Construction method for unit
The method allows for unit construction within a building frame, addressing the challenge of narrow site constraints by using an assembly frame for safe, efficient production and storage, enhancing safety and productivity.
Patent Information
- Application Number
- JP2023070141
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-21
- Publication Date
- 2024-10-31
- Estimated Expiration
- 2043-04-21
AI Technical Summary
The slab unit construction method requires large assembly yards and stockyards, which are difficult to secure in urban areas with narrow sites, and involves high-risk work at elevated heights due to large-scale rack equipment.
A construction method where units are manufactured and installed within a building frame, using an assembly frame that extends inside the building, allowing production and storage within the building itself, with processes conducted from ground level to enhance safety and efficiency.
Enables unit construction on narrow sites by utilizing the building's interior as a production and storage area, improving safety and productivity by eliminating the need for external yards and high-risk work, and reducing construction time through efficient assembly line manufacturing.
Smart Images

Figure 2024155433000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for constructing a unit. [Background technology]
[0002] The slab unit method is a method in which units are produced in an assembly yard set up at ground level by assembling the steel frame, laying the deck, fixing the studs, covering with fireproofing, and installing facilities. The completed units are then laid out in an external stockyard and lifted at the appropriate time while the steel frame is being erected, and then attached to the building structure (see, for example, Patent Documents 1 and 2).
[0003] In the slab unit construction method, the number of lifts required during steel frame erection can be reduced by unitizing the steel frame, shortening the steel frame erection period and improving productivity. In addition, because a deck is laid on the unit, a wide floor is formed at the same time as the unit is installed, ensuring safety. In addition, by completing fireproofing and ceiling equipment work, which are generally performed after the slab concrete is poured, in advance, it is possible to reduce labor and shorten the construction period during the interior construction period. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2009-91874 A [Patent Document 2] JP 2009-299311 A Summary of the Invention [Problem to be solved by the invention]
[0005] The slab unit construction method requires an assembly yard for the units and a stockyard to store the completed units, but when construction is carried out on narrow sites such as in urban areas, it can be difficult to secure sufficient assembly yards and stockyards.
[0006] In Patent Document 1, multiple units are stored in upper and lower layers in a rack device, and the topmost unit is lifted and removed from the rack device in order. In this case, many units can be stored in a limited space, but the rack device becomes large-scale and work at high altitudes is also required, which raises safety concerns.
[0007] The present invention has been made in consideration of the above problems, and has an object to provide a unit construction method and the like suitable for construction on narrow sites. [Means for solving the problem]
[0008] In order to solve the above-mentioned problems, the present invention is a unit construction method in which a unit having additional members attached to floor structure members consisting of beams and flooring is manufactured and installed, characterized in that an assembly frame that extends within the building structure in a plan view is installed, and then the unfinished unit placed on the assembly frame is moved from one end to the other end of the assembly frame while the unit is manufactured, and the completed unit is lifted and installed in a predetermined position on the building structure.
[0009] In this invention, the inside of the building frame can be used as a manufacturing yard and a stockyard for the units, so the unit construction method can be applied even in construction on a narrow site. In addition, since the assembly frame is located inside the building frame, the manufacturing and storage of the units are not affected by the weather, which is also favorable in terms of the quality of the units. In addition, in this invention, the units can be manufactured in a flow process like a factory where production lines are used, while moving the unfinished units from one end of the assembly frame to the other like a conveyor belt, which leads to improved manufacturing efficiency.
[0010] It is preferable that the unit is manufactured through a plurality of steps, and the position in the extension direction of the assembly stand on which each step is performed differs for each step. This allows the materials, personnel, etc. required for each process to be concentrated at locations corresponding to each process.
[0011] It is desirable that both ends of the assembly frame protrude outside the building structure. This allows the beams and other parts required for manufacturing the unit to be hung onto the assembly stand outside the building structure at one end of the assembly stand, and the completed unit can be lifted by a crane or the like outside the building structure at the other end of the assembly stand.
[0012] It is desirable that the assembly stand be provided on the floor closest to the ground surface of the building structure. This makes it easier to set up the assembly stand and to manufacture the units.
[0013] The additional components include, for example, building facilities. In this way, by installing the equipment in the units in advance, it is possible to reduce labor and shorten construction time during the interior construction work.
[0014] It is desirable to attach the additional member by performing work below the uncompleted unit placed on the assembly stand. This eliminates the need to install additional members at height, making the work easier and improving safety. Effect of the Invention
[0015] The present invention makes it possible to provide a unit construction method suitable for construction on a narrow site. [Brief description of the drawings]
[0016] [Figure 1] FIG. [Diagram 2] Diagram showing unit 3. [Diagram 3] A diagram explaining the construction method of unit 3. [Figure 4] A diagram explaining the construction method of unit 3. [Diagram 5] A diagram showing Unit 3' before completion. [Figure 6] A diagram explaining the construction method of unit 3. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.
[0018] (1. Assembly stand 2) In the construction method of the unit according to the embodiment of the present invention, as shown in Figures 1(a) and (b), first, the steel frame construction work of the building skeleton 1 is carried out up to a predetermined floor, and then the assembly frame 2 that extends within the building skeleton 1 in a plan view is installed. Figure 1(a) is a view of the assembly frame 2 as seen from above, and Figure 1(b) is a view of the assembly frame 2 as seen from the side. This is also the case in Figures 3 and 6 described later.
[0019] The building skeleton 1 has steel columns 11 and steel beams 12, and a slab 13 is formed on the steel beams 12. However, the building skeleton 1 is not limited to this.
[0020] The assembly frame 2 is provided on the first floor of the building skeleton 1 under construction, which is closest to the ground level. The assembly frame 2 traverses the building skeleton 1, with both ends thereof protruding to the outside of the building skeleton 1.
[0021] The assembly stand 2 has a configuration in which rails 23 are supported at a predetermined height by pillars 22 from foundation girders 21. Steel materials such as H-shaped steel are used for the foundation girders 21 and the rails 23, and they are installed horizontally along the extension direction of the assembly stand 2. The extension direction of the assembly stand 2 corresponds to the left-right direction in Figures 1(a) and (b).
[0022] As shown in Fig. 1(a), the rails 23 (and foundation girders 21) are arranged in a pair parallel to each other in a plan view. At one end of the assembly stand 2 (the left end in Figs. 1(a) and (b)), a support girder 24 is suspended between the pair of rails 23. The support girders 24 are arranged in a pair parallel to each other in a plan view, and a slide jig such as a chill tank is attached in advance to the undersides of both ends of the support girders 24 to slide the support girders 24 on the rails 23. Steel material such as H-shaped steel is used for the support girders 24.
[0023] (2. Unit 3) 2 is a diagram showing a unit 3 (slab unit) constructed by the construction method of this embodiment. The unit 3 includes a small beam 31, a deck 32, a stud 33, a fireproof covering material 34, an air conditioner 35, piping (various piping and ducts) 36, electrical equipment 37, etc.
[0024] In the unit 3, a number of girders 31 (beams) are arranged in parallel, and a deck 32, which is a flooring material, is laid on top of the multiple girders 31. The deck 32 is fixed to the girders 31 by welding or the like. H-shaped steel is used for the girders 31, and a corrugated steel plate is used for the deck 32, but this is not limited to the above. The girders 31 and the deck 32 constitute the floor structure members of the present invention.
[0025] A stud 33 is fixed to the joist 31. The stud 33 protrudes upward from the upper surface of the joist 31. The stud 33 penetrates the deck 32 in the portion where the deck 32 is laid.
[0026] A fire-resistant covering material 34 is provided around the cross section of the minor beam 31 (excluding the upper side). The fire-resistant covering material 34 is a sheet-like member, which is wrapped around the minor beam 31 to attach the fire-resistant covering material 34. However, the fire-resistant covering material 34 is not limited to this. For example, a fire-resistant covering material such as rock wool may be sprayed around the cross section of the minor beam 31.
[0027] The air conditioner 35, piping 36, and electrical equipment 37 are facilities provided on the underside of the deck 32. The piping 36 includes various pipes for circulating refrigerant, fire extinguishing agent, etc., and ducts used for air supply and exhaust. The electrical equipment 37 is an electric cable, etc. In the present invention, the air conditioner 35, piping 36, electrical equipment 37, and the fire-resistant covering material 34 correspond to additional members attached to the floor structure members (the beams 31 and the deck 32).
[0028] (3. Construction method of unit 3) Next, a method for constructing the unit 3 of this embodiment will be described. In this embodiment, after the assembly stand 2 is installed as described above, the unit 3 is manufactured by carrying out a plurality of steps while moving the uncompleted unit from one end of the assembly stand 2 to the other end. Then, the completed unit 3 is installed in a predetermined position on the building skeleton 1.
[0029] When manufacturing the unit 3, first, as shown in Figures 3(a) and (b), a small beam 31 is set at one end of the assembly stand 2. A plurality of small beams 31 are spanned in parallel along the extension direction of the assembly stand 2 between a pair of support girders 24. Figure 5(a) is a perspective view showing the small beams 31 in this state (unit 3' before completion).
[0030] Next, as shown in Fig. 4(a), the small beam 31 previously set is transported to position A on the other end side in the extension direction of the assembly stand 2. The small beam 31 is transported by pulling the support girder 24 using a towing means (not shown) such as a Tilclimber (registered trademark) and sliding it on the rail 23 using a guide member such as a Tiltank. Note that Fig. 4(a) and Figs. 4(b) to (e) described later are views of the assembly stand 2 as seen from above, and the other end side in the extension direction of the assembly stand 2 corresponds to the right side of each figure.
[0031] At the position A, as shown in Fig. 4(b), the deck 32 is laid on the small beam 31. As described above, the deck 32 is fixed to the small beam 31 by welding or the like.
[0032] Thereafter, as shown in Fig. 4(c), the uncompleted unit 3' with the deck 32 laid on the minor beams 31 is transported to position B on the other end side in the extension direction of the assembly stand 2 in the same manner as above. Then, work is carried out at position B to fix the studs 33 onto the minor beams 31. The work of fixing the studs 33 can be carried out by a worker standing on the deck 32, and at this time, safety measures such as installing a life rope (not shown) around the periphery of the deck 32 are taken.
[0033] 5(b) is a perspective view showing an uncompleted unit 3' in which a deck 32 is laid on a joist 31 and a stud 33 is fixed. The deck 32 is laid over the range excluding both ends of the joist 31. This is because both ends of the joist 31 will be bolted to the building skeleton 1 when the unit 3 is installed on the building skeleton 1.
[0034] Thereafter, as shown in Fig. 4(d), this unfinished unit 3' is transported to position C on the other end side in the extension direction of the assembly stand 2 in the same manner as described above. Then, work is performed at position C to attach the fire-resistant covering material 34 to the minor beams 31. Fig. 5(c) is a perspective view showing the unfinished unit 3' with the fire-resistant covering material 34 attached to the minor beams 31. The fire-resistant covering material 34 is attached to the area of the minor beams 31 excluding both ends.
[0035] Thereafter, as shown in Fig. 4(e), the uncompleted unit 3' is transported successively to positions D and E on the other end side in the extension direction of the assembly stand 2 in the same manner as described above, while an air conditioner 35, piping 36, and electrical equipment 37 are attached to the underside of the deck 32 by work at each of positions D and E. Fig. 5(d) is a perspective view showing the state where the air conditioner 35 has been attached to the unit 3'.
[0036] In the example of Fig. 4(e), an air conditioner 35 and piping 36 (mechanical equipment) are installed at position D, and electrical equipment 37 is installed at position E. This completes the unit 3. The completed unit 3 is transported to position F on the other end side in the extension direction of the assembly stand 2, as described above, and an inspection of the equipment, etc. is carried out at position F.
[0037] The height of the assembly stand 2 in this embodiment is about 2 to 3 m, and the installation process of the fireproof covering material 34, the air conditioner 35, the piping 36, and the electrical equipment 37 can be performed by workers on the ground below the unfinished unit 3' placed on the assembly stand 2. Therefore, there is no need to use a high-altitude work vehicle as in normal construction work, and the work can be carried out more safely and efficiently. The height of the assembly stand 2 is determined so that the above installation process can be performed from the ground and so that there is no hindrance when materials required for each process are brought into the space below the unfinished unit 3', and is not limited to the above.
[0038] In the example of Fig. 4, in the process described in Fig. 4(c) above, a small beam 31 is set at one end of the assembly stand 2, and the manufacture of the next unit 3 following the previous unit 3 is started. The manufacture of the next unit 3 is also carried out in parallel with the manufacture of the previous unit 3. In this manner, a plurality of units 3 are manufactured in sequence.
[0039] After the inspection, the unit 3 is transported to the other end of the assembly stand 2 as shown in Figures 6(a) and (b) by sliding the support girders 24 on the rails 23. The unit 3 is then lifted by a crane (not shown) and installed in a predetermined position on the building skeleton 1.
[0040] Reference numeral 4 in Fig. 6(b) denotes a hoist made by combining steel materials such as H-beams, and in this embodiment, slings are attached to each of the small beams 31 of the unit 3 from the hoist 4, and the unit 3 is lifted so as not to deform the deck 32. Note that, since the unit 3 exists in the external space of the building structure 1 before and after lifting, it is desirable to complete the covering of the air conditioner 35, piping 36, electrical equipment 37, etc. at the manufacturing stage of the unit 3.
[0041] As described above, in this embodiment, the inside of the building skeleton 1 can be used as a manufacturing yard and a stockyard for the units 3 (3'), so the unit construction method can be applied even in construction on a narrow site. In addition, since the assembly frame 2 is arranged inside the building skeleton 1, the manufacturing and storage of the units 3 are not affected by the weather, which is also preferable in terms of the quality of the units 3. In addition, in this embodiment, the units 3 can be manufactured in an assembly line like a factory where production lines are used, while the unfinished units 3' are slid from one end of the assembly frame 2 to the other like a conveyor belt, which leads to improved manufacturing efficiency and eliminates the need for a lifting machine or the like for moving the units 3.
[0042] In addition, in this embodiment, positions A to F in the extension direction of the assembly stand 2 where each process is carried out during the manufacture of unit 3 differ for each process, so that materials, personnel, etc. required for each process can be concentrated at positions corresponding to each individual process, making it easy to organize traffic lines, etc.
[0043] In addition, since both ends of the assembly frame 2 protrude outside the building structure 1, the small beams 31 required for manufacturing the unit 3 can be hung onto the assembly frame 2 outside the building structure 1 at one end of the assembly frame 2, and the completed unit 3 can be lifted by a crane or the like outside the building structure 1 at the other end of the assembly frame 2.
[0044] In this embodiment, the installation process of additional components such as the air conditioner 35, piping 36, and electrical equipment 37 is performed below the unit 3' before completion, so there is no need to install the additional components at a height, making the work easier and improving safety. Also, by installing the equipment in the unit 3' in advance, it is possible to reduce labor and shorten the construction period during the interior construction work.
[0045] However, the present invention is not limited to the above embodiment. For example, the configuration of the unit 3 is not limited to the above. The unit 3 may be a floor structure member to which an additional member is attached, and there are various configurations of the floor structure member and the additional member. The steps and the order of steps performed when manufacturing the unit 3 also differ depending on the configuration of the unit 3.
[0046] In this embodiment, the assembly frame 2 is provided on the first floor of the building skeleton 1 to fabricate the unit 3, but it is also possible for workers standing on the deck 32 to carry out fireproof coating work and equipment work on the first floor ceiling of the building skeleton 1. In the case of a top-down construction method, the completed unit 3 can be lowered and installed on the building skeleton 1 below the first floor (underground).
[0047] In this embodiment, the assembly frame 2 is provided on the first floor, which is closest to the ground surface of the building structure 1, which makes it easy to install the assembly frame 2 and manufacture the units 3, but the floor on which the assembly frame 2 is installed is not limited to this.
[0048] Although the preferred embodiment of the present invention has been described above with reference to the accompanying drawings, the present invention is not limited to the above examples. It is clear that a person skilled in the art can come up with various modified or altered examples within the scope of the technical ideas disclosed in this application, and it is understood that these also naturally belong to the technical scope of the present invention. [Explanation of symbols]
[0049] 1: Building structure 2: Assembly stand 3: Unit 3': (Unfinished) Unit 21: Base digit 22: Post 23: Rail 24: Receiving column 31: Small beam 32: Deck 33: Stud 34: Fireproof covering material 35:Air conditioner 36: Piping 37: Electrical equipment
Claims
1. A method for constructing and installing a unit in which an additional member is attached to a floor structure member consisting of a beam and a floor material, comprising: After installing the assembly platform that extends inside the building structure in plan view, The uncompleted unit placed on the assembly stand is moved from one end of the assembly stand to the other end, while the unit is manufactured; A method for constructing a unit, comprising the steps of: lifting the completed unit and installing it in a predetermined position on the building structure.
2. The unit is manufactured through a plurality of steps, 2. The method for constructing a unit according to claim 1, wherein a position in the extension direction of the assembly frame for carrying out each step is different for each step.
3. 2. The method for constructing a unit according to claim 1, wherein both ends of the assembly frame protrude outside the building structure.
4. 2. The method for constructing a unit according to claim 1, wherein the assembly frame is provided on a floor closest to the ground surface of the building structure.
5. 2. The method for constructing a unit according to claim 1, wherein the additional member includes a building facility.
6. 2. The method for constructing a unit according to claim 1, wherein the additional member is attached by performing an operation below the unit before completion that is placed on the assembly stand.
Citation Information
Patent Citations
Manufacture of unit floor and method and device for stocking the same unit floor
JP1990080741A
Method of constructing high rise building
JP1992161631A
Pre-assembly method of unit member and pre-assembly device of unit member
JP2009091874A
Construction method of floor unit for stock on construction story
JP2012012836A
Construction method of reinforced-concrete building
JP2017160681A