Management device for pitting-corrosion development quantity at implantation part of rotor blade of rotor of steam turbine

A device for managing pitting corrosion in steam turbine rotors predicts future corrosion progression, addressing unnecessary inspections by providing timely maintenance recommendations based on past data and operating conditions.

JP2024165333AActive Publication Date: 2024-11-28KK TOSHIBA
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023081448
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-17
Publication Date
2024-11-28
Estimated Expiration
2043-05-17

AI Technical Summary

Technical Problem

The increased number of starts and stops and load changes in thermal power generation facilities operating as regulated power sources leads to enhanced pitting corrosion and stress corrosion cracking in steam turbine rotor blades, necessitating unnecessary and costly periodic inspections.

Method used

A device for managing pitting corrosion progress in steam turbine rotors that predicts future corrosion based on past data and operating conditions, using a system that includes measurement, calculation, and display units to provide timely inspection recommendations.

Benefits of technology

Enables accurate prediction and management of pitting corrosion, reducing unnecessary inspections and optimizing maintenance schedules based on real-time and future operating conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024165333000001_ABST
    Figure 2024165333000001_ABST
Patent Text Reader

Abstract

To provide a management device for a pitting-corrosion development quantity at an implantation part of a rotor blade of a rotor of a steam turbine that can recognize development of pitting-corrosion at the implantation part of the rotor blade of the rotor of the steam turbine from the past to the present predicted based upon operation data and future development of pitting-corrosion predicted based upon future operation conditions in time series.SOLUTION: A management device 100 for a pitting-corrosion development quantity comprises a display information generation part which generates display information for causing a display part of a user interface 140 to display past pitting-corrosion development quantity-related information showing information related to a pitting-corrosion development quantity at an implantation part of a rotor blade of a rotor of a steam turbine which is calculated based upon measured information and future pitting-corrosion development quantity-related information showing information related to a future pitting-corrosion development quantity in future calculated based upon future operation conditions and the past pitting-corrosion development quantity-related information which are input through operation using an input screen of the user interface 140.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to a pitting corrosion progress amount management device for an implantation portion of a blade in a rotor of a steam turbine. [Background technology]

[0002] In recent years, the introduction of renewable energy has been accelerated in power generation facilities as a measure to reduce carbon dioxide (CO2) emissions. In power generation using renewable energy, the amount of power generated varies depending on weather, etc. Therefore, in recent years, thermal power generation facilities have shifted to operation centered on regulating thermal power as a regulating power source to compensate for the unstable power supply in power generation using renewable energy. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 9-26273 [Patent Document 2] JP 2006-194550 A [Patent Document 3] JP 2002-297710 A Summary of the Invention [Problem to be solved by the invention]

[0004] When the turbine is switched to operation as a regulating power source, the number of starts and stops and load changes will tend to increase. As a result, the latter stages of the low-pressure turbine will fluctuate between wet and dry regions, and it is known that pitting corrosion caused by corrosion occurring in the blade roots of the rotor of the low-pressure turbine will occur more frequently than before. Repeated operation, which is harsh for the low-pressure turbine, will cause pitting corrosion in the blade roots to progress, and as a result, the risk of stress corrosion cracking (SCC) and corrosion fatigue (CF) in the blade roots will increase.

[0005] In the past, investigations into SCC (Stress Corrosion Cracking) and CF (Corrosion Fatigue) caused by the progression of pitting corrosion were carried out by lifting out the turbine rotor, removing the blades, and inspecting the installation parts. However, depending on the operating conditions, there may be cases where no abnormality is found, and in such cases, the power generation company ends up wasting unnecessary time and money on regular inspections. Therefore, there is a need to at least know whether inspection of the actual equipment is necessary.

[0006] An object of the present invention is to provide a device for managing the amount of pitting corrosion progression in a steam turbine rotor, which is capable of recognizing, in a chronological order, the progression of pitting corrosion occurring in the implantation portions of moving blades in a steam turbine rotor from the past to the present, which is predicted based on operational data, and the progression of future pitting corrosion, which is predicted based on future operating conditions. [Means for solving the problem]

[0007] In order to achieve the above-mentioned object, an embodiment of a device for managing the progression amount of pitting corrosion occurring in the implantation portion of a blade in a rotor of a steam turbine is characterized in that it includes a display information generation unit that generates display information on a display unit of the user interface, the display information including past pitting progression amount related information indicating information related to the past pitting progression amount occurring in the implantation portion of the blade in the rotor of the steam turbine from the past to the present, calculated based on measured information, and future pitting progression amount related information indicating information related to the future pitting progression amount that will occur in the implantation portion of the blade in the rotor in the future, calculated based on future operating conditions inputted through an operation using an input screen of a user interface and the past pitting progression amount related information. [Brief description of the drawings]

[0008] [Figure 1] 1 is a system diagram showing a schematic configuration of a steam turbine including a pitting corrosion progress amount management device according to a first embodiment. [Diagram 2] 1 is a block diagram showing a functional configuration of a pitting corrosion progress amount management device according to a first embodiment. [Diagram 3] FIG. 3 is a diagram showing an example of an input screen for future operating conditions displayed on a user interface in the pitting corrosion progress amount management device according to the first embodiment. [Figure 4] FIG. 2 is a flowchart showing a procedure of periodic calculation processing of pitting progress by the pitting progress amount management device according to the first embodiment. [Diagram 5] FIG. 2 is a flowchart showing a procedure of a future prediction calculation process of pitting corrosion progression performed by the pitting corrosion progression amount management device according to the first embodiment. [Figure 6] 5A to 5C are diagrams showing an example of results of periodic calculation and future prediction calculation of an evaluation portion of a low-pressure turbine displayed on a user interface in the pitting corrosion progress amount management device according to the first embodiment. [Figure 7] FIG. 3 is a diagram showing an example of water quality data displayed on a user interface in the pitting corrosion progress amount management device according to the first embodiment. [Figure 8] FIG. 3 is a flow chart for explaining an initial setting step of basic information in the pitting corrosion progress management device according to the first embodiment. [Figure 9] FIG. 3 is a flow chart for explaining a periodic calculation step in the pitting corrosion progress management device according to the first embodiment. [Figure 10] FIG. 3 is a flow chart for explaining a future prediction calculation step in the pitting corrosion progress amount management device according to the first embodiment. [Figure 11] 10 is a flowchart for explaining a future prediction calculation process in a pitting corrosion progress amount management device according to a second embodiment. [Figure 12] 10 is a flowchart for explaining a future prediction calculation process in a pitting corrosion progress amount management device according to a second embodiment. [Figure 13] FIG. 11 is a diagram showing an example of a display screen in the pitting corrosion progress management device according to the second embodiment. [Figure 14] FIG. 11 is a diagram showing an example of a selection screen for selecting a comparison calculation result to be displayed on a user interface in the pitting corrosion progress amount management device according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, a pitting corrosion progress amount management device for a steam turbine rotor according to an embodiment of the present invention (hereinafter referred to as a "pitting corrosion progress amount management device") will be described with reference to the drawings. Hereinafter, identical or similar parts will be denoted by common reference numerals, and overlapping descriptions will be omitted.

[0010] (First embodiment) FIG. 1 is a system diagram showing a schematic configuration of a power generation facility 1 including a steam turbine 10 having a pitting corrosion progress amount management device 100 according to a first embodiment.

[0011] The power generation facility 1 includes a steam turbine 10, a generator 20, and a heat source device 30. Here, the heat source device 30 includes a boiler 31 and a reheater 32.

[0012] As shown in Fig. 1, a steam turbine 10 includes a high-pressure turbine 11, an intermediate-pressure turbine 12, a low-pressure turbine 13, a condenser 16, a feedwater pump 17, and a pitting corrosion progress amount management device 100. The low-pressure turbine 13 has a low-pressure turbine rotating part 13a and a low-pressure casing 13b. Here, the low-pressure turbine rotating part 13a is a rotor shaft on which a plurality of moving blades (vanes) are implanted. Note that hereinafter, when the term rotor is used, it refers to the rotating part, or in particular, the low-pressure turbine rotating part 13a.

[0013] The boiler 31 heats feed water supplied from the steam turbine 10 side to generate steam. The steam generated in the boiler 31 is guided to the high-pressure turbine 11 by the main steam pipe 33. The high-pressure turbine 11 converts the thermal energy of the steam introduced from the main steam pipe 33 into rotational energy, and discharges the steam that has done work in the high-pressure turbine 11 to a low-temperature reheat pipe 34. The steam discharged to the low-temperature reheat pipe 34 is introduced into the reheater 32. The reheater 32 reheats the introduced steam and outputs the steam to the high-temperature reheat pipe 35.

[0014] The intermediate-pressure turbine 12 converts the thermal energy of the steam introduced from the high-temperature reheat pipe 35 into rotational energy, and discharges the steam that has done work in the intermediate-pressure turbine 12 to the crossover pipe 14. The low-pressure turbine 13 converts the thermal energy of the steam introduced from the crossover pipe 14 into the rotational energy of the low-pressure turbine rotating section 13a, etc., and discharges the steam that has done work in the low-pressure turbine 13 to an exhaust pipe 15. The generator 20 is driven by the high-pressure turbine 11, the intermediate-pressure turbine 12, and the low-pressure turbine 13 to convert the rotational energy into electrical energy and generate electricity.

[0015] The condenser 16 condenses the steam introduced from the exhaust pipe 15 to produce condensed water. The feed water pump 17 supplies the condensed water of the condenser 16 to the boiler 31 via the feed water pipe 18 as feed water.

[0016] The pitting corrosion progress amount management device 100 is a device for managing soundness related to pitting corrosion progress in the steam turbine 10. State quantities related to the steam turbine 10 are measured by respective detectors (not shown), and these signals are input to a power generation facility control device 40 such as a distributed control system (DCS). The pitting corrosion progress amount management device 100 acquires measurement data required for pitting corrosion progress amount management from the power generation facility control device 40. Details of the pitting corrosion progress amount management device 100 will be described later.

[0017] The pitting corrosion progress amount management device 100 is a device for managing the progress of pitting corrosion (pitting corrosion progress) in an implantation portion of a rotor blade in a rotor shaft of a steam turbine 10.

[0018] In the first embodiment, the relevant portion of the steam turbine 10 targeted by the pitting corrosion progress management device 100 is the blade implantation portion of the rotor shaft that is alternately exposed to dry steam and wet steam due to load changes in the unit during operation. The following description will be given taking as an example a case in which the blade implantation portion one to three stages upstream from the final stage of the low-pressure turbine 13 is targeted for management. Here, the implantation portion of the low-pressure turbine 13 refers to the blade grooves formed in the disk of the rotor shaft in the low-pressure turbine rotating portion 13a for implanting the blades.

[0019] Hereinafter, the implantation sections of the stages one to three stages upstream from the final stage of the low-pressure turbine 13 will be referred to as implantation sections L1 to L3, respectively. Note that L1 to L3 are merely examples, and there may be more or fewer stages.

[0020] <Configuration of pitting corrosion progress control device> Next, the pitting corrosion progress control device 100 will be described.

[0021] FIG. 2 is a block diagram showing a functional configuration of the pitting progress amount management device 100 according to the first embodiment.

[0022] The pitting corrosion progression amount management device 100 is a device that manages the amount of pitting corrosion progression by, for example, predicting the amount of pitting corrosion progression from the past to the present based on information measured by an actual machine (hereinafter, "measurement information" or "measured information"), and predicting the amount of pitting corrosion progression in the future based on assumed future operating conditions. The pitting corrosion progression amount management device 100 also generates display information for displaying the predicted results, such as the amount of pitting corrosion progression, on a display unit. The measurement information includes time information when the measurement value was measured.

[0023] 2, the pitting corrosion progress amount management device 100 includes a measurement information acquisition unit 110, a calculation unit 120, a storage unit 130, a user interface 140, and a progress control unit 150. The pitting corrosion progress amount management device 100 is, for example, a computer system, but may also be a collection of individual devices or apparatuses having the functions of each element.

[0024] The measurement information acquiring unit 110 is an interface that acquires measurement data necessary for pitting corrosion progress amount management from the power generation facility control device 40. The measurement information acquiring unit 110 acquires measurement information (hereinafter also referred to as measurement data) related to the steam turbine 10 during operation that is necessary for pitting corrosion progress amount management from among the measurement data input to the power generation facility control device 40 at a predetermined time interval (measurement information acquisition period), such as one minute.

[0025] The measured information includes the generator power output (MW) and water quality parameters, such as chlorine concentration (μg / L), acid electrical conductivity (μS / m), silica concentration (μg / L), hydrazine concentration (μg / L), sodium concentration (μg / L), SO4 concentration (μg / L), dissolved oxygen concentration (μg / L), and pH (-).

[0026] The measurement information acquiring unit 110 outputs the acquired measurement information to a measurement information storage unit 132 in the storage unit 130. The measurement information storage unit 132 stores and stores this measurement information.

[0027] The calculation unit 120 includes a dry / wet alternating determination unit 121 , an average value calculation unit 122 , a pitting corrosion progress calculation unit 123 , a future prediction unit 124 , and a display information generation unit 125 .

[0028] In the calculation unit 120, a dry / wet alternation determination unit 121, an average value calculation unit 122, and a pitting corrosion progress calculation unit 123, which will be described below, are parts related to a fixed cycle calculation process which is a calculation process relating to a pitting corrosion progress amount a from the past to the present.

[0029] The wet / dry alternation determination unit 121 derives the range of the generator output in a period (pitting corrosion progression calculation period ΔT), such as one hour, for calculating the amount of pitting corrosion progression, and determines whether or not there is a wet / dry alternation.

[0030] The average value calculation unit 122 derives the average value of each water quality parameter in a pitting corrosion progress calculation period ΔT based on the measurement information acquired by the measurement information acquisition unit 110 at each measurement information acquisition period, such as one minute.

[0031] The pitting corrosion progress calculation unit 123 calculates the amount of pitting corrosion progress in a pitting corrosion progress calculation period ΔT based on the dry-wet alternating time ΔT1 in the pitting corrosion progress calculation period ΔT and the average values ​​of the respective water quality parameters.

[0032] The future prediction unit 124 performs a future prediction calculation process, which is a calculation process for the pitting corrosion advance amount a in the future, i.e., for a period after the present. As the future prediction calculation process, the future prediction unit 124 calculates the pitting corrosion advance amount for one year by integrating the pitting corrosion advance amounts for each operation pattern that have been calculated in advance and stored in the storage unit 130 based on information input as a future operation plan (see FIG. 3) to a user interface 140 described later. Here, the information input as the operation plan is the calculation condition, and is hereinafter referred to as the operation condition.

[0033] An operation pattern is the output [MW] at each time of day, in other words, the pattern of time change in output [MW] over the course of a day. The percentage (%) of the number of days for each of multiple pre-set operation patterns relative to the number of days in a year is input. Note that below, an operation pattern may also be referred to as a daily load condition, and a curve showing an operation pattern may also be referred to as a daily load curve.

[0034] For each pattern of the start-up conditions and daily load conditions, the hourly contribution Δdj to the pitting corrosion progression amount is calculated in advance and is stored in the pattern-specific pitting corrosion progression amount storage unit 135 of the storage unit 130. Note that these contribution values ​​may be stored in the program storage unit 133 together with the program as data portions within the installed program stored in the program storage unit 133 of the storage unit 130.

[0035] The future prediction unit 124 predicts the contribution Δd of each operation time input as a future operation plan to the corresponding pitting corrosion growth amount. j Multiplying by , the annual pitting corrosion progression amount ΔD for the operating pattern is j The total value is calculated as the annual pitting corrosion growth amount ΔD mThe future prediction unit 124 calculates the pitting corrosion progress amount ΔD m The amount of pitting corrosion in the previous year D m-1 In addition, the amount of pitting corrosion D m In addition, the amount of pitting corrosion progress in the year is calculated as ΔD m It is assumed that the increase in is linear. Note that the operating time here is calculated by multiplying the operating rate input on an input screen 141 in FIG.

[0036] The display information generating unit 125 generates display information for an input screen and an output screen to be displayed on the user interface 140. The input screen will be described later with reference to Fig. 3, and the output screen will be described later with reference to Figs. 6 and 7, respectively.

[0037] The storage unit 130 includes an input information storage unit 131, a measurement information storage unit 132, a program storage unit 133, a calculation result storage unit 134, a pattern-specific pitting corrosion progress amount storage unit 135, a template storage unit 136, and a display information storage unit 137. The storage unit 130 is realized by, for example, a hard disk drive, a non-volatile memory device, etc. The storage unit 130 may not be physically integrated with the pitting corrosion progress amount management device 100, but may be connected via a network (not shown).

[0038] The input information storage unit 131 stores, for example, future operating conditions, various setting conditions, and the like, input via the user interface 140.

[0039] The measurement information storage unit 132 sequentially stores and stores the measurement information acquired by the measurement information acquisition unit 110 .

[0040] The program storage unit 133 stores the programs installed in the pitting corrosion progress management device 100. At this time, data for calculations accompanying the programs are also stored.

[0041] The calculation result storage unit 134 sequentially stores and stores the results calculated by the calculation unit 120. The calculation result storage unit 134 stores, as information relating to the amount of pitting corrosion progress from the past to the present (past pitting corrosion progress amount), for example, the results of calculation of the amount of pitting corrosion progress from the past to the present in a periodic calculation process described later with reference to Fig. 6. This information functions as information relating to the amount of past pitting corrosion progress.

[0042] The calculation result storage unit 134 also stores calculation results such as the amount of pitting corrosion progression in the future (future pitting corrosion progression amount), inspection threshold value, recommended inspection timing, etc., as information related to the amount of pitting corrosion progression in the future, which will be described later with reference to Fig. 6. This information functions as information related to the amount of future pitting corrosion progression.

[0043] The inspection threshold is a threshold value indicating the amount of pitting corrosion progression at which inspection is recommended, and the recommended inspection time is the time (year, month, and date) when inspection is recommended.

[0044] The pattern-specific pitting corrosion progress amount storage unit 135 stores the amount of pitting corrosion progress calculated in advance for each pattern in the future operating conditions input via the user interface 140. The pattern-specific pitting corrosion progress amount storage unit 135 may be a part of the program storage unit 133. In other words, it may be stored in the program storage unit 133 as a part of data for calculations attached to the program, and this part may be called the pattern-specific pitting corrosion progress amount storage unit 135.

[0045] The template storage unit 136 stores templates that are to be common parts when generating images to be displayed on the user interface 140 .

[0046] The display information storage unit 137 stores the display information generated by the display information generation unit 125 .

[0047] The user interface 140 comprises a display unit that displays various information to a user (administrator) and an input device through which the user inputs various information. The display unit is, for example, a display. The display unit may also be configured with a touch panel that has the function of a display screen and also has the function of an input device that allows direct input to the screen. The input device may be, for example, a keyboard or a mouse. The input device has an information exchange terminal with, for example, a USB port that allows input of various setting conditions and the like in a predetermined format. As described above, the input function of the display unit may be used in some cases.

[0048] The user interface 140, particularly the input section, may be different for the manager of the power generation facility 1 and for the manager of the manufacturer of the steam turbine 10.

[0049] The progress control unit 150 controls the progress of each flow in the pitting progress amount management method performed by the pitting progress amount management device 100. The progress control unit 150 also makes a judgment for each judgment step in these flows. Specifically, the progress control unit 150 makes a judgment in the flows shown in Figs. 8 to 10 described later, and instructs a part in the pitting progress amount management device 100 that should perform a corresponding function to perform that function in each step. For example, a programmable logic controller may be used as the progress control unit 150.

[0050] <Input screen>

[0051] FIG. 3 is a diagram showing an example of an input screen 141 for inputting future operating conditions to be displayed on the user interface 140 in the pitting corrosion progress management device 100 according to the first embodiment.

[0052] In part A at the top left of the input screen 141, the heading "Future operation plan setting" is displayed.

[0053] In part B below the title, the subtitle "Select Start Up Pattern" is displayed, and in part C below that, the title "Select Oparion Pattern" is displayed.

[0054] Further below that, in section D, a subtitle "Daily Load Curve" is displayed, and below that, in the example of FIG. 3, a graph F is displayed in which curves (daily load curves) showing temporal changes in load in three days are plotted as operation patterns. The horizontal axis of graph F is the time in a day, and the vertical axis is the load ("Load [MW]"). Here, the load may be the output [MW] of the generator 20.

[0055] Below graph D, table F for inputting operation patterns is displayed. Each horizontal column of table F is a field for inputting the operation pattern, unit, and each year from the current year onwards. Each vertical row of table F is pattern 1 to 3 and the operation rate [%] for each year. The input fields for patterns 1 to 3 are the percentage [%] of the days when the operation pattern is performed relative to the number of days in a year. The value of the operation rate [%] is the percentage [%] of operation time in a year. In this way, future operating conditions, i.e. the start-up pattern and operation pattern for each year, can be set as desired.

[0056] A "Back" selection indicator H and a "Save" selection indicator K are displayed in the upper right portion of input screen 141. When "Save" is pressed, the information entered in table F is stored and stored in display information storage unit 137. When "Back" is pressed without pressing "Save", the display of the information entered in table F returns to the display before input.

[0057] In addition, when the selection display is expressed as "pressing" here, this is intended to collectively refer to the action of touching the part on a touch screen, clicking with a cursor, or other actions that identify or select the part by acting on the part from the outside. The same applies hereinafter.

[0058] <Pitting corrosion progress evaluation> Here, the pitting corrosion progress evaluation in the fixed-period calculation process will be described. Below, the flow in each pitting corrosion progress calculation period ΔT will be described. Here, the period of the fixed-period calculation process will be referred to as the pitting corrosion progress calculation period ΔT. In other words, the fixed-period calculation process is performed every pitting corrosion progress calculation period ΔT (for example, every hour).

[0059] Fig. 4 is a flow diagram showing the procedure of a pitting corrosion progress evaluation step S100 by the pitting corrosion progress amount management device 100 according to the first embodiment. Here, Fig. 4 shows details of the procedure of a fixed-period calculation step S100 following a plan information acquisition step S22, which will be described later with reference to Fig. 9.

[0060] Prior to the pitting corrosion progress evaluation step S100, the measurement information acquisition unit 110 acquires measurement information including the generator output from the power generation facility control device 40 (step S22).

[0061] In the pitting corrosion progress evaluation step S100, first, the progress control unit 150 sets f=1 (step S101). Here, f is a number used when ranking the types of water quality parameters. Also, F is the number of types of water quality parameters. For example, the target water quality parameters are selected from the water quality parameters chlorine concentration, acid electrical conductivity, silica concentration, hydrazine concentration, sodium concentration, SO4 concentration, dissolved oxygen concentration, and pH. When all of them are selected, there are eight types, and the maximum value of f, F, is 8.

[0062] Next, the average value calculation unit 122 calculates the average value of the time data (water quality data) acquired at each acquisition cycle of the f-th water quality parameter in the pitting corrosion progress calculation cycle ΔT (step S102). For example, for water quality data acquired at an acquisition cycle of one minute, the average value is calculated over the pitting corrosion progress calculation cycle ΔT of one hour. Next, the progress control unit 150 determines whether f has reached F (step S103), and if it is determined that f has not reached F (step S103 NO), it adds 1 to f (step S104) and repeats steps S102 and S103.

[0063] When it is determined that f has reached F (YES in step S103), the wet / dry alternation determination unit 121 derives the range of the generator output in the pitting corrosion progress calculation period ΔT. Specifically, the maximum value GLH and the minimum value GLL of the generator output in the pitting corrosion progress calculation period ΔT are derived (step S105).

[0064] Next, the progress control unit 150 sets i=1 (step S106). Here, i is the serial number of the implantation parts L1 to L3 of the low-pressure turbine 13 to be evaluated. For the implantation parts L1 to L3, i=1 to 3. The maximum value of i is I. In this case, I=3.

[0065] Next, the wet / dry alternating determination unit 121 determines whether or not there is wet / dry alternating operation for the case of i (step S107). The presence or absence of wet / dry alternating operation is determined as follows: if there is GLCi between GLH and GLL in the pitting calculation cycle, there is wet / dry alternating operation; if there is no GLCi between GLH and GLL, there is no wet / dry alternating operation. GLCi is the generator output at which the wet / dry alternation is switched, and is a constant set for each turbine design and each stage. That is, if the value of JDG calculated by the following formula (1) is negative, it is determined that there is wet / dry alternating operation. The value of GLCi is stored in the program storage unit 133 together with the program as data accompanying the program.

[0066] JDG=(GLH-GLCi)×(GLL-GLCi) ···(1)

[0067] First, a case where it is determined that the wet / dry alternating operation is performed in the pitting corrosion calculation cycle (YES in step S107) will be described.

[0068] First, the pitting corrosion progress calculation unit 123 calculates a correction coefficient C using the average value of the fth water quality parameter. fi1 (f=1 to F) are calculated (step S108a). Here, each correction coefficient C fi1is the water quality correction factor for the pitting corrosion growth rate (da / dt) when wet and dry alternate operation is performed. Correction factor C fi1 The formula for calculating the above and the coefficients of the formula are stored in the program storage unit 133 as data accompanying the program.

[0069] Next, the pitting corrosion progress calculation unit 123 calculates the pitting corrosion progress rate (da / dt) (step S109a).

[0070] The pitting corrosion growth rate (da / dt) is calculated by the pitting corrosion growth calculation unit 123 using a correction coefficient C fi1 It is calculated as a value of a function that depends on (f=1 to F). Note that each coefficient and the like used in this function are also stored in program storage unit 133 as data accompanying the program.

[0071] Next, the pitting corrosion progress calculation unit 123 multiplies the pitting corrosion progress rate (da / dt) by the pitting corrosion progress calculation period ΔT to calculate the pitting corrosion progress amount of the evaluation object i in the pitting corrosion progress calculation period ΔT (step S110a). The pitting corrosion progress amount is added to the pitting corrosion amount at the start point of the pitting corrosion progress calculation period ΔT of the evaluation object i to calculate a new pitting corrosion amount. The initial value of the pitting corrosion depth is stored in the program storage unit 133 as data accompanying the program. If a defect removal (skin cut) is performed during a periodic inspection by cutting the surface of the implanted portion, the initial pitting corrosion value immediately thereafter is reset to 0.

[0072] Next, a case where it is not determined that the wet-dry alternating operation is performed in the pitting corrosion calculation cycle (NO in step S107) will be described.

[0073] First, the pitting corrosion progress calculation unit 123 calculates a correction coefficient C using the average value of the fth water quality parameter. fi2 (f=1 to F) are calculated (step S108b). Here, each correction coefficient C fi2 is the water quality correction factor for the pitting corrosion growth rate (da / dt) when there is no wet / dry alternating operation. Correction factor C fi2The formula for the calculation and the coefficients of the formula are stored in the program storage unit 133 as data accompanying the program.

[0074] Next, the pitting corrosion progress calculation unit 123 calculates the pitting corrosion progress rate (da / dt) in the same manner as in step S109a (step S109b). Furthermore, the pitting corrosion progress calculation unit 123 multiplies the pitting corrosion progress rate (da / dt) by the pitting corrosion progress calculation period ΔT in the same manner as in step S110a to calculate the pitting corrosion progress amount of the evaluation object i in the pitting corrosion progress calculation period ΔT (step S110b). Furthermore, this pitting corrosion progress amount is added to the pitting corrosion amount at the start point of the pitting corrosion progress calculation period ΔT of the evaluation object i to calculate a new pitting corrosion amount.

[0075] Next, the progress control unit 150 judges whether or not i has reached the maximum value I (step S111). If it is not judged that i has reached the maximum value I (step S111 NO), 1 is added to the value of i (step S112), and steps S107 to S111 are repeated.

[0076] When it is determined that i has reached the maximum value I (YES in step S111), the pitting progress evaluation step S100 for the pitting progress calculation cycle ΔT in the fixed cycle calculation process is terminated.

[0077] <Calculation of future pitting corrosion progression> Fig. 5 is a flow diagram showing the procedure of a step (future prediction step) S200 of future prediction calculation by the future prediction unit 124 of the pitting corrosion progress management device 100 according to the first embodiment. Fig. 5 shows details of the procedure of the future prediction step S200 following the future operation plan reading step S32 described below with reference to Fig. 10. Note that Fig. 5 shows a separate flow for each evaluation target (implanted portions L1 to L3). Although not shown, the future prediction unit 124 automatically performs evaluation in the order of each evaluation target (implanted portions L1 to L3).

[0078] In the future prediction step S200, no pitting corrosion progression calculation is performed, but the pitting corrosion progression amount for each year is calculated using the pitting corrosion progression amount calculated in advance for each pattern and stored in the pattern-specific pitting corrosion progression amount memory unit 135 and the input values ​​of each pattern for each year input via the user interface 140.

[0079] First, the future prediction unit 124 sets m=1 and D1=D0 (step S201). Here, m indicates the order of the year, for example, 2045. Also, D0 is the initial value of the pitting corrosion amount calculation for the first year of the future calculation (for example, the year to which the present belongs, or the next year). For example, if m=1 is the year to which the present belongs, it is the current pitting corrosion amount, that is, the current value obtained by periodic calculation. The value of D0 is stored in the calculation result storage unit 134. Also, the calculation result storage unit 134 stores the latest pitting corrosion amount calculated in the following steps.

[0080] Next, the future prediction unit 124 calculates m =D m―1 , ΔD m = 0, j = 1 (step S202). In other words, the initial value of the amount of pitting corrosion in the year to be calculated is set to the amount of pitting corrosion at the end of the previous year, and the amount of pitting corrosion progress in the current year (year m) is set to ΔD m is set to 0. Here, j (j=1 to J) is the number of the future driving pattern in the input screen 141 of Fig. 3. Each pattern related to "driving pattern" in Table F is arranged in a consistent number, and the total number is set to J. For example, in the case of the input screen 141 shown in Fig. 3, J is 3.

[0081] Next, the future prediction unit 124 derives the operation time of the jth pattern (step S203). Specifically, the operation time is calculated by multiplying the operation rate of the jth pattern in the mth year, which is input on the input screen 141 of the user interface 140 in FIG. 3 and stored in the input information storage unit 131, by the total time for one year.

[0082] Next, the future prediction unit 124 reads out the pre-calculated hourly contribution Δdj to the pitting corrosion progression amount by pattern from the pattern-specific pitting corrosion progression amount storage unit 135 (step S204), and multiplies it by the operating time of the jth pattern to obtain the annual pitting corrosion progression amount ΔD j is calculated (step S205).

[0083] Next, the future prediction unit 124 calculates the pitting corrosion progress amount ΔD of the jth pattern derived in step S205. j The amount of pitting corrosion in the mth year ΔD is calculated by adding the above values ​​in order. m (Step S206). The future prediction unit 124 also determines whether j has reached J (Step S207), and if j has not reached J (NO in Step S207), adds 1 to j (Step S209) and repeats Steps S203 to S207.

[0084] If it is determined that j has reached J (YES in step S207), the future prediction unit 124 calculates a new pitting corrosion amount D m In detail, the amount of pitting corrosion D in the (m-1)th year stored in the calculation result storage unit 134 is calculated (step S208). m-1 The amount of pitting corrosion growth in the mth year ΔD calculated in step S206 is read out. m Adding this, the new pitting corrosion amount D in the mth year is m Calculate the new pitting corrosion amount D in the mth year. m is stored in the calculation result storage unit 134.

[0085] Next, the future prediction unit 124 determines whether m has reached M (step S210), and if m has not reached M (step S210 NO), it adds 1 to m (step S211) and repeats steps S202 to S210. If it is determined that m has reached M (step S210 YES), the future prediction step S200 is terminated.

[0086] <Output screen> FIG. 6 is an output screen 142 showing an example of the results of the periodic calculation and the future prediction calculation displayed on the user interface 140 in the pitting corrosion progress management device 100 according to the first embodiment.

[0087] The top section A has the title "Turbine rotor implant pitting corrosion prediction."

[0088] Below that, in section B, the name of the plant in question is displayed.

[0089] In part C below part B, the title "Pitting corrosion depth" is displayed. In part C, the check box on the right side is used to select the water quality parameter screen shown in Figure 7 via a pull-down menu, allowing the user to switch the target information.

[0090] A graph F showing the results of the periodic calculation and future prediction calculation is displayed in the lower part of the output screen 142. The horizontal axis of the graph is the calendar year, and the year is displayed at the midpoint of the calendar year (for example, June 30). The vertical axis is the "Pitting corrosion depth ratio [mm / mm]."

[0091] The options "5 years", "10 years", "15 years", and "20 years" are displayed in section D above graph F. In the case of output screen 142, "5 years" has been selected, so the calendar year on the horizontal axis of graph F is the solid line LC indicating the present in the center of the horizontal axis, with the past five years displayed to the left of the solid line LC and the future five years displayed to the right.

[0092] Curves L11 to L31 and curves L12 to L32 in graph F indicate the amount of pitting corrosion of implanted parts L1 to L3, respectively. Curves L11 to L31 on the left side of solid line LC indicate the results of periodic calculations up to the present. Curves L12 to L32 on the right side of solid line LC indicate the results of future calculations. The line type and the name of the evaluation part indicated by the curve are displayed in part E in the upper right of graph F. Curves L11 to L31 and curves L12 to L32 are displayed in a manner that corresponds to the line indicating the managed object displayed in part E (line type, color, etc.). If necessary, the results of periodic calculations and the results of future calculations may be distinguished from each other.

[0093] As described later, the future prediction calculation process for creating the future curves L12 to L32 is performed only when it is determined that a future operation plan has been input. The initial value of the pitting corrosion at this time is the final value when it is determined that a future operation plan has been input. Meanwhile, the periodic calculation of the pitting corrosion progress amount for creating the past curves is performed at every pitting corrosion progress calculation period ΔT (for example, every hour). Therefore, for example, every hour, the curves L11 to L31 of the past portion change, and the final value of the past portion, i.e., the intersection point with the solid line LC, continues to increase. For this reason, the deviation between the final value of the past portion, i.e., the intersection point with the solid line LC, and the start point of the future portion, i.e., the intersection point with the solid line LC, increases every hour.

[0094] Graph F in FIG. 6 shows the case where the intersection points of the curves L11 to L31 of the past portion and the solid line LC coincide with the start points, i.e., the intersection points, of the curves L12 to L32 of the future portion and the solid line LC, respectively, that is, the case where the intersection points ...

[0095] A dashed line H1 indicating the inspection threshold level is displayed along the vertical axis of graph F. Correspondingly, table G is displayed in the upper right corner of output screen 142 as an alarm display. Table G displays the "Recommendation" and "Remaining Period" for "Detail rotor inspection." Note that table G may or may not be displayed depending on the determination results described below with reference to Figures 9 and 10.

[0096] On the output screen 142, a pull-down selection field H having a selection indicator (the "R" part) is displayed above the table G. When the selection indicator is pressed, a selection candidate screen such as the input screen 141 for a future operation plan is displayed in a pull-down, and the user can select the screen to transition to.

[0097] Among the items displayed on the output screen 142, the sections A, B, C, and H are common to all the output screens including the output screen 143 shown in FIG.

[0098] 7 is an output screen 143 showing an example of water quality data displayed on the user interface of the pitting corrosion progress amount management device according to the first embodiment. In the following, a description of parts common to the output screen 142 will be omitted.

[0099] In part C, "Steam chloride" is displayed as the selected title. That is, the output screen 143 shows the concentration of chlorine among the water quality data.

[0100] A curve LC showing the chlorine concentration ("Average steam chloride [μg / L]") against the threshold value LCth [μg / L] of the average chlorine concentration [μg / L] is displayed on the graph F1 in the output screen 143.

[0101] In the section D, which is the span selection field for the horizontal axis, 10 years is selected. Here, since the chlorine concentration is the actual value from the past to the present, the curve LC shows the actual value from 10 years ago to the present.

[0102] A straight line LCth indicating the threshold value of the vertical axis is displayed on the graph F1. In the case shown in the graph F1, there are two times when the value of the curve LC indicating the actual chlorine concentration exceeds the straight line LCth indicating the threshold value.

[0103] As a corresponding alarm display, table G1 in the upper right corner displays the number of times that the value of curve LC, which indicates the actual chlorine concentration, has exceeded line LCth, which indicates the threshold, within the range displayed in graph F1, and the time when it most recently exceeded the threshold.

[0104] The output screen 142 and the output screen 143 have been described above with reference to Figures 6 and 7. Note that, although the output screen 143 shows an example of the chlorine concentration as a water quality parameter, by pressing the part C on the output screen, output screens for other water qualities such as acid conductivity, silica concentration, etc. can be displayed.

[0105] Next, each flow of the method for managing the amount of progress of pitting corrosion by the device 100 for managing the amount of progress of pitting corrosion according to the first embodiment will be described.

[0106] <Basic information setting process> 8 is a flow diagram for explaining the initial setting step (S10) of basic information in the pitting corrosion progress management device 100 according to the first embodiment. This basic information setting process is performed by an administrator, engineer, etc. of the manufacturer.

[0107] First, a program is written into the pitting corrosion progress amount management device 100 (step S11). The written program is stored in the program storage unit 133 of the pitting corrosion progress amount management device 100. When the program is written, data information such as various parameters for calculation, setting values, and an initial value of the amount of pitting corrosion is also written. The following steps are based on the premise that the pitting corrosion progress amount management device 100 has been started up after the program has been installed.

[0108] Next, it is determined whether or not there are records related to the turbine rotor implantation portion (step S12). If it is determined that there are no such records (step S12 NO), this flow ends.

[0109] If it is determined that these records exist (YES in step S12), the records are registered (step S13).

[0110] The above is the flow of the basic information setting step S10.

[0111] <Fixed-cycle calculation processing> FIG. 9 is a flow chart for explaining the periodic calculation step (S20) in the pitting corrosion progress management device 100 according to the first embodiment.

[0112] First, the progress control unit 150 determines whether the power generation facility 1 is in operation (step S21). The determination is made based on, for example, the generator output from among the information stored in the measurement information storage unit 132.

[0113] If it is not determined that the power generation equipment 1 is in operation (NO in step S21), the fixed-cycle calculation process is not performed and is terminated.

[0114] If it is determined that the power generation facility 1 is in operation (step S21: YES), the measurement information acquisition unit 110 acquires measurement information as operation data from the power generation facility control device 40 (step S22). Here, the acquired measurement information (measured information) is the generator output and data on each water quality parameter, as described above.

[0115] Next, the calculation of the pitting corrosion progression amount and the like are performed in step S100, which has been described with reference to Fig. 4. The generated calculation results are stored in the calculation result storage unit 134.

[0116] The display information generating unit 125 generates display information based on the calculation results stored in the calculation result storage unit 134 and the information stored in the template storage unit 136 (step S23). Furthermore, the display information generating unit 125 outputs the generated display information to the display information storage unit 137 and the user interface 140. The display information storage unit 137 stores the display information.

[0117] The user interface 140 displays the display information output from the display information generating unit 125 on the display unit as shown in FIGS. 6 and 7 (step S24).

[0118] Here, the display information generating unit 125 outputs display information based on the calculation results for each pitting corrosion progress calculation period ΔT (for example, one hour) to the display information storage unit 137 and the user interface 140. Therefore, the curve from the past to the present in the graph F showing the calculation results of the output diagram 142 shown in Fig. 6 and displayed on the display unit is updated for each pitting corrosion progress calculation period ΔT.

[0119] The above-mentioned processes from step S21 to step S24 are repeated for each pitting corrosion progress calculation period ΔT, that is, for example, every hour. Therefore, the portion of the periodic calculation result displayed in the graph F illustrated in the output screen 142 of Fig. 6 is updated for each pitting corrosion progress calculation period ΔT.

[0120] Next, the progress control unit 150 performs a judgment for each of the implanted portions L1 to L3 to be managed based on the calculation result of the pitting progress amount obtained in step S100. These judgments are also performed every pitting progress calculation period ΔT (for example, one hour).

[0121] The progress control unit 150 judges whether or not the amount of pitting progress of each managed object calculated in step S100 has reached an inspection threshold value (step S25).

[0122] If it is not determined that the pitting corrosion progress amount has reached the inspection threshold value for the turbine rotating portion 10a (NO in step S25), this determination is repeated for each pitting corrosion progress calculation period ΔT.

[0123] When it is determined that the amount of pitting corrosion progress has reached the inspection threshold of the turbine rotating section 10a (step S25: YES), the progress control section 150 outputs information relating to the date on which the amount of pitting corrosion progress reached the inspection threshold (information relating to the recommended inspection timing) to the calculation result storage section 134. The calculation result storage section 134 stores this information. The display information generation section 125 generates display information based on the calculation results stored in the calculation result storage section 134 and the information stored in the template storage section 136 (step S26). Furthermore, the display information generation section 125 outputs the generated display information to the display information storage section 137 and the user interface 140. The display information storage section 137 stores the display information.

[0124] The user interface 140 displays a screen including information related to the recommended inspection timing based on the display information output from the display information generating unit 125 (step S27). Here, the information related to the recommended inspection timing on the screen is the "Detail rotor inspection" portion shown in table G of the output screen 142 shown in Fig. 6. Note that Fig. 6 shows a case in which the recommended inspection timing has not yet arrived within the range of the fixed-period calculation processing, but has arrived within the range of the future prediction calculation processing.

[0125] The above is the flow of the fixed-period calculation process. Next, the flow of the future prediction calculation process will be described.

[0126] <Future prediction calculation processing> FIG. 10 is a flow chart for explaining the future prediction calculation step (S30) in the pitting corrosion progress management device 100 according to the first embodiment.

[0127] Here, the future operating conditions shown in Fig. 3 are initially set on the day the pitting corrosion progress amount management device 100 is installed. After installation, the user inputs the future operating conditions on an annual basis in table F of the input screen 141 shown in Fig. 3 in the user interface 140.

[0128] For example, by pressing a selection button in a pull-down selection field H in an example screen such as the output screen 142 shown in Fig. 6 or the output screen 143 shown in Fig. 7, selection screen items including an input screen 141 for future operating conditions are displayed from the pull-down display. When the input screen 141 is selected in the pull-down selection field H, the screen of the display unit of the user interface 140 switches to the input screen 141 for future operating conditions shown in Fig. 3. At this time, the display information generating unit 125 inputs information related to the selection of the input screen 141 from the user interface 140, and outputs display information for displaying the input screen 141 on the user interface 140.

[0129] After inputting the future operating conditions, the user presses the "Save" display in the input screen 141 in Fig. 3. The user interface 140 receives the input from the "Save" display and outputs information related to the future operating conditions to the input information storage unit 131. The input information storage unit 131 stores the information related to the future operating conditions.

[0130] The progress control unit 150 receives information from the user interface 140 accompanying the pressing of the "Save" button and determines that future driving conditions have been input.

[0131] In the procedure of the future prediction calculation process shown in FIG. 10, under the above background, first, the progress control unit 150 determines whether or not future operating conditions have been input (step S31).

[0132] If it is determined in step S31 that the future operating conditions have not been input (NO in step S31), the progress control unit 150 repeats this determination for each pitting progress calculation period ΔT.

[0133] If it is determined in step S31 that future operating conditions have been input (YES in step S31), the future prediction unit 124 reads out a program for executing a future prediction calculation from the program storage unit 133 and the future operating conditions stored in the input information storage unit 131 (step S32).

[0134] Next, the future prediction unit 124 calculates the future pitting corrosion growth amount by the calculation method described with reference to Fig. 5, and outputs the calculation result to the calculation result storage unit 134 (step S200). The calculation result storage unit 134 stores the calculation result.

[0135] The display information generating unit 125 generates display information based on the calculation results stored in the calculation result storage unit 134 and the information stored in the template storage unit 136 (step S33). Furthermore, the display information generating unit 125 outputs the generated display information to the display information storage unit 137 and the user interface 140. The display information storage unit 137 stores the display information.

[0136] The user interface 140 displays the display information output from the display information generating unit 125 on the display unit as shown in the example of FIG. 6 (step S34).

[0137] Here, the display information generating unit 125 executes the calculation process of the future pitting corrosion progress amount in step S200 every time it is determined that a future operation plan has been input in step S31 (YES in step S31), and outputs display information based on the calculation result to the display information storage unit 137 and the user interface 140. Therefore, the graph F (FIG. 6) showing the calculation result related to the future pitting corrosion progress amount displayed on the display unit is updated every time the calculation process of the future pitting corrosion progress amount is executed in step S200. In other words, the graph F showing the calculation result related to the future pitting corrosion progress amount is updated every time information is received in response to pressing "Save" in section K on the input screen 141 for future operating conditions.

[0138] The above-mentioned processes from step S31 to step S34 are repeated every time it is determined that a future operation plan has been input. Therefore, the curve showing the calculation result regarding the future pitting corrosion progress amount displayed in graph F illustrated in the output screen 142 of Fig. 6 is updated every time.

[0139] Next, the progress control unit 150 judges whether or not the amount of pitting corrosion progression calculated in step S200 has reached the inspection threshold value of the object to be managed, that is, the implanted portions L1 to L3 (step S35).

[0140] If it is not determined that the pitting corrosion progress amount has reached the inspection threshold value of the managed object (step S35 NO), the display information generating unit 125 generates display information based on the calculation results stored in the calculation result storing unit 134 and the information stored in the template storing unit 136 (step S46). The details are as follows.

[0141] First, at the stage of delivery of the power generation facility 1 from the manufacturer of the pitting corrosion progress amount management device 100 to the customer, the initial environment settings are made within the manufacturer, and table G may be displayed as an alarm display on the output screen 142 of the pitting corrosion progress amount management device 100 illustrated in Fig. 6. Alternatively, table G may already be displayed as an alarm display before the judgment in step S35.

[0142] If it is not determined in this determination in step S35 that the amount of pitting corrosion progress has reached the inspection threshold value of the managed object (step S35 NO), the display information generating unit 125 generates display information without displaying table G as an alarm display (step S36). Similar display information is output when a display without an alarm display has already been set, but in this case, a method may be used in which the same display information is not output again.

[0143] Furthermore, the display information generating unit 125 outputs the generated display information to the display information storage unit 137 and the user interface 140. The display information storage unit 137 stores and stores the display information. The user interface 140 displays a screen based on the generated information (step S37). Thereafter, step S35 and subsequent steps are repeated.

[0144] When it is determined that the amount of pitting corrosion progress has reached the inspection threshold of the turbine rotating section 10a (YES in step S35), the progress control section 150 outputs information on the date when the amount of pitting corrosion progress reached the inspection threshold (information on the recommended inspection timing) to the calculation result storage section 134. Here, in the case of graph F on the output screen 142 illustrated in FIG. 6, the curves L12 to L32 on the right side of the line C indicating the present, which indicates the amount of pitting corrosion progress in the future, change linearly for each year. That is, the curves L12 to L32 are broken lines. The information on the year and month is obtained by calculating the value on the horizontal axis of the point where the line H1 indicating the inspection threshold and any of the curves L12 to L32 first intersect.

[0145] The calculation result storage unit 134 stores this information. The display information generation unit 125 generates display information based on the calculation results stored in the calculation result storage unit 134 and the information stored in the template storage unit 136 (step S38). Furthermore, the display information generation unit 125 outputs the generated display information to the display information storage unit 137 and the user interface 140. The display information storage unit 137 stores the display information.

[0146] The user interface 140 displays a screen including information related to the recommended inspection timing based on the display information output from the display information generating unit 125 (step S39). Here, the information related to the recommended inspection timing on the screen is the dotted line H1 indicating the inspection threshold in table G and graph F in the output screen 142 in Fig. 6 shown as an example.

[0147] As described above, the procedure of the future prediction calculation process updates information on the future pitting corrosion progression amount on the output screen 142 illustrated in Fig. 6. The information on the future pitting corrosion progression amount on the output screen 142 changes depending on the future operating conditions. In addition, the recommended inspection timing also changes depending on the future operating conditions.

[0148] According to the pitting corrosion progression amount management device 100 of the first embodiment described above, the amount of pitting corrosion progression from the past to the present predicted based on the operating data of the actual machine, and the amount of pitting corrosion progression in the future predicted based on assumed operating conditions can be displayed in chronological order on the graph F of the output screen 142 on the display section of the user interface 140. In addition, as shown in the output screen 143 as an example, the transition of the value of each water quality parameter in the past can be displayed. As a result, the past performance and the future prediction of pitting corrosion can be visually confirmed.

[0149] Furthermore, in the pitting corrosion progress amount management device 100, the inspection threshold value can be displayed on the graph F of the output screen 142. This allows the user to visually confirm the recommended inspection timing for the managed object.

[0150] By specifically recognizing the recommended inspection timing, the user can make appropriate preparations for the relevant periodic inspection, such as adjusting the process and work location and securing the budget.

[0151] The pitting corrosion progression amount management device 100 can display the calculation results of the future pitting corrosion progression amount based on the operating conditions input on the future operating condition input screen 141 shown in Fig. 3. Therefore, by changing the operating conditions on the future operating condition input screen 141, the user can visually confirm the difference in the future pitting corrosion progression amount due to the operating conditions in the graph F on the output screen 142. In addition, the user can visually confirm the difference in the recommended inspection timing due to the future operating conditions in the table G as an alarm display on the output screen 142.

[0152] Second Embodiment In the second embodiment, another example of information relating to the future pitting corrosion growth amount displayed on the display unit of the user interface 140 will be described.

[0153] 11 and 12 are flowcharts for explaining the future prediction calculation process in the pitting corrosion progress amount management device 100 according to the second embodiment. Since the flowchart cannot be shown in one diagram due to the configuration of the drawings, FIG. 12 shows the flowchart following NO in step S41 in FIG. 11. FIG. 12 is a diagram showing an example of a display screen in the pitting corrosion progress amount management device 100 according to the second embodiment. In the second embodiment, the same components as those in the pitting corrosion progress amount management device 100 of the first embodiment are denoted by the same reference numerals, and duplicated explanations are omitted or are given in brief.

[0154] The second embodiment differs from the pitting corrosion progress amount management device 100 of the first embodiment in that the output screen 144 (FIG. 13) showing the calculation results of the pitting corrosion progress amount can simultaneously display calculation results under other future operating conditions. This different configuration will be mainly described here. The fixed-period calculation process of pitting corrosion progress in the second embodiment is similar to the fixed-period calculation process in the first embodiment.

[0155] In the future prediction calculation process in the second embodiment shown in FIG. 11 and FIG. 12, steps S41 to S46 are added to the future prediction calculation process in the first embodiment.

[0156] Here, after inputting the future operating conditions, the user presses the selection display K of "Save" in Fig. 3. In the future prediction calculation process in the second embodiment, similarly to the future prediction calculation process in the first embodiment, the user interface 140 receives the input from the selection display K of "Save" and outputs information related to the future operating conditions to the input information storage unit 131. The input information storage unit 131 stores the information related to the future operating conditions.

[0157] Furthermore, the progress control unit 150 receives information from the user interface 140 in response to pressing of the "Save" selection display K, and determines that future driving conditions have been input.

[0158] As shown in FIG. 11, the progress control unit 150 determines whether or not a future driving condition has been input (step S31).

[0159] When it is determined in step S31 that the future operating conditions have been input (YES in step S31), the process is executed from step S32 through step S200 to step S34 as described above. Then, after the process of step S34, the process of step S31 is executed again as described above.

[0160] On the other hand, when it is determined in step S31 that the future operating conditions have not been input (NO in step S31), as shown in Fig. 12, the display information generating unit 125 determines whether or not there is a request to display the results of the calculation under other future operating conditions (comparison calculation results) (step S41). The comparison calculation results are calculation results that have already been predicted based on other future operating conditions, and are stored in the calculation result storage unit 134. The other future operating conditions function as second future operating conditions, and the comparison calculation results function as second future pitting corrosion progress amount related information.

[0161] Here, FIG. 14 is a diagram showing an example of a selection screen 145 for selecting the comparison calculation results to be displayed on a user interface 140 in the pitting corrosion progress management device according to the second embodiment.

[0162] For example, by pressing the pull-down selection field H on the output screen 142 shown in Fig. 6, selection items such as a selection screen 145 are displayed in the pull-down selection field H, although not shown. Then, when the selection screen 145 is selected from the selection items in the pull-down selection field H, the screen of the display unit of the user interface 140 switches to the selection screen 145 shown in Fig. 14. At this time, the display information generating unit 125 inputs information related to the selection of the selection screen 145 from the user interface 140, and outputs display information for displaying the selection screen 145 on the user interface 140.

[0163] 14, a list of already calculated calculation results stored in the calculation result storage unit 134 is displayed in the list display unit 145a. Also shown here is an example of the list display unit 145a that also displays the date and time stored in the calculation result storage unit 134. In the list display unit 145a, for example, the file names of five calculation results are displayed in order of the most recent date and time stored in the calculation result storage unit 134. Note that the configuration displayed in the list display unit 145a is not limited to this. It is sufficient that the list display unit 145a displays a list of already calculated calculation results.

[0164] The user selects the file name of the calculation result that the user wishes to display as the comparison calculation result, for example, in graph F of output screen 142 in Fig. 6, from the list displayed in list display section 145a. Then, the user presses Load button 145b on selection screen 145. When the user presses Load button 145b, the screen switches to output screen 142 showing the calculation result.

[0165] The BACK button 145d is a button to be pressed when returning to the output screen 142, for example, without pressing the Load button 145b or the Reset button 145c.

[0166] The display information generating unit 125 receives a signal based on the pressing of the Load button 145b from the user interface 140, and determines in step S41 that there is a request to display the comparison calculation result.

[0167] When it is determined in step S41 that there is a request to display the comparison calculation result (step S41 YES), the display information generating unit 125 generates display information based on the calculation result stored in the calculation result storage unit 134 and the information stored in the template storage unit 136 (step S42). Here, the display information generating unit 125 reads out both the calculation result based on the future driving conditions stored in the calculation result storage unit 134 and the selected comparison calculation result. Then, the display information generating unit 125 outputs the generated display information to the display information storage unit 137 and the user interface 140. The display information storage unit 137 stores the display information.

[0168] The user interface 140 displays the display information output from the display information generating unit 125 on the display unit as shown in Fig. 12 (step S43). As shown in Fig. 13, the output screen 144 displays curves L12a to L32a, each indicated by a two-dot chain line, as a comparison calculation result, in addition to curves L12 to L32 as a calculation result based on future operating conditions, as the future pitting corrosion progression amount. Note that the curves L12a to L32a may be displayed to be distinguished from one another, as necessary.

[0169] Specifically, the pitting corrosion progression ratio in each calculation result is shown in chronological order as the future pitting corrosion progression amount. The pitting corrosion progression ratio in the comparison calculation result is shown by the dashed line L3. Also, in table M as an alarm display, the recommended inspection timing and replacement timing for each calculation result are displayed. As shown in FIG. 13, the past pitting corrosion progression amount is also shown in chronological order.

[0170] The recommended inspection time in the comparison calculation result functions as a second recommended inspection time, and the recommended replacement time in the comparison calculation result functions as a second recommended replacement time.

[0171] When it is determined in step S61 that there is no request to display the comparison operation result (NO in step S41), the display information generating unit 125 determines whether there is a request to delete the display of the comparison operation result (step S64).

[0172] Here, the user can delete the comparison calculation result shown on the output screen 144 of Fig. 13 by pressing the Reset button 145c on the selection screen 145 of Fig. 14. The display information generating unit 125 receives a signal based on the pressing of the Reset button 145c from the user interface 140, and determines in step S64 that there is a request to delete the display of the comparison calculation result. When the user presses the Reset button 145c, the screen is switched to a display screen showing the calculation result.

[0173] When it is determined in step S44 that there is a request to delete the display of the comparison calculation result (step S44 YES), the display information generating unit 125 generates display information based on the calculation result stored in the calculation result storage unit 134 and the information stored in the template storage unit 136 (step S45). Here, the display information generating unit 125 reads out the calculation result based on the future driving conditions stored in the calculation result storage unit 134. Then, the display information generating unit 125 outputs the generated display information to the display information storage unit 137 and the user interface 140. The display information storage unit 137 stores the display information.

[0174] The user interface 140 displays the display information output from the display information generating unit 125 on the display unit as shown in Fig. 12 (step S46). That is, as shown in Fig. 6, the comparison calculation results are deleted from the output screen 142, and only the calculation results based on the future operating conditions are displayed.

[0175] In the case where it is determined in step S44 that there is no request to delete the display of the comparison operation result (NO in step S44), the process returns to step S31.

[0176] After the process of step S200, the progress control unit 150 determines whether the amount of pitting corrosion progress has reached the replacement threshold based on the calculation result of step S200 (step S35), as described above. Then, the processes of steps S37 to S39 are executed, as described above.

[0177] The information on the future pitting corrosion progression amount on the output screen 144 is updated each time information is received in response to the selection display K of “Save” on the input screen 141 for future operating conditions and the pressing of the Load button 145b or the Reset button 145c on the selection screen 145 for the comparison calculation results.

[0178] Although an example in which one operation result is selected as the comparison operation result has been shown here, a setting may be made such that a plurality of comparison operation results can be selected.

[0179] According to the above-described pitting corrosion progress amount management device 100 of the second embodiment, the same effects as those of the pitting corrosion progress amount management device 100 of the first embodiment can be obtained.

[0180] Furthermore, according to the pitting corrosion progress amount management device 100 of the second embodiment, both the calculation result predicted based on future operating conditions and the comparison calculation result can be displayed on the output screen 144 as the future pitting corrosion progress amount.

[0181] This allows the user to visually confirm the difference between the pitting corrosion progression amount in the calculation result based on the future operating conditions and the pitting corrosion progression amount in the comparative calculation result in the graph F1 on the output screen 144. In addition, the user can visually confirm the difference between the recommended inspection timing in the calculation result based on the future operating conditions and the recommended inspection timing in the comparative calculation result in the table G1 as an alarm display on the output screen 144.

[0182] According to the embodiment described above, it is possible to provide a pitting corrosion progression amount management device for a steam turbine rotor, which is capable of recognizing, in a chronological order, the amount of pitting corrosion progression from the past to the present predicted based on measured information and the amount of future pitting corrosion progression predicted based on future operating conditions.

[0183] [Other embodiments] Although the embodiments of the present invention have been described above, the embodiments are presented as examples and are not intended to limit the scope of the invention. In addition, the features of each embodiment may be combined. Furthermore, the embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. The embodiments and their modifications are included in the scope of the invention and its equivalents as described in the claims, as well as in the scope and gist of the invention. [Explanation of symbols]

[0184] 10... steam turbine, 10a... turbine rotating part, 11... high pressure turbine, 12... intermediate pressure turbine, 13... low pressure turbine, 13a... low pressure turbine rotating part, 13b... low pressure casing, 14... crossover pipe, 15... exhaust pipe, 16... condenser, 17... feed water pump, 18... feed water pipe, 20... generator, 30... heat source device, 31... boiler, 32... reheater, 33... main steam pipe, 34... low temperature reheat pipe, 35... high temperature reheat pipe, 40... control device in power generation equipment, 100... pitting corrosion progress amount management device, 110... measurement information acquisition unit, 120... calculation unit, 121... dry / wet alternating determination unit, 122... average value calculation unit, 123... pitting corrosion progress calculation unit, 124... future prediction unit, 125... display information generation unit, 130... storage unit, 131... input information storage unit, 132... measurement data storage unit, 133... program storage unit, 134... calculation result storage unit, 135... pattern-specific pitting corrosion progress amount storage unit, 136... template storage unit, 137... display information storage unit, 140... user interface, 141... input screen, 142, 143, 144... output screen, 145... selection screen, 150... progress control unit

Claims

1. a display information generating unit that generates display information for displaying on a display unit of a user interface: past pitting corrosion progression amount related information indicating information on past pitting corrosion progression amount occurring in the implantation portion of the rotor of the steam turbine from the past to the present, calculated based on measured information; and future pitting corrosion progression amount related information indicating information on future pitting corrosion progression amount occurring in the implantation portion of the rotor of the rotor in the future, calculated based on future operating conditions input through an operation using an input screen of a user interface and the past pitting corrosion progression amount related information.

2. The display information generating unit 2. The device for managing the amount of pitting corrosion progress at an implantation portion of a blade in a rotor of a steam turbine according to claim 1, wherein the display information is generated so that both the information related to the amount of past pitting corrosion progress and the information related to the amount of future pitting corrosion progress are displayed on the display unit in chronological order.

3. The display information generating unit 2. The pitting corrosion progress amount management device for a rotor of a steam turbine according to claim 1, further comprising: a display unit that displays the past pitting corrosion progress amount related information on the display unit at predetermined time intervals, the display information being generated based on the past pitting corrosion progress amount related information.

4. The display information generating unit 2. The device for managing the amount of pitting corrosion progress at an implantation portion of a blade in a rotor of a steam turbine according to claim 1, further comprising: a display unit that displays the information related to the future pitting corrosion progress amount on the display unit each time the future operating conditions are input.

5. the rotor being a blade implant for the last three stages of a low pressure turbine; The display information generating unit 2. The device for managing the amount of pitting corrosion progress at an implantation portion of a blade in a rotor of a steam turbine according to claim 1, wherein the display information is generated so that information relating to an inspection threshold indicating a pitting corrosion progress amount at which inspection of the rotor is recommended, the inspection threshold being calculated based on the future pitting corrosion progress amount, is displayed on the display unit.

6. The display information generating unit 2. The device for managing the amount of pitting corrosion progress at an implantation portion of a blade in a rotor of a steam turbine according to claim 1, further comprising: generating the display information for displaying on the display unit second pitting corrosion progress amount related information indicating information regarding a second future pitting corrosion progress amount of the rotor in the future calculated based on second future operating conditions and the past pitting corrosion progress amount related information inputted in an operation using a user interface screen.

7. The display information generating unit 7. The device for managing the amount of pitting corrosion progression at an implantation portion of a blade in a rotor of a steam turbine as claimed in claim 6, further comprising: a display unit that displays, on the display unit, information relating to a recommended inspection time for the rotor, calculated based on a second pitting corrosion progression amount.

Citation Information

Patent Citations

  • Method and device for diagnosing corrosive environment damage of mechanical structure component

    JP2001041860A

  • Device and method for diagnosing operation of plant equipment

    JP2002073155A

  • Steam turbine rotor

    JP2015052318A

  • Evaluation device for power generator, and evaluation method for power generator

    JP2022077540A

  • Corrosion damage computation unit, corrosion damage computation system, and corrosion damage computation method for low pressure turbine rotor blade implanted part

    JP2022119060A