Raw material supply device and raw material supply method

The raw material supply device stabilizes reactive gas production by dividing the container into regions and using a control system to manage valve operations, addressing fluctuations in sublimation and enhancing processing device efficiency.

JP7553192B2Active Publication Date: 2024-09-18TOKYO ELECTRON LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2020154854
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-15
Publication Date
2024-09-18
Estimated Expiration
2040-09-15

AI Technical Summary

Technical Problem

Existing methods for generating reactive gas from solid raw materials experience fluctuations in the amount of sublimation, leading to instability in the supply of reactive gases.

Method used

A raw material supply device that includes a container divided into multiple regions by a filter, which stabilizes the sublimation process by controlling the distribution and removal of solid raw materials, using a dispersion system in a dispersion medium, and employing a control device to manage valve operations.

Benefits of technology

The device stabilizes the sublimation process, ensuring a consistent supply of reactive gas by minimizing fluctuations and improving the operating efficiency of processing devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007553192000005
    Figure 0007553192000005
  • Figure 0007553192000006
    Figure 0007553192000006
  • Figure 0007553192000009
    Figure 0007553192000009
Patent Text Reader

Abstract

To provide a technology capable of suppressing a fluctuation amount of a solid raw material.SOLUTION: A raw material feeding device in an embodiment, which is a raw material feeding device for generating reactive gas from solution formed by dissolving a solid raw material into a solvent, or a disperse system formed by dispersing a solid raw material into a disperse medium, has a container for storing the solution or the disperse system, an injection part for injecting the solution or the disperse system into the container, an exhaust port for exhausting the inside of the container, and a filter provided in the container, which is a filter for partitioning the inside of the container into multiple areas including a first area provided with the injection part and a second area provided with the exhaust port.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a raw material supplying device and a raw material supplying method. [Background technology]

[0002] A technique is known in which a solid raw material is dissolved in a solvent and sprayed into a processing chamber, the processing chamber is heated to remove the solvent and leave the solid raw material, and then the processing chamber is heated again to sublimate the solid raw material and generate a corresponding gas (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2004-115831 A Summary of the Invention [Problem to be solved by the invention]

[0004] The present disclosure provides a technique capable of suppressing fluctuations in the amount of sublimation of a solid source material. [Means for solving the problem]

[0005] According to one aspect of the present disclosure, a raw material supplying device , solid A raw material supplying device for generating a reactive gas from a dispersion system in which a raw material is dispersed in a dispersion medium. ,before A container for storing the dispersion system; Before The container has an injection part for injecting the dispersion, an exhaust port for exhausting the inside of the container, and a filter provided in the container, the filter dividing the inside of the container into a plurality of regions including a first region in which the injection part is provided and a second region in which the exhaust port is provided. death , The dispersion is a slurry or a colloidal solution. . Effect of the Invention

[0006] According to the present disclosure, fluctuations in the amount of sublimation of the solid source material can be suppressed. [Brief description of the drawings]

[0007] [Figure 1] FIG. 1 is a diagram showing an example of a raw material supply system according to an embodiment. [Diagram 2] FIG. 1 is a diagram for explaining the operation of the raw material supply system of FIG. [Diagram 3] FIG. 2 is a diagram for explaining the operation of the raw material supply system of FIG. 1. [Figure 4] Diagram to explain the filling process (1) [Diagram 5] Diagram to explain the filling process (2) [Figure 6] Diagram to explain the drying process (1) [Figure 7] Diagram to explain the drying process (2) [Figure 8] Diagram to explain the vaporization process (1) [Figure 9] Diagram to explain the vaporization process (2) DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] Hereinafter, non-limiting exemplary embodiments of the present disclosure will be described with reference to the accompanying drawings. In all of the accompanying drawings, the same or corresponding members or parts are designated by the same or corresponding reference numerals, and duplicated descriptions will be omitted.

[0009] (Raw material supply system) A raw material supply system according to an embodiment will be described with reference to Fig. 1. Fig. 1 is a diagram showing an example of a raw material supply system according to an embodiment.

[0010] The raw material supply system 1 is a system that generates a reactive gas by sublimating a second solid raw material formed by removing the solvent from a solution (hereinafter simply referred to as the "solution") in which a first solid raw material is dissolved in a solvent, and performs film formation in a processing device using the generated reactive gas.

[0011] The first solid source material is not particularly limited, and may be, for example, an organometallic complex containing a metal element such as strontium (Sr), molybdenum (Mo), ruthenium (Ru), zirconium (Zr), hafnium (Hf), tungsten (W), aluminum (Al), etc., or a chloride containing a metal element such as tungsten (W), aluminum (Al), etc. The solvent may be, for example, hexane, as long as it can dissolve the first solid source material to generate a solution.

[0012] The raw material supply system 1 includes a raw material supply source 10, raw material supply devices 30 and 40, a processing device 50, and a control device 90.

[0013] The raw material supply source 10 supplies the solution M1 to the raw material supply devices 30 and 40. The raw material supply source 10 is disposed in, for example, a sub-fab. In this embodiment, the raw material supply source 10 includes a tank 11 and a float sensor 12. The tank 11 is filled with the solution M1. The float sensor 12 detects the amount of the solution M1 filled in the tank 11.

[0014] One end of a pipe L1 is inserted into the raw material supply source 10 from above the tank 11. The other end of the pipe L1 is connected to a carrier gas supply source G1, and the carrier gas is supplied from the supply source G1 into the tank 11 through the pipe L1. The carrier gas may be an inert gas such as nitrogen (N2) or argon (Ar). A valve V1 is provided in the pipe L1. When the valve V1 is opened, the carrier gas is supplied from the supply source G1 to the raw material supply source 10, and when the valve V1 is closed, the supply of the carrier gas from the supply source G1 to the raw material supply source 10 is cut off. In addition, a flow rate controller (not shown) for controlling the flow rate of the carrier gas flowing through the pipe L1, an additional valve, etc. may be provided in the pipe L1.

[0015] The raw material supply source 10 is connected to the raw material supply device 30 via pipes L2 and L3, and supplies the solution M1 to the raw material supply device 30 via the pipes L2 and L3. Valves V2 and V3 are provided in the pipes L2 and L3, respectively. When the valves V2 and V3 are opened, the solution M1 is supplied from the raw material supply source 10 to the raw material supply device 30, and when the valves V2 and V3 are closed, the supply of the solution M1 from the raw material supply source 10 to the raw material supply device 30 is blocked. In addition, a flow rate controller (not shown) for controlling the flow rate of the solution M1 flowing through the pipe L3, an additional valve, etc. may be provided in the pipe L3.

[0016] Furthermore, the raw material supply source 10 is connected to the raw material supply device 40 via pipes L2 and L4, and supplies the solution M1 to the raw material supply device 40 via the pipes L2 and L4. A valve V4 is provided in the pipe L4. When the valves V2 and V4 are opened, the solution M1 is supplied from the raw material supply source 10 to the raw material supply device 40, and when the valves V2 and V4 are closed, the supply of the solution M1 from the raw material supply source 10 to the raw material supply device 40 is blocked. Furthermore, a flow rate controller (not shown) for controlling the flow rate of the solution M1 flowing through the pipe L4, an additional valve, etc. may be provided in the pipe L4.

[0017] The raw material supply device 30 stores the solution M1 transported from the raw material supply source 10. In this embodiment, the raw material supply device 30 includes a container 31, a heating unit 32, a pressure gauge 33, and a filter 34. The container 31 stores the solution M1 transported from the raw material supply source 10. The heating unit 32 heats a solid raw material (hereinafter referred to as "second solid raw material M2") formed by removing the solvent from the solution M1, thereby sublimating the second solid raw material M2 to generate a reactive gas. The heating unit 32 may be, for example, a heater arranged to cover the bottom and outer periphery of the container 31. The heating unit 32 is configured to heat the inside of the container 31 to a temperature at which the second solid raw material M2 can be sublimated to generate a reactive gas. The pressure gauge 33 detects the internal pressure of the container 31. The detected internal pressure of the container 31 is transmitted to the control device 90, and the control device 90 controls the opening and closing of various valves based on the internal pressure. For example, when the internal pressure becomes higher than a predetermined pressure, the control device 90 closes the valve V3 to prevent an excess of the solution M1 from being supplied to the container 31. The filter 34 is provided substantially horizontally in the container 31 and divides the inside of the container 31 into a first region 31a and a second region 31b. The tip of the pipe L3 is inserted into the first region 31a. This allows the inside of the pipe L3 to communicate with the first region 31a. The second region 31b is a region located above the first region 31a. The filter 34 may be formed of a material that allows the reactive gas to pass through and captures the second solid raw material M2 and impurities such as particles, and is formed of, for example, a porous material. The porous material may be, for example, a porous metal material such as a sintered body of stainless steel, or a porous ceramic material.

[0018] One end of the pipe L8 is inserted into the raw material supplying device 30 from above the container 31. One end of the pipe L8 is inserted into, for example, the first region 31a. This allows the inside of the pipe L8 to communicate with the first region 31a. However, one end of the pipe L8 may be inserted into the second region 31b. The other end of the pipe L8 is connected to a carrier gas supply source G7 via a pipe L7, and the carrier gas is supplied from the supply source G7 into the container 31 via the pipes L7 and L8. The carrier gas may be, for example, an inert gas such as N2 or Ar. Valves V8a and V8b are interposed in the pipe L8 in this order from the supply source G7 side. When the valves V8a and V8b are opened, the carrier gas is supplied from the supply source G7 to the raw material supplying device 30, and when the valves V8a and V8b are closed, the supply of the carrier gas from the supply source G7 to the raw material supplying device 30 is blocked. A flow rate controller F7 for controlling the flow rate of the carrier gas flowing through the pipe L7 is provided in the pipe L7. In this embodiment, the flow rate controller F7 is a mass flow controller (MFC).

[0019] The raw material supplying device 30 is connected to the processing device 50 via the pipes L10 and L12, and supplies reactive gas to the processing device 50 via the pipes L10 and L12. The end of the pipe L10 is inserted into the second region 31b in the container 31. This allows the inside of the pipe L10 to communicate with the second region 31b. Valves V10a to V10c are installed in the pipe L10 in this order from the raw material supplying device 30 side. When the valves V10a to V10c are opened, the reactive gas is supplied from the raw material supplying device 30 to the processing device 50, and when the valves V10a to V10c are closed, the supply of reactive gas from the raw material supplying device 30 to the processing device 50 is blocked.

[0020] One end of the pipe L13 is connected between the valve V10a and the valve V10b of the pipe L10. The other end of the pipe L13 is connected between the valve V8a and the valve V8b of the pipe L8. The pipe L13 functions as a bypass pipe that connects the pipe L8 and the pipe L10 without the raw material supply device 30. The valve V13 is interposed in the pipe L13. When the valve V13 is opened, the pipe L8 and the pipe L10 communicate with each other, and when the valve V13 is closed, the communication between the pipe L8 and the pipe L10 is blocked.

[0021] One end of the pipe L14 is connected between the valves V10b and V10c of the pipe L10. The other end of the pipe L14 is connected to an exhaust device E1 such as a vacuum pump. A valve V14 is interposed in the pipe L14. When the valve V14 is opened while the valves V10a and V10b are open, the inside of the container 31 is exhausted and the solvent can be removed from the solution M1 stored in the container 31. When the valve V14 is closed, the removal of the solvent from the solution M1 stored in the container 31 can be stopped.

[0022] The raw material supply device 40 stores the solution M1 transported from the raw material supply source 10. The raw material supply device 40 is provided in parallel with the raw material supply device 30. In this embodiment, the raw material supply device 40 includes a container 41, a heating unit 42, a pressure gauge 43, and a filter 44. The container 41 stores the solution M1 transported from the raw material supply source 10. The heating unit 42 heats the second solid raw material M2 formed by removing the solvent from the solution M1, thereby sublimating the second solid raw material M2 to generate a reactive gas. The heating unit 42 may be, for example, a heater arranged to cover the bottom and outer periphery of the container 41. The heating unit 42 is configured to heat the inside of the container 41 to a temperature at which the second solid raw material M2 can be sublimated to generate a reactive gas. The pressure gauge 43 detects the internal pressure of the container 41. The detected internal pressure of the container 41 is transmitted to the control device 90, and the control device 90 controls the opening and closing of various valves based on the internal pressure. For example, when the internal pressure becomes higher than a predetermined pressure, the control device 90 closes the valve V4 to prevent an excess of the solution M1 from being supplied to the container 41. The filter 44 is disposed substantially horizontally in the container 41, and divides the inside of the container 41 into a first region 41a and a second region 41b. The tip of the pipe L4 is inserted into the first region 41a. This allows the inside of the pipe L4 to communicate with the first region 41a. The second region 41b is a region located above the first region 41a. The filter 44 is formed of, for example, the same material as the filter 34.

[0023] One end of the pipe L9 is inserted into the raw material supplying device 40 from above the container 41. One end of the pipe L9 is inserted into the first region 41a. This allows the inside of the pipe L9 to communicate with the first region 41a. However, one end of the pipe L9 may be inserted into the second region 41b. The other end of the pipe L9 is connected to the carrier gas supply source G7 via the pipe L7, and the carrier gas is supplied from the supply source G7 into the container 41 via the pipes L7 and L9. The carrier gas may be, for example, an inert gas such as N2 or Ar. Valves V9a and V9b are interposed in the pipe L9 in this order from the supply source G7 side. When the valves V9a and V9b are opened, the carrier gas is supplied from the supply source G7 to the raw material supplying device 40, and when the valves V9a and V9b are closed, the supply of the carrier gas from the supply source G7 to the raw material supplying device 40 is blocked.

[0024] The raw material supplying device 40 is connected to the processing device 50 via the pipes L11 and L12, and supplies reactive gas to the processing device 50 via the pipes L11 and L12. The end of the pipe L11 is inserted into the second region 41b in the container 41. This allows the inside of the pipe L11 to communicate with the second region 41b. Valves V11a to V11c are provided in the pipe L11. When the valves V11a to V11c are opened, the reactive gas is supplied from the raw material supplying device 40 to the processing device 50, and when the valves V11a to V11c are closed, the supply of reactive gas from the raw material supplying device 40 to the processing device 50 is blocked.

[0025] One end of the pipe L15 is connected between the valve V11a and the valve V11b of the pipe L11. The other end of the pipe L15 is connected between the valve V9a and the valve V9b of the pipe L9. The pipe L15 functions as a bypass pipe that connects the pipe L9 and the pipe L11 without the raw material supply device 40. The valve V15 is interposed in the pipe L15. When the valve V15 is opened, the pipe L9 and the pipe L11 communicate with each other, and when the valve V15 is closed, the communication between the pipe L9 and the pipe L11 is blocked.

[0026] One end of the pipe L16 is connected between the valves V11b and V11c of the pipe L11. The other end of the pipe L16 is connected to an exhaust device E2 such as a vacuum pump. The pipe L16 is provided with the valve V16. When the valve V16 is opened while the valves V11a and V11b are open, the inside of the container 41 is exhausted and the solvent can be removed from the solution M1 stored in the container 41. When the valve V16 is closed, the removal of the solvent from the solution M1 stored in the container 41 can be stopped.

[0027] The processing device 50 is connected to the raw material supply device 30 via pipes L10 and L12, and is supplied with a reactive gas generated by heating and sublimating the second solid raw material M2 in the raw material supply device 30. The processing device 50 is also connected to the raw material supply device 40 via pipes L11 and L12, and is supplied with a reactive gas generated by heating and sublimating the second solid raw material M2 in the raw material supply device 40.

[0028] The processing device 50 performs various processes such as film formation on substrates such as semiconductor wafers using reactive gas supplied from the raw material supply devices 30 and 40. In this embodiment, the processing device 50 includes a processing vessel 51, a flow meter 52, a storage tank 53, a pressure sensor 54, and a valve V12. The processing vessel 51 accommodates one or more substrates. In this embodiment, the flow meter 52 is a mass flow meter (MFM). The flow meter 52 is disposed in the pipe L12 and measures the flow rate of the reactive gas flowing through the pipe L12. The storage tank 53 temporarily stores the reactive gas. By providing the storage tank 53, a large flow rate of reactive gas can be supplied into the processing vessel 51 in a short time. The storage tank 53 is also called a buffer tank or a fill tank. The pressure sensor 54 detects the pressure in the storage tank 53. The pressure sensor 54 is, for example, a capacitance manometer. The valve V12 is disposed in the pipe L12. When the valve V12 is opened, reactive gas is supplied from the source supply devices 30 and 40 to the processing vessel 51, and when the valve V12 is closed, the supply of reactive gas from the source supply devices 30 and 40 to the processing vessel 51 is stopped.

[0029] The control device 90 controls each part of the raw material supply system 1. For example, the control device 90 controls the operation of the raw material supply source 10, the raw material supply devices 30 and 40, the processing device 50, etc. The control device 90 also controls the opening and closing of various valves. The control device 90 may be, for example, a computer.

[0030] (Operation of raw material supply system) 2 and 3, an example of the operation (raw material supplying method) of the raw material supplying system 1 will be described. In the raw material supplying system 1, a control device 90 controls the opening and closing of various valves, so that one of two raw material supplying devices 30, 40 provided in parallel supplies reactive gas to a processing device 50, and the other charges a solid raw material. An example of the operation of the raw material supplying system 1 will be specifically described below.

[0031] First, referring to FIG. 2, a case where the raw material supplying device 30 supplies reactive gas to the processing device 50 and the raw material supplying device 40 fills the solid raw material will be described. FIG. 2 is a diagram for explaining the operation of the raw material supplying system 1 of FIG. 1. In FIG. 2, the pipes through which the carrier gas, the solution M1, and the reactive gas flow are shown by thick solid lines, and the pipes through which the carrier gas, the solution M1, and the reactive gas do not flow are shown by thin solid lines. In FIG. 2, the open state of the valves is shown by outlined symbols, and the closed state of the valves is shown by filled symbols. Note that the raw material supplying system 1 will be described assuming that, in the initial state, all the valves are closed as shown in FIG. 1, and the second solid raw material M2 is stored in the raw material supplying device 30.

[0032] The controller 90 controls the heating unit 32 of the raw material supplying device 30 to heat and sublimate the second solid raw material M2 in the container 31 to generate a reactive gas (sublimation step). The controller 90 also opens the valves V8a, V8b, V10a to V10c, and V12. As a result, a carrier gas is injected from the supply source G7 through the pipes L7 and L8 into the container 31 of the raw material supplying device 30, and the reactive gas generated in the container 31 together with the carrier gas is supplied to the processing container 51 through the pipes L10 and L12.

[0033] 2, the control device 90 opens valves V1, V2, and V4. This causes carrier gas to be supplied from the supply source G1 to the raw material supply source 10, and the solution M1 is transported from the raw material supply source 10 to the raw material supply device 40 via the pipes L2 and L4. This causes the solution M1 to be stored in the container 41 of the raw material supply device 40 (filling process).

[0034] Next, the control device 90 opens the valves V11a, V11b, and V16. As a result, the inside of the container 41 of the raw material supply device 40 is exhausted by the exhaust device E2, so that the solvent is removed from the solution M1 in the container 41, and the second solid raw material M2 is formed in the container 41 (drying process). For example, the control device 90 judges whether a predetermined amount of the solution M1 is stored in the container 41 based on the detection value of the float sensor 12, and when it judges that the predetermined amount of the solution M1 is stored in the container 41, it opens the valves V11a, V11b, and V16. The predetermined amount is set, for example, to an amount that can be stored in the container 41 of the raw material supply device 40. Note that, when removing the solvent from the solution M1 in the container 41, the control device 90 preferably controls the heating unit 42 to heat the solution M1 in the container 41 to a predetermined temperature. This promotes the removal of the solvent. The predetermined temperature is set, for example, lower than the temperature at which the second solid raw material M2 is sublimated to generate a reactive gas. FIG. 2 shows the state of the solution M1 in the container 41 before the solvent is removed.

[0035] Next, referring to FIG. 3, a case where the raw material supplying device 40 supplies reactive gas to the processing device 50 and the raw material supplying device 30 fills the solid raw material will be described. FIG. 3 is a diagram for explaining the operation of the raw material supplying system 1 of FIG. 1. In FIG. 3, the pipes through which the carrier gas, the solution M1, and the reactive gas flow are indicated by thick solid lines, and the pipes through which the carrier gas, the solution M1, and the reactive gas do not flow are indicated by thin solid lines. In addition, in FIG. 3, the open state of the valves is indicated by outlined symbols, and the closed state of the valves is indicated by filled symbols. Note that in the raw material supplying system 1, all the valves are closed in the initial state as shown in FIG. 1. Also, as shown in FIG. 3, the description will be given assuming that the second solid raw material M2 is stored in the raw material supplying device 40.

[0036] The controller 90 controls the heating unit 42 of the raw material supplying device 40 to heat and sublimate the second solid raw material M2 in the container 41 to generate a reactive gas (sublimation step). The controller 90 also opens the valves V9a, V9b, V11a to V11c, and V12. As a result, a carrier gas is injected from the supply source G7 into the container 41 of the raw material supplying device 40 through the pipes L7 and L9, and the reactive gas generated in the container 41 together with the carrier gas is supplied to the processing container 51 through the pipes L11 and L12.

[0037] 3, the control device 90 opens valves V1, V2, and V3. This causes carrier gas to be supplied from the supply source G1 to the raw material supply source 10, and the solution M1 is transported from the raw material supply source 10 to the raw material supply device 30 via the pipes L2 and L3. This causes the solution M1 to be stored in the container 31 of the raw material supply device 30 (filling process).

[0038] Next, the control device 90 opens the valves V10a, V10b, and V14. As a result, the inside of the container 31 of the raw material supply device 30 is exhausted by the exhaust device E1, so that the solvent is removed from the solution M1 in the container 31, and the second solid raw material M2 is formed in the container 31 (drying process). For example, the control device 90 judges whether a predetermined amount of the solution M1 is stored in the container 31 based on the detection value of the float sensor 12, and when it judges that the predetermined amount of the solution M1 is stored in the container 31, it opens the valves V10a, V10b, and V14. The predetermined amount is set, for example, to an amount that can be stored in the container 31 of the raw material supply device 30. Note that, when removing the solvent from the solution M1 in the container 31, it is preferable that the control device 90 controls the heating unit 32 to heat the solution M1 in the container 31 to a predetermined temperature. This promotes the removal of the solvent. The predetermined temperature is set, for example, lower than the temperature at which the second solid raw material M2 is sublimated to generate a reactive gas. FIG. 3 shows the state of the solution M1 in the container 31 before the solvent is removed.

[0039] As described above, according to the raw material supply system 1, the control device 90 controls the opening and closing of the valves, so that one of the two raw material supply devices 30, 40 supplies reactive gas to the processing device 50, and the other charges the solid raw material. This enables the raw material supply devices 30, 40 to be automatically replenished with raw material, improving the continuous operation capability of the processing device 50 and improving the availability of the processing device 50.

[0040] (Action and effect) 4 to 9, the operation and effect of the raw material supplying devices 30, 40 of the embodiment will be described by taking the raw material supplying device 30 as an example.

[0041] 4 and 5 are diagrams for explaining the filling step. As shown in FIG. 4, in the filling step, splashes P1 may occur when the solution M1 is filled into the container 31 from the tip of the pipe L3. For example, splashes P1 are likely to occur when the pressure inside the container 31 is high. In contrast, as shown in FIG. 5, the raw material supply device 30 of the embodiment has a filter 34 that divides the inside of the container 31 into a first region 31a and a second region 31b. This makes it possible to prevent splashes from occurring by the filter 34 when the solution M1 is filled into the container 31 from the tip of the pipe L3 inserted into the first region 31a.

[0042] 6 and 7 are diagrams for explaining the drying process. As shown in FIG. 6, in the drying process, the solvent may boil when the solvent is removed from the solution M1. When the solvent boils, the second solid raw material M2 scatters over a wide area. Therefore, the second solid raw material M2 may get caught in the valve V10a, causing internal leakage. In addition, the second solid raw material M2 may adhere to a wide area of ​​the inner wall of the container 31, and the sublimation amount of the second solid raw material M2 may become unstable when the second solid raw material M2 is sublimated in the sublimation process. In response to this, as shown in FIG. 7, the raw material supply device 30 of the embodiment has a filter 34 that divides the inside of the container 31 into a first region 31a and a second region 31b. This makes it possible to prevent the second solid raw material M2 from scattering into the valve V10a even when the solvent boils. Therefore, it is possible to prevent internal leakage from occurring in the valve V10a.

[0043] 8 and 9 are diagrams for explaining the sublimation process. As shown in FIG. 8, in the initial stage of the sublimation process, the second solid raw material M2 attached to a wide area of ​​the inner wall of the container 31 and the second solid raw material M2 deposited on the bottom of the container 31 are sublimated. Therefore, the amount of sublimation is large. Then, in the middle stage of the sublimation process, the second solid raw material M2 attached to the inner wall of the container 31 disappears, and only the second solid raw material M2 deposited on the bottom of the container 31 is sublimated. Therefore, the amount of sublimation is reduced compared to the initial stage. In this way, if the second solid raw material M2 is attached to a wide area of ​​the inner wall of the container 31, the fluctuation of the amount of sublimation in the sublimation process becomes large. Therefore, the supply flow rate of the reactive gas becomes unstable in the sublimation process. In contrast, as shown in FIG. 9, the raw material supply device 30 of the embodiment has a filter 34 that divides the inside of the container 31 into a first region 31a and a second region 31b. This narrows the area where the second solid source material M2 adheres during the drying process, so the difference in the amount of sublimation between the initial stage and the intermediate stage of the sublimation process is reduced. In other words, the fluctuation in the amount of sublimation during the sublimation process can be suppressed. Therefore, the reactive gas can be stably supplied during the sublimation process.

[0044] In the above embodiment, the pipes L3 and L4 are an example of an injection section, the pipes L10 and L11 are an example of an exhaust port, and the control device 90 is an example of a control section.

[0045] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The above-described embodiments may be omitted, substituted, or modified in various forms without departing from the scope and spirit of the appended claims.

[0046] In the above embodiment, the raw material supply system 1 has two raw material supply devices 30, 40 arranged in parallel, but the present disclosure is not limited thereto. For example, the raw material supply device may be one, or three or more raw material supply devices may be arranged in parallel. However, from the viewpoint of eliminating downtime associated with filling the solution M1, it is preferable that the raw material supply device is two or more.

[0047] In the above embodiment, a system has been described in which a reactive gas is generated by sublimating a second solid raw material M2 formed by removing a solvent from a solution M1, and a film is formed in a processing device 50 using the generated reactive gas, but the present disclosure is not limited thereto. For example, instead of the solution M1, a dispersion such as a slurry in which a first solid raw material is dispersed in a dispersion medium, or a colloidal solution in which a first solid raw material is dispersed in a dispersion medium can be used. For example, by using a colloidal solution, a precursor with a higher concentration can be filled than when the solution M1 or a slurry is used. The dispersion includes a slurry and a colloid as subordinate concepts. A slurry is also called a suspension. A colloid includes a colloidal solution as a subordinate concept. A colloidal solution is also called a sol. [Explanation of symbols]

[0048] 30,40 Raw material supply equipment 31,41 container 31a, 41a First Area 31b, 41b Second Area 32,42 Heating section 34,44 Filter 50 Processing equipment E1, E2 exhaust system L3, L4 piping L10, L11 piping

Claims

1. A raw material supplying apparatus for generating a reactive gas from a dispersion system in which a solid raw material is dispersed in a dispersion medium, comprising: A container for storing the dispersion; an injection part for injecting the dispersion into the container; an exhaust port for exhausting the inside of the container; a filter provided in the container, the filter dividing the inside of the container into a plurality of regions including a first region in which the injection part is provided and a second region in which the exhaust port is provided; having The dispersion is a slurry or a colloidal solution. Raw material supply equipment.

2. The filter is disposed substantially horizontally within the container. The raw material supplying device according to claim 1.

3. The filter is formed of a porous material. The raw material supplying device according to claim 1 or 2.

4. The second region is located above the first region. The raw material supplying device according to any one of claims 1 to 3.

5. The exhaust port is connected to a processing device. The raw material supplying device according to any one of claims 1 to 4.

6. The exhaust port is connected to an exhaust device that exhausts the inside of the container. The raw material supplying device according to any one of claims 1 to 5.

7. Further comprising a heating unit for heating the container. The raw material supplying device according to any one of claims 1 to 6.

8. Injecting a solution in which a first solid raw material is dissolved in a solvent or a dispersion in which the first solid raw material is dispersed in a dispersion medium into a first region defined by a filter in a container; forming a second solid source material by removing the solvent or the dispersion medium from the solution or the dispersion system injected into the first region; generating a reactive gas by heating and sublimating the second solid source material, and supplying the reactive gas to a processing device from a second region partitioned by the filter in the container; The raw material supply method according to claim 1,

Citation Information

Patent Citations

  • Semiconductor vapor growth device

    JP1989318229A

  • Liquid bubbling apparatus

    JP1993335243A

  • Method and device for gasifying solid material, and method and apparatus for forming thin film

    JP2004115831A

  • Organometallic chemical vapor deposition system and raw material carburetor

    JP2005256107A

  • Film-deposition apparatus and source supplying apparatus therefor

    JP2007162139A