Column structure and construction method thereof

The method of erecting precast concrete columns with prestressing steel material fixed at both ends addresses verticality and earthquake resistance issues, enabling safe and efficient construction without temporary supports, thus reducing construction time and costs.

JP2024167010APending Publication Date: 2024-11-29TAISEI CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023083517
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-19
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

Existing column structures, particularly unbonded prestressed concrete columns, face challenges in ensuring verticality during erection and lack adequate earthquake resistance, necessitating temporary support which prolongs construction time and increases costs.

Method used

A method involving precast concrete columns with prestressing steel material fixed at both ends, allowing the column to stand upright with introduced prestress, ensuring verticality and enhanced earthquake resistance without temporary supports.

Benefits of technology

Ensures safe and efficient construction by maintaining verticality and improving initial rigidity and earthquake resistance, reducing construction time and costs by eliminating the need for temporary supports and allowing immediate work on column members.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167010000001_ABST
    Figure 2024167010000001_ABST
Patent Text Reader

Abstract

To provide a column structure capable of safely advancing work while ensuring verticality of a column member when the column member is built on a base.SOLUTION: A column-beam frame 1 of a building is constructed by building a second column member 10B on a floor surface 2. On the floor surface 2, a sleeve 40 is provided at the upper end. In the second column member 10B, a bearing plate 41 is provided at the upper end, and a through-hole 43 is formed from the bearing plate 41 to the lower end of the second column member 10B. A PC steel material 44 is inserted into the through-hole 43 of the second column member 10B. The lower end of the PC steel material 44 is fixed to the sleeve 40 of the floor surface 2. The upper end of the PC steel material 44 is fixed to the bearing plate 41 of the second column member 10B by a nut 45. A tensile force is introduced into the PC steel material 44.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a pillar structure constructed by erecting a pillar member on a base, and to a method for constructing such a pillar structure. [Background technology]

[0002] Unbonded prestressed concrete columns have been known in the past (see Patent Documents 1 and 2). Patent Document 1 describes an unbonded precast prestressed concrete column that includes a plurality of precast concrete column bodies arranged vertically, tension members inserted into the precast concrete column bodies in an unbonded state, and assembly reinforcement bars embedded in the precast concrete column bodies, and the assembly reinforcement bars include unattached portions that are not attached to the concrete within the precast concrete column bodies.

[0003] In Patent Document 2, the unbonded PCaPC structure includes a first unbonded PCaPC column body including a first concrete member molded into a column shape and a tendon inserted into the first concrete member in an unbonded state and to which tension is applied, and a second unbonded PCaPC column body including a second concrete member molded into a column shape and a tendon inserted into the second concrete member in an unbonded state and to which tension is applied. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2022-150677 A [Patent Document 2] JP 2021-156152 A Summary of the Invention [Problem to be solved by the invention]

[0005] The present invention aims to provide a pillar structure and a method for constructing the same, which allows work to be carried out safely while ensuring the verticality of the pillar members when erecting them on a base, and which has excellent earthquake resistance. [Means for solving the problem]

[0006] The inventors focused on the fact that by forming a precast concrete column member that is one or more stories high, placing PC steel on the central axis of the column member, and fixing the lower end of the PC steel to a first fixing part provided at the base and fixing the upper end of the PC steel to a second fixing part of the column member, the column member can be made to stand on its own as a prestressed concrete column with prestress introduced in an unbonded state, and arrived at the present invention. The column structure of the first invention (e.g., column-beam frame 1, 1A of a building described later) is a column structure constructed by erecting column members (e.g., first column member 10A, second column member 10B, third column member 10C described later) made of reinforced concrete on a base (e.g., floor surface 2, first column member 10A, second column member 10B, third column member 10C described later), in which a first fixing portion (e.g., sleeve 40 described later) is provided at an upper end of the base, and a second fixing portion (e.g., sleeve 40 described later) is provided at an upper end of the column member. The column member is arranged on the base, and a tension member (for example, PC steel 44 described later) is inserted into the through hole of the column member, the lower end of the tension member is fixed to the first fixing portion, the upper end of the tension member is fixed to the second fixing portion, and a tensile force is introduced into the tension member.

[0007] According to this invention, a column member is placed on a base, a tendon is inserted into the through hole of the column member, the lower end of the tendon is fixed to the first fixing part, and in this state, the tendon is pulled upward and the upper end of the tendon is fixed to the second fixing part. As a result, the column member becomes a prestressed concrete column with prestress introduced in an unbonded state, and stands on its own with verticality secured on the base. Moreover, this prestressed column member has superior initial rigidity and earthquake resistance compared to a column member without prestress. Therefore, work can be carried out safely without temporarily supporting the side of the column member with bracing members during the period from when the column member is erected until the column main reinforcement of the column member is joined to the column main reinforcement of the base, as was done in the conventional method. In addition, after erecting the column member, work can be immediately carried out on this column member without having to join the column main reinforcement of the column member to the column main reinforcement of the base, thereby shortening the construction period of the column structure.

[0008] The column structure of the second invention is characterized in that the column member (e.g., the second column member 10B and the third column member 10C described below) comprises a lower column portion (e.g., the lower column portion 11 described below) extending in the vertical direction, a column-beam joint (e.g., the column-beam joint 12 described below) provided on the lower column portion and to which a beam member is joined, and an upper column portion (e.g., the upper column portion 13 described below) provided on the column-beam joint and extending in the vertical direction.

[0009] According to this invention, the column member is configured to include a lower column section and an upper column section, sandwiching a column-beam joint section. In other words, the height above one story is considered to be one section. Therefore, compared to the case where reinforced concrete column members are joined for each story, construction time can be shortened and construction costs can be reduced.

[0010] The method for constructing a column structure according to the third invention is a method for constructing a column structure in which a column member made of reinforced concrete (e.g., the first column member 10A, the second column member 10B, and the third column member 10C described later) is erected on a base made of reinforced concrete (e.g., a floor surface 2, a first column member 10A, a second column member 10B, and a third column member 10C described later), in which a first fixing portion (e.g., a sleeve 40 described later) is provided at an upper end of the base, a second fixing portion (e.g., a bearing plate 41 described later) is provided at an upper end of the column member, and the second fixing portion (e.g., a bearing plate 41 described later) is provided at an upper end of the column member. The method includes a first step (e.g., step S1 described below) of forming a through hole (e.g., through hole 43 described below) extending from a fixed portion to a lower end of the column member, and positioning the column member on the base, a step (e.g., step S2 described below) of inserting a tension member (e.g., PC steel member 44 described below) into the through hole of the column member and fixing the lower end of the tension member to the first fixed portion, and a step (e.g., step S3 described below) of pulling the tension member upward and fixing the upper end of the tension member to the second fixed portion.

[0011] According to this invention, the same effects as those of the first invention described above are obtained. Effect of the Invention

[0012] According to the present invention, it is possible to provide a pillar structure and a construction method thereof that allows work to be carried out safely while ensuring the verticality of the pillar member when erecting the pillar member on top of the base, and that has excellent earthquake resistance. [Brief description of the drawings]

[0013] [Figure 1] FIG. 1 is a front view of a column-beam frame structure of a building according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is an exploded perspective view of a portion of a column-beam frame of a building according to the first embodiment. [Diagram 3] 2 is a longitudinal cross-sectional view of a portion surrounded by a dashed line A (a second pillar member) and a portion surrounded by a dashed line B (a first pillar member) in FIG. 1. [Figure 4] FIG. 4 is a cross-sectional view of the second pillar member taken along line CC of FIG. 3. [Diagram 5]4 is an enlarged view of the areas surrounded by dashed lines D and E in FIG. 3. [Figure 6] 13 is a flowchart of the procedure for erecting a second pillar member onto the floor surface. [Figure 7] This is an explanatory diagram of the procedure for erecting the second pillar member onto the floor surface. [Figure 8] This is a vertical cross-sectional view of the joint between the column member of the lower floor and the column member of the upper floor, and an enlarged view of the area surrounded by dashed line F. [Figure 9] 4 is a flowchart showing a procedure for constructing a column-beam frame for a building according to the first embodiment. [Figure 10] FIG. 1 is an explanatory diagram of a procedure for constructing a column-beam frame for a building according to the first embodiment (part 1, a situation in which a second column member is erected on the floor surface and a beam member is attached). [Figure 11] FIG. 11 is an explanatory diagram of the procedure for constructing a column-beam frame for a building according to the first embodiment (part 2, the state in which the first column member is erected on the floor surface). [Figure 12] FIG. 11 is an explanatory diagram of the procedure for constructing a column-beam frame for a building according to the first embodiment (part 3, the situation of constructing a beam section for pouring on-site concrete). [Figure 13] FIG. 11 is a front view of a column-beam frame for a building according to a second embodiment of the present invention. [Figure 14] FIG. 14 is a vertical cross-sectional view of a portion (third pillar member) surrounded by a dashed line G in FIG. 13. [Figure 15] 13 is a flowchart showing a procedure for constructing a column-beam frame for a building according to the second embodiment. [Figure 16] FIG. 13 is an explanatory diagram of a procedure for constructing a column-beam frame for a building according to the second embodiment (a situation in which a third column member is erected on the floor surface). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] The present invention relates to a column structure constructed by erecting precast concrete column members (column members 10A, 10B) on a reinforced concrete base (floor surface 2, column members 10A, 10B), and a method for constructing the column structure. Specifically, the lower end of the PC steel 44 inserted into the column members 10A, 10B of the upper floor is fixed to the sleeve 40 at the upper end of the floor surface 2 and column members 10B, 10A of the lower floor, and the upper end of the PC steel 44 is fixed to the bearing plate 41 at the upper end of the column members 10A, 10B of the upper floor. Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following description of the embodiments, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified. [First embodiment] Fig. 1 is a front view of a column-beam frame 1 of a building as a column structure according to a first embodiment of the present invention, Fig. 2 is an exploded perspective view of a part of the column-beam frame 1 of the building. The column-beam structure 1 of the building is made of reinforced concrete and is constructed on a reinforced concrete floor surface 2. The column-beam structure 1 of the building is composed of a first column member 10A, a second column member 10B, a beam member 20, and a beam section 30 where concrete is poured in place.

[0015] The first column member 10A is a vertical member made of precast concrete (PCa) with one section and one story height F1. The first column member 10A is erected on the floor surface 2 as a base or on a column member (second column member 10B) of a lower floor. The second column member 10B is a 1.5-story, 1-section, precast concrete (PCa) vertical member having a height F1.5, which is the height of 1.5 stories. The second column member 10B is erected on the floor surface 2 as a base or on the column member (first column member 10A) of the lower floor. The beam member 20 is a horizontal member made of precast concrete (PCa). The on-site concrete poured beam section 30 is constructed by pouring concrete on-site.

[0016] The first pillar members 10A and the second pillar members 10B are provided alternately in the vertical direction. Also, the first pillar members 10A and the second pillar members 10B are provided alternately in the horizontal direction. The beam member 20 is installed for one span between the first column member 10A and the second column member 10B. The horizontal length of the beam member 20 is shorter than one span between the first column member 10A and the second column member 10B, and a first end portion 21, which is one end side of the beam member 20, is disposed at a predetermined distance from the side surface of the first column member 10A and is joined to the side surface of the first column member 10A via a beam portion 30 poured in-situ concrete. A second end portion 22, which is the other end side of the beam member 20, is directly joined to the side surface of the second column member 10B.

[0017] FIG. 3(a) is a vertical cross-sectional view of the part surrounded by dashed line A in FIG. 1 (second pillar member 10B). FIG. 3(b) is a vertical cross-sectional view of the part surrounded by dashed line B in FIG. 1 (first pillar member 10A). FIG. 4 is a CC cross-sectional view of the second pillar member 10B in FIG. 3(a). FIG. 5(a) is an enlarged view of the part surrounded by dashed line D in FIG. 3(a). FIG. 5(b) is an enlarged view of the part surrounded by dashed line E in FIG. 3(a). The second column member 10B is a column member comprising a lower column portion 11 extending in the vertical direction, a column-beam joint portion 12 provided on the lower column portion 11 and to which the beam member 20 is joined, and an upper column portion 13 provided on the column-beam joint portion 12 and extending in the vertical direction. The first pillar member 10A is a pillar member including a lower pillar portion 11 extending in the vertical direction and a pillar-beam joint portion 12 provided on the lower pillar portion 11 and joined to the beam member 20.

[0018] Below, the second pillar member 10B erected on the floor surface 2 as the base will be described in detail, but the first pillar member 10A erected on the floor surface 2 has the same configuration as the second pillar member 10B. A steel sleeve 40 and column main reinforcement 15 are embedded in the floor surface 2 as the first fixing part, and the column main reinforcement 15 protrudes upward from the floor surface 2. This sleeve 40 has a female thread formed on the inner peripheral surface and is cylindrical with a closed lower end. The second column member 10B comprises a concrete body 14 extending in the vertical direction, column main reinforcements 15 embedded in the concrete body 14 and extending in the vertical direction, web reinforcements (not shown) embedded in the concrete body 14 and wrapped around the column main reinforcements 15 at predetermined intervals, and beam main reinforcements 16 extending horizontally and embedded in the column-beam joint 12 of the concrete body 14. The upper ends of the column main reinforcements 15 protrude upward from the peripheral portion of the upper end surface of the concrete body 14. In addition, the beam main reinforcements 16 protrude laterally from the side surfaces of the concrete body 14.

[0019] A steel bearing plate 41 serving as a second fixing part is buried in the center of the upper end of the concrete body 14. This bearing plate 41 is provided so as to be exposed on the upper end surface of the concrete body 14. A sheath pipe 42 is buried directly below the bearing plate 41 in the concrete body 14, and a through hole 43 is formed by this sheath pipe 42, which extends from the bearing plate 41 to the lower end surface of the concrete body 14. In other words, the through hole 43 is provided on the central axis of the concrete body 14. A reinforcing bar joint 17, which is a cylindrical sleeve, is embedded in the peripheral portion of the lower end of the concrete body 14, and the lower end of the column main reinforcement 15 is joined to the upper end of the reinforcing bar joint 17. The lower end surface of the reinforcing bar joint 17 is exposed at the lower end surface of the concrete body 14.

[0020] A prestressing steel member 44 serving as a tension member is inserted into the through-hole 43 of the second column member 10B. A male thread is formed at least on the upper and lower ends of the prestressing steel member 44. The lower end of the prestressing steel member 44 is screwed into a sleeve 40 embedded in the floor surface 2, whereby the lower end of the prestressing steel member 44 is fixed to the sleeve 40 embedded in the floor surface 2. A nut 45 is screwed into the upper end of the prestressing steel member 44, and the nut 45 is engaged with the support plate 41 of the second column member 10B. As a result, the upper end of the prestressing steel member 44 is fixed to the support plate 41 of the second column member 10B. A tension (tensile force) is introduced into the prestressing steel member 44. In addition, the column main reinforcement 15 protruding upward from the floor surface 2 is inserted into the lower end of the reinforcing bar joint 17 of the second column member 10B, and in this state, the inside of the reinforcing bar joint 17 is filled with grout material 18. In this way, the floor surface 2 and the second column member 10B are joined together.

[0021] Returning to Figure 2, the beam member 20 comprises a concrete body 23 extending horizontally, main beam reinforcement bars 24 embedded in the concrete body 23 and extending horizontally, and stirrups (not shown) embedded in the concrete body 23 and wrapped around the main beam reinforcement bars 24 at predetermined intervals. The beam main reinforcement bars 24 protrude laterally from the end face of the first end 21 of the concrete body 23. The beam main reinforcement bars 24 protruding from the concrete body 23 of the beam member 20 and the beam main reinforcement bars 16 protruding from the side face of the concrete body 14 of the first column member 10A are joined with a joint. In this state, concrete is poured on-site between the end face of the first end 21 of the concrete body 23 of the beam member 20 and the side face of the concrete body 14 of the first column member 10A to construct a field concrete poured beam section 30, and the first end 21 of the beam member 20 and the first column member 10A are joined.

[0022] A reinforcing bar joint 25, which is a cylindrical sleeve, is embedded in the second end 22 of the concrete body 23, and the second end 22 side of the beam main reinforcement 24 is joined to the first end 21 side of the reinforcing bar joint 25. The second end side of the reinforcing bar joint 25 is exposed at the end face of the second end 22 side of the concrete body 23. The beam main reinforcement 16 of the second column member 10B is inserted into the second end 22 side of the reinforcing bar joint 25 of the beam member 20, and in this state, the inside of the reinforcing bar joint 25 is filled with grout material. This joins the second end 22 of the beam member 20 and the second column member 10B.

[0023] The procedure for erecting the second pillar member 10B onto the floor surface 2 will be described with reference to the flow chart of FIG. In step S1, as shown in Fig. 7(a), the second column member 10B is lifted by a lifting machine 50 and placed on the floor surface 2. As a result, the column main reinforcement 15 on the floor surface 2 is inserted into the lower end of the reinforcing bar joint portion 17 of the second column member 10B. In step S2, as shown in FIG. 7(b), the PC steel member 44 is inserted into the through hole 43 of the second pillar member 10B, and the lower end of the PC steel member 44 is fixed to the sleeve 40 of the floor surface 2. In step S3, as shown in Fig. 7(b), the PC steel 44 is pulled upward by the jack 51, and in this state, the upper end of the PC steel 44 is fixed to the support plate 41 of the second column member 10B with the nut 45. As a result, unbonded tension is introduced into the PC steel 44, and the second column member 10B stands upright on the floor surface 2 in a stable state.

[0024] As described above, when erecting the first column member 10A and the second column member 10B on the floor surface 2 serving as the base, the sleeve 40 and the column main reinforcement 15 are embedded in the floor surface 2 as shown in Figure 7(a), and the lower end of the PC steel member 44 is fixed to the sleeve 40 embedded in the floor surface 2, and the column main reinforcement 15 protruding upward from the floor surface 2 is joined to the steel bar joint portion 17 of the first column member 10A and the second column member 10B.

[0025] In contrast to this, when erecting the column members (first column member 10A, second column member 10B) of an upper floor on top of the column members (first column member 10A, second column member 10B) of a lower floor as a base, the following procedure is followed. Fig. 8(a) is a vertical cross-sectional view of a joint between a lower-floor column member (first column member 10A, second column member 10B) and an upper-floor column member (first column member 10A, second column member 10B). Fig. 8(b) is an enlarged view of the area surrounded by the dashed line F in Fig. 8(a). That is, a steel sleeve 40 is screwed and attached as a first fixing part to the upper end of the PC steel 44 of the column members 10A, 10B of the lower floor. The lower end of the through hole 43 of the column members 10A, 10B of the upper floor is expanded in diameter so that the sleeve 40 attached to the PC steel 44 of the column members 10A, 10B of the lower floor can be accommodated. The lower end of the PC steel 44 is screwed and fixed to the sleeve 40 of the column members 10A, 10B of the lower floor, and the column main reinforcement bars 15 protruding upward from the column members 10A, 10B of the lower floor are joined to the reinforcing bar joint parts 17 of the column members 10A, 10B of the upper floor.

[0026] Next, a procedure for constructing the column-beam frame 1 of a building will be described with reference to the flow chart of FIG. In step S11, the second pillar member 10B is erected onto the floor surface 2 as shown in FIG. The procedure for erecting the second pillar member 10B on the floor surface 2 is the same as the above-mentioned steps S1 to S3. As a result, the second pillar member 10B stands upright on the floor surface 2 in a stable state.

[0027] In step S12, as shown in Fig. 10, the beam member 20 is lifted by a lifting machine, and the second end portion 22 of the beam member 20 is joined to the second column member 10B. Note that the beam member 20 is supported from below by a support (not shown) or the like. Specifically, the main beam reinforcement 16 of the second column member 10B is inserted into the reinforcing bar joint portion 25 of the beam member 20, and in this state, grout material is filled inside the reinforcing bar joint portion 25 to join the second end portion 22 of the beam member 20 and the second column member 10B.

[0028] In step S13, the first pillar member 10A is erected onto the floor surface 2, as shown in FIG. The procedure for erecting the first pillar member 10A on the floor surface 2 is the same as the above-mentioned steps S1 to S3. As a result, the first pillar member 10A stands upright on the floor surface 2 in a stable state.

[0029] In step S14, as shown in FIG. 12, the on-site concrete poured beam section 30 is constructed, and the first end portion 21 of the beam member 20 and the first column member 10A are joined. Specifically, the main beam reinforcement 24 of the beam member 20 and the main beam reinforcement 16 of the first column member 10A are joined with a joint, and in this state, formwork is erected between the end face of the first end 21 of the concrete body 23 of the beam member 20 and the side surface of the concrete body 14 of the first column member 10A and concrete is poured on site to construct the on-site concrete poured beam section 30 and join the first end 21 of the beam member 20 and the first column member 10A. In step S15, the above steps S11 to S14 are repeated. In step S15 and after, the second pillar member 10B is erected on the first pillar member 10A instead of on the floor surface 2, and the first pillar member 10A is erected on the second pillar member 10B instead of on the floor surface 2.

[0030] According to this embodiment, the following effects are obtained. (1) The upper floor column members (first column member 10A, second column member 10B) are placed on the floor surface 2 or the lower floor column members (first column member 10A, second column member 10B), then the prestressing steel members 44 are inserted into the through holes 43 of the upper floor column members 10A, 10B, and the lower ends of the prestressing steel members 44 are fixed to the sleeves 40 of the floor surface 2 or the lower floor column members 10A, 10B. In this state, the prestressing steel members 44 are pulled upward, and the upper ends of the prestressing steel members 44 are fixed to the bearing plates 41 of the upper floor column members 10A, 10B with nuts 45. As a result, the upper floor column members 10A, 10B are provisionally fixed to the floor surface 2 or the lower floor column members 10A, 10B, and become prestressed concrete columns to which prestress has been introduced in an unbonded state, and stand on their own with verticality ensured. Moreover, the prestressed column members 10A, 10B of the upper floor have superior initial rigidity and earthquake resistance compared to column members not prestressed. Therefore, unlike the conventional method, from when the upper floor column members 10A, 10B are erected until the column main reinforcements 15 of the upper floor column members 10A, 10B are joined to the floor surface 2 or the column main reinforcements 15 of the column members 10A, 10B of the lower floor, work can be carried out safely without temporarily supporting the sides of the upper floor column members 10A, 10B with bracing members. In addition, after erecting the column members 10A, 10B on the upper floor, work can be immediately carried out on the column members 10A, 10B on the upper floor without first joining the column main reinforcements 15 of the column members 10A, 10B on the upper floor to the floor surface 2 or the column main reinforcements 15 of the column members 10A, 10B on the lower floor, thereby shortening the construction period of the column-beam frame 1 of the building.

[0031] (2) The second column member 10B is configured to include a lower column portion 11 and an upper column portion 13 sandwiching a column-beam joint portion 12, and is configured as one section for 1.5 stories. Therefore, compared to the case where reinforced concrete column members are joined for each story, the construction period can be shortened and construction costs can be reduced.

[0032] Second Embodiment FIG. 13 is a front view of a column-beam frame 1A for a building according to the second embodiment of the present invention. This embodiment differs from the first embodiment in that, instead of using a first pillar member 10A having a height F1 equivalent to one story and a second pillar member 10B having a height F1.5 equivalent to 1.5 stories, a third pillar member 10C having a height F2 equivalent to two stories is used as the pillar member.

[0033] FIG. 14 is a vertical cross-sectional view of the part surrounded by the dashed line G in FIG. 13 (the third pillar member 10C). That is, the third column member 10C is a column member comprising a lower column portion 11 extending in the vertical direction, a column-beam joint 12 provided on the lower column portion 11 and to which the beam member 20 is joined, an upper column portion 13 provided on the column-beam joint 12 and extending in the vertical direction, and a column-beam joint 12 provided on the upper column portion 13 and joined to the beam member 20.

[0034] Next, a procedure for constructing the column-beam frame 1A of a building will be described with reference to the flow chart of FIG. In step S21, the third pillar member 10C is erected onto the floor surface 2 as shown in FIG. In step S22, as shown in Fig. 16, the beam member 20 is lifted by a lifting machine and placed between the third pillar members 10C, and the second end portion 22 of the beam member 20 is joined to one of the third pillar members 10C. Note that this beam member 20 is supported from below by a support (not shown) or the like. In step S23, the on-site poured concrete beam section 30 is constructed, and the first end portion 21 of the beam member 20 is joined to the other third column member 10C. In step S24, the above steps S21 to S23 are repeated. Note that, in and after step S24, the third pillar member 10C is erected not on the floor surface 2 but on top of the third pillar member 10C. According to this embodiment, there are advantages similar to those of (1) and (2) above.

[0035] The present invention is not limited to the above-described embodiment, and modifications and improvements within the scope of the present invention that can achieve the object of the present invention are included in the present invention. [Explanation of symbols]

[0036] 1, 1A... Building's column-beam structure (column structure) 2... Floor surface (base) 10A...First pillar member 10B...Second pillar member 10C...Third pillar member 11...Lower column part 12...Column beam joint part 13...Upper column part 14...Concrete body 15...Column main bar 16...Beam main bar 17...Reinforcing bar joint 18...Grout material 20: Beam member 21: First end portion 22: Second end portion 23: Concrete body 24... Main beam bar 25... Reinforcement bar joint 30…On-site concrete pouring beam section 40...Sleeve (first fixing part) 41...Support plate (second fixing part) 42...Sheath tube 43...Through hole 44...PC steel (tension material) 45...Nut 50...Lifting machine 51...Jack

Claims

1. A column structure constructed by erecting a column member made of reinforced concrete on a base made of reinforced concrete, The base portion has a first fixing portion at an upper end portion, The pillar member has a second fixing portion at an upper end thereof, and a through hole is formed from the second fixing portion to a lower end of the pillar member, The post member is disposed on the base, A column structure characterized in that a tension material is inserted into the through hole of the column member, the lower end of the tension material is fixed to the first fixing part, the upper end of the tension material is fixed to the second fixing part, and a tensile force is introduced into the tension material.

2. The column structure described in claim 1, characterized in that the column member comprises a lower column portion extending in the vertical direction, a column-beam joint provided on the lower column portion and to which a beam member is joined, and an upper column portion provided on the column-beam joint and extending in the vertical direction.

3. A method for constructing a column structure by erecting a column member made of reinforced concrete on a base made of reinforced concrete, comprising the steps of: The base portion has a first fixing portion at an upper end portion, The pillar member has a second fixing portion at an upper end thereof, and a through hole is formed from the second fixing portion to a lower end of the pillar member, a first step of placing the pillar member on the base; a step of inserting a tendon into a through hole of the pillar member and fixing a lower end of the tendon to the first fixing portion; A method for constructing a column structure, comprising the steps of: pulling the tendon upward and fixing the upper end of the tendon to the second fixing portion.

Citation Information

Patent Citations

  • Unbonded precast pre-stressed concrete structure and building with the structure

    JP2021156152A

  • Un-bonded precast pre-stressed concrete column and precast concrete column body

    JP2022150677A