Construction support system and construction support method of foundation pile

The foundation pile construction support system uses RiDAR to calculate and correct pile core data, ensuring accurate alignment and inclination of multiple piles within tolerance ranges.

JP2024161939AActive Publication Date: 2024-11-21KINSOKU CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023077014
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-09
Publication Date
2024-11-21
Estimated Expiration
2043-05-09

AI Technical Summary

Technical Problem

Existing methods fail to accurately adjust the inclination and alignment of multiple piles during construction, leading to deviations beyond permissible ranges, which complicates the alignment of multiple piles driven simultaneously.

Method used

A foundation pile construction support system utilizing RiDAR to scan measurement light intersecting pile cores, calculating actual pile core data from three-dimensional point cloud data, and generating correction information to align piles within allowable ranges using terminal devices.

Benefits of technology

The system effectively suppresses deviations between actual and designed pile cores, reducing alignment errors and ensuring piles are positioned and inclined within specified tolerances.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024161939000001_ABST
    Figure 2024161939000001_ABST
Patent Text Reader

Abstract

To provide a construction support system of a foundation pile that can keep an alignment error of a plurality of piles within an allowable range while keeping a deviation between an actual pile core and a designed pile core of each pile within an allowable range, when driving the piles simultaneously.SOLUTION: A construction support system of a foundation pile comprises: a RiDAR that measures distances by scanning measurement light in a direction intersecting a pile core of each pile held by each of a plurality of pile drivers and driven into the ground; an actual pile core data calculation section that calculates pile core data for each pile based on three-dimensional point cloud data of each pile obtained by the RiDAR; a correction information calculation section that calculates correction information for each pile based on actual pile core data and design pile core data of each pile calculated by the actual pile core data calculation section so that the actual pile core data of each pile converges within an allowable range of each design pile core data and the alignment error in plan view of each pile converges within a specified allowable range; and a plurality of terminal devices that individually displays the correction information for each pile calculated by the correction information calculation section.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction support system and a construction support method for foundation piles. [Background technology]

[0002] Patent Document 1 proposes a position measurement method that can measure the position of a predetermined point that has a predetermined positional relationship with respect to the contour of a measurement object in real time using a measurement device that is simpler than a total station.

[0003] The position measurement method is a position measurement method for measuring the position of a specific point that has a specific positional relationship with the contour of a measured object, and includes an information acquisition step of acquiring position information of a plurality of measurement points on the surface of the measured object by scanning distance measuring light on the surface of the measured object using an optical scanning distance measuring device, and an estimation step of estimating the position of the specific point based on the position information of the plurality of measurement points acquired in the information acquisition step.

[0004] The object to be measured is a cylinder, the predetermined point is a point on the central axis of the cylinder, and in the estimation step, an equation of a circle that approximates the positions of the multiple measurement points is found using the least squares method or the maximum likelihood method, and the position of the point on the central axis is estimated based on the equation of the circle that is found. By using this position measurement method, for example, the driving position of a pile can be confirmed in real time. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2011-257151 A Summary of the Invention [Problem to be solved by the invention]

[0006] By using the above-described position measurement method, it becomes possible to adjust the position of the pile core while checking the movement trajectory of the pile core of the pile driven by the pile driver and the target position.

[0007] However, at construction sites, multiple piles are often driven in an array along a specified direction. Although it is possible to adjust the posture of the pile driver when driving the pile so that the deviation between the actual pile core position estimated at the measured height for each pile falls within a specified tolerance range, there is still room for further improvement in that it is not possible to measure the inclination of the pile core, and therefore it is not possible to adjust the inclination of the pile core so that it falls within the tolerance range, and it is not possible to adjust the alignment error of multiple piles.

[0008] In consideration of the above-mentioned conventional problems, the object of the present invention is to provide a foundation pile construction support system and construction support method that, when driving multiple piles simultaneously, can keep the deviation between the actual pile core and the designed pile core of each pile within an acceptable range, while keeping the arrangement error of multiple piles within an acceptable range. [Means for solving the problem]

[0009] In order to achieve the above-mentioned object, a first characteristic configuration of the foundation pile construction support system according to the present invention is that it comprises a RiDAR that measures distances by scanning measurement light in a direction intersecting the pile core of each pile held by each of a plurality of pile drivers and driven into the ground, an actual pile core data calculation unit that calculates pile core data for each pile based on the three-dimensional point cloud data of each pile obtained by the RiDAR, a correction information calculation unit that calculates correction information for each pile based on the actual pile core data and design pile core data of each pile calculated by the actual pile core data calculation unit so that the actual pile core data of each pile converges within the allowable range of each design pile core data and the planar view arrangement error of each pile converges within a predetermined allowable range, and a plurality of terminal devices that individually display the correction information for each pile calculated by the correction information calculation unit.

[0010] The RiDAR scans each pile held by each of the pile drivers and driven into the ground in a direction intersecting with the pile core of each pile, and the RiDAR detects the reflected light, thereby obtaining 3D point cloud data showing the surface shape of each pile. The actual pile core data calculation unit obtains pile core data for each pile from the 3D point cloud data of each pile, and the correction information calculation unit calculates correction information for each pile so that the actual pile core data of each pile converges to the allowable range of each design pile core data and the arrangement error in plan view of each pile converges to a predetermined allowable range, and the correction information for each pile is displayed individually on multiple terminal devices. The operator of each pile driver adjusts the pile core of the pile driven by the pile driver based on the correction information displayed on the terminal device, so that the piles are arranged so that the arrangement error in plan view of each pile converges to a predetermined allowable range, even without information on other piles.

[0011] The second characteristic configuration is, in addition to the first characteristic configuration described above, that the three-dimensional point cloud data includes at least two sets of three-dimensional point cloud data having different heights along the pile core direction of each pile, and the actual pile core data calculation unit determines the pile core position and pile core posture of each pile based on the two sets of point cloud data.

[0012] The pile core position and pile core attitude, i.e., inclination, of each pile are determined based on at least two sets of 3D point cloud data having different heights along the pile core direction of each pile, and the pile core position and pile core attitude of each pile are adjusted.

[0013] The third characteristic configuration is that, in addition to the first or second characteristic configuration described above, the terminal device displays a correction guide image indicating the amount of correction and the direction of correction for the corresponding pile body based on the correction information calculated by the correction information calculation unit.

[0014] By operating the pile driver based on the correction guide image displayed on the terminal device, which indicates the amount of correction and the direction of correction, the position and attitude of each pile, as well as the arrangement of each pile, can be easily adjusted so that they fall within the allowable range.

[0015] The characteristic configuration of the foundation pile construction support method of the present invention is that it comprises a measurement process in which RiDAR is used to scan measurement light in a direction intersecting the pile core of each pile held by each of a plurality of pile drivers and driven into the ground to measure distance; an actual pile core data calculation process in which the pile core position and pile core attitude of each pile are determined based on the three-dimensional point cloud data of each pile obtained in the measurement process; a correction information calculation process in which correction information for each pile is calculated based on the actual pile core data and design pile core data of each pile determined in the actual pile core data calculation process so that the actual pile core data of each pile converges within the allowable range of each design pile core data and the arrangement error in the planar view of each pile converges within a predetermined allowable range; and a display process in which the correction information for each pile calculated in the correction information calculation process is individually displayed using a plurality of terminal devices.

[0016] The second characteristic configuration, in addition to the first characteristic configuration described above, is that the three-dimensional point cloud data includes at least two sets of three-dimensional point cloud data having different heights along the pile core direction of each pile, and the actual pile core data calculation process determines the pile core position and pile core posture of each pile based on the two sets of point cloud data.

[0017] The third characteristic configuration is that, in addition to the first or second characteristic configuration described above, the display process displays on each terminal device a correction guide image indicating the amount and direction of correction for the corresponding pile body based on the correction information calculated by the correction information calculation unit. Effect of the Invention

[0018] As described above, according to the present invention, it is possible to provide a foundation pile construction support system and construction support method that, when driving multiple piles simultaneously, can keep the deviation between the actual pile core and the designed pile core of each pile within an acceptable range, while keeping the arrangement error of multiple piles within an acceptable range. [Brief description of the drawings]

[0019] [Figure 1] Diagram of the pile driver and foundation pile construction support system [Diagram 2]Functional block diagram of foundation pile construction support system [Diagram 3] (a) is an explanatory diagram of the calculation principle of the actual pile center and inclination angle from 3D point cloud data, and (b) is an explanatory diagram of the correction guide image when providing construction support for a single pile. [Figure 4] (a) is an explanatory diagram of the design pile core positions of multiple foundation piles and their tolerance range, (b) is an explanatory diagram of the relationship between the design pile core positions and the actual pile core positions before the pile core adjustment, (c) is an explanatory diagram of a state in which the actual pile core positions are within the tolerance range, but the planar arrangement of each actual pile core deviates from the tolerance range, and (d) is an explanatory diagram of a state in which the actual pile core positions are within the tolerance range and the planar arrangement of each actual pile core is within the tolerance range. [Diagram 5] 1A to 1C are explanatory diagrams of correction guide images displayed on the terminal device of each pile driver 1. [Figure 6] Flowchart showing the steps of the foundation pile construction support method DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Hereinafter, one embodiment of a foundation pile construction support system and a construction support method will be described with reference to the drawings. [Pile driving site configuration] As shown in Fig. 1, a plurality of pile drivers 1 are arranged at predetermined positions at a construction site, and each pile driver 1 holds a foundation pile 2 (hereinafter, simply referred to as "pile 2") to be driven into the ground. A RiDAR 10 is installed that is held by each pile driver 1 and scans a measurement light in a direction intersecting the pile core of each pile 2 to measure distance, and a foundation pile construction support device 20 (hereinafter, simply referred to as "construction support device 20") connected to RiDAR 10 so as to be able to communicate with it is installed near RiDAR 10.

[0021] The RiDAR 10 and the construction support device 20 are communicatively connected via a wireless communication interface such as Bluetooth (registered trademark), and the construction support device 20, the terminal device 30 provided in each pile driver 1, and the construction management server 40 are connected to the Internet 5 via a wireless communication interface such as Wi-Fi. The construction support device 20 and the terminal device 30 are configured as tablet computers.

[0022] [Configuration of the pile driver] The pile driver 1 includes a swivel base 1b equipped with a crawler running device 1a, a leader 1d supported in an upright position in front of a driver's seat 1c provided on the swivel base 1b, and a pair of left and right cylinder mechanisms 1e for adjusting the upright position of the leader 1d.

[0023] When drilling holes, a motor that rotatably supports the drilling auger is suspended by a wire on the leader 1d, and the auger, driven to rotate by the motor, is lowered along the leader 1d from above the designed pile core position to be drilled, thereby drilling holes for pile driving.

[0024] Once the drilling is completed, a pile holding mechanism 3 is attached to the leader 1d, and a pile 2 such as an RC pile or a centrifugal prestressed concrete pile (PC pile) is held by the pile holding mechanism 3 and driven into the hole excavated by the auger.

[0025] While the operator in the driver's seat 1c visually checks the correction guidance display on the terminal device 30, he or she operates multiple control sticks to extend and retract the left and right cylinder mechanisms 1e to adjust the posture of the leader 1d, thereby adjusting the driving position and posture of the pile during pile driving to the design values.

[0026] As an example, the diameter of the pile 2 is 600 to 800 mm, and the diameter of the auger shaft and the diameter of the screw blade are set so that the diameter of the hole drilled by the auger is approximately 200 mm larger than the diameter of the pile 2. In other words, the diameter of the hole drilled by the auger is set to a value sufficiently larger than the diameter of the pile to be driven into the hole, making it possible to adjust the driving position and posture of the pile 2.

[0027] [Foundation pile construction support system] As shown in FIG. 2, the foundation pile construction support system includes RiDAR 10, a construction support device 20, a plurality of terminal devices 30, a construction management server 40, and the like.

[0028] The construction management server 40 is provided with a database DB in which design data 40a such as the designed pile core position is stored in advance. The database DB cumulatively stores construction management data 40b supported by the construction support device 20. The construction management data 40b includes the history of the pile posture measured during pile driving support, that is, the driving depth of the pile 2 and the history of the position of the actual shaft core of the pile 2 at that time (including the deviation from the designed pile core position), the maximum pile tip depth, and further the arrangement accuracy of the pile cores of multiple adjacent piles 2 in a plan view.

[0029] RiDAR10 is a rotary scanning distance measuring device that scans a measurement space two-dimensionally by scanning a near-infrared laser beam in one direction along a planar scanning surface while swinging the scanning surface up and down in units of a specified angle. The distance to the object is calculated based on the time difference between the emission of the laser beam and the receiving axis of the reflected light from the object, and the propagation speed of the light.

[0030] The RiDAR 10 acquires its own coordinates based on the measurement results of a reference object whose position in the reference coordinate system is known in advance. Therefore, based on the distance and direction to the object detected by the RiDAR 10, 3D point cloud data that is a distance image of the object in the reference coordinate system is obtained. The reference coordinate system may be either an absolute coordinate system or a relative coordinate system in the construction site.

[0031] As shown in Figure 1, for multiple piles 2 driven into the ground by multiple pile drivers 1, the RiDAR 10 scans measurement light along two scanning lines D1 and D2 in the vertical direction, thereby obtaining point cloud data for each pile 2 located on the scanning lines D1 and D2.

[0032] 2, the construction support device 20 includes the following functional blocks: a three-dimensional point cloud data acquisition unit 20a, an actual pile core data calculation unit 20b, a design pile core data acquisition unit 20c, a correction information calculation unit 20d, a corrected guide image generation unit 20e, a corrected guide image transmission unit 20f, and a storage unit 20g. These functional blocks are realized by executing the construction support program stored in the storage unit 20g by a CPU provided in the tablet computer.

[0033] The three-dimensional point cloud data acquisition unit 20a controls the RiDAR 10 to extract three-dimensional point cloud data for each pile 2 from the three-dimensional point cloud data obtained by reflected light from various objects at the construction site.

[0034] The actual pile core data calculation unit 20b calculates actual pile core data for each pile 2 from the three-dimensional point cloud data for each pile 2. The designed pile core data acquisition unit 20c acquires the designed pile core data of each pile 2 from the construction management server 40. The correction information calculation unit 20d compares the actual pile core data and the designed pile core data of each pile 2, and calculates correction information for each pile 2 so that each pile 2 falls within the allowable range of the designed pile core data.

[0035] The correction guide image generating unit 20e generates a correction guide image for each pile 2 based on the correction information calculated by the correction information calculating unit 20d, and the correction guide image transmitting unit 20f transmits the correction guide image to the terminal device 30 provided in each pile driver 1. The correction guide image display processing unit 30a provided in the terminal device 30 displays the correction guide image 30A on the display screen.

[0036] FIG. 3(a) shows an example of an algorithm executed by the real pile core data calculation unit 20b to calculate the real pile core position and the inclination of the real pile core, which are examples of real pile core data. (1) Point cloud data representing the surface of the pile 2, scanned up and down along the pile core P by the LiDAR 10, is shown by multiple black dots. From the 3D point cloud data (distance data between the LiDAR 10 and the surface of the pile 2) obtained by optically scanning the scanning line D1 in the first direction that intersects with the pile core P of the pile 2, the straight line L1 with the shortest distance and the point S1 on the surface of the pile at that point are obtained. At this time, the pile core P is located on the straight line L1. (2) From the point cloud data (distance data between the LiDAR 10 and the surface of the pile 2) obtained by optically scanning the second direction scanning line D2 (lower along the pile core P than the first direction scanning line D1) that intersects with the axis of the pile, the straight line L2 with the shortest distance and the point S2 on the surface of the pile 2 at that time are obtained. The second direction scanning line D2 is in a direction that is tilted at a predetermined angle φ toward the pile core P of the pile 2 with respect to the first direction D1. At this time, the pile core P exists on the straight line L2. (3) The line segment L3 connecting points S1 and S2 is determined as a line segment parallel to the pile core P. (4) On a plane formed by straight lines L1 and L3, a straight line L4 is obtained that is perpendicular to line segment L3 and passes through point S1, and the coordinate PO1 on straight line L4 that reaches the radius R (known) of the pile from point S1 is the point on the pile core P obtained in response to scanning of the scanning line D1 in the first direction. (5) On the plane formed by the straight lines L2 and L3, a straight line L5 that is perpendicular to the line segment L3 and passes through point S2 is obtained, and the coordinate PO2 on the straight line L5 that reaches the radius R (known) of the pile from point S2 is the point on the pile core P obtained in response to the scanning of the scanning line D2 in the second direction. (6) The line segment passing through PO1 and O2 is determined as pile core P, and the inclination of the actual pile core is determined. Then, the position of pile core P at a predetermined height in the driving direction of pile 2 is determined as the actual pile core position. The deviation (position and inclination) of the actual pile core from the design value is obtained. Note that the "predetermined height" is not a specific fixed height, but an arbitrary height that is set as a reference for adjusting the driving position of the pile 2 to the design position by operating the pile driver 1.

[0037] For each pile 2 held by multiple pile drivers 1, based on the 3D point cloud data obtained when scanning in a first direction D1 and a second direction D2 by LiDAR 10, the upper and lower actual pile core positions corresponding to the upper and lower scanning lines along which laser light is irradiated onto each pile 2 and the inclination of the actual pile core connecting them are obtained.

[0038] In the example shown in Fig. 3(a), the 3D point cloud data is constructed from distance data based on the LiDAR 10, but since the position of the LiDAR 10 in the reference coordinate system is known, the 3D point cloud data of each pillar may be point sequence data of (x, y, z) in the reference coordinate system. Note that the method for determining the pile core P of the pile 2 from the 3D point cloud data is not particularly limited, and any known algorithm may be used as appropriate.

[0039] 3(b) illustrates a correction guide image 30A that is generated by the correction guide image generating unit 20e based on the correction information calculated by the correction information calculating unit 20d and is displayed on the terminal device 30. The correction guide image 30A is an image that guides the correction direction and amount so that the target pile 2 falls within an allowable range for the design value. The operator visually checks the correction guide image 30A displayed on the terminal device 30 and operates the control stick of the pile driver 1 to adjust the attitude of the leader 1d, thereby adjusting the attitude of the pile 2.

[0040] On the right side of the correction guide image 30A, double concentric circles C1 and C2 are shown with the design pile core at the center, in the directions indicating east-west-north-south. The smaller circle C2 indicates the allowable range of deviation of the actual pile core from the design pile core, and the larger circle C1 indicates the unacceptable range. Two hatched small circles are shown between the larger circle C1 and the smaller circle C2. One of the small circles indicates the upper actual pile core position P1 along the pile core, and the other indicates the lower actual pile core position P2.

[0041] The upper left corner of the correction guide image 30A shows the distance required to move the actual pile core position P2 to the design pile core based on the coordinates of the actual pile core position P2 below. For example, it shows that if the actual pile core position P2 is moved ** mm toward the north and ** mm toward the west, the actual pile core position P2 will move to the design pile core, and it shows that if the actual pile core position P2 enters the small diameter circle C2, it will fall within the allowable range.

[0042] Furthermore, the lower left part of the correction guide image 30A shows the inclination angle in the north-south direction and the inclination angle in the east-west direction, which are calculated from the coordinates of the upper and lower real pile core positions P1 and P2. It shows that when these inclination angles are adjusted to 0°, the real pile core positions P1 and P2 overlap and assume a vertical position.

[0043] The operator visually checks the correction guide image 30A displayed on the terminal device 30 and operates the cylinder mechanism 1e, which is a posture adjustment device for the survey object, so that the pile core coincides with the design pile core. Measurement by the RiDAR 10 and generation of the correction guide image 30A are repeated at a predetermined cycle, allowing the operator to perform appropriate pile driving operations based on the latest correction guide image 30A.

[0044] The memory unit 20g functions as a history management device, and is operated by the operator to store the deviation and inclination attitude of the actual pile core from the designed pile core of the pile 2 reflected in the correction guide image 30A as history information associated with the positioning depth of the pile. The positioning depth of the pile is managed by transmitting the descent amount of the pile 2 driven along the leader 1d from the pile driver 1 to the construction support device 20 via the terminal device 30. If the history information is uploaded from the construction support device 20 to the construction management server 40 after the work is completed, the work history and the installation accuracy of the pile can be managed as history data.

[0045] The above explanation has been about construction support when driving each pile individually, but with the construction support system of the present invention, when multiple piles 2 are driven simultaneously, construction support is provided so that the pile core of each pile 2 falls within the tolerance range with respect to the designed pile core and so that the linear arrangement error in the plan view of each pile 2 is reduced.

[0046] FIG. 4(a) shows the design pile core Pd (shown by a dashed line) for three piles 2d (shown by a dashed line) to be driven into the construction site, and the allowable range T shown by a circle centered on the design pile core Pd. In addition, the allowable tilt range ±Δθ of the tilt angle θr of each of the three piles 2d relative to the reference line L on which the design pile core Pd is located in a plan view is shown. The allowable tilt range ±Δθ is also the allowable range of the tilt angle θr relative to the reference line L of the approximated line La obtained from the actual pile cores Pr of the three piles 2. Furthermore, the allowable distance range ±ΔD (see FIG. 4(c)) for the distance Dr from the approximated line La to the actual pile core Pr of each pile 2 is determined. The approximated line La is obtained by the least squares method using the x and y coordinates at a specified height of each actual pile core Pr. It is preferable to set the height on the scanning line D2 by the RiDAR10 as the specified height. It is sufficient that there is at least consistency with the corrected guide image 30A.

[0047] It is required that the actual pile core Pr of each pile 2 falls within the allowable range T, the approximate straight line La of each actual pile core Pr in a planar view falls within the allowable inclination range Δθ relative to the reference straight line L, and the distance Lr from the approximate straight line La to each actual pile core Pr falls within the allowable distance range ΔD.

[0048] Figure 4(b) shows the positions of three piles 2 (shown by solid lines) driven by the pile driver 1 and the actual pile core Pr at a certain point in time, with respect to the above-mentioned design values. The left end shows the pile 2 corresponding to the pile driver 1 at the left end of Figure 1, the center shows the pile 2 corresponding to the pile driver 1 at the center of Figure 1, and the right end shows the pile 2 corresponding to the pile driver 1 at the right end of Figure 1. FIG. 4(c) shows an example in which the position and posture of each pile 2 is adjusted based on the corrected guide image 3A already described in FIG. 3(b), and each actual pile core Pr is adjusted to its respective allowable range T.

[0049] However, in Figure 4(c), the angle θr between the approximate straight line La of each actual pile core Pr in a planar view and the reference straight line L deviates from the permissible inclination range Δθ, and the distance Lr between the actual pile core Pr of the central pile 2 and the approximate straight line La deviates from the permissible distance range ΔD.

[0050] Therefore, the correction information calculation unit 20d calculates correction information for each pile 2 so that the actual pile core data of each pile 2 converges within the allowable range of each designed pile core data, as shown in Figure 4(d), and the correction guide image generation unit 20e is configured to generate a correction guide image for each pile 2 calculated by the correction information calculation unit 20d, so that the arrangement error in plan view of each pile 2 converges within a predetermined allowable range.

[0051] Figure 5(a) shows a correction guide image 30A displayed on the terminal device 30 provided on the pile driver 1 at the left end of Figure 1, Figure 5(b) shows a correction guide image 30A displayed on the terminal device 30 provided on the pile driver 1 at the center of Figure 1, and Figure 5(c) shows a correction guide image 30A displayed on the terminal device 30 provided on the pile driver 1 at the right end of Figure 1.

[0052] In addition to the allowable range C2 of deviation of the actual pile core, these correction guide images 30A also display an operation guide circle C3 superimposed on the allowable range C2 of deviation of the actual pile core, for converging the arrangement error in the planar view of each pile 2 within a predetermined allowable inclination range Δθ and ΔD.

[0053] The correction information calculation unit 20d compares the real pile core data of each pile 2 calculated by the real pile core data calculation unit 20b with the design pile core data acquired by the design pile core data acquisition unit 20c, and calculates the shortest movement distance toward the design pile core so that each real pile core falls within the allowable range C2 of deviation of the real pile core. The correction information calculation unit 20d calculates an approximation line based on the position when each real pile core moves by the movement distance, and judges whether the slope of the approximation curve falls within the allowable slope range Δθ and whether the distance between each real pile core and the approximation line falls within ΔD.

[0054] When the inclination of the approximation curve falls within the allowable inclination range Δθ and the distance between each actual pile core and the approximation line falls within ΔD, the corrected guide image generating unit 20e generates a corrected guide image 30A for each of them.

[0055] If either the slope of the approximation curve or the distance between each actual pile core and the approximation straight line deviates from the allowable range, the movement position of the actual pile core position when each actual pile core is moved a specified pitch toward the design pile core is calculated, and the calculated movement positions of the actual pile core positions of each pile 2 are combined to obtain an approximation curve for each, and a combination is identified in which the slope of the approximation curve falls within the allowable slope range Δθ and the distance between each actual pile core and the approximation straight line falls within ΔD.

[0056] The largest circle centered on the design pile core and including the moving positions of each actual pile core position included in the identified combination is displayed superimposed on the allowable range C2 of the deviation of the actual pile core as an operation guide circle C3 for converging the planar alignment error of each pile 2 within the specified allowable tilt ranges Δθ and ΔD.

[0057] By displaying a correction proposal image corresponding to each terminal device 30, it is possible to guide the actual pile core Pr of each pile 2 to fall within the allowable range T, the approximate straight line La of each actual pile core Pr in a planar view to fall within the allowable inclination range Δθ with respect to the reference straight line L, and the distance Lr from the approximate straight line La to each actual pile core Pr to fall within the allowable distance range ΔD.

[0058] The terminal device 30 installed in each pile driver 1 is equipped with a position acquisition function using a satellite such as GPS, and the position of each terminal device 30 is grasped by communication between each terminal device 30 and the construction support device 20. Then, the terminal device 30 closest to the actual pile core of each pile 2 calculated by the actual pile core data calculation unit 20b is specified. Therefore, the corrected guide image transmission unit 20f is configured to transmit the corrected guide image generated by the corrected guide image generation unit 20e to the terminal device 30 corresponding to each pile 2.

[0059] [Support method for foundation pile construction] The foundation pile construction support method according to the present invention is executed by the above-mentioned foundation pile construction support system, and the procedure is shown in FIG. When the pile driving support application installed in the construction support device 20 is launched (SA1), a design file of a construction target is downloaded from the construction management server 40 (SA2).

[0060] Next, the construction support device 20 starts up RiDAR 10 to perform initial settings (SA3) and sets the ID of the terminal device 30 (SA4). When pile driving is started by the multiple pile drivers 1, the construction site is measured by remotely operating RiDAR 10 (SA5), and 3D point cloud data is obtained from RiDAR 10 (SA6).

[0061] The construction support device 20 extracts three-dimensional point cloud data corresponding to each pile from the acquired three-dimensional point cloud data (SA6), and calculates the actual pile core position and actual pile core inclination angle, which are actual pile core data, from the three-dimensional point cloud data (SA7, SA8).

[0062] The construction support device 20 calculates correction information for the real pile core of each pile based on the real pile core position, the real pile core inclination angle, and the design axis (SA9), and further evaluates the arrangement situation of the multiple piles to calculate a correction value such that the real pile core Pr of each pile 2 falls within the allowable range T, the approximation straight line La of each real pile core Pr in a planar view falls within the allowable inclination range Δθ with respect to the reference straight line L, and the distance Lr from the approximation straight line La to each real pile core Pr falls within the allowable distance range ΔD (SA10), generates a corrected guide image based on the correction value (SA11), and outputs the corrected guide image to each terminal device 30 (SA12).

[0063] The operator of the pile driver 1 visually checks the correction guide image displayed on each terminal device 30 and operates the pile driver 1, and the processing from step SA5 to step SA12 is repeated until each pile 2 falls within a specified tolerance range (SA13, N).

[0064] When each pile 2 falls within a predetermined allowable range (SA13, Y), the correction history for each pile 2 is stored in the memory unit 20g, and the correction history is uploaded to the construction management server 40 (SA15).

[0065] In other words, the construction support method for foundation piles includes a measurement process in which RiDAR is used to scan measurement light in a direction intersecting the pile core of each pile held by each of a plurality of pile drivers and driven into the ground to measure distance; an actual pile core data calculation process in which pile core data for each pile is obtained based on the three-dimensional point cloud data of each pile obtained in the measurement process; a correction information calculation process in which correction information for each pile is calculated based on the actual pile core data and design pile core data of each pile calculated in the actual pile core data calculation process so that the actual pile core data of each pile converges within the allowable range of each design pile core data and the arrangement error in a planar view of each pile converges within a predetermined allowable range; and a display process in which the correction information for each pile calculated in the correction information calculation process is individually displayed using a plurality of terminal devices.

[0066] In addition, the three-dimensional point cloud data includes at least two sets of three-dimensional point cloud data having different heights along the pile core direction of each pile, and the actual pile core data calculation process determines the pile core position and pile core posture of each pile based on the two sets of point cloud data.

[0067] Furthermore, the display step includes displaying, on each terminal device, a correction guide image indicating the amount and direction of correction for the corresponding pile body, based on the correction information calculated by the correction information calculation unit.

[0068] In the above-described embodiment, an example was described in which three pile drivers were used to drive three piles simultaneously, but the number of piles driven simultaneously is not particularly limited, and the present invention can also be applied to cases in which four or more piles are driven simultaneously.

[0069] Each of the above-described embodiments is merely one aspect of the present invention, and the technical scope of the present invention is not limited by the description. It goes without saying that the specific configuration of each part can be appropriately modified and designed within the scope of the effect of the present invention. [Explanation of symbols]

[0070] 1: Pile driver 1d: Leader 2:Pile 10: RiDAR 20: Construction support equipment 20a: 3D point cloud data acquisition section 20b: Actual pile core data calculation section 20c: Design axis data acquisition part 20d: Correction information calculation unit 20e: Correction guide image generation unit 20f: Correction guide image transmission device 20g: Storage part 30: Terminal equipment 30a: Guidance image display processing unit 30A: Correction guide image 40: Construction management server

Claims

1. A foundation pile construction support system, A RiDAR that scans each pile held by each of a plurality of pile drivers and driven into the ground with a measurement light in a direction intersecting the pile core of each pile to measure the distance; An actual pile core data calculation unit that calculates pile core data for each pile based on the three-dimensional point cloud data of each pile obtained by the RiDAR; A correction information calculation unit that calculates correction information for each pile based on the actual pile core data and the design pile core data of each pile obtained by the actual pile core data calculation unit so that the actual pile core data of each pile converges within the allowable range of each design pile core data and the arrangement error of each pile in plan view converges within a predetermined allowable range; A plurality of terminal devices that individually display the correction information for each pile calculated by the correction information calculation unit; A foundation pile construction support system that is equipped with the following:

2. The three-dimensional point cloud data includes at least two sets of three-dimensional point cloud data having different heights along the pile core direction of each pile, and the actual pile core data calculation unit determines the pile core position and pile core attitude of each pile based on the two sets of point cloud data.

3. The foundation pile construction support system of claim 1 or 2, wherein the terminal device displays a correction guide image indicating the amount of correction and the direction of correction for the corresponding pile body based on the correction information calculated by the correction information calculation unit.

4. A construction support method for foundation piles, comprising: A measurement process in which a measurement light is scanned in a direction intersecting the pile core of each pile held by each of a plurality of pile drivers and driven into the ground using RiDAR to measure the distance; A real pile core data calculation process for calculating pile core data of each pile based on the three-dimensional point cloud data of each pile obtained in the measurement process; A correction information calculation process for calculating correction information for each pile based on the actual pile core data and the design pile core data of each pile obtained in the actual pile core data calculation process so that the actual pile core data of each pile converges within the allowable range of each design pile core data and the arrangement error of each pile in plan view converges within a predetermined allowable range; A display step of individually displaying the correction information for each pile calculated in the correction information calculation step using a plurality of terminal devices; A construction support method for foundation piles comprising the steps of:

5. The construction support method for foundation piles described in claim 4, wherein the three-dimensional point cloud data includes at least two sets of three-dimensional point cloud data having different heights along the pile core direction of each pile, and the actual pile core data calculation process determines the pile core position and pile core attitude of each pile based on the two sets of point cloud data.

6. A foundation pile construction support method as described in claim 4 or 5, wherein the display process displays on each terminal device a correction guide image indicating the amount and direction of correction for the corresponding pile body based on the correction information calculated by the correction information calculation unit.

Citation Information

Patent Citations

  • Concrete pile monitoring system and installation method

    JP2008507925A

  • Position measuring method, position measuring system, and program

    JP2011257151A

  • Method for constructing precast piles