Steel structure sliding system monitoring method
By simulating, analyzing and monitoring the stress, strain and slipper synchronicity of the large-span structure and the sliding support structure, the repair timing is determined, which solves the problem of heavy monitoring workload in the existing technology and improves the slip construction efficiency and structural safety.
Patent Information
- Application Number
- CN202411012441.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-15
AI Technical Summary
The existing technology lacks a coordinated monitoring solution during the sliding process of large-span steel structures, resulting in a heavy monitoring workload and the inability to deal with stress, strain and sliding shoe synchronization issues in a timely manner.
Simulation analysis is used to calculate the stress, strain and sliding shoe synchronization of long-span structures and sliding support structures. By monitoring the deformation of the rods and the synchronization status of the sliding shoes, the repair timing is determined, the replacement of rods is reduced, and the construction efficiency is improved.
It achieves simultaneous monitoring of stress and strain of large-span structures and sliding support structures, reduces the workload of rod repairs, improves the efficiency of sliding construction, and solves deformation problems by reinforcing or replacing rods.
Smart Images

Figure CN118776451A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of building construction technology, and more specifically, relates to a method for monitoring steel structure slippage systems. Background Technology
[0002] Due to site and mechanical limitations, large-span steel structures often employ unconventional installation methods such as sliding, jacking, and lifting. During the sliding process, the supporting structure transforms from the original design support system to a sliding support system, causing changes in stress and strain in the large-span steel structure. Therefore, the strength, stiffness, and deformation of the large-span steel structure itself, as well as the strength, stiffness, and deformation of the sliding measures, and the synchronization of each sliding shoe, all need to be monitored to ensure the safety of the original design structure and the sliding support structure, and to facilitate smooth construction.
[0003] Existing technologies monitor the stress and strain of the large-span steel structure, the stress and strain of the sliding support structure, and the synchronicity between the sliding shoes during the sliding process. However, these monitoring methods are typically implemented in isolation, with interventions only implemented when a dangerous point is detected. This results in a significant workload for intervention. If the monitoring of various stress and strain parameters, as well as the synchronicity of the sliding shoes, could be coordinated, it would potentially reduce the workload. However, no such solutions exist at present. Summary of the Invention
[0004] To address the above problems, this application provides a method for monitoring a steel structure slippage system, comprising:
[0005] The entire process of sliding construction was simulated and analyzed. The stress and strain of large-span structural members, the stress and strain of sliding support structural members, and the maximum asynchronousity of sliding were calculated to obtain the simulated calculation values of the entire sliding process.
[0006] During the sliding construction, stress and strain monitoring is carried out on large-span structural components and sliding support structural components. The timing of repairing the corresponding members is determined based on whether the deformation of the members of the sliding support structural components meets the first multiple of the simulated calculation value ≤ deformation ≤ second multiple of the simulated calculation value, and the synchronous state of the sliding shoe.
[0007] After the sliding construction is completed, the structure is left to stand for a period of time, and the stress and strain of the large-span structural components and the sliding support structural components are continuously monitored. The sliding monitoring is completed when the deformation is less than the first multiple of the simulated calculation value.
[0008] Optionally, the lower end of the sliding support structure is mounted on the sliding track via a sliding shoe, and the upper end supports the large-span structure, with each sliding track arranged in parallel.
[0009] Optionally, the simulated values of each stress should not exceed 0.9 times the design value of the steel, and the simulated values of the deformation of each member should not exceed the standard values; otherwise, the members should be reinforced or replaced.
[0010] Optionally, the stress-strain monitoring of large-span structural components and sliding support structural components includes:
[0011] Stress monitoring was performed on the installation stress plates of the large-span structural components, and the deformation ΔX1, ΔY1, and ΔZ1 in the X, Y, and Z axes was monitored at the mid-span and cantilever of the large-span structural components.
[0012] Stress monitoring was performed on the installation stress plates of the sliding support structure, and the deformation ΔX2, ΔY2, and ΔZ2 in the X, Y, and Z axes was monitored at the mid-span and cantilever of the sliding support structure.
[0013] Optionally, during the sliding construction, stress and strain monitoring is performed on large-span structural members and sliding support structural members. The timing for repairing corresponding members is determined based on whether, during the sliding construction, the deformation of at least one member of the sliding support structural member satisfies a first multiple of the simulated calculation value ≤ deformation ≤ second multiple of the simulated calculation value, and the synchronization status of the sliding shoe. This includes:
[0014] Step S21: When the values of ΔX1, ΔY1, and ΔZ1 of any member in the large-span structural component and the values of ΔX2, ΔY2, and ΔZ2 of any member in the sliding support structural component are all less than the first multiple of the simulated calculated values, the sliding process continues.
[0015] Step S22: When at least one member of the sliding support structure satisfies the condition that the first multiple of the simulated calculation value ≤ deformation ≤ the second multiple of the simulated calculation value, the sliding shoe is adjusted to synchronization first. Then, ΔX1, ΔY1, ΔZ1, ΔX2, ΔY2, and ΔZ2 are observed. If the stress of the corresponding member decreases to less than the first multiple of the simulated calculation value, the sliding continues. If the stress of the corresponding member does not decrease to less than the first multiple of the simulated calculation value, the increase of ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 is observed during the sliding. If ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 do not increase, the sliding continues. If the increase of any one of ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 exceeds a set threshold, the sliding is stopped, and the corresponding member is repaired by reinforcement or replacement.
[0016] Step S23: When the ΔX1, ΔY1, and ΔZ1 of the members in the large-span structural component satisfy the first multiple of the simulated calculation value ≤ deformation amount ≤ second multiple of the simulated calculation value, and the ΔX2, ΔY2, and ΔZ2 of any member in the sliding support structural component are all < the first multiple of the simulated calculation value, then the sliding is stopped, and the corresponding members are repaired by reinforcing or replacing the members of the large-span structural component.
[0017] Optionally, after step S23, the method further includes:
[0018] Step S24: When any member in the large-span structural component or the sliding support structural component satisfies a value greater than the second multiple of the simulated calculation value, the sliding is stopped, and the corresponding member is repaired by reinforcing or replacing the member in the large-span structural component.
[0019] Optionally, the first multiple of the simulated calculation value is 0.7 to 0.8 of the simulated calculation value, and the second multiple of the simulated calculation value is 0.9 of the simulated calculation value.
[0020] Optionally, the statement that at least the sliding support structure has a member whose deformation satisfies a first multiple of the simulated calculation value ≤ deformation ≤ a second multiple of the simulated calculation value means:
[0021] In both large-span structural components and sliding brace structural components, the deformation of the members satisfies the following condition: first multiple of the simulated calculated value ≤ deformation ≤ second multiple of the simulated calculated value.
[0022] Alternatively, in large-span structural members, the deformation of the members is less than the first multiple of the simulated calculation value; in sliding support structural members, the first multiple of the simulated calculation value ≤ deformation ≤ the second multiple of the simulated calculation value.
[0023] Optionally, a jack can be used to adjust the elevation of the track in the Z direction, and a localized slipper inching method can be used to eliminate the asynchrony of the slipper.
[0024] Optionally, the displacements of different track shoes in the X, Y, and Z axes are ΔX3, ΔY3, and ΔZ3, respectively, and the displacements of the same track shoe in the X, Y, and Z axes are ΔX4, ΔY4, and ΔZ4, respectively.
[0025] When ΔZ3 and ΔZ4 are both ≤2mm, and ΔX3, ΔY3, ΔX4, and ΔY4 are all ≤0.8 times the maximum asynchronous value, they are judged to be synchronized.
[0026] If either ΔZ3 or ΔZ4 is greater than 2mm, or if any of ΔX3, ΔY3, ΔX4, or ΔY4 is greater than 0.9 times the maximum asynchronous value, then it is determined to be asynchronous.
[0027] Compared with the prior art, this application has the following advantages:
[0028] This invention provides a monitoring method for a steel structure sliding system, which simultaneously monitors the stress and strain of a large-span structure and a sliding support structure, as well as the synchronicity between the sliding shoes during the sliding process. When the deformation of a member meets the condition that the first multiple of the simulated calculation value ≤ deformation ≤ second multiple of the simulated calculation value, instead of directly replacing the member as in the past, the deformation of the member is further monitored after adjusting the synchronicity of the sliding shoes. This reduces the need for member repairs and improves the overall construction efficiency of the sliding process. Furthermore, when the ΔX1, ΔY1, and ΔZ1 values of members in the large-span structure meet the condition that the first multiple of the simulated calculation value ≤ deformation ≤ second multiple of the simulated calculation value, while the ΔX2, ΔY2, and ΔZ2 values of any member in the sliding support structure are all less than the first multiple of the simulated calculation value, it is determined that the stress increase in the large-span structure is not caused by the asynchronous sliding shoes. Sliding can be stopped directly, and the corresponding members can be repaired by reinforcing or replacing the members of the large-span structure. If any member in a large-span structural component or sliding support structural component satisfies a value greater than the second multiple of the simulated calculation value, it is determined that there is a serious deformation problem in the structure. In this case, the sliding is stopped, and the corresponding member is repaired by strengthening or replacing the member in the large-span structural component.
[0029] Furthermore, after the sliding construction is completed, the large-span structural components are left to stand for a period of time, and the stress and strain of the large-span structural components and the stress and strain of the sliding support structural components are continuously monitored until the stress monitoring values stabilize and no longer deform. Attached Figure Description
[0030] Figure 1 This is a flowchart of the steel structure sliding system monitoring method according to an embodiment of the present invention.
[0031] Figure 2 This is a schematic diagram illustrating the stress generated on the sliding support structure by the asynchronous movement of the slippers on different tracks, as described in an embodiment of the present invention.
[0032] Figure 3 This is a schematic diagram illustrating the stress generated on the sliding support structure by the asynchronous sliding shoes on the same track, as described in an embodiment of the present invention. Detailed Implementation
[0033] The technical solution of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the embodiments described are only some embodiments of the present invention, not all embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.
[0034] The steel structure slip system monitoring method of this embodiment includes the following steps:
[0035] Step S1: Use finite element software to simulate and analyze the entire sliding construction process, calculate the stress and strain of large-span structural components, the stress and strain of sliding support structural components, and the maximum asynchronous sliding, and obtain the simulated calculation values at different stages of the entire sliding process.
[0036] The lower part of the sliding support structure is mounted on the sliding track via a sliding shoe, and its upper end is used to support the large-span structure. The sliding tracks are arranged in parallel, and the sliding shoe can move along the track.
[0037] The simulated values include the stress and strain of each member in the long-span structural component, the stress and strain of each member in the sliding support structure, and the degree of maximum asynchrony between each sliding shoe during the sliding process.
[0038] The calculated stress values should not exceed 0.9 times the steel design value (the steel design value is the yield strength of the selected steel grade, i.e., the design value for Q235 steel is 235 MPa). The deformation values of the members in each structural component must not exceed the standard values (the standard values are selected according to the "Steel Structure Design Standard"). When the calculated stress value exceeds 0.9 times the steel design value or the member deformation value exceeds the standard value, the member should be reinforced or replaced. The maximum asynchrony between the various sliding shoes should meet the construction design requirements.
[0039] Step S2: During the sliding construction, stress and strain monitoring is performed on the large-span structural components and the sliding support structural components. The process is based on whether the deformation of any member in the sliding support structural components exceeds the first multiple of the simulated calculation value but is less than the second multiple of the simulated calculation value. If so, the sliding shoe is adjusted to a synchronized state first, and monitoring continues. If the deformation of the member decreases to less than the first multiple of the simulated calculation value, sliding continues. Otherwise, during sliding, the values ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, ΔZ2 of the large-span structural components and the sliding support structural components are observed to increase. If ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, ΔZ2 do not increase, sliding continues. If ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, ΔZ2 are still increasing and the increase exceeds a set threshold, sliding is stopped, and the corresponding member is repaired by reinforcement or replacement.
[0040] Stress monitoring of stress gauges installed on large-span structural components can be performed on only the main load-bearing members. The main load-bearing members can be determined empirically or based on members experiencing significant stress in simulation calculations. For locations prone to large deformations, such as mid-span and cantilever sections of large-span structures, the deformation amounts ΔX1, ΔY1, and ΔZ1 in the X, Y, and Z axes are monitored using the BeiDou satellite system.
[0041] Among these measures, stress and strain monitoring of sliding support structural components includes: stress monitoring of stress gauges installed on the sliding support structural components; this can be done on only the main supporting members or members with complex stress, determined based on experience or on members with high stress in simulation calculations; and for locations of high deformation such as mid-span and cantilever sections of the sliding support structural components, the deformation amounts ΔX2, ΔY2, and ΔZ2 in the X, Y, and Z axes are monitored using BeiDou satellites.
[0042] The following is in conjunction with the appendix Figure 2 , 3 Let me explain the process in detail.
[0043] Step S21: When ΔX1, ΔY1, ΔZ1 of any member in the large-span structural component and ΔX2, ΔY2, ΔZ2 of any member in the sliding support structural component are all less than the first multiple of the simulated calculation value, the sliding continues. The first multiple of the simulated calculation value can be 0.7 to 0.8 times the simulated calculation value. For example, the first multiple of the simulated calculation value is 0.8 times the simulated calculation value.
[0044] Step S22: At least the deformation of a member in the sliding support structure satisfies a first multiple of the simulated calculation value ≤ deformation ≤ a second multiple of the simulated calculation value, where the second multiple of the simulated calculation value can be 0.9 times the simulated calculation value. Specifically, this means that both the large-span structural member and the sliding support structure have members whose deformation satisfies a first multiple of the simulated calculation value ≤ deformation ≤ a second multiple of the simulated calculation value; or, the deformation of a member in the large-span structural member is less than the first multiple of the simulated calculation value, and a member in the sliding support structure satisfies a first multiple of the simulated calculation value ≤ deformation ≤ a second multiple of the simulated calculation value.
[0045] During sliding construction, the asynchronous movement of the sliding shoes on different tracks can exert torsional stress on the sliding support structure, for example... Figure 2 As shown, the sliding shoe at the front end of the left slide rail 10 is not synchronized with the sliding shoe at the front end of the right slide rail 10. The sliding shoe 30 at the front end of the left slide rail 10 exceeds the sliding shoe 30 at the front end of the right slide rail 10. During the process of the left slide rail 10 sliding past the right slide rail 10, a certain torsional stress will be applied to the sliding support structure 20. This torsional stress may affect the stress of the sliding support structure, potentially causing an instantaneous increase in stress. The increase in stress and deformation of the sliding support structure may then cause changes in stress and deformation of the large-span structure.
[0046] Similarly, when the slippers on the same track are out of sync, it will also cause an increase in stress and a change in deformation in the sliding support structure, for example... Figure 3In the middle, there are 3 sliding shoes 30 on the left slide rail. Two of the sliding shoes 30 are out of sync, with the uppermost sliding shoe moving faster than the middle one. As the sliding shoes move along with the sliding support structure 20, these two sliding shoes will cause stress on the sliding support structure to be pulled to both sides. This will inevitably increase the stress on the sliding support structure and may also cause changes in stress and deformation of large-span structures.
[0047] Therefore, when at least one member of the sliding support structure satisfies the condition that the first multiple of the simulated calculation value ≤ deformation ≤ the second multiple of the simulated calculation value, priority is given to checking whether the sliding shoes are synchronized in the monitoring data. Specifically, the sliding shoes at both ends of each sliding track are monitored using Beidou satellites for three-dimensional displacement ΔX3, ΔY3, and ΔZ3. The X and Y directions are observed to ensure the synchronization of the sliding shoes on different tracks, and the Z direction is observed to ensure that the sliding shoes on each track are at the same elevation. After each sliding operation, the difference in the X direction (sliding direction) is the sliding stroke ΔX3; the difference in the Y direction is the sliding stroke ΔY3; and the difference in the Z direction is the sliding stroke ΔZ3. The synchronization between the sliding shoes of different tracks is determined by comparing the displacement differences of the sliding shoes in each direction for any two tracks. The specific difference required to determine asynchrony can be determined based on empirical values, which will not be detailed here.
[0048] Among them, the synchronization monitoring of each skid on the same track is to use Beidou satellite to monitor the displacement of all skids on the track in the three directions of X, Y and Z axes ΔX4, ΔY4 and ΔZ4. The displacement difference between adjacent skids in each direction is observed to determine whether the skids are synchronized. The specific difference value that determines asynchrony can be determined based on empirical values, which will not be described in detail here.
[0049] For example, when ΔZ3 and ΔZ4 (track elevation difference) are both ≤2mm, and ΔX3, ΔY3, ΔX4, and ΔY4 are all ≤0.8 times the maximum asynchronous value, then they are considered to be synchronized.
[0050] If either ΔZ3 or ΔZ4 is greater than 2mm, or any one of ΔX3, ΔY3, ΔX4, or ΔY4 is greater than 0.9 times the maximum asynchronous value, then it is determined to be asynchronous.
[0051] The track elevation can be adjusted using jacks to ensure that the shoe elevations of all tracks are the same. Asynchrony can be eliminated by locally moving the shoes in jogs, synchronizing their travel with the other shoes. After synchronizing the shoes, observe ΔX1, ΔY1, ΔZ1, ΔX2, ΔY2, and ΔZ2. If the stress of the corresponding member decreases to less than a first multiple of the simulated value, continue sliding. If the stress of the corresponding member does not decrease to less than a first multiple of the simulated value, continue observing the increase in ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 during sliding. If ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 do not increase, continue sliding. If the increase in ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 exceeds a set threshold, stop sliding and repair the corresponding member by reinforcing or replacing it. The set threshold is 3mm to 5mm.
[0052] Step S23: When the ΔX1, ΔY1, and ΔZ1 of the members in the large-span structural component satisfy the first multiple of the simulated calculation value ≤ deformation ≤ second multiple of the simulated calculation value, and the ΔX2, ΔY2, and ΔZ2 of any member in the sliding support structural component are all < the first multiple of the simulated calculation value, it is determined that the stress increase of the large-span structural component is not caused by the asynchronous movement of the sliding shoes. In other words, the stress situation cannot be changed by adjusting the synchronization of the sliding shoes. Therefore, the sliding is stopped directly, and the corresponding members are repaired by reinforcing or replacing the members of the large-span structural component.
[0053] Step S24: When any member in the large-span structural component or sliding support structural component has a deformation value greater than the second multiple of the simulated calculation value, it is determined that a serious deformation problem has occurred in the structure. Sliding must be stopped immediately, and the corresponding member must be repaired by reinforcing or replacing the member in the large-span structural component. Sliding can only continue after all members with deformation exceeding the second multiple of the simulated calculation value have been repaired.
[0054] Step S3: After the sliding construction is completed, the large-span structural components should be left to stand for at least a period of time, such as 48 hours. The stress and strain of the large-span structural components and the stress and strain of the sliding support structural components should be continuously monitored. The monitoring should be stopped when the stress monitoring value is stable and no more deformation occurs, thus completing the monitoring of the entire sliding process.
[0055] Of course, the present invention may have other various embodiments. Without departing from the spirit and essence of the present invention, those skilled in the art can make various corresponding changes and modifications according to the present invention, but these corresponding changes and modifications are all within the protection scope of the claims of the present invention.
Claims
1. A method for monitoring a steel structure sliding system, characterized in that: include: The whole process of sliding construction is simulated and analyzed, and the stress and strain of large-span structural members, the stress and strain of sliding support structural members, and the maximum asynchronicity of sliding are calculated to obtain the simulation calculation value of the whole sliding process; During the sliding construction, the stress and strain of the large-span structural members and the sliding support structural members are monitored, and the timing of repairing the corresponding rods is determined according to whether the deformation of at least one rod of the sliding support structural member during the sliding construction satisfies the first multiple of the simulation calculation value ≤ deformation ≤ the second multiple of the simulation calculation value, and the synchronization state of the sliding shoe; After the sliding construction is completed, let it stand for a period of time, and continuously monitor the stress and strain of the large-span structural members and the stress and strain of the sliding support structural members. When the deformation is less than the first multiple of the simulation calculation value, the sliding monitoring is completed.
2. The method for monitoring the sliding system of a steel structure according to claim 1, characterized in that: The lower end of the sliding support structure is arranged on the sliding track through a sliding shoe, and the upper end supports the large-span structure, and each sliding track is arranged in parallel.
3. The method for monitoring the sliding system of a steel structure according to claim 1, characterized in that: The simulated calculated value of each stress should not be greater than 0.9 times the design value of the steel, and the simulated calculated value of each rod deformation should not be greater than the specification value, otherwise the rod should be reinforced or replaced.
4. The method for monitoring a steel structure sliding system according to claim 1, characterized in that: The stress and strain monitoring of the large-span structural members and the sliding support structural members includes: Install stress gauges on large-span structural members to monitor stress, and monitor the deformation ΔX1, ΔY1, and ΔZ1 in the X, Y, and Z axes at the mid-span and cantilever of large-span structural members; Stress plates are installed on the sliding support structure to carry out stress monitoring, and the deformation ΔX2, ΔY2, and ΔZ2 of the sliding support structure in the mid-span and cantilever directions in the X, Y, and Z axes are monitored.
5. The method for monitoring the sliding system of a steel structure according to claim 4, characterized in that: During the sliding construction, the stress and strain of the long-span structural member and the sliding support structural member are monitored, and the timing of repairing the corresponding rod member is determined according to whether the deformation amount of at least one rod of the sliding support structural member satisfies the first multiple of the simulation calculation value ≤ the deformation amount ≤ the second multiple of the simulation calculation value during the sliding construction, and the synchronization state of the sliding shoe, including: Step S21, when ΔX1, ΔY1, ΔZ1 of any member in the long-span structural member and ΔX2, ΔY2, ΔZ2 of any member in the sliding support structural member are all less than the first multiple of the simulation calculation value, the sliding is continued; Step S22, when at least one of the rods in the sliding support structure satisfies the first multiple of the simulation calculation value ≤ the deformation amount ≤ the second multiple of the simulation calculation value, the sliding shoe is preferentially adjusted to synchronization, and then ΔX1, ΔY1, ΔZ1, ΔX2, ΔY2, and ΔZ2 are observed. If the stress of the corresponding rod is reduced to an average < the first multiple of the simulation calculation value, the sliding is continued; if the stress of the corresponding rod is not reduced to an average < the first multiple of the simulation calculation value, the increase of ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 is continued to be observed during the sliding. If ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 do not increase, the sliding is continued. If the increase of any one of ΔX1, ΔY1, ΔZ1 and ΔX2, ΔY2, and ΔZ2 exceeds the set threshold, the sliding is stopped, and the corresponding rod is repaired by reinforcing or replacing the rod; Step S23, when ΔX1, ΔY1, ΔZ1 of a member in the large-span structural member satisfies the first multiple of the simulated calculation value ≤ deformation ≤ the second multiple of the simulated calculation value, and ΔX2, ΔY2, ΔZ2 of any member in the sliding support structure are all < the first multiple of the simulated calculation value, then stop sliding and repair the corresponding member by reinforcing or replacing the member of the large-span structural member.
6. The method for monitoring the sliding system of a steel structure according to claim 5, characterized in that: After step S23, the method further includes: Step S24, when there are rods in the long-span structural member and the sliding support structural member that satisfy> the second multiple of the simulation calculation value, the sliding is stopped, and the corresponding rods are repaired by reinforcing or replacing the rods of the long-span structural member.
7. The method for monitoring the sliding system of a steel structure according to claim 5, characterized in that: The first multiple of the simulation calculated value is 0.7 to 0.8 of the simulation calculated value, and the second multiple of the simulation calculated value is 0.9 of the simulation calculated value.
8. The method for monitoring the sliding system of a steel structure according to claim 5, characterized in that: Whether the deformation amount of the rod of at least the sliding support structure satisfies the first multiple of the simulation calculation value ≤ the deformation amount ≤ the second multiple of the simulation calculation value means: The deformation of the rods in the large-span structural members and the sliding support structural members satisfies the first multiple of the simulated calculation value ≤ deformation ≤ the second multiple of the simulated calculation value. Or the deformation of the rod in the large-span structure is < the first multiple of the simulated calculated value, and there are rods in the sliding support structure that satisfy the first multiple of the simulated calculated value ≤ deformation ≤ the second multiple of the simulated calculated value.
9. The method for monitoring a steel structure sliding system according to claim 5, characterized in that: Use a jack to adjust the elevation of the track in the Z direction, and use the method of local sliding shoe inching to eliminate the asynchrony of the sliding shoe.
10. The method for monitoring a steel structure sliding system according to claim 5, characterized in that: The displacements of different rail slides in the X, Y, and Z axis directions are ΔX3, ΔY3, and ΔZ3, and the displacements of the same rail slide in the X, Y, and Z axis directions are ΔX4, ΔY4, and ΔZ4. When ΔZ3 and ΔZ4 are both ≤2mm, and ΔX3, ΔY3, ΔX4, and ΔY4 are all ≤0.8 times the maximum asynchronous value, it is judged to be synchronous; When any one of ΔZ3 and ΔZ4 is greater than 2 mm, or any one of ΔX3, ΔY3, ΔX4, and ΔY4 is greater than 0.9 times the maximum asynchronous value, it is determined to be asynchronous.
Citation Information
Cited By
Large-span steel structure high-altitude slip real-time monitoring mechanism based on multi-sensor fusion
CN120333377A
Large-span bidirectional fish-bellied steel truss slippage monitoring method
CN120766492A
A method for monitoring the slippage of a large-span, two-way fish-belly type steel truss
CN120766492B