Operation support system and operation support method

The driving support system provides real-time evaluation of train power consumption and travel time during travel, optimizing driving patterns for energy savings by using past data and simulations, addressing the limitation of post-trip evaluations.

JP2024163753APending Publication Date: 2024-11-22HITACHI LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023079619
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-12
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Existing systems fail to provide real-time evaluation of train power consumption during travel between stations, limiting opportunities for energy-saving awareness and optimization.

Method used

A driving support system that calculates actual and predicted power consumption, generates evaluation indices, and presents results to the driver in real-time during travel, using data from past operations and simulations to optimize the remaining driving pattern.

Benefits of technology

Enables real-time evaluation of power consumption and travel time, allowing for improved energy-saving driving practices and reduced operational costs by presenting evaluation results mid-trip, enhancing crew awareness and reducing variations in driving patterns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024163753000001_ABST
    Figure 2024163753000001_ABST
Patent Text Reader

Abstract

To provide an operation support system and an operation support method that can present the evaluation result of a power consumption not only after completing running between stations but also during running between stations in a railway system.SOLUTION: An operation support system 1 comprises: a power consumption calculation unit 102 for calculating an actual station-to-station power consumption 152 that is a power consumption accompanied by a running train; a remaining section driving pattern prediction unit 106 for predicting a remaining section predicted driving pattern 158 that is a driving pattern in a remaining section between stations on which the train is running; a remaining section power consumption prediction unit 107 for predicting a remaining section power consumption predicted value 159 that is a predicted power consumption in the remaining section on the basis of the remaining section predicted driving pattern 158; and an evaluation index comparison unit 104 for creating an evaluation result 156 about the power consumption of the train before it arrives at the next stop on the basis of the actual station-to-station power consumption 152 and the remaining section power consumption predicted value 159.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a train operation support system and a train operation support method, and more particularly to a train operation support system and the like capable of evaluating the amount of power consumption of a train. [Background technology]

[0002] In order to deal with environmental issues and reduce operation costs, railway operators are facing the challenge of reducing the amount of power consumed by trains. One method of reducing the amount of power consumed by trains is to optimize the speed patterns (hereafter referred to as running patterns) when trains are traveling between stations.

[0003] Patent Document 1 describes a train operation simulator. In this train operation simulator, an energy information calculation unit calculates the power consumption related to train operation and integrates the amount of power consumption during the operation simulation. An energy screen display control unit controls the display of the running speed for each running position in a graph, and also controls the display of the power consumption for each running position in a graph. An individual evaluation unit evaluates the running time based on a timetable, and evaluates the amount of power consumption based on a standard amount of power consumption. A comprehensive evaluation unit performs a comprehensive evaluation of the operation simulation based on the evaluation results by the individual evaluation unit. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2020-134757 A Summary of the Invention [Problem to be solved by the invention]

[0005] Because punctual operation is important for railways, it is necessary to evaluate the amount of power consumption taking into account the travel time between stations. Therefore, in order to evaluate the amount of power consumption based on the actual travel time between stations, the evaluation can only be done after the travel between stations has ended, when the travel time is fixed, which creates an issue in that there are limited opportunities to raise awareness of energy-saving driving among drivers. The present invention aims to provide a driving assistance system and a driving assistance method that can present the evaluation results of power consumption not only after the end of inter-station travel but also during the inter-station travel. [Means for solving the problem]

[0006] In order to solve the above problems, the present invention provides a driving assistance system including: a power consumption calculation unit that calculates actual inter-station power consumption, which is the power consumption associated with train travel; a remaining section travel pattern prediction unit that predicts a remaining section predicted travel pattern, which is the travel pattern for the remaining section between stations along which the train is travelling; a remaining section power consumption prediction unit that predicts a remaining section power consumption predicted value, which is the predicted power consumption for the remaining section, based on the remaining section predicted travel pattern; and an evaluation index generation unit that generates an evaluation result for the power consumption of the train before arriving at the next stop station, based on the actual inter-station power consumption and the remaining section power consumption predicted value. In this case, the evaluation result for the power consumption can be presented not only after the end of inter-station travel, but also during inter-station travel.

[0007] Here, the evaluation index generating unit can generate the evaluation result by comparing the evaluation reference value of the power consumption between stations with the sum of the actual power consumption between stations and the predicted power consumption value for the remaining section. In this case, a more appropriate evaluation index can be applied for comparison. Furthermore, the evaluation reference value can be generated based on comparative operational data, so that the evaluation reference value is more suited to the actual situation. Furthermore, the comparative operation data can be at least one of the operation data obtained from past operation data, the operation data obtained from an average amount of power consumption, and the operation data obtained from an operation simulation, the operation data obtained from an average amount of power consumption, in which the comparative operation data is the least amount of power consumption. In this case, the comparative operation data can be selected from the more appropriate data. Furthermore, the system may further include an evaluation result presentation unit that presents, side by side, the evaluation results of at least one of the amounts of power consumption resulting from operation data with the lowest power consumption obtained from past operation data, operation data with the average power consumption obtained from operation simulation, and the amount of power consumption of the train before arriving at the next stop. In this case, the evaluation results can be presented in an easy-to-understand manner. The evaluation result can be at least one of the difference between the evaluation reference value and the sum, a score based on the difference, and pass / fail. In this case, a more appropriate evaluation result can be selected. Furthermore, the remaining section travel pattern prediction unit can obtain the remaining section predicted travel pattern under the condition that the train travels through the remaining section at a travel time close to the target remaining travel time between stations. In this case, the travel pattern for the remaining section can be obtained more accurately. Furthermore, the remaining section travel pattern prediction unit can obtain the remaining section predicted travel pattern by extracting operation data that matches the train position, train speed, and target remaining travel time from the past operation data, and further selecting operation data that has similar characteristics of the operation history up to the generation timing of the remaining section predicted travel pattern. In this case, a more suitable remaining section travel pattern can be obtained from the past operation data. The remaining section predicted driving pattern is generated by operation simulation, and the driving tendency up to the generation timing of the remaining section predicted driving pattern can be made into a driving pattern that will be obtained if the driving tendency is continued in the remaining section. In this case, a more suitable driving pattern for the remaining section can be obtained by operation simulation. In addition, the remaining section driving pattern prediction unit can obtain the remaining section predicted driving pattern at a timing when it is expected that there will be few changes in driving operation. In this case, the driver's acceptance of the support information is improved, which contributes to improving energy saving effects. Furthermore, the timing can be determined based on the driving pattern at the time of planning, so that a more appropriate timing can be determined in advance. Furthermore, the evaluation index generating unit can generate an evaluation result for the amount of power consumption of the train between stations after the train arrives at the next stop. In this case, the evaluation result for the determined power consumption after traveling between stations can be presented. The evaluation index generating unit can further generate an evaluation result regarding the travel time between stations. In this case, the evaluation result regarding the travel time between stations can further be presented.

[0008] The present invention also provides an operation support method in which a processor executes a program recorded in a memory to calculate actual inter-station power consumption, which is the power consumption associated with train travel, predict a remaining section predicted travel pattern, which is the travel pattern for the remaining section between stations along which the train is travelling, predict a remaining section power consumption predicted value, which is the predicted power consumption for the remaining section, based on the remaining section predicted travel pattern, and generate an evaluation result for the power consumption of the train before arriving at the next stop station, based on the actual inter-station power consumption and the remaining section predicted power consumption value. In this case, the evaluation result for the power consumption can be presented not only after the end of inter-station travel but also during the inter-station travel. Effect of the Invention

[0009] According to the present invention, it is possible to provide a driving assistance system and a driving assistance method that can present the evaluation result of the amount of power consumption not only after the end of the inter-station travel but also during the inter-station travel. [Brief description of the drawings]

[0010] [Figure 1] 1 is a block diagram showing an overall configuration of a driving assistance system according to an embodiment of the present invention. [Diagram 2] FIG. 13 shows the results of the first type of evaluation. [Diagram 3] FIG. 13 shows the results of the first type of evaluation. [Figure 4] FIG. 13 shows the results of the first type of evaluation. [Diagram 5] This is an example of the first type of evaluation result being displayed in a graph. [Figure 6] FIG. 13 is a diagram showing an example of how to assign points to a running time. [Figure 7] FIG. 13 is a diagram showing an example of how to assign points to the amount of power consumption. [Figure 8] FIG. 13 is a diagram showing an example of presentation of the second type of evaluation results. [Figure 9] FIG. 13 is a diagram showing an example of presentation of the third type of evaluation results. [Figure 10] FIG. 13 shows the results of the first type of evaluation. [Figure 11] FIG. 13 shows the results of the first type of evaluation. [Figure 12] FIG. 13 shows the results of the first type of evaluation. [Figure 13] This is an example of the first type of evaluation result being displayed in a graph. [Figure 14] FIG. 13 is a diagram showing an example of presentation of the second type of evaluation results. [Figure 15] FIG. 13 is a diagram showing an example of presentation of the third type of evaluation results. [Figure 16] FIG. 11 is a diagram showing an example of a timing when driving operations are not busy. [Figure 17] FIG. 13 is a diagram showing an example of a database that defines positions for predicting process execution timing. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In this embodiment, the driving assistance system 1 evaluates the power consumption and running time associated with the inter-station running during and after the inter-station running, and presents the evaluation result to the driver. After the inter-station running is completed, the actual values ​​of the power consumption and running time during the entire inter-station running are compared with the power consumption and running time that are the evaluation thresholds. On the other hand, when evaluation is performed during inter-station running, the power consumption compared with the power consumption that is the evaluation threshold is the sum of the actual power consumption value from the departure from the previous stop station to the evaluation timing and the predicted power consumption value from the evaluation timing to the arrival at the next stop station. Note that, since the overall running time of the inter-station running is not determined during inter-station running, no comparison for evaluation is performed.

[0012] <Overall explanation of driving assistance system 1> FIG. 1 is a block diagram showing the overall configuration of a driving assistance system 1 according to the present embodiment. As shown in FIG. 1, the driving assistance system 1 of this embodiment is composed of an operation data recording unit 101, a power consumption calculation unit 102, a driving time calculation unit 103, an evaluation index comparison unit 104, an evaluation result presentation unit 105, a remaining section driving pattern prediction unit 106, and a remaining section power consumption prediction unit 107.

[0013] The operation data recording unit 101 records data related to train operation. A specific device example of the operation data recording unit 101 is a driving status recording device. The operation data recording unit 101 can record and output data in chronological order regarding at least power consumption information 151, which is information related to power consumption associated with operation, train position 153, which is the position of the train between stations, train speed 154, which is the speed of the train, target remaining running time between stations 157, and driving operation details 160. The operation data recording unit 101 is not limited to a driving status recording device, and may be any device as long as it is a device that can record such information in chronological order.

[0014] As an example of the definition of the target remaining running time 157, it may be considered to be a time obtained by subtracting the current time from the target arrival time of the train at the next stop station. As another example of the definition of the target remaining running time 157, it may be considered to be a time obtained by subtracting the elapsed time from the departure timing from the previous stop station to the current time from the target running time for the entire interval between the previous stop station and the next stop station. The target running time is a target time required to run between the previous stop station and the next stop station, and may be determined in advance, for example, by the running pattern at the time of planning. Furthermore, the driving operation content 160 includes at least the operation content of the notch and the operation content of the constant speed running switch.

[0015] The power consumption calculation unit 102 receives the power consumption information 151, the train position 153, and the train speed 154 from the operation data recording unit 101. Then, the power consumption calculation unit 102 calculates the instantaneous power consumption of the train based on this information.

[0016] An example of the power consumption information 151 is the input voltage and input current of each inverter in the train. Therefore, the power consumption calculation unit 102 can calculate the power consumption of the train by summing up the products of the input voltage and the input current for all inverters mounted on the train. Furthermore, the power consumption calculation unit 102 calculates the actual inter-station power consumption 152 by integrating the power consumption for the time range of the target inter-station running. That is, the actual inter-station power consumption 152 is the power consumption associated with the train running from the departure station of the target inter-station to the current time. Note that the train position 153 and the train speed 154 are used in the power consumption calculation unit 102 to determine the time range of the target inter-station running. That is, using the train position 153 and the train speed 154, the time range of the inter-station running can be determined from the time when the speed at the departure station position of the target inter-station between the stations becomes positive from zero to the time when the speed at the stop station position becomes positive from positive to zero. Note that the calculation of power consumption in the power consumption calculation unit 102 may be performed only when the input current is positive, i.e., only the running power excluding regenerative power. In this way, the effects of the presence of other trains on the track and the braking / driving state of the train itself can be eliminated, and the power consumption of the train itself alone can be evaluated.

[0017] The running time calculation unit 103 receives the train position 153 and the train speed 154 from the operation data recording unit 101. Then, the running time calculation unit 103 calculates the actual inter-station running time 155 based on this information. The actual inter-station running time 155 is the time from when the train departs from a departure station to when it stops at a stop station. The running time calculation unit 103 calculates, for example, the actual inter-station running time 155 from the time when the train position 153 is at the departure station position of the target inter-station running and the train speed 154 changes from zero to positive to the time when the train position 153 is at the stop station position and the train speed 154 changes from positive to zero.

[0018] The processes of the operation data recording unit 101, the power consumption calculation unit 102, and the running time calculation unit 103 described above are always executed at a constant cycle. The processing cycle is determined by simulation or the like, on the condition that the required accuracy can be ensured from the viewpoint of power consumption calculation and evaluation.

[0019] The remaining section running pattern prediction unit 106 receives the train position 153, the train speed 154, the target remaining running time 157, and the operation operation details 160 from the operation data recording unit 101. Then, based on these pieces of information, the remaining section running pattern prediction unit 106 generates a remaining section predicted running pattern 158, which is a running pattern for the remaining section, during the intermediate stage of running between stations. It can also be said that the remaining section running pattern prediction unit 106 predicts the remaining section predicted running pattern 158, which is a running pattern for the remaining section between stations where the train is running. Here, the data of the running pattern is time-series data, and includes the time, position, speed, operation details, and input voltage and input current of each inverter as data items. The method of the prediction process will be described later. The remaining section predicted running pattern 158, which is the prediction result, is transmitted to the remaining section power consumption prediction unit 107 and the operation data recording unit 101. By recording the contents of remaining section predicted driving pattern 158 together with the actual driving pattern in operation data recording unit 101, it is possible to improve the prediction processing contents based on a comparative analysis of these two types of driving patterns.

[0020] The remaining section power consumption prediction unit 107 receives the remaining section predicted driving pattern 158 from the remaining section driving pattern prediction unit 106. Then, the remaining section power consumption prediction unit 107 generates a remaining section power consumption predicted value 159, which is a predicted value of power consumption for the section, based on the remaining section predicted driving pattern 158. It can also be said that the remaining section power consumption prediction unit 107 predicts the remaining section power consumption predicted value 159, which is a predicted power consumption in the remaining section, based on the remaining section predicted driving pattern 158. The remaining section power consumption prediction unit 107 calculates the instantaneous power consumption of the train by summing up the products of the input voltages and input currents included in the remaining section predicted driving pattern 158 for all inverters mounted on the train, and calculates the remaining section power consumption predicted value 159 by integrating them for the time range up to the next station.

[0021] The evaluation index comparison unit 104 is an example of an evaluation index generation unit that generates an evaluation index. The evaluation index comparison unit 104 receives the actual inter-station power consumption 152, the actual inter-station running time 155, and the remaining section power consumption predicted value 159. Then, the evaluation index comparison unit 104 generates an evaluation result 156 based on these pieces of information. The method of generating the evaluation result 156, which will be described in detail later, differs between during inter-station running and after inter-station running. In the case of inter-station running, it can be said that the evaluation index comparison unit 104 generates an evaluation result 156 about the power consumption of the train before arriving at the next stop station based on the actual inter-station power consumption 152 and the remaining section power consumption predicted value 159.

[0022] The evaluation result presenting unit 105 receives the evaluation result 156 from the evaluation index comparing unit 104. Then, the evaluation result presenting unit 105 displays the evaluation result 156 on a display device that can be visually confirmed by the driver, such as the driver's cab screen of a vehicle information device.

[0023] <Explanation of evaluation results 156 after running between stations and their presentation examples> Next, a specific example of the evaluation result 156 after running between stations and an example of presentation of the evaluation result 156 by the evaluation result presenting unit 105 will be described. First, three types of examples of the evaluation result 156 after running between stations are shown. The first type is a result of simply comparing the values ​​of the running time and the amount of power consumption. The second type is a result of scoring based on the comparison of the values ​​of the running time and the amount of power consumption. The third type is a result of passing or failing the evaluation result 156 based on the comparison of the values ​​of the running time and the amount of power consumption.

[0024] In the first type of simple numerical comparison, [A] to [D] below are compared and the difference is calculated. [A] Comparison of the evaluation reference value for inter-station running time (reference running time) and the actual inter-station running time 155 [B] Comparison of the evaluation standard value for inter-station power consumption (results of searching past operation data, energy saving) and the actual inter-station power consumption 152 [C] Comparison of the evaluation standard value for inter-station power consumption (results of searching past operation data, average) with the actual inter-station power consumption 152 [D] Comparison of the evaluation standard value for inter-station power consumption (results of operation simulation, energy saving) and the actual inter-station power consumption 152

[0025] The evaluation result 156 includes the calculated difference together with the numerical values ​​of each comparison target. The difference is the difference with respect to the evaluation reference value. Here, the evaluation reference value is a value that serves as a comparison reference in evaluating the inter-station running time and the power consumption amount between stations. The evaluation reference value exists as a database inside the evaluation index comparison unit 104, and there are evaluation reference values ​​for the inter-station running time and evaluation reference values ​​for the power consumption amount between stations. An example of the evaluation reference value for the inter-station running time is the standard running time between each station determined by the railway operator. There are variations in the evaluation reference value for the power consumption amount between stations, and they may be generated by searching past operation data or by operation simulation. The generation methods of these will be described later.

[0026] 2 to 4 are diagrams showing the first type of evaluation results 156. Of these, Fig. 2 is a diagram showing an example of the evaluation results 156 regarding [A] and [B]. Fig. 3 is a diagram showing an example of the evaluation results 156 regarding [A] and [C]. Furthermore, Fig. 4 is a diagram showing an example of the evaluation results 156 regarding [A] and [D]. The evaluation result presenting unit 105, which has received the numerical comparison result, which is the first type of evaluation result 156, displays the information in Figures 2 to 4 in a table format or in a graph on a display device that can be visually viewed by the driver, such as the driver's cab screen of the vehicle information device. When displaying these, it is not necessary to display all of the information in Figures 2 to 4, and only a portion of the information may be displayed.

[0027] FIG. 5 is an example of a graph showing the first type of evaluation result 156. In this example, the operation date and the actual arrival and departure times between the stations are displayed in text at the top left of the screen, and a scatter plot is displayed from the center to the bottom of the screen. The horizontal axis of the scatter plot is the travel time between stations, and the vertical axis is the amount of power consumed. Four data points are plotted on the scatter plot. The four data points are the actual value (displayed as "Actual" in the figure), the energy saving performance of the past performance (displayed as "Energy saving (past performance)" in the figure), the average of the past performance (displayed as "Average (past performance)" in the figure), and the result of the energy saving simulation (displayed as "Energy saving (simulation)" in the figure).

[0028] In the second scoring system, a higher score is assigned to the actual running time and power consumption, the closer the actual value is to the ideal value. The ideal value for running time is the evaluation reference value for the running time between stations, i.e., the standard running time between each station set by the railway operator.

[0029] FIG. 6 is a diagram showing an example of how to assign points to driving times. In FIG. 6, the horizontal axis represents the running time, and the vertical axis represents the score. In this example, a time range H1 that provides the highest score is set around the evaluation reference value, and the score is assigned so that the score decreases as the value moves away from this range.The ideal value for power consumption is either the most energy-efficient value obtained by searching past operation data from the evaluation reference value for inter-station power consumption, or the result of an operation simulation.

[0030] FIG. 7 is a diagram showing an example of how to assign points to the amount of power consumption. In FIG. 7, the horizontal axis represents the amount of power consumption, and the vertical axis represents the number of points. In this example, a power amount range H2 that gives the highest score is set around the evaluation reference value, and the score is assigned in such a way that the score decreases as the power amount increases beyond this range.

[0031] The evaluation result presenting unit 105, which has received the scores related to the running time and the power consumption, which are the second type of evaluation result 156, displays these scores on a display device that can be seen by the driver, such as the driver's cab screen of the vehicle information device. When displaying the scores, the scores for the running time and the power consumption may be displayed separately, or a value obtained by adding the two scores together with some weighting may be displayed.

[0032] FIG. 8 is a diagram showing an example of presentation of the second type of evaluation result 156. In this example, the operation date and the actual arrival and departure times between the stations are displayed in text on the left side of the screen, and the evaluation results 156, including the running time, power consumption, and overall evaluation score, are displayed on the right side of the screen.

[0033] In the third type of pass / fail judgment, a method is considered in which the score result of the second type evaluation result 156 is compared with a predetermined standard score value, and if the score exceeds the standard value, the train is deemed to have passed. Alternatively, regarding the amount of power consumption, a method is possible in which an average value obtained by searching past operation data among the evaluation standard values ​​of the amount of power consumption between stations is compared with the actual amount of power consumption between stations 152, and the train is deemed to have passed if the latter is smaller than the former.

[0034] When the evaluation result 156 is a pass / fail result, the evaluation result presenting unit 105 displays a message indicating that the evaluation result 156 is a pass. For example, the message may be "OK" for the driving time and "ECO" for the power consumption.

[0035] FIG. 9 is a diagram showing an example of presentation of the third type of evaluation result 156. In this example, the operation date and the actual arrival and departure times between the stations are displayed in text on the left side of the screen, and the pass / fail judgments for the running time and power consumption are displayed on the right side of the screen as evaluation results 156. For the running time, possible judgment options include "suitable," "early," and "late." For the power consumption, possible judgment options include "ECO" and "non-ECO." As described above, after the train arrives at the next station, the evaluation index comparison unit 104 generates an evaluation result 156 regarding the power consumption of the train between stations. In addition, the evaluation index comparison unit 104 further generates an evaluation result 156 regarding the running time between stations. An example of presentation of the evaluation result 156 by the evaluation result presentation unit 105 after running between stations has been described above.

[0036] <Explanation of evaluation results 156 during inter-station travel and examples of their presentation> Next, a specific example of the evaluation result 156 during inter-station running and an example of presentation of the evaluation result 156 by the evaluation result presentation unit 105 will be described. First, three types of examples of evaluation results 156 during inter-station running are shown. Note that, since the running pattern for the remaining section to the next station is not determined during inter-station running, the running time is not evaluated, and only the power consumption is evaluated. In other words, the comparison corresponding to [A] above is not performed.

[0037] The first type is a result of simply comparing the numerical values ​​of the power consumption. The second type is a score based on the comparison of the numerical values ​​of the power consumption. The third type is a pass / fail judgment of the evaluation result 156 based on the comparison of the numerical values ​​of the power consumption.

[0038] In the first type of simple numerical comparison, the following [B'], [D'], and [F'] are compared and the difference is calculated. [B'] Comparison of the evaluation reference value of the amount of energy consumption between stations (result of searching past operation data, energy saving) with the sum of the actual amount of energy consumption between stations 152 at the time of evaluation and the predicted amount of energy consumption for the remaining sections 159 [D'] Comparison of the evaluation reference value for the amount of power consumption between stations (the result of searching past operation data, the average) with the sum of the actual amount of power consumption between stations 152 at the time of evaluation and the predicted amount of power consumption for the remaining sections 159 [F'] Comparison of the evaluation reference value of the amount of power consumption between stations (result of operation simulation, energy saving) with the sum of the actual amount of power consumption between stations 152 and the remaining section power consumption forecast value 159 at the time of evaluation.

[0039] The evaluation result 156 includes the calculated difference together with the numerical value of each comparison target. The difference is a difference with respect to a reference value for evaluation. The reference value for evaluation here exists as a database inside the evaluation index comparison unit 104, and a reference value related to the amount of power consumption between stations is used. The reference value related to the amount of power consumption between stations is the same as that used in the evaluation after the above-mentioned inter-station run.

[0040] 10 to 12 are diagrams showing the first type of evaluation result 156. Of these, Fig. 10 is a diagram showing an example of the evaluation result 156 for [B']. Fig. 11 is a diagram showing an example of the evaluation result 156 for [D']. Furthermore, Fig. 12 is a diagram showing an example of the evaluation result 156 for [F']. The evaluation result presenting unit 105, which has received the numerical comparison result, which is the first type of evaluation result 156, displays the information in Figures 10 to 12 in a table format or in a graph on a display device that can be visually viewed by the driver, such as the driver's cab screen of the vehicle information device. When displaying these, it is not necessary to display all of the information in Figures 10 to 12, and only a portion of the information may be displayed.

[0041] FIG. 13 is a presentation example in which the first type of evaluation result 156 is displayed in a graph. It is preferable to clearly indicate in the display on the evaluation result display unit 105 that the evaluation is based on the estimated value on the way between stations. Here, this is clearly indicated by displaying "Estimated value on the way between stations." In this example, the operation date and the actual departure times between the stations are displayed in text at the top of the screen (it says "not collected" because the arrival time is not yet determined), and a bar graph is displayed from the center to the bottom of the screen. The vertical axis of the bar graph represents the amount of power consumed. The graph shows four types of data: estimated values, past energy savings (displayed in the figure as "Energy savings (past results)"), the average of past results (displayed in the figure as "Average (past results)"), and the results of an energy savings simulation (displayed in the figure as "Energy savings (simulation)").

[0042] In the second type of scoring, the closer the sum of the actual inter-station power consumption at the time of evaluation 152 and the predicted power consumption for the remaining section 159 is to the ideal value of the inter-station power consumption, the higher the score is assigned. The ideal value of the power consumption is determined by using either the most energy-efficient value obtained by searching past operation data or the result of an operation simulation, among the reference values ​​for evaluation of the inter-station power consumption.

[0043] The method of assigning points for the amount of power consumption is the same as that in Fig. 7. That is, a power consumption range H2 that gives the highest score is set around the evaluation reference value, and the score is assigned so that the score decreases as the amount of power consumption increases beyond that range.

[0044] The evaluation result presenting unit 105 that has received the score related to the power consumption amount, which is the second type of evaluation result 156, displays this score on a display device that can be visually confirmed by the driver, such as the driver's cab screen of the vehicle information device.

[0045] FIG. 14 is a diagram showing an example of presentation of the second type of evaluation result 156. It is preferable to clearly indicate that the evaluation is based on estimated values ​​midway between stations in the display on the evaluation result presentation unit 105. Here, this is clearly indicated by displaying "estimated values ​​midway between stations." In this example, the operation date and the actual departure time between the stations are displayed in text on the left side of the screen (it says "not collected" because the arrival is not yet determined), and the power consumption score is displayed on the right side of the screen as the evaluation result 156. Because the running pattern for the remaining section between the stations is not yet determined, the running time and overall evaluation columns say "not determined."

[0046] In the third type of pass / fail judgment, a method is considered in which the score result of the second type evaluation result 156 is compared with a predetermined standard score value, and if the score exceeds the standard value, the train is deemed to have passed. Alternatively, regarding the amount of power consumption, a method is possible in which an average value obtained by searching past operation data among the evaluation standard values ​​of the amount of power consumption between stations is compared with the actual amount of power consumption between stations 152, and the train is deemed to have passed if the latter is smaller than the former.

[0047] When the evaluation result 156 is a pass / fail result, the evaluation result presenting unit 105 displays a message indicating that the evaluation result 156 is a pass. For example, the message "ECO" may be displayed in relation to the amount of power consumption.

[0048] FIG. 15 is a diagram showing an example of presentation of the third type of evaluation result 156. It is preferable to clearly indicate that the evaluation is based on estimated values ​​midway between stations in the display on the evaluation result presentation unit 105. Here, this is clearly indicated by displaying "estimated values ​​midway between stations." In this example, the operation date and the actual departure time between the stations are displayed in text on the left side of the screen (it says "not collected" because the arrival is not yet determined), and the pass / fail judgment for the amount of power consumption is displayed on the right side of the screen as evaluation result 156. Because the running pattern for the remaining section between the stations is not yet determined, the running time column says "not determined." Regarding the amount of power consumption, possible judgment options include "ECO" and "Non-ECO." As described above, the evaluation index comparison unit 104 generates the evaluation result 156 by comparing the evaluation reference value of the power consumption between stations with the sum of the actual inter-station power consumption 152 and the remaining section power consumption predicted value 159. In the above example, the evaluation result 156 is at least one of the difference between the evaluation reference value and this sum, a score based on the difference, and pass / fail. An example of presentation of the evaluation result 156 by the evaluation result presentation unit 105 during inter-station running has been described above.

[0049] <Explanation of how to generate the evaluation standard values ​​for inter-station power consumption> Next, a method for generating the evaluation reference value of the inter-station power consumption amount used in the evaluation index comparison unit 104 will be described. The evaluation reference value for the inter-station power consumption is generated based on comparative operation data for comparison with the operation record. Here, the comparative operation data is operation data that is the subject of comparison when traveling between target stations. The comparative operation data is time-series operation data, and includes information on speed, position, notch operation, and the associated power consumption. Hereinafter, the evaluation reference value for the inter-station power consumption is referred to as the reference inter-station power consumption. The reference inter-station power consumption is calculated by accumulating the power consumption included in the comparative operation data over the entire period of traveling between stations.

[0050] Below, we explain how to create comparative operation data. There are two examples of how to create comparative operation data: searching past operation data and operation simulation. In addition, there are two main types of comparative operation data: "operation data for energy-efficient operation" and "operation data for operation with average power consumption" when traveling between target stations.

[0051] <How to create comparative operation data by searching past operation data> Searching for past operation data is premised on the existence of a group of past operation data accumulated between target stations. The accumulated operation data is time-series operation data, and includes information on speed, position, notch operation, and power consumption. Accumulation of operation data can be realized by periodically acquiring data from the operation data recording unit 101, which is represented by a driving status recording device (not shown).

[0052] From the accumulated operation data, data within a predetermined range of running time is extracted, and among them, operation data with the most energy-efficient running and operation data with running at an average amount of power consumption are searched for, and the respective amounts of power are calculated. When the power consumption calculation unit 102 adopts calculation of power consumption based only on power running, a search is performed for operation data with energy-efficient and average amounts of power consumption from the viewpoint of power running in order to have something to compare. The above-mentioned predetermined range of running time is a time range that can be considered as regular operation. The time range is set near the standard running time between the target stations, and may have a width of, for example, about 5 to 10 seconds in order to ensure a sufficient number of samples for statistical processing.

[0053] <How to create comparative operation data through operation simulation> Condition settings required for operation simulation include vehicle conditions (weight, running resistance characteristics, traction force, braking force, and electric braking force characteristics), line conditions (station distance, line gradient and curvature, presence or absence of tunnels, and speed limit), timetable conditions (running time between stations), and operation method conditions. These conditions are stored in advance in the evaluation index comparison unit 104. Note that the weight included in the vehicle conditions is affected by passenger load fluctuations depending on the day of the week and the time of day, so a more accurate operation simulation can be performed in terms of speed patterns and power consumption by additionally acquiring and using the passenger load value in the running between stations to be simulated from the operation data recording unit 101 (not shown). Note that the traction force characteristics included in the vehicle conditions are affected by the overhead line voltage in electric railways, so a more accurate operation simulation can be performed in terms of speed patterns and power consumption by additionally acquiring and using the overhead line voltage value in the running between stations to be simulated from the operation data recording unit 101 (not shown). In addition, since the electric control force characteristics included in the vehicle conditions are affected by the overhead line voltage in electric railways, by additionally obtaining and using the overhead line voltage value during the inter-station running to be simulated from the operation data recording unit 101, it is possible to perform a more accurate operation simulation in terms of power consumption (not shown).

[0054] The operating conditions are the way to decide the running speed pattern while running between stations, and also the strategy of handling notches. The running time and the amount of power consumption change depending on the operating conditions. In the operation simulation to create the comparative operation data, first, a running speed pattern that allows the train to travel between stations in the shortest time is generated. Hereafter, this running speed pattern is referred to as the fastest pattern. The fastest pattern is a speed pattern that uses the maximum acceleration and maximum deceleration allowed in consideration of safety and ride comfort, and runs at a high speed that does not exceed the speed limit. If the running time when traveling between stations using the fastest pattern is equal to or longer than the running time specified in the timetable, the fastest pattern will be used as the comparative operation data.

[0055] When the running time of the fastest pattern is shorter than the running time specified in the timetable, the extra running time can be utilized to create flexibility in the running speed pattern. In other words, by running at the running time specified in the timetable, and then reducing the maximum speed from the fastest pattern or increasing coasting, it is possible to run between stations more energy-efficiently than with the fastest pattern. In such cases, a mathematically generated energy-efficient running pattern (hereinafter, "energy-efficient pattern") that runs at the running time specified in the timetable is used as the operation data for comparison. There is a lot of existing research on methods for mathematically generating energy-efficient patterns, such as methods using dynamic programming and hill-climbing methods, so these methods can be used.

[0056] The inter-station power consumption of the generated comparative operation data can be calculated by accumulating the instantaneous power consumption estimated from the magnitude of traction force and electric control force required to run along the running pattern, taking into account equipment efficiency, etc., over the course of running between stations. Note that, when the power consumption calculation unit 102 uses calculation of the power consumption that targets only the power consumption for traction, the power consumption for traction between stations is also calculated by accumulating only the positive power consumption.

[0057] Because it is difficult to represent the variation in driving patterns during actual operation using operation simulation methods, only "operation data showing energy-efficient driving" is generated as operation data for comparison; "operation data showing driving with average power consumption" is not generated.

[0058] The above is an explanation of the method for creating comparative operation data. Using these creation methods, two types of "operation data for energy-efficient driving" (a method based on searching past operation data and a method based on operation simulation) and one type of "operation data for driving with average power consumption" (a method based on searching past operation data) are created as comparative operation data, and a reference inter-station power consumption amount is calculated for each. In this case, it can be said that the comparative operation data is at least one of the operation data obtained from past operation data that shows driving with the lowest power consumption (energy-efficient), operation data that shows driving with average power consumption, and operation data obtained by operation simulation that shows driving with the lowest power consumption (energy-efficient).

[0059] In addition, the forms of Figures 10 to 13 can also be said to be such that the evaluation result presentation unit 105 presents, side by side, evaluation results 156 for at least one of the power consumption amounts obtained from the operation data in which the train ran with the least power consumption (energy-efficient) among past operation data, the operation data in which the train ran with the average power consumption, and the operation data in which the train ran with the least power consumption (energy-efficient) among operation data obtained by an operation simulation, as well as the power consumption amount of the train before arriving at the next stop.

[0060] <Description of Method for Generating Remaining Section Predicted Driving Pattern 158> Next, an example of a method for generating the remaining section predicted driving pattern 158 in the remaining section driving pattern prediction unit 106 will be described in detail. First, the timing of the process of generating the remaining section predicted driving pattern 158 in the remaining section driving pattern prediction unit 106 will be described. The process of generating the remaining section predicted driving pattern 158 is not executed all the time. Specifically, the process is performed at discrete timing so that the information presented in the evaluation result presentation unit 105 based on the generated result can be presented at a timing that is easy for the driver to accept. Here, the timing at which the driver is easy to accept the information presentation means a timing when the driving operation is not busy or a timing when the vehicle is not entering a section where a speed limit is imposed by a branch or a curve. Providing information at such timing improves the driver's acceptance of the support information, which contributes to improving the energy saving effect.

[0061] An example of a timing when driving operations are not busy is a timing when the vehicle is coasting or cruising at a constant speed after accelerating. In this case, the remaining section driving pattern prediction unit 106 can be said to obtain the remaining section predicted driving pattern 158 at a timing when it is expected that there will be few changes in driving operations. FIG. 16 is a diagram showing an example of timing when driving operations are not busy. The driving pattern shown in FIG. 16 is not an actual driving pattern, but a driving pattern at the time of planning, as represented by a driving curve diagram. In the driving pattern at the time of planning, a section where coasting or constant speed cruising continues is extracted in advance, and the remaining section driving pattern prediction unit 106 is controlled to execute a prediction process while traveling through that section. In FIG. 16, this section is indicated by an arrow. As a method for selecting a timing when driving operations are not busy, in addition to a method that refers to the driving pattern at the time of planning, a method that statistically extracts sections where coasting or constant speed cruising is often performed from past driving records is also considered as an example.

[0062] As an example of a judgment regarding the timing of the prediction process in the remaining section driving pattern prediction unit 106, there is a method of making a judgment based on the train position 153 by referring to a database provided inside the remaining section driving pattern prediction unit 106 that defines positions for the timing of executing the prediction process.

[0063] FIG. 17 is a diagram showing an example of a database that defines positions for predicting process execution timing. The database shown in the figure is composed of three types of data: "Inter-station", "Prediction number during inter-station", and "Inter-station running position". "Inter-station" has a value that indicates a combination of a departure station and a destination station. "Prediction number during inter-station" indicates a number that distinguishes between multiple prediction timings for the same station. "Inter-station running position" contains a value that indicates the position where prediction processing is performed, and when the train position 153 reaches that position, the processing of the remaining section running pattern prediction unit 106 is executed.

[0064] Next, a description will be given of the process of generating the remaining section predicted driving pattern 158 in the remaining section driving pattern prediction unit 106. There are two methods for generating the remaining section predicted driving pattern 158, namely, searching for past driving data and driving simulation.

[0065] <Method of generating remaining section predicted driving pattern 158 by searching past operation data> Searching for past operation data is premised on the existence of a group of past operation data accumulated between target stations. The accumulated operation data is time-series operation data, and includes information on speed, position, notch operation, and power consumption. Accumulation of operation data can be realized by periodically acquiring data from the operation data recording unit 101, which is represented by a driving status recording device (not shown).

[0066] First, at the timing of generating the remaining section predicted running pattern 158, operation data that matches the train position 153, train speed 154, and target remaining running time 157 is extracted from the accumulated past operation data. Here, the matching judgment of each element does not need to be strictly the same value, and a method of judging whether the values ​​are close by setting a predetermined judgment criterion may be used.

[0067] Next, from the extracted operation data group, the operation data is further narrowed down and extracted, taking into consideration the characteristics of the operation history up to the generation timing of the remaining section predicted running pattern 158, and the operation data with the most similar characteristics of the operation history is selected. The part of the operation data selected in this way after the train position 153 is set as the remaining section predicted running pattern 158. Here, examples of the characteristics of the operation history include characteristics of the running speed pattern shape and characteristics of the driving operation. The characteristics of the driving operation are characteristics related to the driver's operation regarding the braking and driving of the vehicle, such as notch operation and constant speed running switch. An example of a method for extracting operation data based on the running speed pattern shape and the characteristics of the driving history is pattern matching using time series data of parameters (speed, notch, switch, etc.) related to the characteristics of the driving history. As a result, a running pattern in the case where the driving tendency up to the generation timing of the remaining section predicted running pattern 158 is continued in the remaining section can be generated from the past operation data.

[0068] <Method of generating remaining section predicted driving pattern 158 by operation simulation> Condition settings required for operation simulation include vehicle conditions (weight, running resistance characteristics, traction force, braking force, and electric braking force characteristics), line conditions (station distance, line gradient and curvature, presence or absence of tunnels, and speed limit), timetable conditions (running time between stations), and operation method conditions. These conditions are stored in advance in the remaining section running pattern prediction unit 106. Note that the weight included in the vehicle conditions is affected by passenger load fluctuations depending on the day of the week and the time of day, so a more accurate operation simulation can be performed in terms of speed patterns and power consumption by additionally acquiring and using the passenger load value in the running between stations to be simulated from the operation data recording unit 101 (not shown). Also, the traction force characteristics included in the vehicle conditions are affected by the overhead line voltage in electric railways, so a more accurate operation simulation can be performed in terms of speed patterns and power consumption by additionally acquiring and using the overhead line voltage value in the running between stations to be simulated from the operation data recording unit 101 (not shown). In addition, since the electric control force characteristics included in the vehicle conditions are affected by the overhead line voltage in electric railways, by additionally obtaining and using the overhead line voltage value during the inter-station running to be simulated from the operation data recording unit 101, it is possible to perform a more accurate operation simulation in terms of power consumption (not shown).

[0069] The operating conditions are how to determine the running speed pattern while running between stations, and are also the strategy for handling notches. The running time and the amount of power consumption change depending on the operating conditions. The premise for generating the remaining section predicted running pattern 158 is that the crew will aim for punctual operation, and the remaining section will be run at a running time as close as possible to the target remaining running time 157.

[0070] In the operation simulation for generating the remaining section predicted running pattern 158, first, starting from the train position 153 and train speed 154 at the timing of generating the remaining section predicted running pattern 158, a running speed pattern that can run the remaining section to the next stop in the shortest time is generated. Hereinafter, this running speed pattern is referred to as the fastest pattern. The fastest pattern is a speed pattern that uses the maximum acceleration and maximum deceleration allowed in consideration of safety and ride comfort, and runs at a high speed within the range that does not exceed the speed limit. If the running time when running the remaining section using the fastest pattern is equal to or longer than the target remaining running time 157, the fastest pattern is used as the comparison operation data.

[0071] When the running time of the fastest pattern is shorter than the target remaining running time 157, the extra running time can be utilized to create a degree of freedom in the running speed pattern. In other words, by running at the target remaining running time 157, and then lowering the maximum speed from the fastest pattern or increasing coasting, it is possible to run between stations more energy-efficiently than with the fastest pattern.

[0072] In such a case, a method of generating a driving pattern for driving the remaining section at the target remaining driving time 157 by simulation can be considered, taking into consideration the characteristics of the driving history up to the generation timing of the remaining section predicted driving pattern 158. Here, the characteristics of the driving history include characteristics related to driving operations when braking and driving the vehicle, such as notch operation and constant speed driving switch. More specifically, the frequency of notch operation and the use or non-use of the constant speed driving function. Such characteristics related to driving operations are determined from the driving history up to the generation timing of the remaining section predicted driving pattern 158, and are incorporated as a driver model when performing operation simulation for the remaining section. In this way, a driving pattern in the case where the driving tendency up to the generation timing of the remaining section predicted driving pattern 158 is continued in the remaining section can be generated by the operation simulation.

[0073] As another example of a method for generating, by simulation, a driving pattern for driving the remaining section at a target remaining driving time of 157, a driving pattern may be generated by assuming that the remaining section is driven in a mathematically optimal energy-saving pattern. There are many existing researches on the mathematical generation of energy-saving patterns, such as methods using dynamic programming and hill-climbing methods, and these methods can be utilized.

[0074] In the above-described example, it can also be said that the remaining section driving pattern prediction unit 106 determines the remaining section predicted driving pattern 158 on the condition that the train travels through the remaining section in a driving time close to the target remaining driving time between stations. The above is a description of an example of the method for generating the remaining section predicted driving pattern 158 in the remaining section driving pattern prediction unit 106.

[0075] Regarding the installation locations of each processing unit described above, the power consumption calculation unit 102, the running time calculation unit 103, the evaluation index comparison unit 104, the remaining section running pattern prediction unit 106, and the remaining section power consumption prediction unit 107 may be installed either on the ground or on the train, and data is exchanged between the ground and train as necessary. In particular, the remaining section running pattern prediction unit 106 requires a lot of processing and uses a database of past operation data, so processing it on a high-performance ground server leads to cost reduction and compactness of the on-board device. The evaluation result presentation unit 105 is implemented on the driver's cab screen on the train and is assumed to be checked by the driver immediately after the end of the station-to-station run, but it may also be implemented in a form such as a tablet terminal carried by the driver or a computer terminal used on the ground.

[0076] There is variation in the driving patterns when the driver manually drives the train, which causes variation in the running time and power consumption. By reducing the variation in the driving patterns and operating in an energy-efficient manner within the range of running time that allows for punctuality, it is possible to reduce the power consumption associated with train operation. In order to reduce the variation in driving patterns, it is effective to adopt an automatic train operation system that automates driving, as well as to provide education on energy-saving driving methods and introduce a driving support system that provides driving operation advice, assuming manual driving. Methods that assume manual driving have lower introduction costs than the adoption of an automatic train operation system, so until automatic driving becomes mainstream in the future, reducing the variation in driving patterns assuming manual driving is effective.

[0077] In reducing the variability of driving patterns that are based on manual driving, maintaining the motivation of drivers is a major challenge. For many drivers, this means modifying the driving methods they have been accustomed to, and so there is a certain amount of psychological resistance. Therefore, in order to establish energy-saving driving methods, the energy-saving effects must be visible and tangible. One way to address this issue is to introduce a driving support system that displays the amount of power consumed and the driving time associated with driving between stations, as well as the evaluation results of driving skills on the driver's cab screen. By checking their own driving results and evaluation results for each driving between stations, drivers can maintain their motivation to improve their driving methods. According to the driving support system 1 in the above-described embodiment, the evaluation result of the amount of power consumption can be presented not only after the end of the inter-station running but also during the inter-station running. Therefore, the driver can check his / her own driving result and evaluation result even while the train is running between stations. This can strengthen the driver's awareness of energy-saving driving, leading to energy saving in train operation.

[0078] <Explanation of operation support method> The above-described processing performed by the driving assistance system 1 is realized by the cooperation of software and hardware resources. That is, a processor in a computer provided in the driving assistance system 1 loads software for realizing each of the above-described functions into memory, executes the software, and realizes each of these functions. Therefore, the processing performed by the operation assistance system 1 can be considered as an operation assistance method in which a processor executes a program recorded in a memory to calculate actual inter-station power consumption 152, which is the power consumption associated with the running of the train, predict a remaining section predicted running pattern 158, which is the running pattern for the remaining section between the stations along which the train is running, predict a remaining section power consumption predicted value 159, which is the predicted power consumption for the remaining section, based on the remaining section predicted running pattern 158, and generate an evaluation result 156 of the power consumption of the train before arriving at the next station based on the actual inter-station power consumption 152 and the remaining section power consumption predicted value 159.

[0079] Although the present embodiment has been described above, the technical scope of the present invention is not limited to the scope described in the above embodiment. It is clear from the claims that various modifications and improvements to the above embodiment are also included in the technical scope of the present invention. [Explanation of symbols]

[0080] 1... Driving assistance system, 101... Operation data recording unit, 102... Power consumption calculation unit, 103... Running time calculation unit, 104... Evaluation index comparison unit, 105... Evaluation result presentation unit, 106... Remaining section running pattern prediction unit, 107... Remaining section power consumption prediction unit, 151... Power consumption information, 152... Actual inter-station power consumption, 153... Train position, 154... Train speed, 155... Actual inter-station running time, 156... Evaluation result, 157... Target remaining running time, 158... Remaining section predicted running pattern, 159... Remaining section power consumption predicted value, 160... Driving operation content, H1... Time range, H2... Power amount range

Claims

1. a power consumption calculation unit that calculates actual inter-station power consumption, which is the power consumption associated with train operation; a remaining section travel pattern prediction unit that predicts a remaining section predicted travel pattern, which is a travel pattern in the remaining section between stations where the train is traveling; a remaining section power consumption prediction unit that predicts a remaining section power consumption predicted value, which is a predicted power consumption amount in the remaining section, based on the remaining section predicted driving pattern; an evaluation index generating unit that generates an evaluation result regarding the power consumption of the train before arriving at the next stop station based on the actual inter-station power consumption and the remaining section power consumption predicted value; A driving assistance system equipped with

2. The driving assistance system according to claim 1 , wherein the evaluation index generation unit generates the evaluation result by comparing a reference evaluation value for the amount of power consumption between stations with a sum of the actual amount of power consumption between stations and the predicted value of the amount of power consumption for the remaining sections.

3. The driving assistance system according to claim 2 , wherein the evaluation reference value is generated based on comparative driving data.

4. The driving assistance system according to claim 3, wherein the comparative operation data is at least one of operation data obtained from past operation data, operation data obtained from past operation data, operation data obtained from past operation data, and operation data obtained from past operation data, and operation data obtained from past operation data, and operation data obtained from past operation data.

5. The driving assistance system according to claim 4, further comprising an evaluation result presentation unit that presents, side by side, evaluation results for at least one of the amounts of power consumption resulting from operation data in which the train has run with the lowest amount of power consumption obtained from past operation data, operation data in which the train has run with an average amount of power consumption, and operation data in which the train has run with the lowest amount of power consumption obtained by an operation simulation, and the amount of power consumption of the train before arriving at the next stop station.

6. The driving assistance system according to claim 2 , wherein the evaluation result is at least one of a difference between the evaluation reference value and the sum, a score based on the difference, and a pass / fail result.

7. 2. The driving assistance system according to claim 1, wherein the remaining section driving pattern prediction unit determines the remaining section predicted driving pattern under the condition that the train travels through the remaining section in a driving time close to a target remaining driving time between stations.

8. The driving assistance system of claim 7, wherein the remaining section driving pattern prediction unit obtains the remaining section predicted driving pattern by extracting from past operation data operation data in which the train position, train speed, and target remaining driving time match, and further selecting operation data in which the driving history characteristics up to the timing of generating the remaining section predicted driving pattern are similar.

9. The driving assistance system according to claim 7 , wherein the remaining section predicted driving pattern is generated by a driving simulation and is a driving pattern in the case where a driving tendency up to a generation timing of the remaining section predicted driving pattern is continued in the remaining section.

10. The driving assistance system according to claim 1 , wherein the remaining section driving pattern prediction unit determines the remaining section predicted driving pattern at a timing when it is expected that there will be few changes in driving operation.

11. The driving assistance system according to claim 10 , wherein the timing is determined based on a driving pattern at the time of planning.

12. The driving assistance system according to claim 1 , wherein the evaluation index generating unit generates an evaluation result regarding the amount of power consumption of the train between stations after the train arrives at the next stop station.

13. The driving assistance system according to claim 12 , wherein the evaluation index generating unit further generates an evaluation result regarding a travel time between stations.

14. The processor executes the program stored in the memory, Calculate the actual inter-station power consumption, which is the amount of power consumed by trains while they are running, A remaining section predicted running pattern is predicted, which is a running pattern for the remaining section between stations where the train is running; A remaining section power consumption predicted value, which is a predicted power consumption amount in the remaining section, is predicted based on the remaining section predicted driving pattern; generating an evaluation result of the train's power consumption before arriving at the next stop station based on the actual inter-station power consumption and the remaining section power consumption predicted value; Operation support method.

Citation Information

Patent Citations

  • Program and train operation simulator

    JP2020134757A