Disassembly method of exhaust cylinder

The exhaust stack disassembly method using a hanging tool and demolition weight machine with an aerial work vehicle stabilizes disassembly, simplifies mount structure, and minimizes dust dispersion, addressing stability and environmental concerns.

JP7553253B2Active Publication Date: 2024-09-18HITACH PLANT CONSTR +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2020044695
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-03-13
Publication Date
2024-09-18
Estimated Expiration
2040-03-13

AI Technical Summary

Technical Problem

Existing methods for dismantling exhaust stacks face challenges in ensuring stability during disassembly, particularly when dealing with stacks containing pollutants, and require large-scale frames that are unstable due to suspension cables, risking dust dispersion from debris falling into the pipe.

Method used

A method involving a hanging tool from a lifting means with a demolition weight machine, including a main arm and clamp arm, which lifts and disassembles the stack while supporting disassembled pieces, and transfers them to an aerial work vehicle for safe disposal, eliminating the need for ground-based lowering and reducing dust dispersion.

Benefits of technology

This method simplifies the mount structure, ensures stable disassembly, accommodates various exhaust stacks, and reduces environmental impact by containing dust dispersion, while allowing work in restricted access areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007553253000004
    Figure 0007553253000004
  • Figure 0007553253000005
    Figure 0007553253000005
  • Figure 0007553253000003
    Figure 0007553253000003
Patent Text Reader

Abstract

To provide an exhaust flue demolition method that can simplify constitution of a frame and secure work safety in demolition work, and is adaptive to various exhaust flues.SOLUTION: A demolition method for an exhaust flue 10 comprises: mounting a demolition machine 40 which comprises at least a main arm 48 and a clamp arm 46 on a frame 30 suspended with a lifting attachment 20a hung from a tip of an arm 20 of crane means 18 capable of extending the arm 20 to a position higher than the height of the exhaust flue 10 as an object of demolition; and hoisting the demolition machine 40 together with the frame 30 to carry out demolition work. The main arm 48 is used with a part of the exhaust flue 10 held with the clamp arm 46 to disassemble parts other than the held part.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for dismantling a structure, and more particularly to a method for dismantling an exhaust stack which requires working at height and in which access for workers is restricted. [Background technology]

[0002] As disclosed in Patent Document 1, the dismantling of a typical exhaust stack involves setting up scaffolding around the outer periphery of the exhaust stack, and then cutting the exhaust stack from the top side at predetermined lengths using a wire saw or the like. The technology disclosed in Patent Document 1 describes that when the inside of the exhaust stack is contaminated with pollutants, the inside surface of the exhaust stack is scraped off before the cutting work to remove the contaminated areas before the cutting work is performed. By adopting such a method, it is said that there is no risk of dust containing pollutants scattering to the outside due to cutting.

[0003] Patent Document 2 also discloses a method in which a frame-like platform suspended by a crane so as to be liftable is placed around the exhaust stack, and dismantling work is performed while moving the platform along the exhaust stack. In the method disclosed in Patent Document 2, a concrete crusher and a steel cutter that can be used on the ground are mounted on the platform, and dismantling work is performed by remotely operating the concrete crusher and the steel cutter. It also discloses that debris resulting from the dismantling is dropped through the hollow part of the exhaust stack. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2019-135352 A [Patent Document 3] JP 2003-301615 A Summary of the Invention [Problem to be solved by the invention]

[0005] The method disclosed in Patent Document 2 makes it possible to carry out dismantling work without erecting scaffolding around the exterior of the exhaust stack. However, in order to carry out the dismantling method disclosed in Patent Document 2, a large-scale stand is required. In addition, since the stand is supported only by a hanging cable and a fall prevention cable, there is a problem that it is difficult to ensure stability during the dismantling work. Furthermore, since the debris is dropped into the exhaust stack, there is a concern that dust may be stirred up as the debris falls. For this reason, it cannot be applied to exhaust stacks that have parts containing pollutants, as disclosed in Patent Document 1.

[0006] Therefore, the present invention aims to provide an exhaust stack dismantling method that can simplify the structure of the mounting frame, ensures work stability during dismantling work, and is capable of accommodating various types of exhaust stacks. [Means for solving the problem]

[0007] In order to achieve the above-mentioned object, the exhaust stack dismantling method of the present invention is a method for dismantling an exhaust stack in which a demolition heavy machine having at least a main arm and a clamp arm is mounted on a platform suspended from a hanging device hanging from the end of the arm of a lifting means capable of extending the arm to a position higher than the height of the exhaust stack to be dismantled, and the demolition heavy machine is lifted together with the platform to perform dismantling work, and is characterized in that, with a part of the exhaust stack clamped by the clamp arm, the main arm is used to dismantle parts other than the clamped part.

[0008] In the exhaust stack dismantling method having the above-mentioned features, it is preferable that the dismantling heavy machine is provided with a dismantling piece support arm, and dismantling is performed by the main arm while the dismantling piece is supported by the dismantling piece support arm. With such a feature, there is no risk of the dismantled piece dropping when it is cut out.

[0009] In addition, in the exhaust stack dismantling method having the above-mentioned characteristics, it is desirable to transfer the dismantled pieces dismantled by the demolition heavy machinery to a lifting cage of an aerial work vehicle that is extended from the ground so as to approach the dismantling site, and then to lower them. With such a characteristic, it is not necessary to lower the demolition heavy machinery to the ground one by one, and therefore the efficiency of the dismantling work can be improved.

[0010] Furthermore, in the exhaust stack dismantling method having the above-mentioned features, it is preferable that the hoisting tool is provided with a rotating device, and when the lifting means moves the suspending position of the frame along the periphery of the exhaust stack, the frame is rotated so that the exhaust stack is located in front of the dismantling heavy machine. By having such features, good workability can be ensured regardless of where the dismantling heavy machine is positioned around the exhaust stack. Effect of the Invention

[0011] According to the exhaust stack dismantling method having the above-mentioned features, the structure of the frame can be simplified. Also, the stability of the work during the dismantling work can be ensured, and it becomes possible to deal with various exhaust stacks. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a diagram showing a configuration for dismantling an exhaust stack using a crawler-type crane (lifting means). [Diagram 2] FIG. 13 is a diagram showing a configuration for dismantling an exhaust stack using a climbing crane (lifting means). [Diagram 3] FIG. 2 is a diagram for explaining the configuration of an exhaust stack to be dismantled in the embodiment. [Figure 4] FIG. 2 is a diagram for explaining the configuration of a stand and a dismantling heavy machine used in the embodiment. [Diagram 5] 11A and 11B are diagrams showing the state of exhaust stack dismantling work of the exhaust stack according to the embodiment. [Figure 6] 13 is a diagram for explaining a disassembly procedure for cutting out disassembly pieces. FIG. [Figure 7]FIG. 2 is a flow diagram for explaining an exhaust stack dismantling method according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of the exhaust stack dismantling method of the present invention will be described in detail with reference to the drawings. [Exhaust stack] First, the structure of an exhaust stack 10 to be dismantled in the following embodiment will be described with reference to Fig. 1 to Fig. 3. The exhaust stack 10 to be dismantled in the following embodiment is composed of an exhaust stack body 12 and a supporting steel frame 14. The exhaust stack body 12 is equipped with emergency gas treatment system piping (hereinafter referred to as SGTS piping 16) inside (see Fig. 3). Note that both the exhaust stack body 12 and the SGTS piping 16 according to this embodiment are composed of materials such as carbon steel that have excellent corrosion resistance, chemical resistance, and environmental resistance.

[0014] The support steel frame 14 is an element that is disposed on the outer periphery of the exhaust stack body 12 and plays a role in supporting the exhaust stack body 12. The support steel frame 14 has a so-called truss structure, and is configured in a tower shape with a planar structure that widens toward the lower end.

[0015] [Lifting means] The lifting means 18 may have any specific configuration as long as it can extend the arm 20 to a position higher than the exhaust stack 10 to be dismantled and can lift the platform 30 equipped with the demolition heavy machinery 40, the details of which will be described later. For example, it may be a crawler type crane as shown in Fig. 1 or a climbing type crane as shown in Fig. 2.

[0016] Furthermore, in the exhaust stack dismantling method according to this embodiment, in addition to the lifting means 18, an aerial work vehicle 22 is deployed near the exhaust stack 10. By transferring dismantled pieces 60 (see Figs. 5 and 6) dismantled by a demolition heavy machine 40, the details of which will be described later, to a lifting cage 26 provided at the tip of an arm 24 of the aerial work vehicle 22, it becomes unnecessary to lower the platform 30 to the ground each time a dismantled piece 60 is cut out, and work efficiency can be improved.

[0017] [Mounting] The stand 30 may be any stand that has the load-bearing capacity and durability to allow the dismantling work to be carried out with the demolition heavy machine mounted on it. The stand 30 shown in Fig. 4 is plate-shaped, and the demolition heavy machine 40 is fixed to the stand.

[0018] The platform 30 is lifted up via a balance 32 arranged on the top of the dismantling machine 40. The balance 32 is suspended from the hoisting tool 20a of the lifting means 18 via a horizontal device 34 and a swivel device 36. The horizontal device 34 is not shown in detail, but it is sufficient if it is equipped with a load detection means and a traction means corresponding to each of the multiple suspension parts defined on the balance 32. In the horizontal device 34 configured in this way, the length of each suspension part is adjusted according to the inclination detected by the load inclination detection means, so that the platform suspended via the balance 32 can be kept level.

[0019] The rotation device 36, like the horizontal device 34, is not shown in detail, but it is sufficient if it is equipped with at least a gyro sensor and a flywheel inside and can suppress automatic rotation due to the effects of wind, etc., while allowing horizontal rotation by operation.

[0020] [Demolition heavy machinery] The dismantling heavy machine 40 has a base 42 and a swivel base 44. The base 42 is provided with a clamp arm 46, and the swivel base 44 is provided with a main arm 48 and a dismantling piece support arm 50. The base 42 is the foundation of the dismantling heavy machine 40, and is fixed to the stand 30 as described above in this embodiment. The clamp arm 46 provided on the base 42 is an element for clamping a part of the exhaust stack 10 to be dismantled. By clamping a part of the exhaust stack 10, the dismantling heavy machine 40 suspended from the arm 20 of the lifting means 18 via the hoist 20a can be stabilized. Therefore, the stand 30 does not need to be large and stable, and the stand 30 can be made small.

[0021] The swivel base 44 is a base that can rotate horizontally with the base 42 as a starting point. The main arm 48 is an arm used to dismantle the exhaust stack 10, and in this embodiment, a steel frame cutter 48a is attached to the tip thereof, enabling it to cut the metallic exhaust stack body 12, the SGTS piping 16, and the supporting steel frame 14. The main arm 48 is configured to have four degrees of freedom: three axes in the elevation direction and one axis in the rotation direction.

[0022] The dismantled piece support arm 50 is disposed on the lower side of the swivel base 44, and is disposed so as to face the same direction as the main arm 48. The tip of the dismantled piece support arm 50 is provided with a gripping means 50a for supporting the dismantled piece 60. The dismantled piece support arm 50 is configured to be extendable and retractable with the swivel base 44 as the starting point.

[0023] The lifting means 18, the slewing device 36, and the dismantling heavy vehicle 40 configured as described above can all be remotely controlled using an operating means (not shown). This configuration makes it possible to dismantle the exhaust stack 10 even in places where access by workers is restricted.

[0024] [Disassembly method] Next, a method for dismantling the exhaust stack 10 configured as described above using the lifting means 18, the aerial work platform 22, the platform 30, and the demolition heavy machinery 40 as described above will be described with reference to FIG. 7. The exhaust stack 10 is dismantled from the tip side of the exhaust stack body 12. The specific dismantling procedure is to remove the walkway 12a provided at the tip of the exhaust stack body 12. After removing the walkway 12a, the exhaust stack body 12 is dismantled to expose the SGTS piping 16. After that, the exposed SGTS piping 16 is dismantled, and the exhaust stack body 12 is dismantled again. When the dismantling of the exhaust stack body 12 reaches the part where the supporting steel frame 14 is arranged, the supporting steel frame 14 is dismantled to a predetermined extent, and then the exhaust stack body 12 is dismantled, and the SGTS piping 16 is exposed. The subsequent dismantling work may be performed in sequence by repeating the SGTS piping 16, the supporting steel frame 14, and the piping body 12.

[0025] In carrying out the dismantling method as described above, first, the lifting means 18 and the aerial work vehicle 22 are deployed near the exhaust stack 10 to be dismantled. Here, the lifting means 18 needs only to be capable of lifting the platform 30 carrying the dismantling heavy machinery 40, the horizontal device 34, and the swivel device 36 when the arm 20 is lowered so that the tip of the arm 20 is located at the top of the exhaust stack 10 and the lifting means 18 needs only to be capable of lifting the platform 30 carrying the dismantling heavy machinery 40, the horizontal device 34, and the swivel device 36 (Step 10: Deploying the lifting means).

[0026] After the lifting means 18 and the aerial work vehicle 22 have been deployed, the platform 30 carrying the dismantling heavy machine 40 is lifted up via the lifting means 18. At this time, it is desirable to use the above-mentioned leveling device 34 and swivel device 36 to adjust the platform 30 so that it does not tilt or point in an unexpected direction, and to lift and lower the platform 30 in a stable state. In addition, the aerial work vehicle 22 extends the arm 24 so as to move the lifting cage 26 as close to the platform 30 as possible. If the lifting cage 26 cannot be moved close to the platform 30, the arm 24 may be extended to a height at which it can be raised (Step 20: Lifting the platform).

[0027] After the platform 30 has been lifted to the designated working position, a part of the exhaust stack 10 is grasped using the clamp arm 46 of the demolition heavy machine 40 (see Figure 5) to ensure the stability of the demolition heavy machine 40 during dismantling work (Step 30: Fixing with the clamp arm).

[0028] After gripping a portion of the exhaust stack 10 with the clamp arm 46, a pair of cuts are made with the steel frame cutter 48a of the main arm 48 so that part of the exhaust stack body 12 becomes a strip (the cuts are shown by the dashed lines in FIG. 6(A)). This determines the width of the dismantled pieces 60 (slices) to be cut out by dismantling. Here, the parts to be cut with the steel frame cutter 48a are parts other than the part gripped by the clamp arm 46 (step 40: cut widthwise).

[0029] After making a cut in the exhaust pipe body 12, the tip of the rectangular plate piece is gripped by the tip of the main arm 48 (steel frame cutter 48a) and bent outward as shown in FIG. 6(B). A part (for example, the tip side) of the dismantled piece 60 bent outward is supported by the gripping means 50a provided on the dismantled piece support arm 50. After the dismantled piece 60 is gripped by the gripping means 50a, the base end side (the bending base point side) of the dismantled piece 60 is cut by the steel frame cutter 48a, and the removal of the dismantled piece 60 is completed. The size of the dismantled piece 60 to be removed in one operation is set to a weight range that satisfies both the allowable load of the lifting means 18 and the allowable load of the demolition heavy machine 40. Therefore, as shown by the dashed line in FIG. 5, the exhaust pipe 10 (exhaust pipe body 12) is cut into multiple pieces (step 50: removal of dismantled pieces).

[0030] The cut dismantled pieces 60 are transferred from the dismantled piece support arm 50 to the main arm 48, and are transferred to the lifting cage 26 of the aerial work vehicle 22 waiting near the dismantling work site. If the lifting cage 26 of the aerial work vehicle 22 cannot be extended to the vicinity of the dismantling work site, the platform 30 is moved by the lifting means 18 to the minimum necessary extent, and the demolition heavy machine 40 is brought closer to the lifting cage 26 of the aerial work vehicle 22, after which the dismantled pieces 60 are transferred (step 60: transfer of dismantled pieces).

[0031] After transferring the dismantled pieces 60 to the lifting cage 26 of the aerial work vehicle 22, the demolition heavy machine 40 returns to the dismantling work of the exhaust stack 10. Meanwhile, the aerial work vehicle 22 moves the dismantled pieces 60 transferred to the lifting cage 26 to the ground. Here, if the aerial work vehicle 22 has a margin in its weight capacity, the dismantled pieces 60 may be lowered to the ground after the transfer work from the demolition heavy machine 40 is repeated multiple times (step 70: lowering the dismantled pieces).

[0032] The dismantling work of the exhaust stack 10 is performed by moving the suspension position of the dismantling heavy machine 40 each time a dismantling piece 60 is cut off. Specifically, the suspension position of the dismantling heavy machine is rotated and moved in a circumferential direction with the center of the exhaust stack 10 as the base point. When moving the dismantling position, the rotation device 36 is operated so that the exhaust stack 10 is positioned in front of the dismantling heavy machine 40. In this way, the dismantling work of the exhaust stack 10 is performed by repeating the above-mentioned steps 30 to 70 for the exhaust stack body 12, the SGTS piping 16, and the supporting steel frame 14 in order.

[0033] [effect] According to the exhaust stack dismantling method as described above, it is possible to shorten the construction period because it is not necessary to build scaffolding around the exhaust stack 10. In addition, the cost for constructing the scaffolding can also be reduced.

[0034] The lifting means 18 lifts the dismantling heavy machine 40 and the dismantling work is performed by remote control, so there is no need for workers to enter the work site. This makes it possible to work in dangerous places where human access is restricted.

[0035] Since the dismantling work is carried out by transferring the dismantled pieces 60 to the lifting cage 26 of the aerial work vehicle 22 and lowering them to the ground, the dismantled pieces 60 can be lowered to the ground more efficiently than by raising and lowering the platform 30 on which the demolition heavy machinery 40 is mounted. In addition, there is no stirring up of dust, which occurs when the dismantled pieces 60 are dropped, so the impact on the surrounding environment can be kept small. [Industrial Applicability]

[0036] In the above embodiment, the material of the exhaust pipe body 12 is carbon steel or the like, but the dismantling method according to the present invention can also be applied to exhaust pipes made of reinforced concrete or the like. [Explanation of symbols]

[0037] 10...Exhaust stack, 12...Exhaust stack body, 12a...walkway, 14...support steel frame, 16...SGTS piping, 18...lifting means, 20...arm, 20a...hoisting device, 22...aerial work vehicle, 24...arm, 26...lifting cage, 30...frame, 32...balance, 34...leveling device, 36...rotating device, 40...dismantling heavy machinery, 42...base, 44...rotating table, 46...clamp arm, 48...main arm, 48a...steel frame cutter, 50...dismantled piece support arm, 50a...gripping means, 60...dismantled piece.

Claims

1. A method for dismantling an exhaust stack, comprising the steps of: mounting a dismantling heavy machine having at least a main arm and a clamp arm on a platform suspended from a hoisting tool suspended from the tip of an arm of a lifting means capable of extending the arm to a position higher than the height of the exhaust stack to be dismantled; and hoisting the dismantling heavy machine together with the platform to perform dismantling work, The dismantling heavy machine includes a dismantling piece support arm, An exhaust stack dismantling method, characterized in that, while a portion of the exhaust stack is clamped by the clamp arm and the dismantling piece is supported by the dismantling piece support arm, the main arm is used to dismantle the section above the portion clamped by the clamp arm.

2. The exhaust stack dismantling method according to claim 1, characterized in that the pieces dismantled by the demolition heavy machinery are transferred to a lifting cage of an aerial work vehicle extended from the ground so as to approach the dismantling site, and then lowered.

3. The hoist is provided with a rotating device, and when the lifting means moves the hanging position of the frame along the circumference of the exhaust stack, 3. The exhaust stack dismantling method according to claim 1, further comprising rotating the platform so that the exhaust stack is positioned in front of the demolition heavy machine.

Citation Information

Patent Citations

  • JP1978145733U

  • Method and apparatus for disassembling chimney

    JP1986290172A

  • Valve controller for internal combustion engine

    JP1989096449A

  • Field cutting machine

    JP1994313365A

  • Demolishing device of tower structure and method thereof

    JP2003301615A