Construction structure for sealing joints in trenches excavated for poorly constructed foundation pits

The construction structure for trenching joints in defective foundation pits uses a mesh piece and connecting components to ensure precise and secure hanging net installation, addressing the challenge of bolt positioning accuracy and preventing slipping.

JP3248661UActive Publication Date: 2024-10-07CHINA RAILWAY NO 8 ENG GRP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
JP2024002686U
Authority / Receiving Office
JP · JP
Patent Type
Utility models
Current Assignee / Owner
Priority Date
2024-08-02
Filing Date
2024-08-09
Publication Date
2024-10-07
Estimated Expiration
2034-08-09

AI Technical Summary

Technical Problem

The challenge in constructing trenching joints in defective bottom foundation pit excavation is the need for precise control of expansion bolt installation to prevent slipping and ensure high accuracy, which affects the construction performance of hanging nets.

Method used

A construction structure comprising a mesh piece, connecting plate, locking plate, locking frame, screw, plastic sleeve, adjustment block, and support spring, which facilitate precise positioning and secure attachment of hanging nets through a series of connections and adjustments.

Benefits of technology

Enhances the convenience and accuracy of hanging net installation, allowing for construction operations even with minor errors, improving the overall construction performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0003248661000001_ABST
    Figure 0003248661000001_ABST
Patent Text Reader

Abstract

To provide a construction structure for sealing trench joints in poorly constructed bottom foundation pits. The net comprises a mesh piece 1 and a connecting plate 2, a locking plate 3 slidably connected to the surface of the connecting plate, a locking frame fixedly connected to the surface of the connecting plate facing away from the locking plate, a screw engaged and connected to the inside of the locking frame, a plastic sleeve 4 fitted to the outer surface of the screw, and a locking rod fixedly connected to one surface of the locking plate. The connection between the screw sleeve and the adjustment block realizes a support control effect for the connection position of the locking plate on the connecting plate, the connection between the locking plate and the locking rod facilitates the connection support operation of the mesh piece on the connecting plate, the connection with the connecting plate by the locking frame, and the connection between the abutment plate and the support spring realizes the insertion support effect of the screw on the locking frame, and the sectioned connection method improves the convenience of the hanging net and simplifies the installation operation.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] This invention relates to the technical field of pipe jacking construction, and more particularly to a construction structure for sealing the trench joints in poorly-drained foundation pits. [Background technology]

[0002] Subway stations are sensitive to geographical locations and have complex surrounding environments. The geology of the station includes poor geology such as coarse sand, fine sand layer, and medium-coarse sand layer in the sludge about 4m to 6m thick. In order to ensure that the joints of the retaining wall (piles) of the station are not filled with seepage water during the subsequent excavation process of the station, in the process of excavating the foundation pit, the foundation pit is divided into sections and stratified, and an inclined trench is first excavated. The hanging net shotcrete bolt treatment between the piles is promptly completed before excavation. Before the concrete is sprayed on the hanging net, the soil of the pile body is manually adjusted and checked for seepage water at this location. If a small amount of seepage water is found, the drain blocking method is promptly adopted to stop the water, and the hanging net is promptly installed after completion. However, when the installation operation of the conventional hanging net is performed, the hanging net is installed by the method of expansion bolts, and the installation position of the expansion bolts needs to be precisely controlled during the installation operation, which requires high precision in the operation and construction, and is easy to be misaligned during the construction and installation, which will affect the construction performance of the hanging net. Summary of the Invention [Problem to be solved by the invention]

[0003] The purpose of the present invention is to provide an installation structure for sealing the joints of trenches excavated in poorly-done foundation pits, in order to solve the problems described in the background art above, that is, the installation position of the expansion bolt needs to be precisely controlled during the installation operation, which requires high operation and construction precision and is prone to misalignment during installation, which affects the installation performance of the hanging net. [Means for solving the problem]

[0004] In order to achieve the above object, the present invention provides the following technical solution: The construction structure for sealing the trench excavation joint of poor bottom foundation pit excavation includes a mesh piece and a connecting plate, a locking plate is slidably connected to the surface of the connecting plate, a locking frame is fixedly connected to the surface of the connecting plate away from the locking plate, a screw is engaged and connected to the inside of the locking frame, a plastic sleeve is fitted to the outer surface of the screw, a locking rod is fixedly connected to one surface of the locking plate, an adjustment block is fixedly connected to the surface of the locking plate away from the locking rod, a screw sleeve is fitted to the outer surface of the adjustment block by a screw, an adjustment groove is opened on the surface of the connecting plate, a support spring is fixedly connected to the inside of the locking frame, and a contact plate is fixedly connected to the surface of the support spring.

[0005] Preferably, the mesh piece has a net shape, the locking plate is engaged with and connected to the mesh piece by locking rods, and the locking rods are fixedly connected to the surface of the locking plate in four sets.

[0006] Preferably, the surface of the locking bar facing away from the locking plate is arcuate, and the cross section of the locking frame is "C" shaped.

[0007] Preferably, the screw is engaged and connected to a connecting plate by a locking frame, and the screw is rotatably connected by a plastic sleeve and a screw.

[0008] Preferably, the cross section of the adjusting block is "T" shaped, the adjusting block is slidably connected to the adjusting groove, and the threaded sleeve is abutted and connected to the connecting plate by the adjusting block.

[0009] Preferably, the locking plate is slidably connected to the connecting plate by an adjustment block and an adjustment groove, and the cross section of the locking frame presents an "L" shape.

[0010] Preferably, the surface of the abutment plate is arc-shaped, the abutment plate is elastically connected to the locking frame by a support spring, and the abutment plate abuts against and is connected to the screw by the locking frame. Effect of the Invention

[0011] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0012] 1. Through the connection between the connecting plate and the adjusting groove, the adjusting block and the adjusting groove can be slidably connected, and the fixed connection between the adjusting block and the locking plate realizes the moving operation effect of the locking plate on the connecting plate; through the connection between the screw sleeve and the adjusting block, the support control effect of the locking plate on the connecting plate; through the connection between the locking plate and the locking rod, the connection support operation of the connecting plate of the mesh piece is facilitated; through the connection between the locking frame and the connecting plate, the connection between the abutment plate and the support spring realizes the insertion support effect of the screw on the locking frame; the sectional connection mode improves the convenience of the hanging net, and the installation operation is simple, and the installation operation can be completed even with a certain error. [Brief description of the drawings]

[0013] [Figure 1] FIG. 2 is a process diagram of the present invention. [Diagram 2] 1 is a schematic front perspective view of a mesh piece structure according to the present invention; [Diagram 3] FIG. 2 is a schematic perspective view of the structure of a mesh piece according to the present invention; [Figure 4] FIG. 2 is a schematic rear perspective view of the structure of the present invention; [Diagram 5] FIG. 2 is a partial perspective exploded schematic view of the connection structure between the connecting plate and the locking plate of the present invention; [Figure 6] FIG. 5 is a perspective exploded schematic view of the connection structure between the locking frame and the screw in FIG. 4 according to the present invention; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] 1 to 6, one embodiment of the present invention is shown.

[0015] The construction structure for sealing the trench excavation joint of poor bottom foundation pit excavation includes a mesh piece 1 and a connecting plate 2, a locking plate 3 is slidably connected to the surface of the connecting plate 2, a locking frame 5 is fixedly connected to the surface of the connecting plate 2 away from the locking plate 3, a screw 6 is engaged and connected to the inside of the locking frame 5, a plastic sleeve 4 is fitted to the outer surface of the screw 6, a locking rod 10 is fixedly connected to one surface of the locking plate 3, and an adjustment block 8 is fixedly connected to the surface of the locking plate 3 away from the locking rod 10. A screw-fitting sleeve 9 is fitted to the outer surface of the adjustment block 8 by a screw, an adjustment groove 7 is opened on the surface of the connecting plate 2, a support spring 11 is fixedly connected to the inside of the locking frame 5, and a contact plate 12 is fixedly connected to the surface of the support spring 11. The connection between the connecting plate 2 and the adjustment groove 7 and the slidable connection between the adjustment groove 7 and the adjustment block 8 realizes a control effect on the connection position of the locking plate 3 on the connecting plate 2, and improves the range of use and performance of the locking plate 3 for attaching the mesh piece 1.

[0016] Furthermore, the mesh piece 1 has a net-like shape, and the locking plate 3 is engaged and connected to the mesh piece 1 by the locking rods 10, and the locking rods 10 are fixedly connected to the surface of the locking plate 3 in four sets. Through the fixed connection between the mesh piece 1 and the locking plate 3 and the locking rods 10, and through the engagement connection between the locking rods 10 and the mesh piece 1, a connecting and supporting effect between the mesh piece 1 and the locking plate 3 is realized.

[0017] Furthermore, the surface of the locking rod 10 facing away from the locking plate 3 is arc-shaped, and the cross section of the locking frame 5 is C-shaped. The shape of the locking rod 10 facilitates the engagement and connection operation between the mesh piece 1 and the locking plate 3, and the connection between the locking frame 5 and the connecting plate 2 facilitates the connection and support operation of the screw 6 on the connecting plate 2.

[0018] Furthermore, the screw 6 is engaged and connected to the connecting plate 2 by the locking frame 5, and the screw 6 is rotatably connected to the plastic sleeve 4 by a screw. Through the engagement and connection between the screw 6 and the locking frame 5, the connection between the screw 6 and the plastic sleeve 4 realizes a supporting effect for the operating position of the connecting plate 2.

[0019] Furthermore, the cross section of the adjustment block 8 is “T” shaped, the adjustment block 8 is slidably connected to the adjustment groove 7, and the screw sleeve 9 is abutted and connected to the connecting plate 2 by the adjustment block 8. Through the slidable connection between the adjustment block 8 and the adjustment groove 7, the fixed connection between the adjustment block 8 and the locking plate 3 realizes a control effect on the operating position of the locking plate 3 on the connecting plate 2.

[0020] Furthermore, the locking plate 3 is slidably connected to the connecting plate 2 by the adjustment block 8 and the adjustment groove 7, and the cross section of the locking frame 5 is "L" shaped. Through the connection between the adjustment block 8 and the screw sleeve 9 and the abutment connection between the screw sleeve 9 and the connecting plate 2, an abutment control effect is realized for the connection position of the locking plate 3 on the connecting plate 2.

[0021] Furthermore, the surface of the abutment plate 12 is arc-shaped, and the abutment plate 12 is elastically connected to the locking frame 5 by the support spring 11. The abutment plate 12 abuts and connects to the screw 6 by the locking frame 5. The connection between the locking frame 5 and the abutment plate 12, and through the connection between the abutment plate 12 and the support spring 11, achieves the elastic support effect of the abutment plate 12 in the locking frame 5, and completes the abutment support operation for the connection of the screw 6 in the locking frame 5 through the action of the abutment plate 12.

[0022] Working principle: When installing the mesh piece 1, first puncture the foundation hole surface, stuff the plastic sleeve 4 into the hole, then rotate the screw 6 to deform the plastic sleeve 4 in the hole, and achieve a fixed effect on the working position of the screw 6. Then the connecting plate 2 is hung on the screw 6 by the locking frame 5, and the connection between the abutment plate 12 and the support spring 11 improves the contact stability performance between the screw 6 and the locking frame 5. Finally, the connection between the locking plate 3 and the locking rod 10 fixes the mesh piece 1. and engage with the locking plate 3 to complete the installation operation of the mesh piece 1. When the operating position of the screw 6 shifts, the threaded sleeve 9 is rotated and the threaded sleeve 9 is separated from the connecting plate 2. At this time, the locking plate 3 changes its position on the connecting plate 2 through the adjustment block 8 and the adjustment groove 7. After being adjusted to the appropriate position, the threaded sleeve 9 is rotated in the opposite direction to abut the connecting plate 2, thereby achieving a fixing effect on the operating position of the locking plate 3 on the connecting plate 2, and improving the convenience and range of operation of the installation and use of the mesh piece 1. [Explanation of symbols]

[0023] 1 mesh piece 2 Connecting plate 3 Locking plate 4 Plastic Sleeve 5 Locking frame 6 Screw 7 Adjustment groove 8 Adjustment Block 9 Threaded sleeve 10 Locking rod 11 Support spring 12 Contact plate

Claims

1. A construction structure for closing trench excavation joints when excavating poor-quality foundation pits, comprising a mesh piece and a connecting plate, characterized in that a locking plate is slidably connected to the surface of the connecting plate, a locking frame is fixedly connected to the surface of the connecting plate facing away from the locking plate, a screw is engaged and connected to the inside of the locking frame, a plastic sleeve is fitted to the outer surface of the screw, a locking rod is fixedly connected to one surface of the locking plate, an adjustment block is fixedly connected to the surface of the locking plate facing away from the locking rod, a screw-fastened sleeve is fitted to the outer surface of the adjustment block by a screw, an adjustment groove is opened on the surface of the connecting plate, a support spring is fixedly connected to the inside of the locking frame, and a contact plate is fixedly connected to the surface of the support spring.

2. The construction structure for sealing trench excavation joints in poor bottom foundation pit excavation as described in claim 1, characterized in that the mesh pieces are net-like, the locking plate is engaged and connected to the mesh pieces by locking rods, and the locking rods are fixed and connected to the surface of the locking plate in four sets.

3. The construction structure for sealing trench excavation joints in poor bottom foundation pit excavation as described in claim 1, characterized in that the surface of the locking rod that faces away from the locking plate is arc-shaped, and the cross section of the locking frame is "C" shaped.

4. The construction structure for sealing trench excavation joints in poor bottom foundation pit excavation as described in claim 1, characterized in that the screw is engaged and connected to a connecting plate by a locking frame, and the screw is rotatably connected to a plastic sleeve and a screw.

5. The construction structure for closing trench excavation joints in poor bottom foundation pit excavation, as described in claim 1, characterized in that the cross section of the adjustment block is "T" shaped, the adjustment block is slidably connected to the adjustment groove, and the screw sleeve is abutted and connected to the connecting plate by the adjustment block.

6. The construction structure for closing trench excavation joints in poor bottom foundation pit excavation as described in claim 1, characterized in that the locking plate is slidably connected to the connecting plate by an adjustment block and an adjustment groove, and the cross section of the locking frame is "L" shaped.

7. The construction structure for closing trench excavation joints in poor bottom foundation pit excavation as described in claim 1, characterized in that the surface of the abutment plate is arc-shaped, the abutment plate is elastically connected to the locking frame by a support spring, and the abutment plate abuts and connects to the screw by the locking frame.

Citation Information

Cited By

  • Drilling and completion integrated tool and drilling and completion operation method

    CN120906476A