Alignment adjustment amount calculation method for generator rotor and alignment adjustment amount arithmetic unit for generator rotor

The method and device calculate generator rotor alignment adjustment by pre-disassembly measurements, reducing post-assembly steps and improving accuracy by eliminating the need for centering measurement, thus simplifying and enhancing the alignment process.

JP2024157993AActive Publication Date: 2024-11-08KK TOSHIBA +1
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2023072731
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-26
Publication Date
2024-11-08
Estimated Expiration
2043-04-26

AI Technical Summary

Technical Problem

The existing methods for generator rotor alignment adjustment during periodic inspections require centering measurement after assembly, which increases the number of steps and complicates the adjustment process, and the alignment can be disrupted by jacking up or moving the generator during disassembly.

Method used

A method and device for calculating the alignment adjustment amount of a generator rotor by measuring center difference and surface opening before disassembly, using three-dimensional measurement to determine relative positions before and after assembly, and calculating alignment adjustment amounts without requiring centering measurement post-assembly.

Benefits of technology

This approach reduces the number of post-assembly steps, simplifies the alignment process, and improves accuracy by eliminating the need for post-assembly centering measurement, allowing for precise alignment adjustments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024157993000001_ABST
    Figure 2024157993000001_ABST
Patent Text Reader

Abstract

To eliminate the need for centering measurement for alignment adjustment of a generator rotor after assembling a turbine power generation system.SOLUTION: An alignment adjustment amount calculation method for a generator rotor comprises: a centering measurement step for performing centering measurement to measure a core difference and a surface opening amount between couplings before disassembling a turbine power generation system; a first relative position measurement step for measuring a relative position of an evaluation point on a generator with respect to a rest point with a three-dimensional measurement device before disassembling the turbine power generation system; a second relative position measurement step for measuring a relative position of the evaluation point with respect to the rest point with the three-dimensional measurement device; and an alignment adjustment amount calculation step for calculating an alignment adjustment amount of the generator rotor on the basis of a measured result in the centering measurement step, a measured result in the first relative position measurement step, and a measured result in the second relative position measurement step.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to a generator rotor alignment adjustment amount calculation method and a generator rotor alignment adjustment amount calculation device. [Background technology]

[0002] A turbine power generation system is composed of a generator rotor of a generator and a turbine rotor of a turbine, which are connected via their respective couplings. The generator rotor and turbine rotor are separated (disassembled) during regular inspections of the power generation equipment, and are reconnected (assembled) before the completion of the regular inspections. When connecting the rotors, it is necessary to adjust the support positions of the bearings of each rotor, which is called alignment adjustment.

[0003] A typical method for adjusting the alignment of generator rotors during regular inspections involves performing a centering measurement to measure the core error and face opening between the couplings of each rotor immediately before the alignment adjustment in order to calculate the amount of alignment adjustment, and then checking the alignment state of each rotor.

[0004] However, with this method, centering measurement is performed and alignment adjustment is performed after inspection and assembly during regular inspection. This increases the number of processes to be performed after assembly of the turbine power generation system, making process adjustments after assembly difficult. In addition, if the generator is jacked up during regular inspection or moved for disassembly, the position of the generator rotor moves during the regular inspection, which increases the amount of alignment adjustment required for the generator rotor, and more time is required for alignment adjustment. This is also one of the factors that makes process adjustments after assembly of the turbine power generation system difficult. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2010-159673 A Summary of the Invention [Problem to be solved by the invention]

[0006] The present invention has been made in consideration of the above points, and has an object to provide a generator rotor alignment adjustment amount calculation method and generator rotor alignment adjustment amount calculation device that can eliminate the need for centering measurements for adjusting the alignment of the generator rotor after assembly of a turbine power generation system. [Means for solving the problem]

[0007] A generator rotor alignment adjustment amount calculation method according to an embodiment is a method for calculating an alignment adjustment amount of a generator rotor in a turbine power generation system configured by connecting a generator rotor of a generator and a turbine rotor of a turbine via respective couplings. The generator rotor alignment adjustment amount calculation method includes a centering measurement step of performing a centering measurement to measure a center difference and a surface opening amount between the couplings before disassembling the turbine power generation system, a first relative position measurement step of measuring a relative position of an evaluation point on the generator with respect to a stationary point by a three-dimensional measuring device before disassembling the turbine power generation system, a second relative position measurement step of measuring a relative position of the evaluation point with respect to a stationary point by the three-dimensional measuring device after assembling the disassembled turbine power generation system, and an alignment adjustment amount calculation step of calculating an alignment adjustment amount of the generator rotor based on a measurement result in the centering measurement step, a measurement result in the first relative position measurement step, and a measurement result in the second relative position measurement step.

[0008] Furthermore, a generator rotor alignment adjustment amount calculation device according to the embodiment is a device that calculates and outputs an alignment adjustment amount of the generator rotor using the above-mentioned generator rotor alignment adjustment amount calculation method. The generator rotor alignment adjustment amount calculation device includes an input unit to which the measurement results of the centering measurement process, the first relative position measurement process, and the second relative position measurement process are input, a calculation unit that calculates an alignment adjustment amount of the generator rotor based on the measurement results of the centering measurement process, the first relative position measurement process, and the second relative position measurement process input to the input unit, and an output unit that outputs the alignment adjustment amount of the generator rotor calculated by the calculation unit. Effect of the Invention

[0009] According to the present invention, it is possible to eliminate the need for centering measurement for adjusting the alignment of a generator rotor after assembly of a turbine power generation system. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a schematic diagram showing a schematic configuration of a turbine power generation system according to a first embodiment, and is a schematic diagram showing the positional relationship of each rotor in the up-down direction. [Diagram 2] FIG. 2 is a schematic diagram showing a schematic configuration of the turbine power generation system according to the first embodiment, and is a schematic diagram showing the positional relationship of each rotor in the left-right direction. [Diagram 3] FIG. 3 is an enlarged schematic view of the coupling in FIG. 1, showing the center misalignment and the surface opening amount between the couplings in the vertical direction. [Figure 4] FIG. 4 is a schematic diagram for explaining a method of adjusting the alignment in the vertical direction of the generator rotor of the turbine power generation system according to the first embodiment. [Diagram 5] FIG. 5 is a schematic diagram for explaining a method of adjusting the alignment in the left-right direction of the generator rotor of the turbine power generation system according to the first embodiment. [Figure 6]FIG. 6 is a side view showing the generator of the turbine power generation system according to the first embodiment. [Figure 7] FIG. 7 is a top view of FIG. [Figure 8] FIG. 8 is an enlarged top view showing the evaluation points in FIG. [Figure 9] FIG. 9 is a side view of FIG. [Figure 10] FIG. 10 is a top view showing an enlarged static point of FIG. [Figure 11] FIG. 11 is a side view of FIG. [Figure 12] FIG. 12 is a schematic diagram for explaining a method of adjusting the alignment in the vertical direction of the generator rotor of the turbine power generation system according to the second embodiment. [Figure 13] FIG. 13 is a schematic diagram for explaining a method of adjusting the alignment in the left-right direction of the generator rotor of the turbine power generation system according to the second embodiment. [Figure 14] FIG. 14 is an enlarged top view showing a part of the turbine power generation system according to the third embodiment. [Figure 15] FIG. 15 is an enlarged side view of the stationary point of FIG. [Figure 16] FIG. 16 is a top view showing the generator of the turbine power generation system according to the fourth embodiment. [Figure 17] FIG. 17 is an enlarged side view of the stationary point of FIG. [Figure 18] FIG. 18 is a block diagram showing a functional configuration of an alignment adjustment amount calculation device for a generator rotor according to the fifth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A generator rotor alignment adjustment amount calculation method and generator rotor alignment adjustment amount calculation device according to embodiments of the present invention will now be described with reference to the drawings.

[0012] (First embodiment) First, a generator rotor alignment adjustment amount calculation method according to the first embodiment will be described with reference to Figs. 1 to 11.

[0013] First, a turbine power generation system 1 according to the present embodiment will be described with reference to Figs. 1 to 3.

[0014] As shown in FIGS. 1 and 2, the turbine power generation system 1 includes a generator 2 and a turbine 3.

[0015] The generator 2 has a generator rotor 2a, two couplings 2b, and two bearings 2c and 2d. The couplings 2b are provided at both ends of the generator rotor 2a. The bearings 2c and 2d rotatably support the generator rotor 2a. The bearing 2c is provided on one side (the left side in the figure) of the generator rotor 2a in the axial direction. The bearing 2d is provided on the other side (the right side in the figure) of the generator rotor 2a in the axial direction.

[0016] The turbine 3 has a turbine rotor 3a, two couplings 3b, and two bearings 3c and 3d. The couplings 3b are provided at both ends of the turbine rotor 3a. The bearings 3c and 3d support the turbine rotor 3a so that it can rotate. The bearing 3c is provided on one side (the left side in the figure) of the turbine rotor 3a in the axial direction. The bearing 3d is provided on the other side (the right side in the figure) of the turbine rotor 3a in the axial direction.

[0017] The turbine power generation system 1 is configured by connecting a generator rotor 2a of a generator 2 and a turbine rotor 3a of a turbine 3 via respective couplings 2b, 3b. Although not shown, the turbine power generation system 1 may include a plurality of turbines, and the turbine rotors of the respective turbines may also be connected to each other via their respective couplings.

[0018] Fig. 1 shows the positional relationship of the rotors 2a, 3a in the up-down direction (vertical direction). Fig. 2 shows the positional relationship of the rotors 2a, 3a in the left-right direction (horizontal direction). As shown in Figs. 1 and 2, when the generator rotor 2a and the turbine rotor 3a are connected during assembly of the turbine power generation system 1, the generator rotor 2a may be positioned out of alignment with the turbine rotor 3a, which serves as a reference. Adjusting the support positions of the bearings 2c, 2d, 3c, and 3d that support the rotors 2a, 3a in order to eliminate this positional misalignment between the rotors 2a, 3a is called alignment adjustment.

[0019] Fig. 3 shows the center difference 5 and the surface opening amount 6 in the up-down direction between the couplings 2b, 3b. The center difference 5 and the surface opening amount 6 in the left-right direction between the couplings 2b, 3b are not shown. As shown in Fig. 3, the center difference 5 is the amount of deviation between the centers (center points on the outermost surfaces) of the adjacent couplings 2b, 3b. The surface opening amount 6 is the maximum amount of opening between the outer surfaces of the adjacent couplings 2b, 3b. The center difference 5 and the surface opening amount 6 can be measured by centering measurement.

[0020] In a general method of adjusting the alignment of the generator rotor during periodic inspection, after assembling the turbine power generation system 1, centering measurement is performed to measure the center difference 5 and the surface opening amount 6 in the vertical and horizontal directions between the couplings 2b and 3b. Then, based on the measurement results, the positional relationship of each rotor 2a and 3a is evaluated, and alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a at each bearing 2c and 2d are calculated so that the center difference 5 and the surface opening amount 6 between the couplings 2b and 3b are within the control values. Here, as shown in FIG. 1, the alignment adjustment amount a1 is the vertical adjustment amount of the generator rotor 2a at the bearing 2c, and the alignment adjustment amount a2 is the vertical adjustment amount of the generator rotor 2a at the bearing 2d. Also, as shown in FIG. 2, the alignment adjustment amount b1 is the horizontal adjustment amount of the generator rotor 2a at the bearing 2c, and the alignment adjustment amount b2 is the horizontal adjustment amount of the generator rotor 2a at the bearing 2d.

[0021] In contrast, in the generator rotor alignment adjustment amount calculation method according to this embodiment, the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a are calculated without performing centering measurement after the turbine power generation system 1 is assembled.

[0022] During regular inspection, after disassembly of the turbine power generation system 1, the generator 2 may be jacked up or moved for disassembly. In this case, the position of the generator rotor 2a moves in the vertical and horizontal directions from position A before disassembly of the turbine power generation system 1, as shown in Fig. 4 and Fig. 5.

[0023] Here, if the movement amounts c1, c2, d1, and d2 of the generator rotor 2a during the periodic inspection can be measured, the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a can be calculated from the position A of the generator rotor 2a before disassembly of the turbine power generation system 1 to the target position B of the generator rotor 2a after assembly of the turbine power generation system 1. Here, as shown in FIG. 4, the movement amount c1 is the vertical movement amount of the generator rotor 2a at the bearing 2c, and the movement amount c2 is the vertical movement amount of the generator rotor 2a at the bearing 2d. Also, as shown in FIG. 5, the movement amount d1 is the left-right movement amount of the generator rotor 2a at the bearing 2c, and the movement amount d2 is the left-right movement amount of the generator rotor 2a at the bearing 2d.

[0024] In the method for calculating the alignment adjustment amount of the generator rotor according to this embodiment, by measuring the movement amounts c1, c2, d1, and d2 of the generator rotor 2a during regular inspection, it is possible to calculate the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a without performing centering measurements after assembly of the turbine power generation system 1.

[0025] Hereinafter, the generator rotor alignment adjustment amount calculation method according to this embodiment will be described in detail with reference to Figs.

[0026] The generator rotor alignment adjustment amount calculation method according to this embodiment is performed during regular inspection of the turbine power generation system 1. The generator rotor alignment adjustment amount calculation method according to this embodiment includes a centering measurement step, a first relative position measurement step, a second relative position measurement step, and an alignment adjustment amount calculation step.

[0027] First, a centering measurement process is performed. In the centering measurement process, a centering measurement is performed to measure the centering difference 5 and the surface gap amount 6 between the couplings 2b, 3b before disassembling the turbine power generation system 1. In the centering measurement, with the generator rotor 2a and the turbine rotor 3a connected to each other, the centering difference 5 and the surface gap amount 6 between the couplings 2b, 3b are directly measured while rotating each of the rotors 2a, 3a.

[0028] Subsequently, a first relative position measuring step is performed. In the first relative position measuring step, the relative position of the evaluation point on the generator 2 with respect to a stationary point is measured by a three-dimensional measuring device before disassembly of the turbine power generation system 1.

[0029] The evaluation points are provided at any positions on the generator 2. The evaluation points may be provided on the generator body 7 of the generator 2. The generator rotor 2a is supported by bearings 2c and 2d provided on the generator body 7, and the amount of movement of the generator rotor 2a can be considered to be equal to the amount of movement of the generator body 7. Therefore, the amount of movement of the generator rotor 2a can be measured by measuring the amount of movement of the evaluation points on the generator body 7. In the example shown in Figs. 6 and 7, evaluation points P1 to P8 are provided on a leg plate 8 provided on the generator body 7.

[0030] The number of evaluation points is arbitrary. For example, two or more evaluation points may be provided along the axial direction of the generator rotor 2a. Furthermore, two evaluation points may be provided at the same position in the axial direction of the generator rotor 2a. The two evaluation points may be provided on one side (lower side in FIG. 7) and the other side (upper side in FIG. 7) of the generator rotor 2a in a direction perpendicular to the axial direction. The two evaluation points may be provided at the same distance from the generator rotor 2a.

[0031] In the example shown in FIG. 7, leg plates 8 are provided on one and the other sides of the generator body 7 in the axial direction and one and the other sides in the direction perpendicular to the axial direction, and two evaluation points P1 to P8 are provided on each leg plate 8. On one side (lower side in FIG. 7) in the direction perpendicular to the axial direction, four evaluation points P1, P2, P5, P6 are lined up along the axial direction. On the other side (upper side in FIG. 7) in the direction perpendicular to the axial direction, four evaluation points P3, P4, P7, P8 are lined up along the axial direction. In addition, two evaluation points P1, P3 are provided at the same position in the axial direction. In addition, two evaluation points P2, P4 are provided at the same position in the axial direction. In addition, two evaluation points P5, P7 are provided at the same position in the axial direction. In addition, two evaluation points P6, P8 are provided at the same position in the axial direction.

[0032] The stationary points are provided at any positions other than the generator 2. The stationary points may be provided at positions near the generator 2. The stationary points may be provided on the foundation 10 around the generator 2. In the example shown in FIG. 7, stationary points Q1 to Q4 are provided at the center positions of holes 11 provided in the foundation 10 around the generator 2. The holes 11 may be provided near the leg plates 8. The holes 11 may be rectangular prism-shaped holes having rectangular openings. The holes 11 may be holes provided in advance in the foundation 10 for inserting jacking posts used when lifting (jacking up) the generator 2.

[0033] The number of still points is arbitrary. Only one still point may be provided, or the same number as the number of evaluation points may be provided so as to correspond to each evaluation point. In the example shown in FIG. 7, a total of four still points Q1 to Q4 are provided, one near each leg plate 8. Still point Q1 is a still point corresponding to evaluation points P1 and P2. Still point Q2 is a still point corresponding to evaluation points P3 and P4. Still point Q3 is a still point corresponding to evaluation points P5 and P6. Still point Q4 is a still point corresponding to evaluation points P7 and P8.

[0034] In this embodiment, the positions of the eight evaluation points P1 to P8 and the four stationary points Q1 to Q4 are measured by a three-dimensional measuring device, and the relative positions of the evaluation points P1 to P8 with respect to the stationary points Q1 to Q4 are calculated. As the three-dimensional measuring device, for example, a laser tracker is used. The laser tracker measures the position of the reflector 9 by irradiating the reflector 9 with laser light. In this embodiment, the reflector 9 is disposed at each of the evaluation points P1 to P8 and each of the stationary points Q1 to Q4.

[0035] In this embodiment, the measuring jig 20 is used to place the reflector 9 at each of the evaluation points P1 to P8. As shown in Figs. 8 and 9, the measuring jig 20 has a base 21 and a screw portion 23. The base 21 is a portion that holds the reflector 9. As shown in Figs. 8 and 9, the reflector 9 may be spherical. The base 21 may have a recess 22, and a part of the spherical reflector 9 may fit into the recess 22 to hold the reflector 9. The screw portion 23 is provided on the lower part of the base 21. Screw holes 13 are provided at positions corresponding to the evaluation points P1 to P8 of the leg plate 8, and the screw portion 23 is adapted to screw into the screw holes 13 provided in the leg plate 8. The screw holes 13 are provided in advance in the leg plate 8 in order to jack up the generator 2. In other words, the evaluation points P1 to P8 are set at positions where the screw holes 13 of the leg plate 8 are provided. By using such a measuring jig 20, the reflector 9 can be fixed to each of the evaluation points P1 to P8 on the generator 2.

[0036] In this embodiment, the measuring jig 30 is used to place the reflector 9 at each of the stationary points Q1 to Q4. As shown in FIG. 10 and FIG. 11, the measuring jig 30 has a base 31 and a fixing mechanism 33. The base 31 is a portion that holds the reflector 9. The base 31 may have a recess 32, and a part of the spherical reflector 9 may fit into the recess 32 to hold the reflector 9. The fixing mechanism 33 is provided on the lower part of the base 31. The fixing mechanism 33 is configured to be fixed to a hole 11 provided in a foundation 10 around the generator 2. The fixing mechanism 33 has a beam portion 34 and a claw portion 35. The beam portion 34 is cross-shaped and has a portion that extends vertically so as to straddle the hole 11 and a portion that extends horizontally so as to straddle the hole 11. The claw portion 35 is provided on the lower part of the beam portion 34. A plurality of claws 35 are provided so as to come into contact with each inner surface of the rectangular prism-shaped hole 11. Each claw 35 is movable vertically or horizontally, and the fixing mechanism 33 is fixed to the hole 11 by each claw 35 coming into contact with the inner surface of the hole 11. By using such a measuring jig 30, the reflector 9 can be fixed to each of the stationary points Q1 to Q4.

[0037] In this way, in the first relative position measurement step, the positions (coordinate positions) of the eight evaluation points P1 to P8 and the four stationary points Q1 to Q4 are measured by a laser tracker before disassembling the turbine power generation system 1. The evaluation points P1 to P8 and the stationary points Q1 to Q4 may be measured simultaneously, one by one, or multiple by one. Then, the coordinate positions of the stationary points Q1 to Q4 obtained by measurement are subtracted from the coordinate positions of the evaluation points P1 to P8 obtained by measurement to calculate the relative positions of the evaluation points P1 to P8 with respect to the stationary points Q1 to Q4.

[0038] After the first relative position measurement step, the turbine power generation system 1 is disassembled during regular inspection. That is, the generator rotor 2a and the turbine rotor 3a, which have been connected via the couplings 2b and 3b, are separated. After disassembly of the turbine power generation system 1, the generator 2 may be jacked up or moved for disassembly. Thereafter, the disassembled turbine power generation system 1 is assembled. That is, the generator rotor 2a and the turbine rotor 3a are reconnected via their respective couplings 2b and 3b.

[0039] Next, a second relative position measuring step is performed in which the relative position of the evaluation point with respect to the stationary point is measured by the three-dimensional measuring device.

[0040] The evaluation points and stationary points in the second relative position measurement process are set at the same positions as the evaluation points P1 to P8 and stationary points Q1 to Q4 in the first relative position measurement process. Also, similar to the first relative position measurement process, a laser tracker is used as the three-dimensional measurement device. In this case, similar to the first relative position measurement process, a measuring jig 20 is used to place a reflector 9 at each of the evaluation points P1 to P8. Also, a measuring jig 30 is used to place a reflector 9 at each of the stationary points Q1 to Q4.

[0041] In this way, in the second relative position measurement process, the positions (coordinate positions) of the eight evaluation points P1 to P8 and the four stationary points Q1 to Q4 are measured by the laser tracker after assembly of the turbine power generation system 1. Then, the relative positions of the evaluation points P1 to P8 with respect to the stationary points Q1 to Q4 can be calculated by subtracting the coordinate positions of the stationary points Q1 to Q4 obtained by measurement from the coordinate positions of the evaluation points P1 to P8 obtained by measurement.

[0042] Then, an alignment adjustment amount calculation process is performed in which an alignment adjustment amount of the generator rotor 2a is calculated based on the measurement results of the centering measurement process, the measurement results of the first relative position measurement process, and the measurement results of the second relative position measurement process.

[0043] In the alignment adjustment amount calculation step, first, the amount of relative movement of the generator rotor 2a with respect to the stationary points Q1 to Q4 is calculated based on the measurement results in the first relative position measurement step and the measurement results in the second relative position measurement step.

[0044] More specifically, first, the relative positions of the evaluation points P1 to P8 relative to the stationary points Q1 to Q4 measured in the first relative position measurement process are subtracted from the relative positions of the evaluation points P1 to P8 relative to the stationary points Q1 to Q4 measured in the second relative position measurement process to calculate the relative movement amounts of the evaluation points P1 to P8 relative to the stationary points Q1 to Q4. Here, the vertical relative movement amount of the evaluation point P1 relative to the stationary point Q1 is u11, and the horizontal relative movement amount is v11. The vertical relative movement amount of the evaluation point P2 relative to the stationary point Q1 is u21, and the horizontal relative movement amount is v21. The vertical relative movement amount of the evaluation point P3 relative to the stationary point Q2 is u12, and the horizontal relative movement amount is v12. The vertical relative movement amount of the evaluation point P4 relative to the stationary point Q2 is u22, and the horizontal relative movement amount is v22. The vertical relative movement amount of evaluation point P5 with respect to stationary point Q3 is u31, and the horizontal relative movement amount is v31. The vertical relative movement amount of evaluation point P6 with respect to stationary point Q3 is u41, and the horizontal relative movement amount is v41. The vertical relative movement amount of evaluation point P7 with respect to stationary point Q4 is u32, and the horizontal relative movement amount is v32. The vertical relative movement amount of evaluation point P8 with respect to stationary point Q4 is u42, and the horizontal relative movement amount is v42.

[0045] Next, the relative movement amount of the generator rotor 2a with respect to the stationary points Q1 to Q4 is calculated from the average value of the relative movement amounts of two evaluation points P1 to P8 provided at the same axial position. That is, the vertical relative movement amount u1 of the generator rotor 2a at the axial position of the evaluation points P1 and P2 is calculated from the average value of the vertical relative movement amounts u11 and u12 of the two evaluation points P1 and P3 provided at the same axial position. Also, the left-right relative movement amount v1 of the generator rotor 2a at the axial position of the evaluation points P1 and P2 is calculated from the average value of the left-right relative movement amounts v11 and v12 of the two evaluation points P1 and P3 provided at the same axial position. Similarly, the vertical relative movement amount u2 of the generator rotor 2a at the axial position of the evaluation points P2 and P4 is calculated from the average value of the vertical relative movement amounts u21 and u22 of the evaluation points P2 and P4. Also, the left-right relative movement amount v2 of the generator rotor 2a at the axial position of the evaluation points P2 and P4 is calculated from the average value of the left-right relative movement amounts v21 and v22 of the evaluation points P2 and P4. Similarly, the up-down relative movement amount u3 of the generator rotor 2a at the axial position of the evaluation points P5 and P7 is calculated from the average value of the up-down relative movement amounts u31 and u32 of the evaluation points P5 and P7. Also, the left-right relative movement amount v3 of the generator rotor 2a at the axial position of the evaluation points P5 and P7 is calculated from the average value of the left-right relative movement amounts v31 and v32 of the evaluation points P5 and P7. Similarly, the up-down relative movement amount u4 of the generator rotor 2a at the axial position of the evaluation points P6 and P8 is calculated from the average value of the up-down relative movement amounts u41 and u42 of the evaluation points P6 and P8. Further, the amount of left-right relative movement v4 of the generator rotor 2a at the axial positions of the evaluation points P6 and P8 is calculated from the average value of the amounts of left-right relative movement v41 and v42 of the evaluation points P6 and P8.

[0046] In this way, based on the measurement results in the first relative position measurement process and the measurement results in the second relative position measurement process, the vertical relative movement amounts u1, u2, u3, u4 and the left-right relative movement amounts v1, v2, v3, v4 of the generator rotor 2a at each axial position can be calculated.

[0047] Next, the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a are calculated based on the measurement results in the centering measurement process and the relative movement amounts u1, u2, u3, u4, v1, v2, v3, and v4 of the generator rotor 2a.

[0048] More specifically, first, the centering error 5 and the surface opening amount 6 between the couplings 2b and 3b before disassembly of the turbine power generation system 1 are measured by the centering measurement in the centering measurement process. Based on these measurement results and dimensional information such as the dimension between the coupling 2b and the bearing 2c, the dimension between the bearings 2c and 2d, and the outer diameter dimension of the coupling 2b, the vertical and horizontal alignment adjustment amounts of the generator rotor 2a at each of the bearings 2c and 2d are calculated. Next, based on the relative movement amounts u1, u2, u3, u4, v1, v2, v3, and v4 of the generator rotor 2a and position information such as the axial positions of each evaluation point P1 to P8 and the support positions (alignment adjustment positions) of each of the bearings 2c and 2d, the vertical and horizontal movement amounts c1, c2, d1, and d2 of the generator rotor 2a at each of the bearings 2c and 2d are calculated. Then, by subtracting these movement amounts c1, c2, d1, d2 from the above-mentioned alignment adjustment amounts, the final alignment adjustment amounts a1, a2, b1, b2 in the vertical and horizontal directions of the generator rotor 2a are calculated.

[0049] In this manner, in the alignment adjustment amount calculation process, the alignment adjustment amounts a1, a2, b1, and b2 in the vertical and horizontal directions of the generator rotor 2a at each bearing 2c, 2d can be calculated so that the center difference 5 and face opening amount 6 between the couplings 2b, 3b are within the control values.

[0050] After the alignment adjustment amount calculation process, the alignment of the generator rotor 2a is adjusted based on the calculated alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a. The alignment adjustment is performed by adjusting the support positions of the bearings 2c and 2d of the generator rotor 2a. More specifically, the vertical alignment adjustment is performed by adjusting the shims under the leg plate 8, and the horizontal alignment adjustment is performed by adjusting the position of the generator main body 7.

[0051] In this manner, after the turbine power generation system 1 is assembled, the alignment of the generator rotor 2a can be adjusted so that the center offset 5 and the face opening amount 6 between the couplings 2b, 3b are within the control values.

[0052] As described above, according to this embodiment, the generator rotor alignment adjustment amount calculation method includes a centering measurement step, a first relative position measurement step, a second relative position measurement step, and an alignment adjustment amount calculation step. In the centering measurement step, a centering measurement is performed to measure the center difference 5 and the face opening amount 6 in the left-right direction between the couplings 2b and 3b before disassembling the turbine power generation system 1. In the first relative position measurement step, the relative positions of the evaluation points P1 to P8 on the generator 2 with respect to the stationary points Q1 to Q4 are measured by a three-dimensional measuring device before disassembling the turbine power generation system 1. In the second relative position measurement step, the relative positions of the evaluation points P1 to P8 on the generator 2 with respect to the stationary points Q1 to Q4 are measured by a three-dimensional measuring device after reassembly of the disassembled turbine power generation system 1. Then, in the alignment adjustment amount calculation step, the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a are calculated based on the measurement results of the centering measurement step, the measurement results of the first relative position measurement step, and the measurement results of the second relative position measurement step. That is, the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a are calculated based on the measurement results of the centering measurement before disassembly of the turbine power generation system 1, the measurement results of the relative positions of the evaluation points P1 to P8 with respect to the stationary points Q1 to Q4 before disassembly of the turbine power generation system 1, and the measurement results of the relative positions of the evaluation points P1 to P8 with respect to the stationary points Q1 to Q4 after assembly of the disassembled turbine power generation system 1. This makes it possible to calculate the alignment adjustment amount of the generator rotor 2a without performing centering measurement after assembly of the turbine power generation system 1. This makes it possible to eliminate the need for centering measurement for alignment adjustment of the generator rotor 2a after assembly of the turbine power generation system 1. As a result, during regular inspection, the number of steps to be performed after assembly of the turbine power generation system 1 can be reduced, and post-assembly process adjustments can be made easier.

[0053] Furthermore, according to this embodiment, in the first relative position measuring step and the second relative position measuring step, the relative positions of the evaluation points P1 to P8 on the generator 2 with respect to the stationary points Q1 to Q4 are measured by a three-dimensional measuring device. In general, it is difficult to install a three-dimensional measuring device such as a laser tracker in exactly the same position before disassembling the turbine power generation system 1 and after assembling the turbine power generation system 1. Therefore, by measuring the evaluation points P1 to P8 as relative positions based on the stationary points Q1 to Q4 as in this embodiment, the positions of the evaluation points P1 to P8 can be reliably evaluated regardless of the installation position of the three-dimensional measuring device. This improves the accuracy of calculating the alignment adjustment amount of the generator rotor 2a.

[0054] According to this embodiment, in the alignment adjustment amount calculation step, the relative movement amount of the generator rotor 2a with respect to the stationary points Q1 to Q4 is calculated based on the measurement results in the first relative position measurement step and the second relative position measurement step, and the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a are calculated based on the measurement results in the centering measurement step and the relative movement amount of the generator rotor 2a. During regular inspection, after disassembling the turbine power generation system 1, the generator 2 may be jacked up or moved for disassembly. In this case, the position of the generator rotor 2a moves in the vertical and horizontal directions from the position A before disassembly of the turbine power generation system 1. According to this embodiment, by calculating the movement amounts c1, c2, d1, and d2 of the generator rotor 2a during regular inspection, the alignment adjustment amount of the generator rotor 2a can be calculated without performing centering measurement after assembly of the turbine power generation system 1.

[0055] According to this embodiment, in the alignment adjustment amount calculation step, the relative movement amount of the generator rotor 2a with respect to the stationary point is calculated from the average value of the relative movement amounts of two evaluation points provided at the same position in the axial direction. In order to calculate the alignment adjustment amount of the generator rotor 2a, it is preferable to provide evaluation points P1 to P8 on the generator rotor 2a. However, it is difficult to provide evaluation points P1 to P8 on the generator rotor 2a in a state in which the turbine power generation system 1 is assembled. In contrast, according to this embodiment, the average value of the relative movement amounts of two evaluation points provided at the same position in the axial direction is taken, so that the relative movement amount of the generator rotor 2a can be approximated to the original relative movement amount. Therefore, the calculation accuracy of the relative movement amount of the generator rotor 2a can be improved, and the calculation accuracy of the alignment adjustment amount of the generator rotor 2a can be improved.

[0056] According to the present embodiment, in the first relative position measurement step and the second relative position measurement step, the reflector 9 is placed at the evaluation points P1 to P8 using a measurement jig 20 having a base 21 for holding the reflector 9 and a screw portion 23 provided under the base 21 and screwed into a screw hole 13 provided in the generator 2. This allows the reflector 9 to be firmly fixed to each of the evaluation points P1 to P8 on the generator 2. Therefore, in the first relative position measurement step (before disassembly of the turbine power generation system 1) and the second relative position measurement step (after assembly of the turbine power generation system 1), it is possible to suppress changes in the positions of the evaluation points P1 to P8. As a result, it is possible to improve the measurement accuracy of the positions of the evaluation points P1 to P8, and to improve the calculation accuracy of the alignment adjustment amount of the generator rotor 2a. In addition, since the reflector 9 is fixed onto the generator 2 using the existing screw hole 13 provided in the generator 2, it is not necessary to form a new screw hole or the like, and an increase in the number of steps can be suppressed.

[0057] According to the present embodiment, in the first relative position measurement step and the second relative position measurement step, the reflector 9 is placed at the stationary points Q1 to Q4 using a measurement jig 30 having a base 31 for holding the reflector 9 and a fixing mechanism 33 provided under the base 31 and fixed to a hole 11 provided in the foundation 10 around the generator 2. This allows the reflector 9 to be firmly fixed to each of the stationary points Q1 to Q4. Therefore, in the first relative position measurement step (before disassembly of the turbine power generation system 1) and the second relative position measurement step (after assembly of the turbine power generation system 1), it is possible to suppress changes in the positions of the stationary points Q1 to Q4. As a result, it is possible to improve the measurement accuracy of the positions of the stationary points Q1 to Q4, and it is possible to improve the calculation accuracy of the alignment adjustment amount of the generator rotor 2a. In addition, since the reflector 9 is fixed using the existing hole 11 provided in the foundation 10 around the generator 2, it is not necessary to newly form a screw hole or the like, and it is possible to suppress an increase in the number of steps.

[0058] (Second embodiment) Next, a generator rotor alignment adjustment amount calculation method according to the second embodiment will be described with reference to Figs.

[0059] The second embodiment shown in Figures 12 and 13 differs mainly in that in the alignment adjustment amount calculation step, the alignment adjustment amount of the generator rotor is calculated based on the measurement results in the centering measurement step, the measurement results in the first relative position measurement step, the measurement results in the second relative position measurement step, and the alignment adjustment amount of the turbine rotor. The other configurations are substantially the same as those in the first embodiment shown in Figures 1 to 11. In Figures 12 and 13, the same parts as those in the first embodiment shown in Figures 1 to 11 are given the same reference numerals and detailed description thereof will be omitted.

[0060] In the above-described first embodiment, an example has been described in which the alignment adjustment of the turbine rotor 3a is not performed between disassembly and completion of assembly of the turbine power generation system 1. That is, in the first embodiment, a method for calculating the amount of alignment adjustment of the generator rotor has been described on the premise that the alignment adjustment of the turbine rotor 3a is not performed.

[0061] However, when the turbine power generation system 1 includes two or more turbine rotors, the alignment adjustment is performed sequentially in the axial direction starting from a reference turbine rotor, and the alignment adjustment of the turbine rotor 3a may be performed before the alignment adjustment of the generator rotor 2a. In this embodiment, a method for calculating the alignment adjustment amount of the generator rotor will be described for a case where the alignment adjustment of the turbine rotor 3a is performed before the alignment adjustment of the generator rotor 2a.

[0062] In this embodiment, in the alignment adjustment amount calculation process, the alignment adjustment amount of the generator rotor 2a is calculated based on the measurement results in the centering measurement process, the measurement results in the first relative position measurement process, the measurement results in the second relative position measurement process, and the alignment adjustment amount of the turbine rotor 3a.

[0063] 12 and 13 show the positional relationship of the rotors 2a and 3a when the alignment adjustment of the turbine rotor 3a is further performed from the positional relationship of the rotors 2a and 3a shown in FIG. 4 and FIG. 5. As shown in FIG. 12 and FIG. 13, the position of the turbine rotor 3a after the alignment adjustment can be calculated from the measurement result in the centering measurement process before disassembly of the turbine power generation system 1 and the alignment adjustment amount of the turbine rotor 3a. Therefore, the additional adjustment amounts e1, e2, f1, and f2 of the generator rotor 2a due to the adjustment of the turbine rotor 3a can be calculated. Here, as shown in FIG. 12, the additional adjustment amount e1 is the additional adjustment amount of the generator rotor 2a in the vertical direction at the bearing 2c, and the additional adjustment amount e2 is the additional adjustment amount of the generator rotor 2a in the vertical direction at the bearing 2d. Also, as shown in FIG. 13, the additional adjustment amount f1 is the additional adjustment amount of the generator rotor 2a in the left-right direction at the bearing 2c, and the additional adjustment amount f2 is the additional adjustment amount of the generator rotor 2a in the left-right direction at the bearing 2d. Then, by adding these additional adjustment amounts e1, e2, f1, and f2 to the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a calculated in the first embodiment, it is possible to calculate the alignment adjustment amount of the generator rotor 2a in the case where the alignment adjustment of the turbine rotor 3a has been performed before the alignment adjustment of the generator rotor 2a.

[0064] As described above, according to this embodiment, in the alignment adjustment amount calculation step, the alignment adjustment amount of the generator rotor 2a is calculated based on the measurement results of the centering measurement step, the measurement results of the first relative position measurement step, the measurement results of the second relative position measurement step, and the alignment adjustment amount of the turbine rotor. This makes it possible to improve the calculation accuracy of the alignment adjustment amount of the generator rotor 2a when the alignment adjustment of the turbine rotor 3a has been performed.

[0065] (Third embodiment) Next, a generator rotor alignment adjustment amount calculation method according to the third embodiment will be described with reference to Figs.

[0066] In the third embodiment shown in Fig. 14 and Fig. 15, the first relative position measuring step and the second relative position measuring step are mainly different in that a reflector is placed at a stationary point using a measuring tool having a screw hole formed in a sole plate provided on the foundation around the generator, a base for holding a reflector, and a screw part provided under the base and screwed into the screw hole formed in the sole plate, and a laser tracker is irradiated onto the reflector to measure the position of the stationary point. The other configurations are substantially the same as those of the first embodiment shown in Fig. 1 to Fig. 11. In Fig. 14 and Fig. 15, the same parts as those of the first embodiment shown in Fig. 1 to Fig. 11 are denoted by the same reference numerals, and detailed description thereof will be omitted.

[0067] In this embodiment, as shown in Fig. 14, the stationary points Q1 to Q4 are provided on a sole plate 14 on a foundation 10 around the generator 2. More specifically, the stationary points Q1 to Q4 are provided on screw holes 15 formed in the sole plate 14 provided on the foundation 10 around the generator 2. The sole plate 14 may be provided below the leg plate 8. The screw holes 15 may be formed, for example, in corners of the sole plate 14. The screw holes 15 may be formed in the sole plate 14. The screw holes 15 can be formed by subjecting the sole plate 14 to screw hole processing.

[0068] In the present embodiment, in the first relative position measuring step and the second relative position measuring step, the reflector 9 is disposed at each of the stationary points Q1 to Q4 using a measuring jig 40. As shown in FIG. 15, the measuring jig 40 has a base 41 and a screw portion 43. The base 41 is a portion that holds the reflector 9. The base 41 may have a recess 42, and the reflector 9 may be held by a part of the spherical reflector 9 being inserted into the recess 42. The screw portion 43 is provided on a lower portion of the base 41. The screw portion 43 is adapted to be screwed into a screw hole 15 formed in the sole plate 14. By using such a measuring jig 40, the reflector 9 can be fixed to each of the stationary points Q1 to Q4.

[0069] As described above, according to this embodiment, in the first relative position measurement step and the second relative position measurement step, the reflector 9 is arranged at the stationary points Q1 to Q4 using a measurement jig 40 having a base 41 for holding the reflector 9 and a screw portion 43 provided under the base 41 and screwed into the screw hole 15 formed in the sole plate 14, which is provided on the foundation 10 around the generator 2. This allows the reflector 9 to be firmly fixed to each of the stationary points Q1 to Q4. Therefore, in the first relative position measurement step (before disassembling the turbine power generation system 1) and the second relative position measurement step (after assembling the turbine power generation system 1), it is possible to suppress changes in the positions of the stationary points Q1 to Q4. As a result, it is possible to improve the measurement accuracy of the positions of the stationary points Q1 to Q4, and to improve the calculation accuracy of the alignment adjustment amount of the generator rotor 2a.

[0070] (Fourth embodiment) Next, a generator rotor alignment adjustment amount calculation method according to the fourth embodiment will be described with reference to Figs.

[0071] In the fourth embodiment shown in Fig. 16 and Fig. 17, the first relative position measurement step and the second relative position measurement step are mainly different in that a reflector is placed at a stationary point using a measurement jig having a screw hole formed in a benchmark provided on a foundation around the generator, a base for holding a reflector, and a screw part provided under the base and screwed into the screw hole formed in the benchmark, and a laser tracker is irradiated onto the reflector to measure the position of the stationary point. The other configurations are substantially the same as those of the first embodiment shown in Figs. 1 to 11. In Figs. 16 and 17, the same parts as those of the first embodiment shown in Figs. 1 to 11 are denoted by the same reference numerals, and detailed description thereof will be omitted.

[0072] In this embodiment, as shown in FIG. 16, the stationary points Q1 to Q4 are provided on a benchmark 16 on the foundation 10 around the generator 2. More specifically, the stationary points Q1 to Q4 are provided on screw holes 17 formed in the benchmark 16 provided on the foundation 10 around the generator 2. The benchmark 16 is a fixed point provided in advance on the foundation 10 to measure the amount of change in the vertical direction of the foundation 10 over time. The benchmarks 16 are provided on the left and right sides of the two bearings 2c, 2d of the generator 2. The screw holes 17 may be formed in the center of the benchmark 16. The screw holes 17 can be formed by subjecting the benchmark 16 to a screw hole processing.

[0073] In the present embodiment, in the first relative position measuring step and the second relative position measuring step, the reflector 9 is disposed at each of the stationary points Q1 to Q4 using a measuring jig 50. As shown in FIG. 17, the measuring jig 50 has a base 51 and a screw portion 53. The base 51 is a portion that holds the reflector 9. The base 51 may have a recess 52, and the reflector 9 may be held by a part of the spherical reflector 9 being inserted into the recess 52. The screw portion 53 is provided on a lower portion of the base 51. The screw portion 53 is adapted to be screwed into a screw hole 17 formed in the benchmark 16. By using such a measuring jig 50, the reflector 9 can be fixed to each of the stationary points Q1 to Q4.

[0074] As described above, according to this embodiment, in the first relative position measurement step and the second relative position measurement step, the screw hole 17 is formed in the benchmark 16 provided on the foundation 10 around the generator 2, and the reflector 9 is arranged at the stationary points Q1 to Q4 using the measurement jig 50 having the pedestal 51 for holding the reflector 9 and the screw part 53 provided under the pedestal 51 and screwed into the screw hole 17 formed in the benchmark 16. This allows the reflector 9 to be firmly fixed to each of the stationary points Q1 to Q4. Therefore, in the first relative position measurement step (before disassembling the turbine power generation system 1) and the second relative position measurement step (after assembling the turbine power generation system 1), it is possible to suppress the positions of the stationary points Q1 to Q4 from changing. As a result, it is possible to improve the measurement accuracy of the positions of the stationary points Q1 to Q4, and to improve the calculation accuracy of the alignment adjustment amount of the generator rotor 2a.

[0075] (Fifth embodiment) Next, a generator rotor alignment adjustment amount calculation device according to a fifth embodiment will be described with reference to FIG.

[0076] The fifth embodiment shown in Fig. 18 differs mainly in that the generator rotor alignment adjustment amount calculation device calculates and outputs the generator rotor alignment adjustment amount using the generator rotor alignment adjustment amount calculation method described above. The other configurations are substantially the same as those of the first embodiment shown in Figs. 1 to 11. In Fig. 18, the same parts as those of the first embodiment shown in Figs. 1 to 11 are given the same reference numerals and detailed description thereof will be omitted.

[0077] In this embodiment, a generator rotor alignment adjustment amount calculation device 60 calculates and outputs the alignment adjustment amount of the generator rotor 2a using the generator rotor alignment adjustment amount calculation method explained in the above embodiment. As shown in Fig. 18, the alignment adjustment amount calculation device 60 includes an input unit 61, a calculation unit 62, and an output unit 63.

[0078] The input unit 61 receives the measurement results from the centering measurement process, the measurement results from the first relative position measurement process, and the measurement results from the second relative position measurement process. Also, dimensional information such as the dimension between the coupling 2b and the bearing 2c, the dimension between the bearings 2c and 2d, and the outer diameter dimension of the coupling 2b is input to the input unit 61. Also, position information such as the support positions (alignment adjustment positions) of the bearings 2c and 2d is input to the input unit 61. Also, as described in the second embodiment above, if the alignment adjustment of the turbine rotor 3a has been performed before the alignment adjustment of the generator rotor 2a, the alignment adjustment amount of the turbine rotor 3a is input to the input unit 61.

[0079] The calculation unit 62 calculates the alignment adjustment amount of the generator rotor 2a based on the measurement results of the centering measurement process, the measurement results of the first relative position measurement process, and the measurement results of the second relative position measurement process input to the input unit 61. More specifically, the calculation unit 62 calculates the alignment adjustment amount in the vertical and horizontal directions of the generator rotor 2a at each of the bearings 2c and 2d based on the measurement results of the center difference 5 and the face opening amount 6 between the couplings 2b and 3b before disassembly of the turbine power generation system 1 and the above-mentioned dimensional information. Next, the calculation unit 62 calculates the vertical and horizontal movement amounts c1, c2, d1, and d2 of the generator rotor 2a at each of the bearings 2c and 2d based on the relative movement amounts u1, u2, u3, u4, v1, v2, v3, and v4 of the generator rotor 2a and the above-mentioned position information. Then, by subtracting these movement amounts c1, c2, d1, d2 from the above-mentioned alignment adjustment amounts, the final alignment adjustment amounts a1, a2, b1, b2 in the vertical and horizontal directions of the generator rotor 2a are calculated.

[0080] Furthermore, if the alignment adjustment of the turbine rotor 3a has been performed before the alignment adjustment of the generator rotor 2a, the calculation unit 62 calculates additional adjustment amounts e1, e2, f1, and f2 of the generator rotor 2a due to the adjustment of the turbine rotor 3a, based on the measurement results from the centering measurement process and the alignment adjustment amount of the turbine rotor 3a input to the input unit 61. Then, by adding these additional adjustment amounts e1, e2, f1, and f2 to the alignment adjustment amounts a1, a2, b1, and b2 of the generator rotor 2a described above, the alignment adjustment amount of the generator rotor 2a in the case where the alignment adjustment of the turbine rotor 3a has been performed before the alignment adjustment of the generator rotor 2a is calculated.

[0081] The output unit 63 outputs the alignment adjustment amount of the generator rotor 2a calculated by the calculation unit 62. The output unit 63 may output and display the alignment adjustment amount of the generator rotor 2a on a display device (not shown). The output unit 63 may also output and display schematic diagrams showing the positional relationship of the rotors 2a, 3a as shown in Figures 4, 5, 12, and 13 on the display device.

[0082] As described above, according to this embodiment, the generator rotor alignment adjustment amount calculation device 60 calculates and outputs the alignment adjustment amount of the generator rotor 2a using the generator rotor alignment adjustment amount calculation method explained in the above embodiment. By using the alignment adjustment amount calculation device 60 in this manner, the alignment adjustment amount of the generator rotor 2a can be automatically calculated and output. This makes it possible to easily calculate the alignment adjustment amount of the generator rotor 2a.

[0083] According to the embodiment described above, it is possible to eliminate the need for centering measurement for adjusting the alignment of the generator rotor after assembly of the turbine power generation system.

[0084] Although several embodiments of the present invention have been described above, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their modifications are included in the scope and gist of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0085] 1: turbine power generation system, 2: generator, 2a: generator rotor, 2b: coupling, 3: turbine, 3a: turbine rotor, 3b: coupling, 5: center offset, 6: face opening amount, 9: reflector, 10: foundation, 11: hole, 13: screw hole, 20: measuring jig, 21: base, 23: screw portion, 30: measuring jig, 31: base, 33: fixing mechanism, 40: measuring jig, 41: base, 43: screw portion, 50: measuring jig, 51: base, 53: screw portion, 60: alignment adjustment amount calculation device, 61: input unit, 62: calculation unit, 63: output unit, P1 to P8: evaluation points, Q1 to Q4: stationary points

Claims

1. 1. A method for calculating an alignment adjustment amount of a generator rotor in a turbine power generation system in which a generator rotor of a generator and a turbine rotor of a turbine are connected via respective couplings, the method comprising: a centering measurement step of performing a centering measurement to measure a centering difference and a face opening amount between the couplings before disassembling the turbine power generation system; a first relative position measuring step of measuring a relative position of an evaluation point on the generator with respect to a stationary point by a three-dimensional measuring device before disassembling the turbine power generation system; a second relative position measuring step of measuring a relative position of the evaluation point with respect to the stationary point by the three-dimensional measuring device after assembling the disassembled turbine power generation system; an alignment adjustment amount calculation process for calculating an alignment adjustment amount of the generator rotor based on the measurement results in the centering measurement process, the measurement results in the first relative position measurement process, and the measurement results in the second relative position measurement process.

2. 2. The generator rotor alignment adjustment amount calculation method according to claim 1, wherein, in the alignment adjustment amount calculation step, a relative movement amount of the generator rotor with respect to the stationary point is calculated based on the measurement results in the first relative position measurement step and the measurement results in the second relative position measurement step, and an alignment adjustment amount of the generator rotor is calculated based on the measurement results in the centering measurement step and the relative movement amount of the generator rotor.

3. In the first relative position measuring step and the second relative position measuring step, the two evaluation points are provided at the same position in the axial direction of the generator rotor, 3. The generator rotor alignment adjustment amount calculation method according to claim 2, wherein in the alignment adjustment amount calculation process, the relative movement amount of the generator rotor with respect to the stationary point is calculated from an average value of the relative movement amounts of two evaluation points located at the same position in the axial direction.

4. 2. The generator rotor alignment adjustment amount calculation method according to claim 1, wherein in the alignment adjustment amount calculation step, an alignment adjustment amount of the generator rotor is calculated based on a measurement result in the centering measurement step, a measurement result in the first relative position measurement step, a measurement result in the second relative position measurement step, and an alignment adjustment amount of the turbine rotor.

5. 2. The generator rotor alignment adjustment amount calculation method according to claim 1, wherein in the first relative position measurement step and the second relative position measurement step, the three-dimensional measurement device is a laser tracker that measures the position of the reflector by irradiating a laser beam onto the reflector, and the reflector is placed at the evaluation point using a measurement jig having a base that holds the reflector and a screw portion that is provided on a lower part of the base and screws into a screw hole provided in the generator, and the position of the evaluation point is measured by irradiating the reflector with a laser beam by the laser tracker.

6. 2. The generator rotor alignment adjustment amount calculation method according to claim 1, wherein, in the first relative position measurement step and the second relative position measurement step, the three-dimensional measurement device is a laser tracker that measures the position of the reflector by irradiating a laser beam onto the reflector, and the reflector is placed at the stationary point using a measurement jig having a base that holds the reflector and a fixing mechanism that is provided under the base and is fixed into a hole provided in a foundation around the generator, and the position of the stationary point is measured by irradiating the reflector with a laser beam by the laser tracker.

7. 2. The generator rotor alignment adjustment amount calculation method according to claim 1, wherein, in the first relative position measurement step and the second relative position measurement step, the three-dimensional measuring device is a laser tracker that measures the position of the reflector by irradiating a laser beam onto the reflector, and the reflector is placed at the stationary point using a measuring jig having a screw hole formed in a sole plate provided on a foundation around the generator, a base that holds the reflector, and a screw portion that is provided on a lower part of the base and screws into the screw hole formed in the sole plate, and the position of the stationary point is measured by irradiating a laser beam onto the reflector using the laser tracker.

8. 2. The generator rotor alignment adjustment amount calculation method according to claim 1, wherein, in the first relative position measurement step and the second relative position measurement step, the three-dimensional measurement device is a laser tracker that measures the position of the reflector by irradiating a laser beam onto the reflector, and the reflector is positioned at the stationary point using a measurement jig having a base for holding the reflector and a screw portion that is provided on a lower part of the base and screws into the screw hole formed in the benchmark, and the reflector is irradiated with a laser beam by the laser tracker to measure the position of the stationary point.

9. 9. A generator rotor alignment adjustment amount calculation device that calculates and outputs an alignment adjustment amount of the generator rotor by using the generator rotor alignment adjustment amount calculation method according to any one of claims 1 to 8, comprising: an input unit to which a measurement result from the centering measurement step, a measurement result from the first relative position measurement step, and a measurement result from the second relative position measurement step are input; a calculation unit that calculates an alignment adjustment amount of the generator rotor based on the measurement results of the centering measurement process, the measurement results of the first relative position measurement process, and the measurement results of the second relative position measurement process, which are input to the input unit; and an output unit that outputs the alignment adjustment amount of the generator rotor calculated by the calculation unit.

Citation Information

Patent Citations

  • Method of adjusting alignment of body of revolution

    JP1979089104A

  • Alignment method of tandem connection multiple spindle rotary system

    JP1995109901A

  • Device and method for rotor alignment measuring assessment

    JP2010159673A

  • Alignment adjusting method in rotary shaft system and alignment measuring device

    JP2015137629A

  • Three-dimensional measuring tool

    JP2017120220A