Method of rehabilitating existing pipe

Side spacers correct pipe deviation and deformation in bent sections by guiding the rehabilitated pipe back to a circular shape, ensuring even filling and preventing buckling during rehabilitation.

JP2024167534APending Publication Date: 2024-12-04SEKISUI CHEMICAL CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023083674
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-22
Publication Date
2024-12-04

AI Technical Summary

Technical Problem

Existing pipes with bends deform during rehabilitation, leading to uneven filling and potential buckling due to deviation from a perfect circular shape, which is not corrected over long distances.

Method used

Installation of side spacers along the inner surface of the existing pipe, particularly in the straight sections adjacent to bends, to correct deviation and deformation of the rehabilitated pipe, ensuring it maintains a circular shape by using spacers with angled surfaces that guide the pipe back to its normal state.

Benefits of technology

The method effectively suppresses pipe deviation and deformation, allowing for even filling and preventing buckling, restoring the rehabilitated pipe to a perfect circular shape in a short distance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167534000001_ABST
    Figure 2024167534000001_ABST
Patent Text Reader

Abstract

To perform, when an existing pipe has a bent portion, pipe making of a rehabilitation pipe which is adapted to the bent portion.SOLUTION: A method of rehabilitating an existing pipe 10 performs pipe making of a rehabilitation pipe 20 which is obtained by spirally winding a belt-like member 21 along an inner circumference of the existing pipe 10 including a bent portion 11. In a straight portion 13 which is continuous to the bent portion 11 of the existing pipe 10 and which is on the pipe making progress side of the bent portion 11, long and slender side portion spacers 50A and 50B extending in a pipe axial direction over a predetermined length are installed in advance on an inner surface in an area 13R adjacent to an outer side portion of a bent shape of the bent portion 11. In a process of pipe making of the rehabilitation pipe 20 passing the bent portion 11 and proceeding through the straight portion 13, the rehabilitation pipe 20 is restricted by the side portion spacers 50A and 50B.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for rehabilitating an existing pipe including a bent portion. [Background technology]

[0002] A known method for rehabilitating existing deteriorated pipes, such as sewer pipes, is to use a self-propelled pipe-making machine, as disclosed in Patent Document 1, to construct a helical rehabilitated pipe by winding a strip-shaped member in a spiral shape around the inner circumference of the existing pipe. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication WO2018 / 043619 Summary of the Invention [Problem to be solved by the invention]

[0004] The existing pipe is installed between two manholes, but is not necessarily straight throughout its entire length and may include a bent section. In the process of producing a rehabilitated pipe using the above-mentioned self-propelled pipe-producing machine, after the production of the straight section just before the bend is completed, the rehabilitated pipe gradually deviates to the outside of the bent shape during the process of producing the bent section. Due to this deviation, the rehabilitated pipe comes into contact with the inner surface of the area adjacent to the outside of the bend in the straight section on the pipe-producing advance side of the bend, and is deformed without being able to maintain a perfect circular shape. This deviation and deformation of the rehabilitated pipe continues for a long time in the pipe axial direction of the straight section until it returns to a normal pipe-producing state (a state in which the rehabilitated pipe maintains a perfect circular shape without deviating to the left or right of the existing pipe). As described above, if the rehabilitated pipe continues to bias toward the outside of the bent shape and deform and loses its circular shape in the straight section on the pipe-making progress side of the bend for a long period of time, when backfill material is filled between the rehabilitated pipe and the existing pipe after pipe-making is completed, it will not be possible to fill the material evenly on both sides of the rehabilitated pipe, which may cause buckling of the rehabilitated pipe, etc. [Means for solving the problem]

[0005] The present invention has been made to solve the above-mentioned problems, and provides a method for rehabilitating an existing pipe, which comprises winding a belt-shaped member in a spiral shape around the inner periphery of an existing pipe including a bent portion, and The present invention is characterized in that, in the straight section of the existing pipe that is connected to the bent section and is on the pipe making progress side of the bent section, a long and thin side spacer extending in the pipe axial direction over a predetermined length is pre-installed on the inner surface of the area adjacent to the outer part of the bent shape of the bent section, and the rehabilitated pipe is regulated by the side spacer during the process of pipe making of the rehabilitated pipe passing the bent section and progressing through the straight section. According to this method, the side spacers can correct the deviation and deformation of the rehabilitated pipe in the straight part of the existing pipe, and the rehabilitated pipe can be restored to its normal pipe-making state in a short pipe-making distance.

[0006] Preferably, the surface of the side spacer facing the rehabilitating pipe has a gradient such that the height from the inner surface of the existing pipe increases in the pipe-making proceeding direction. According to this method, the rehabilitating pipe can be smoothly restored to a normal pipe-making state.

[0007] Preferably, a plurality of the side spacers are provided at intervals in the circumferential direction, which makes it possible to more effectively suppress deviation and deformation of the rehabilitating pipe.

[0008] Preferably, prior to the pipe manufacturing process of the rehabilitated pipe, a pipe top spacer is installed on the inner surface of the pipe top of the existing pipe or a portion adjacent thereto, and the multiple side spacers include a first side spacer installed directly to the side of the existing pipe or the rehabilitated pipe, and at least one second side spacer installed circumferentially away from the pipe top spacer and the first side spacer within an angular range between the pipe top spacer and the first side spacer. In the angular range between the first side spacer and the pipe top spacer, the gap between the existing pipe and the rehabilitated pipe is large, and the rehabilitated pipe tends to be biased toward the existing pipe in this angular range. However, with this method, the second side spacer can reliably prevent the rehabilitated pipe from being biased.

[0009] Preferably, at least the surface of the first side spacer facing the rehabilitating pipe has a gradient such that its height from the inner surface of the existing pipe increases in the pipe making proceeding direction. According to this method, the slope of the first side spacer located directly to the side can effectively and smoothly restore the rehabilitated pipe to its normal pipe manufacturing state. Effect of the Invention

[0010] According to the present invention, when manufacturing a helical rehabilitating pipe around the inner circumference of an existing pipe that includes a bent section, bias and deformation of the rehabilitating pipe can be suppressed, particularly in the straight section on the pipe manufacturing progress side of the bent section. [Brief description of the drawings]

[0011] [Figure 1] 1 is a cross-sectional plan view showing a state of a rehabilitating pipe during pipe manufacturing in an existing pipe rehabilitation method according to one embodiment of the present invention. [Diagram 2] FIG. 2 is a vertical cross-sectional view taken along line II-II in FIG. 1, with the pipe-making machine omitted. [Diagram 3] FIG. 2 is an enlarged cross-sectional view taken along line III-III in FIG. [Figure 4] 1 shows a side spacer used in this method, where (A) is a front view and (B) is a plan view of the side spacer installed on the inner surface of an existing pipe. [Diagram 5] 4(B) and shows a modified example of the side spacer. FIG. [Figure 6] 13A and 13B are cross-sectional views showing another modified example of the side spacer, in which (A) is a cross-sectional view of the end on the bent portion side of the existing pipe, and (B) is a cross-sectional view of the end on the side in the pipe making direction. [Figure 7] 4(B) and shows yet another modified example of the side spacer. FIG. [Figure 8] 4 is a diagram equivalent to FIG. 3 and illustrating, by phantom lines, the deviation and deformation of a rehabilitating pipe that occurs when the side spacer of the present invention is not used. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, one embodiment of the present invention will be described with reference to the drawings. <Existing pipe structure> 1 and 2 show an existing pipe 10 to be rehabilitated, buried underground. In this embodiment, the existing pipe 10 is a sewer pipe, and is disposed between two manholes (not shown). Note that the existing pipe 10 is not limited to a sewer pipe, and may be a water supply pipe, an agricultural water pipe, a hydroelectric power generation water pipe, a gas pipe, a tunnel, or the like.

[0013] As shown in Figure 1, an existing pipe 10 includes a bent section 11 where the pipe axis is bent on a substantially horizontal plane, with straight sections 12, 13 continuing on either side of it. As will be described later, the production of a rehabilitated pipe 20 proceeds from left to right in Figures 1 and 2. Based on this pipe production progression direction, the straight section 12 on the left side of the bent section 11 will be referred to as the front straight section, and the straight section 13 on the right side will be referred to as the front straight section (in the direction of progression).

[0014] <Structure of rehabilitation pipe> A rehabilitation pipe 20 is constructed along the inner circumference of the existing pipe 10. The rehabilitation pipe 20 is a spiral pipe made of a strip-shaped member 21 (profile). The main material of the strip-shaped member 21 is a synthetic resin such as polyvinyl chloride. The strip-shaped member 21 is wound spirally around the inner circumference of the existing pipe 1, and the fitting portions of adjacent side edges that are offset from each other by one revolution are fitted together to produce the rehabilitation pipe 20.

[0015] <Outline of pipe manufacturing machine configuration> As shown in FIG. 3, the production of the rehabilitating pipe 20 from the strip-shaped member 21 is performed by a self-propelled pipe-making machine 30. The pipe-making machine 30 of this embodiment has a body 31, and a drive section 35 and an engagement section 36 that are provided on the body 31 and spaced apart from each other. The drive section 35 has a pair of drive rollers 35a, 35b, and the engagement section 36 has an engagement roller 36a and a receiving member 36b. The pipe-making machine 30 is further equipped with a wire (not shown). Both ends of this wire are engaged with engagement sections 31a, 31b at both ends of the body 31. It should be noted that the pipe-making machine 30 of this embodiment does not have an annular inner circumference regulating body made of a number of links and rollers that abuts against the inner circumference of the rehabilitating pipe 20.

[0016] <Function of the pipe making machine> The operation of the pipe making machine 30 will be briefly explained. The belt-shaped member 21 with a curled tendency is supplied through a manhole (starting manhole) connected to the left end of the existing pipe 1 in Figures 1 and 2. The pipe making machine 30 starts making the rehabilitating pipe 20 from the starting end of the existing pipe 1, and as shown in Figure 1, is always located at the leading end of the rehabilitating pipe 20 in the stretching direction during pipe making. The belt-shaped member 20 passes through the inside of the rehabilitating pipe 2 being made and is sent to the pipe making machine 30 at the leading end in the stretching direction of the rehabilitating pipe 2.

[0017] As shown in FIG. 3, in the pipe making machine 30, the trailing band portion 21a of the band-shaped member 21 is introduced between a pair of drive rollers 35a, 35b of the drive unit 35, and is sent from the drive unit 35 to the fitting unit 36. In the fitting unit 36, the fitting rollers 36a and the receiving member 36b fit the opposing side edges of the band portion at the tip end in the extension direction of the rehabilitating pipe 20 and the trailing band portion 21a, which are one turn apart. This allows the trailing band portion 21a to be incorporated into the rehabilitating pipe 20, and the pipe making of the rehabilitating pipe 20 progresses. As the pipe is made, the pipe making machine 30 moves on its own in the spiral winding direction around the inner circumference of the existing pipe 1. The wire of the pipe making machine 30 is wound around the outer periphery of the band portion at the tip end in the extension direction of the rehabilitating pipe 20 during pipe making, thereby adjusting the circumferential length and therefore the pipe diameter of the rehabilitating pipe 20.

[0018] <Preparation process (installation of pipe top spacer)> Prior to the pipe-making process of the rehabilitation pipe 20, a pipe top spacer 40 is installed on the inner surface of the pipe top of the existing pipe 1 as shown in FIG. 2. The pipe top spacer 40 has a body 41 formed in the shape of a long rod with a rectangular cross section, for example, extending along the pipe axis of the existing pipe 10, and butt bolts 45 (set screws) screwed into the body 41 at intervals. The pipe top spacer 40 is fixed to the existing pipe 10 by a driving screw 46 that penetrates the body 41 and is driven into the existing pipe 10. The butt bolts 45 are butted against the existing pipe 1, so that the height of the pipe top spacer 40 can be adjusted relative to the existing pipe 1. A plurality of pipe top spacers 40 are connected together, so that they are installed over substantially the entire length of the existing pipe 1. The structure of the pipe top spacer 40 may be the same as that of the side spacer described later.

[0019] <Preparation process (installation of side spacers)> 1 to 3, in the straight section 13 at the front side of the existing pipe 10, a first side spacer 50A and a second side spacer 50B, which are elongated and extend a predetermined length in the pipe axial direction, are installed on the inner surface of a region 13R adjacent to the outer part of the bent shape in the bent section 11. The first side spacer 50A is installed at a portion directly to the side of the existing pipe 10 (a portion approximately 90° away from the pipe top) or a portion directly to the side of the rehabilitating pipe 20 to be manufactured, and the second side spacer 50B is installed at a position spaced approximately equally apart from the pipe top spacer 40 and the first side spacer 50A within the angular range between them.

[0020] The first and second side spacers 50A, 50B have a common structure, and as shown in Figs. 4(A) and (B), have a main body 51 made by bending a metal plate, and a protruding bolt 55 (set screw). The main body 51 has a base portion and legs with an L-shaped cross section that are connected to both side edges of the base portion. The protruding bolt 55 is screwed into a nut 51a that is housed and fixed in the main body 51, so that the protruding height from the main body 51 can be adjusted. A plurality of through holes 51b are formed at intervals in the main body 51, and the first and second side spacers 50A, 50B are fixed to the existing pipe 10 by driving a driving screw 56 that passes through these through holes 51b into the existing pipe 10.

[0021] As shown in FIG. 4(B), the surface 51x (surface facing the rehabilitating pipe 20) of the base plate part of the first side spacer 50A has a gradient along the pipe axis of the existing pipe 10. More specifically, by changing the protruding amount of the three (plural) protruding bolts 55, the height of the surface 51x of the base plate part from the inner surface of the existing pipe 10 is inclined so that it is low at the end on the bent portion 11 side and gradually increases as it moves away from the bent portion 11. Note that FIG. 1 shows the first side spacer 50A in a schematic cross section. For example, the main body 51 has a length of 2 m and a thickness of 18 mm, and is in contact with the inner surface of the existing pipe 10 at the end on the bent portion 11 side (zero gap), and has a gap of 12 mm between the main body 51 and the inner surface of the existing pipe 10 at the end on the opposite side (pipe manufacturing progress side).

[0022] The height of the surface 51x of the base plate portion at the end of the first side spacer 50A on the pipe production progress side corresponds to the gap between the existing pipe 10 and the rehabilitating pipe 20 that appears at the spacer installation location when the rehabilitating pipe 20 is produced normally. The surface of the base portion of the second side spacer 50B may not have a slope, or may have a slope similar to that of the first side spacer 50A. The dimensions and slope of the side spacers 50A and 50B can be changed according to the pipe diameter of the existing pipe 10, the angle of the bent portion 11, etc.

[0023] <Pipe manufacturing process> In the straight section 12 just before the existing pipe 10, the rehabilitating pipe 20 is well manufactured by the self-propelled pipe making machine 30 as described above. That is, the rehabilitating pipe 20 can ensure a predetermined level of roundness and is not biased to the left or right with respect to the pipe axis of the existing pipe 10. Furthermore, the pipe top of the rehabilitating pipe 20 abuts against the underside of the pipe top spacer 40, thereby maintaining the distance between the pipe tops of the existing pipe 10 and the rehabilitating pipe 20 and maintaining the pipe bottom of the rehabilitating pipe 20 in a state of being seated on the pipe bottom of the existing pipe 10. The function of the pipe top spacer 40 is ensured over the entire length of the existing pipe 10.

[0024] When the pipe manufacturing of the rehabilitating pipe 20 is completed at the near side straight portion 12 of the existing pipe 10 and moves to the bent portion 11, the rehabilitating pipe 20 starts to deviate to the outside of the bent shape, and the amount of deviation gradually increases. Here, a comparative example in which the side spacers 50A and 50B are not installed will be described with reference to FIG. 8. In this comparative example, when the pipe manufacturing of the rehabilitating pipe 20 passes the bent portion 11 and reaches the front straight portion 13 of the existing pipe 10, the rehabilitating pipe 20 is significantly deviated to the outside of the bent shape from the normal pipe manufacturing position shown by the solid line. More specifically, the rehabilitating pipe 20 bulges in the direction shown by the arrow A, and as shown by the imaginary line, at the front straight portion 13, it almost comes into contact with the inner surface of the upper half of the region 13R adjacent to the outer portion of the bent portion 11 of the existing pipe 10. At this time, the opposite side of the rehabilitating pipe 20 is deviated in the direction shown by the arrow B, that is, radially inward as shown by the imaginary line. As a result, the rehabilitated pipe 20 as a whole is significantly biased toward the outside of the bent shape and is deformed, unable to maintain a perfect circular shape, and the left and right gaps between the existing pipe 10 and the rehabilitated pipe 20 become uneven. This abnormal pipe manufacturing condition is not corrected over a long distance.

[0025] In this embodiment, since the side spacers 50A and 50B are installed in the region 13R of the leading straight portion 13 of the existing pipe 10, the above-mentioned deviation and deformation of the rehabilitating pipe 20 can be suppressed. In detail, since the rehabilitating pipe 20 is restricted by contact with the side spacers 50A and 50B during pipe manufacturing, it does not come into contact with the upper half of the region 13R and is suppressed from expanding toward the upper half of the region 13R, and also suppresses deviation toward the radially inward direction on the opposite side. Moreover, the surface 51x of the first side spacer 50A (or the first and second side spacers 50A and 50B) facing the rehabilitating pipe 20 has a slope, and gradually pushes the rehabilitating pipe 20 back toward the pipe axis, so that the deviation and deformation of the rehabilitating pipe 20 are smoothly corrected, and at the stage where the leading end of the rehabilitating pipe 20 passes the side spacers 50A and 50B, the deviation of the rehabilitating pipe 20 is almost eliminated and the rehabilitating pipe 20 is restored to a perfect circular shape. In this way, normal pipemaking conditions can be restored over a relatively short distance.

[0026] After the rehabilitation pipe 20 is manufactured over the entire length of the existing pipe 10, the gap between the rehabilitation pipe 20 and the existing pipe 10 is filled with a backfilling material (not shown) such as mortar. As described above, the rehabilitation pipe 20 is prevented from being biased outward, and the bias is eliminated in a relatively short distance, and the rehabilitation pipe 20 regains its perfect circular shape, so that the backfilling material can be filled almost evenly in the gaps on the left and right sides between the existing pipe 10 and the rehabilitation pipe 20. When filling the backfilling material, the pipe top spacer 40 can prevent the rehabilitation pipe 20 from floating, and the rehabilitation pipe 20 can be kept in a state of being landed on the pipe bottom of the existing pipe 10, and the flow down gradient of the rehabilitation pipe 20 can be secured.

[0027] At the bent portion 11, the outer pipe making distance of the rehabilitated pipe 20 is longer than the inner pipe making distance, so the outer band portion lags behind the inner band portion in the pipe making process at the bent portion 11. If this delayed state continues for a long distance at the leading straight portion 13, it can cause buckling. However, in this embodiment, the side spacers 50A, 50B, and in particular the gradient of the first side spacer 50A, smoothly and forcibly return to the normal pipe making state, so the above-mentioned delay is eliminated over a short distance.

[0028] <Other Aspects of Side Spacer Arrangement> The second side spacers 50B can be arranged in various ways, not limited to the arrangement shown in Fig. 3. For example, two second side spacers 50B may be arranged at positions P1 and P2 in Fig. 3, which bisect the angular range of approximately 90° between the pipe top and the first side spacer 50A. Also, two second side spacers may be arranged at positions P2 and P3 (positions approximately 30° downward from the first side spacer 50A). Furthermore, the second side spacers 50B may be arranged at positions P1, P2, and P3, or positions P1, P2, P3, and P4 (positions further downward from position P3). The first side spacer 50A at the exact side may be omitted, and a plurality of second side spacers 50B may be disposed at positions including positions P2 and P3. In the side spacer arrangements described above, only selected side spacers, such as the first side spacer, may have a slope, or all side spacers may have a slope.

[0029] <Modifications of the Side Spacer> Next, a modified example of a spacer with a gradient will be described. The side spacer 60 shown in Fig. 5 is made of a solid bar material with a rectangular cross section. This side spacer 60 is thin on the side of the bent part of the existing pipe and becomes thicker as it moves away from the bent part, so that the surface 60x facing the rehabilitating pipe has a gradient similar to that of the side spacer 50A in Fig. 4.

[0030] The side spacer 70 shown in Fig. 6 has a hollow circular tube shape, and is significantly crushed at the end on the bent part side of the existing pipe, and the amount of crushing decreases as it moves away from the bent part. As a result, the surface facing the rehabilitated pipe has a slope.

[0031] The side spacer 80 shown in Figure 7 has a shape made by stacking several elongated thin plates 81 of different lengths, with the number of stacked plates increasing as it moves away from the bend, so that the surface facing the rehabilitation pipe has a gradient that gradually becomes higher. The spacers 60, 70, and 80 in Figs. 5 to 7 are fixed to the existing pipe with driving screws in the same manner as the side spacer 50A in Fig. 4.

[0032] The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. In the above embodiment, the side spacer is installed on the straight portion of the existing pipe beyond the bent portion, but the side spacer may be extended to the bent portion. In this case, the extended portion of the side spacer is curved to correspond to the inner shape of the bent portion. Although one pipe top spacer 40 is provided at the pipe top, two may be provided, for example, at the left and right adjacent portions of the pipe top. [Industrial Applicability]

[0033] The present invention can be applied, for example, to a method for rehabilitating aged sewer pipes. [Explanation of symbols]

[0034] 10 Existing pipes 11 Bend 12 Straight part on the front side 13 Straight part at the tip 20 Rehabilitation pipe 21 Belt-shaped member 30 Pipe making machine 40 Pipe top spacer 50A 1st Side Spacer 50B Second side spacer 51x Base plate surface (facing the rehabilitating pipe) 60,70,80 Side spacers

Claims

1. A method for rehabilitating an existing pipe, comprising the steps of: winding a belt-shaped member in a spiral shape around an inner periphery of an existing pipe, including a bent portion; a thin and long side spacer is provided in advance on an inner surface of a straight portion of the existing pipe that is connected to the bent portion and is located on the pipe making progress side of the bent portion, the thin and long side spacer extending in a pipe axial direction over a predetermined length and adjacent to an outer portion of the bent shape of the bent portion; A method for rehabilitating an existing pipe, characterized in that the rehabilitating pipe is regulated by the side spacers during the process of the pipe manufacturing of the rehabilitating pipe passing the bent portion and proceeding along the straight portion.

2. 2. An existing pipe rehabilitation method as described in claim 1, characterized in that the surface of the side spacer facing the rehabilitating pipe has a gradient such that its height from the inner surface of the existing pipe increases in the direction of pipe making.

3. 2. The method for rehabilitating an existing pipe according to claim 1, wherein a plurality of the side spacers are provided at intervals in the circumferential direction.

4. Prior to the pipe-making process of the rehabilitating pipe, a pipe top spacer is installed on the inner surface of the pipe top or a portion adjacent thereto of the existing pipe; The method for rehabilitating an existing pipe as described in claim 3, characterized in that the multiple side spacers include a first side spacer installed directly to the side of the existing pipe or the rehabilitated pipe, and at least one second side spacer installed circumferentially away from the pipe top spacer and the first side spacer within an angular range between the pipe top spacer and the first side spacer.

5. A method for rehabilitating an existing pipe as described in claim 4, characterized in that at least the surface of the first side spacer facing the rehabilitating pipe has a gradient in which the height from the inner surface of the existing pipe increases in the direction of pipe making.