For example, as shown in Fig. 6(A), a part of the buried pile 20 may be broken off. In such a case, if a casing head without a chuck is used, the broken part of the buried pile 20 may fall out of the casing 30 and may not be pulled up properly. Therefore, the extraction process is performed using a casing 30 connected to a casing head 33.
[0045] The construction worker temporarily pulls up the casing 30 used in the excavation process. The construction worker replaces the casing head with a casing head 33. Then, the construction worker inserts the casing 30 into the buried pile 20 until it reaches the bottom of the buried pile 20.
[0046] Then, the worker adjusts the hydraulic pressure applied to the hydraulic hose 1012. For example, when the hydraulic pressure is increased, the chuck of the chuck portion 102 closes, and when the hydraulic pressure is decreased, the chuck of the chuck portion 102 opens. Note that the relationship between the opening and closing of the chuck and the hydraulic pressure may be reversed.
[0047] 6(B) is a diagram showing an example in which the buried pile 20 is fixed by a chuck. The buried pile 20 is fixed by hooking the tip of the chuck onto the buried pile 20. The construction worker recognizes the degree of opening and closing of the chuck from the signal received via the electric signal line 1013, and when the worker determines that the buried pile 20 is sufficiently fixed, he or she lifts up the casing 30.
[0048] [Other embodiments] The hydraulic hose 1012 and the electrical signal line 1013 may be installed as separate lines rather than inside the hose portion 101 .
[0049] Moreover, wireless communication may be used in place of the electric signal line 1013 .
[0050] The casing body 31 connected to the casing head 33 may or may not have a hydraulic rod installed. The casing body 31 connected to the casing head 33 may be one that corresponds to the connection with the casing head 33, does not have a hydraulic rod, and can be simply connected. Simple connection includes, for example, connection with a flexible material such as rubber, connection with a hook and a hole through which the hook passes, or the like. [Explanation of symbols]
[0051] 10: Heavy machinery 20: Buried pile 30: Casing 31: Casing body 32: Casing head 33: Casing head 101: Hose part 102: Chuck part 103: Cover part 104: Housing 105: Cover part 106: Water piping 1011:Protection Department 1012: Hydraulic hose 1013: Electrical signal line
Claims
1. A cylindrical casing head used for extracting a buried pile, which is connected to the bottom of a casing surrounding the buried pile, The hydraulic device has a chuck, a hydraulic cylinder, and a hydraulic hose. The chuck is connected to the hydraulic cylinder, the hydraulic cylinder is connected to the hydraulic hose and opens and closes the chuck in response to applied hydraulic pressure; The hydraulic hose is made of a flexible material, and the hydraulic pressure applied to the hydraulic cylinder can be adjusted. Casing head.
2. Further, the device has an electric signal line, The electric signal line transmits a signal indicating the degree of opening or closing of the chuck. The casing head according to claim 1.
3. The chucks are installed at left and right positions on the lower part of the casing head, The hydraulic hoses are connected to the chucks at the left and right positions, respectively. The casing head according to claim 1.
4. The hydraulic hose is installed to pass through the inside of a cover installed on the outside of the casing head. The casing head according to claim 1.
5. A casing surrounding the buried hole, the casing having a casing body and a casing head and used for extracting buried piles, The casing head includes: A cylindrical member is connected to the bottom of the casing, The hydraulic device has a chuck, a hydraulic cylinder, and a hydraulic hose. The chuck is connected to the hydraulic cylinder, the hydraulic cylinder is connected to the hydraulic hose and opens and closes the chuck in response to applied hydraulic pressure; The hydraulic hose is made of a flexible material, and the hydraulic pressure applied to the hydraulic cylinder can be adjusted. Casing.
Citation Information
Patent Citations
Method and device for exposing the reinforcement in reinforced concrete pile
JP1990503583A
Chucking mechanism of pile extractor and pile extraction method
JP2018119260A
Existing pile extraction device
JP2022099883A
Extraction method for existing piles
JP3823113B2
Existing pile extraction device
JP4249254B1